Professional Documents
Culture Documents
Budge Hospital CH
Budge Hospital CH
Budget
Description Cost $US
Automation and control with power transfer switches 3000
Thermal protections 500
Distribution panel-accessories 23500
Change of units inverte in faults 16500
Construction of a three-phase network with inverters and neutral to ground. 3000
Repair of investors to keep in reserves. 2500
Installation of a new generator to increase availability. 25000
Miscellaneous 5000
Testing and replacement of batteries for inverters 8500
Kit Generator repair 110Kw 4000
TOTAL 91500
July 21 2018
END