Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Doc.

Ref : AJCVSB/HSE/PSL
AJC VENTURES SDN BHD (1025998) Rev. No.: 0
Page: 1 of 1

AIR COMPRESSOR SAFETY CHECKLIST

Company Name :
Date of Inspection :

NO DESCRIPTION YES NO N/A REMARKS

Air Compressor should be physically in good


1 condition and have valid TPI.
Motor should be physically sound and in working
2 condition.

Inspection date and due date should be marked


3
properly and visible.
Piston should be in good condition.
4

Pressure gauge should be free from defect and


5
in working condition with calibration as per
requirement.
Safety valve should be in working condition and
6
inspected & tested as per legal requirement.

All power cable should be free from defects.


7

All joints should be properly tightened.


8

Inspected by: Verified by:

ASST. SSS ASST. PROJECT MANAGER


Name: Name:
Date: Date:

You might also like