SPP PILE TRANSPORTATION 2.30 m 9.10 m 2.30 m


TENDER DRAWING
PCS: 30 NOS

1.00 m0.35 m

1.00 m0.35 m

1.00 m0.35 m

1.00 m0.35 m

1.00 m0.35 m
1.00 m

1.35 m
Stopper

DRAWING STATUS
A: APPROVED-CONSTRUCTION MAY PROCEED
B: APPROVED-SUBMIT FINAL DRAWINGS-CONSTRUCTION
MAY PROCEED
C: APPROVED EXCEPT AS NOTED
-MAKE CHANGES AND SUBMITE FINAL DRAWINGS
-CONSTRUCTION MAY PROCEED AS APPROVED
D: NOT APPROVED-CORRECT AND RESUBMIT
E: REVIEW NOT REQUIRED-CONSTRUCTION MAY PROCEED

1.88 m 42.00 m 3.12 m

July 5, 2023 SUBMISSION FOR APPROVAL

DATE DESCRIPTION ENGINEER STATUS

REVISIONS

4.88 m 9.00 m 9.00 m 9.00 m 9.00 m 6.12 m


REFERENCE
DRAWINGS

DWG NO. TITLE


3.60 m

Approved By:
47.00 m
Senior Port Engineer
1.88 m 42.00 m 3.12 m
KHANG DUC INVESTMENT AND CONSTRUCTION JSC

SAV8-06.05 The Sun Avenue, 28 Mai Chi


Tho St, An Phu Ward, Thu Duc City, HCMC
Tel : +84 28 2200 3377
Web : http://khangducconst.com
2.30 m

Issued By:

13.70 m
9.08 m
Project Manager

Signature Date

Checked By :

Designd By :

Drawn By :
DRAWING TITLE:

2.32 m
DRAWING NO.:PR-01 REV.00

RELATED ORINGINAL DRAWING No.

BERTH A 01
NOTE:

13.70 m
CONCRETE BLOCK TRANSPORTATION TENDER DRAWING
PCS: 64 NOS 1.77 m 2.06 m 1.94 m 2.06 m 2.06 m 2.06 m 1.77 m

1.40 m

DRAWING STATUS
A: APPROVED-CONSTRUCTION MAY PROCEED
B: APPROVED-SUBMIT FINAL DRAWINGS-CONSTRUCTION
MAY PROCEED
C: APPROVED EXCEPT AS NOTED
-MAKE CHANGES AND SUBMITE FINAL DRAWINGS
-CONSTRUCTION MAY PROCEED AS APPROVED
D: NOT APPROVED-CORRECT AND RESUBMIT
E: REVIEW NOT REQUIRED-CONSTRUCTION MAY PROCEED

4.30 m

1.20 m

4.30 m

1.20 m

4.30 m

1.20 m

4.30 m

1.69 m
2.51 m

4.30 m

1.20 m

4.30 m

1.20 m

4.30 m

1.20 m

4.30 m

1.20 m
July 5, 2023 SUBMISSION FOR APPROVAL

DATE DESCRIPTION ENGINEER STATUS

REVISIONS

REFERENCE
DRAWINGS

DWG NO. TITLE


3.60 m

Approved By:
47.00 m
Senior Port Engineer

KHANG DUC INVESTMENT AND CONSTRUCTION JSC

SAV8-06.05 The Sun Avenue, 28 Mai Chi


Tho St, An Phu Ward, Thu Duc City, HCMC
Tel : +84 28 2200 3377
1.77 m Web : http://khangducconst.com

Issued By:
13.70 m

Project Manager

Signature Date
10.16 m
Checked By :

Designd By :

Drawn By :
DRAWING TITLE:

1.77 m
DRAWING NO.:PR-02 REV.00

RELATED ORINGINAL DRAWING No.

BERTH A 02
NOTE:

PRECAST BEAM TRANSPORTATION TENDER DRAWING


PCS: 30 NOS

1.50 m

0.50 m

1.50 m

0.50 m

1.50 m

0.50 m

1.50 m

0.50 m

1.50 m

2.10 m
2.10 m

1.50 m
DRAWING STATUS
A: APPROVED-CONSTRUCTION MAY PROCEED
B: APPROVED-SUBMIT FINAL DRAWINGS-CONSTRUCTION
MAY PROCEED
C: APPROVED EXCEPT AS NOTED
-MAKE CHANGES AND SUBMITE FINAL DRAWINGS
-CONSTRUCTION MAY PROCEED AS APPROVED
D: NOT APPROVED-CORRECT AND RESUBMIT
E: REVIEW NOT REQUIRED-CONSTRUCTION MAY PROCEED

46.97 m
July 5, 2023 SUBMISSION FOR APPROVAL
5.90 m

1.10 m

5.90 m

1.10 m

5.90 m

3.08 m
3.01 m

1.10 m

5.90 m

1.10 m

5.90 m

1.10 m

5.90 m
DATE DESCRIPTION ENGINEER STATUS

REVISIONS

REFERENCE
DRAWINGS

DWG NO. TITLE


3.60 m

Approved By:
47.00 m
Senior Port Engineer

KHANG DUC INVESTMENT AND CONSTRUCTION JSC

SAV8-06.05 The Sun Avenue, 28 Mai Chi


Tho St, An Phu Ward, Thu Duc City, HCMC
Tel : +84 28 2200 3377
Web : http://khangducconst.com

Issued By:
13.70 m

Project Manager

Signature Date

Checked By :

Designd By :

Drawn By :
DRAWING TITLE:

DRAWING NO.:PR-03 REV.00

RELATED ORINGINAL DRAWING No.

BERTH A 03

You might also like