Professional Documents
Culture Documents
SL 399 2-t SP-H Reverse-Return
SL 399 2-t SP-H Reverse-Return
SL
IBC45-260
Boiler IBC Boiler
master
SL-40-399 G3 SL-40-399 G3
Notes
1 – Pump sizing by others according to boiler piping
3 length and pipe diameter. At 45gpm the boiler
heat exchanger has a pressure drop of 6 feet.
Secondary Loop
2 – Expansion tank sizing sizing by others.
Sensor 1 1
(to Master Boiler) 3 – Inlet and outlet connections 1½" NPT; minimum
flow 20 gpm through each boiler.
4 – Closely spaced tees are maximum four primary
circuit piping diameters apart, with a minimum of
Domestic Water eight pipe diameters of straight tubing upstream of
Piping not shown first tee and a minimum four pipe diameters
(for clarity) straight tubing downstream of second tee.
4
2
2½" or 3" fill station with isolation
valve closed
or: fill tank
IBC 399.2.2.reverse-return
DRAWN BY DATE
G G
Field-wiring
Field-wiring
black black
AC in L L
Bundle
Bundle
white AC in white
N N
Primary L yellow
Boiler Primary L yellow
Boiler Wiring Notes
white white
Pump N Pump Pump N Pump 1 – No external voltages to be applied to TB2 control
terminal strip connections 1-20.
DHW Pump 2 – DHW sensor wired to 17 & 18; if instead an Aquastat
is used, that will be wired to 5 (Therm 24V) and 6
Space Heating
(Therm 1) to correspond to the DHW set as Load 1, and
Pump
the DHW sensor connections will be empty.
4 3 – Outdoor sensor installed on North exterior wall,
exposed to actual outdoor air temperature.
4 – Pump circuits are fused for a total draw of 5A;
Factory- maximum amperage draw of 4A is recommended.
Factory-installed
installed
Programming Notes
– See memo Multiple Boiler Systems for full details about network
Building Thermostat or configuring. For the Master Boiler only, in Installer Settings
Summer / Winter Switch Menu / MultiBoiler, set Master Boiler to Yes, and define Boiler ID
as 1 . At subordinate boiler set Boiler ID to 2 , leaving Master
Boiler at No.
– For Master Boiler, in Installer Setup menu set Load 1 as DHW.
Set Load 2 as Reset Heating (requires Outdoor Sensor) or Set Point
1 1
as desired.
3
– In Installer Setup Menu / Edit, for all loads: Maximum Supply
Temperature acts as a high limit. The operating limits Design
Supply Temperature (for Reset Heating) or Supply Set Point (for
Set Point) must remain below this limit.
2
IBC 399.2.2.reverse-return
DRAWN BY DATE