Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 85

Summary Table

[LXI_100MWP PV Project ]

Material Labor Expenses Total


Item Specification Unit Quantity Remarks
Unit Cost Unit Cost Unit Cost Unit Cost Unit Cost Unit Cost Unit Cost Unit Cost

01 PV Electrical 1 01

0101 PV Electrical Works 1 0101

010101 Main Cable Works 1 010101

010102 Cable Works Combiner ~ INV 1 010102

010103 STRINGR Cable Works String 1 010103

010104 Lightining Works 1 010104

010105 Earthing Works 1 010105

010106 Street Lighting 1 010106

010107 CABLETRAY Works 1 010107

010108 PV Equipment Installation 1 010108

010109 Temporary Construction Works Power & Tele. 1 010109

0102 Monitoring & Communication 1 0102

010201 Monitoring Cable 1 010201

0103 Main Equipment 1 0103

010301 Solar Panel Materials 1 010301

010302 ESS Materials 1 010302

010303 Switchgear Materials 1 010303

0104 Government Affairs 1 0104

010401 Pre-Use Inspection and Precision Safety Diagnostic Expenses 1 010401

[ Total ]
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

0
10101 Solar Local Electrical Room inlet main line

12/20kV Concentric Neutral Type XLPE insulated Power Cable) 12/20(24kV), FR-CN/CO-W, 1*400㎟ M 1,693 5

12/20kV Concentric Neutral Type XLPE insulated Power Cable) 12/20(24kV), FR-CN/CO-W, 1*325㎟ M 7,336 5

12/20kV Concentric Neutral Type XLPE insulated Power Cable) 12/20(24kV), FR-CN/CO-W, 1*250㎟ M 4,743 5

12/20kV Concentric Neutral Type XLPE insulated Power Cable) 12/20(24kV), FR-CN/CO-W, 1*200㎟ M 17,170 5

12/20kV Concentric Neutral Type XLPE insulated Power Cable) 12/20(24kV), FR-CN/CO-W, 1*60㎟ M 3,640 5

0.6/1kv 난연 전력케이블(F-CV) 1C*150㎟ M 6,628 5

0.6/1kv 난연 전력케이블(F-CV) 1C*120㎟ M 1,003 5

0.6/1kv 난연 전력케이블(F-CV) 1C*95㎟ M 2,066 5

0.6/1kv 난연 전력케이블(F-CV) 1C*70㎟ M 31,980 5

0.6/1kv 난연 전력케이블(F-CV) 3C*16㎟ M 28,816 5

F-CV PVC cable inside conduit


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
3C*35㎟ M 458 5

F-CV PVC cable inside conduit


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
3C*25㎟ M 334 5

F-CV PVC cable inside conduit


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
3C*16㎟ M 151 5

F-GV PVC cable inside conduit


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kV, 35㎟ M 139 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
175㎜ M 4,207 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
150㎜ M 6,422 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
125㎜ M 2,464 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
100㎜ M 442 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
80㎜ M 1,394 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
65㎜ M 994 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
40㎜ M 151 5

HI-PVC pipe
(Highimpact Unplasticized polyvinyl chloride conduit) HI, 70mm M 22 5

Cable Termination Cold Shrinkable, 24kV, 1C*400㎟ EA 6 5

Cable Termination Cold Shrinkable, 24kv, 1C*325㎟ EA 6 5

Cable Termination Cold Shrinkable, 24kv, 1C*250㎟ EA 6 5

Cable Termination Cold Shrinkable, 24kv, 1C*200㎟ EA 24 5

Cable Termination Cold Shrinkable, 24kv, 1C*60㎟ EA 6 5


[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Cable Straight Joint Resin Injection, 24kv, 1C*400㎟ EA 9 5

Cable Straight Joint Resin Injection, 24kv, 1C*325㎟ EA 30 5

Cable Straight Joint Resin Injection, 24kv, 1C*250㎟ EA 21 5

Cable Straight Joint Resin Injection, 24kv, 1C*200㎟ EA 96 5

Cable Straight Joint Resin Injection, 24kv, 1C*60㎟ EA 24 5

Cable Lug Electrolytic Copper 1 HOLE 150㎟ EA 8 5

Cable Lug Electrolytic Copper 1 HOLE 120㎟ EA 8 5

Cable Lug Electrolytic Copper 1 HOLE 95㎟ EA 8 5

Cable Lug Electrolytic Copper 1 HOLE 70㎟ EA 8 5

Cable Lug Electrolytic Copper 1 HOLE 35㎟ EA 2 5

Cable Lug Electrolytic Copper 1 HOLE 25㎟ EA 24 5

Cable Lug Electrolytic Copper 1 HOLE 16㎟ EA 24 5

conduit inlets/outlets seals (waterproof) Φ175 Locations 48 5

conduit inlets/outlets seals (waterproof) Φ150 Locations 60 5

conduit inlets/outlets seals (waterproof) Φ125 Locations 12 5

conduit inlets/outlets seals (waterproof) Φ100 Locations 8 5

conduit inlets/outlets seals (waterproof) Φ80 Locations 24 5

conduit inlets/outlets seals (waterproof) Φ65 Locations 24 5

conduit inlets/outlets seals (waterproof) Φ40 Locations 24 5

Electrical Manhole (Mechanical) 1100*1800*1000 Locations 21 5

Electrical Manhole (Mechanical) 1000*1000*1000 Locations 1 5

Electrical Manhole (Mechanical) 600*600*600 Locations 2 5

Excavation/earthwork General, Excavator 0.7m3 90%, Labor 10% M3 9,118 5

Backfilling/earthwork, Thickness 15cm General, Excavator 0.7m3 + Rammer 80kg M3 8,204 5

Warning Tape M 2,837 5

Sign Installation EA 289 5

Excavation, Rock Blasting Installation Gravel Crusher M3 3,337 5


[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

010102 Junction Box ~인버터 간선 0

1/1.5kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
1C*1300㎟ M 6,628 5

1/1.5kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
1C*240㎟ M 31,980 5

1/1.5kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
1C*185㎟ M 28,816 5

1/1.5kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
1C*150㎟ M 14,308 5

1/1.5kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
1C*120㎟ M 20,096 5

1/1.5kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
1C*95㎟ M 40,534 5

1/1.5kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
1C*70㎟ M 82 5

1/1.5kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
1C*6㎟ M 887,530 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
80㎜ M 30,881 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
65㎜ M 24,839 5

Cable Lug Electrolytic Copper 1 HOLE 300㎟ EA 8 5

Cable Lug Electrolytic Copper 1 HOLE 240㎟ EA 8 5

Cable Lug Electrolytic Copper 1 HOLE 185㎟ EA 8 5

Cable Lug Electrolytic Copper 1 HOLE 150㎟ EA 28 5

Cable Lug Electrolytic Copper 1 HOLE 130㎟ EA 1,660 5

Cable Straight Joint Resin Injection, 6.9kv, 1C*150㎟ EA 5 5

Cable Straight Joint Resin Injection, 6.9kv, 1C*130㎟ EA 71 5

Excavation/earthwork General, Excavator 0.7m3 90%, Labor 10% M3 5,308 5

Backfilling/earthwork, Thickness 15cm General, Excavator 0.7m3 + Rammer 80kg M3 3,497 5

Warning Tape M 1,779 5


[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

010103 PV string main line 0

1/1.5kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
1C*6㎟ M 887,530 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
30㎜ M 5,903 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
40㎜ M 4,110 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
50㎜ M 4,621 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
65㎜ M 4,211 5

Flexible metal conduits Tensile strength, 70mm, waterproof M 1,321 5

Flexible metal conduits Tensile strength, 70mm, waterproof M 3,462 5

Flexible metal conduits Tensile strength, 54mm, waterproof M 3,695 5

Flexible metal conduits Tensile strength , 16mm, waterproof M 1,976 5

MC4 connector 6㎟(1500V) SET 6,902 5

stainless steel band 9" EA 6,072 5

Excavation/earthwork General, Excavator 0.7m3 90%, Labor 10% M3 16,464 5

Backfilling/earthwork, Thickness 15cm General, Excavator 0.7m3 + Rammer 80kg M3 14,819 5

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

010104 Lightning Protection Equipment 0

Lightning Rod included pole EA 39 5

Lightning Rod foundation 700*500*1000 Locations 39 5

Support Set support wire, turnbuckle, clip etc (SUS) SET 39 5

grounding rod 16Φ*1800mm EA 117 5

Bonding Clamp U-bolt for copper rod EA 117 5

Grounding Resistance Reducer Arson 10kg Bags 39 5

Sleeve Connection C TYPE SLEEVE 70㎟ EA 78 5

BC-WIRE 70㎟ M 410 5

Grounding Terminal Box 1CCT, SUS EA 39 5

Excavation/earthwork General, Excavator 0.7m3 90%, Labor 10% M3 507 5

Backfilling/earthwork, Thickness 15cm General, Excavator 0.7m3 + Rammer 80kg M3 458 5

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

010105 Grounding Equipment 0

Carbon grounding rod EA 10 5

F-GV PVC cable for direct burial


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kv, 185㎟ M 1,699 5

F-GV PVC cable for direct burial


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kv, 150㎟ M 131 5

F-GV PVC cable for direct burial


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kv, 120㎟ M 491 5

F-GV PVC cable for direct burial


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kv, 95㎟ M 283 5

F-GV PVC cable for direct burial


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kv, 70㎟ M 2,660 5

F-GV PVC cable for direct burial


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kv, 25㎟ M 7,368 5

F-GV PVC cable for direct burial


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kv, 16㎟ M 662 5

F-GV PVC cable for Structure


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kv, 16㎟ M 9,687 5

F-GV PVC cable for direct burial


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kv, 6㎟ M 25,954 5

BC-WIRE 95㎟ M 2,596 5

BC-WIRE 70㎟ M 1,258 5

braided grounding wire 6㎟ 120mm EA 656,460 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
30㎜ M 8,519 5

grounding rod 16Φ*1800mm EA 3,161 5

grounding rod 14Φ*1000mm EA 42 5

grounding rod(Structure) 14Φ*1000mm EA 9,276 5

Bonding Clamp U-bolt for copper rod EA 5,675 5

Bonding Clamp(Structure) U-bolt for copper rod EA 9,226 5

Sleeve Connection C TYPE SLEEVE 185㎟ EA 16 5

Sleeve Connection C TYPE SLEEVE 150㎟ EA 35 5

Sleeve Connection C TYPE SLEEVE 120㎟ EA 28 5

Sleeve Connection C TYPE SLEEVE 95㎟ EA 8 5

Sleeve Connection C TYPE SLEEVE 70㎟ EA 183 5

Sleeve Connection C TYPE SLEEVE 25㎟ EA 296 5

Sleeve Connection C TYPE SLEEVE 16㎟ EA 8 5

Water Stop Rod 300x1.5x1sheet EA 92 5


[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Compression Terminal For Copper Wire Compression Terminal 185㎟ EA 144 5

Compression Terminal For Copper Wire Compression Terminal 150㎟ EA 35 5

Compression Terminal For Copper Wire Compression Terminal 95㎟ EA 26 5

Compression Terminal For Copper Wire Compression Terminal 70㎟ EA 374 5

Compression Terminal For Copper Wire Compression Terminal 25㎟ EA 542 5

Compression Terminal For Copper Wire Compression Terminal 16㎟ EA 45 5

Compression Terminal(Structure) For Copper Wire Compression Terminal 16㎟ EA 9,226 5

Compression Terminal For Copper Wire Compression Terminal 6㎟ EA 25,259 5

Grounding Terminal Box 10CCT, SUS EA 20 5

Grounding Terminal Box 3CCT, SUS EA 9 5

Grounding Resistance Reducer Arson 10kg Bags 112 5

Welding Grounding Tools MOLD"-", "+", "T" EA 1 5

Handle Clamp (medium) EA 1 5

Powder #115 EA 195 5

Excavation/earthwork General, Excavator 0.7m3 90%, Labor 10% M3 9,855 5

Backfilling/earthwork, Thickness 15cm General, Excavator 0.7m3 + Rammer 80kg M3 8,870 5

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

010106 Security Light Equipment 0

Pole Light 5m or less, Class 1 Pcs 28 5

Security Light Foundation 700*500*1000 Locations 28 5

Street Light Waterproof Junction Box with ELB EA 28 5

0.6/1kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
3C*25㎟ M 231 5

0.6/1kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
2C*16㎟ M 1,597 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
50㎜ M 227 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
40㎜ M 1,136 5

Cable Lug Electrolytic Copper 1 HOLE 25㎟ EA 16 5

Cable Lug Electrolytic Copper 1 HOLE 16㎟ EA 104 5

Excavation/earthwork General, Excavator 0.7m3 90%, Labor 10% M3 1,034 5

Backfilling/earthwork, Thickness 15cm General, Excavator 0.7m3 + Rammer 80kg M3 933 5

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

010107 Cable Tray Equipment 0

ST CABLE TRAY-Straight 600*100*t2.3mm M 6,096 5

ST CABLE TRAY-Straight 400*100*t2.3mm M 2,882 5

ST CABLE TRAY-Straight 300*100*t2.3mm M 65 5

ST CABLE TRAY-Straight 150*100*t2.3mm M 53 5

H/V ELBOW[ST] 600*100 EA 34 5

H/V ELBOW[ST] 400*100 EA 15 5

H/V ELBOW[ST] 300*100 EA 1 5

H/V TEE[ST] 600*100 EA 20 5

Tray Support W:600 Locations 3,869 5

Tray Support W:400 Locations 1,828 5

Tray Support W:300 Locations 41 5

Tray Support (wall mount) W:150 Locations 33 5

Cable Tray Fittings and Accessories Cable tray accessories, Joint connector, Galvanized, 100*t2.3mm EA 5,776 5

Cable Tray Fittings and Accessories Cable tray accessories, Bonding jumper, 38㎟ EA 2,888 5

Cable Tray Fittings and Accessories Cable tray accessories, Shank bolt and nut, Stainless steel EA 23,104 5

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

010108 Solar Panel Material Installation Cost 0

Inverter Installation 6.6MW EA 15 5

Junction Box Installation 20 circuits or less EA 450 5

Junction Box Boundary stones installation L/S 450 5

Material Transport 2.5-ton truck, transportation distance L=10km TON 5

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

0
010109 Construction Power Temporary Setup and Communication Inlet

Switchgear panel Rental L/S 1 5

22.9kV TR CNCV-W
(22.9kV Concentric Neutral Type XLPE insulated Power Cable)
22.9kv, FR-CN/CO-W, 1*60㎟ M 7,107 5

Optical Cable (LAP TYPE) SM 9/125, 8C M 3,763 5

0.6/1kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
1C*120㎟ M 824 5

F-GV PVC cable inside conduit


(0.6/1kV Flame Retardant PVC Insulated Wire for Grounding)
0.6/1kv, 70㎟ M 210 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
125㎜ M 6,180 5

Cable Termination Cold Shrinkable, 23kv, 1C*60㎟ EA 6 5

Cable Straight Joint Resin Injection, 23kv, 1C*60㎟ EA 6 5

conduit inlets/outlets seals (waterproof) Φ125 Locations 80 5

Electrical Manhole (Mechanical) 600*600*600 Locations 23 5

Fiber Optic Cable Core Connection General connection (12 cores or less) per Core 16 5

Fiber Optic Cable Testing and Measurement Final test per Core 16 5

Excavation/earthwork General, Excavator 0.7m3 90%, Labor 10% M3 1,776 5

Backfilling/earthwork, Thickness 15cm General, Excavator 0.7m3 + Rammer 80kg M3 1,599 5

Warning Tape M 5,550 5

Temporary Office Power L/S 1 5

Distribution Board 225AF/225AT EA 1 5

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

010201 Monitoring and CCTV Equipment 0

CCTV Outdoor Fixed Type(66ea) L/S 1 5

Optical Cable (LAP TYPE) SM 9/125, 4C M 33,515 5

Network Cable CAT.5, 4Pr M 3,958 5

Data Cable RS-485 M 15,440 5

0.6/1kV F-CV power cable


(0.6/1kV XLPE Insulated PVC Sheathed Power Cable)
2C*16㎟ M 4,773 5

ELP conduit for underground Installation


(Corrugated hard polyethylene conduit)
40㎜ M 29,172 5

Flexible metal conduits 16mm, 비waterproof M 12,856 5

conduit inlets/outlets seals (waterproof) Φ40 Locations 162 5

Cable Lug Electrolytic Copper 1 HOLE 16㎟ EA 136 5

Fiber Optic Cable Core Connection General connection (12 cores or less) per Core 336 5

Fiber Optic Cable Testing and Measurement Final test per Core 336 5

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

010301 Solar Panel Materials 0

Solar Panel Module 630W EA 177,884 5

Inverter 6.6MW EA 15 5

Junction Box 14ch EA 450 5

Integrated Monitoring L/S 1 5

PV Monitoring L/S 1 5

Weather Sensor L/S 1 5

Solar Panel Structure General Type 56ea EA 5

Solar Panel Structure General Type 28ea EA 5

Solar Panel Structure Shadow area Type 56ea EA 5

Solar Panel Structure Shadow area Type 28ea EA 5

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

010303 Switchgear Panel Material 0

154kV Substation L/S 1 5

PV Switchgear panel Local Electrical Room-A, B L/S 1 5

PV Switchgear panel Local Electrical Room-C, D L/S 1 5

PV Switchgear panel Local Electrical Room-G, H L/S 1 5

PV Switchgear panel Local Electrical Room-E, F L/S 1 5

154kV Transformer Spare EA 1 5

TR installation L/S 1 5

[ Total ] T
[Solar Power Generation Project Detail Design]

Material Cost Labor Cost Overhead Cost Total


Item Name Specification Unit Quantity Remarks
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

0
010401 Pre-Use Inspection and Precision Safety Diagnostic Expenses

Pre-Use Inspection L/S 1 5

Precision Safety Diagnostics L/S 1 5

[ Total ] T
일위대가목록
[태양광발전사업 실시설계 ]

품 명 규 격 단위 재료비 노무비 경 비 합 계 번 호 비 고

22.9kv동심중성선케이블 22.9kv, FR-CN/CO-W, 1*400㎟ M 63,034.0 13,436.0 0.0 76,470.0 호표 1 전기 4-34

22.9kv동심중성선케이블 22.9kv, FR-CN/CO-W, 1*325㎟ M 43,873.0 13,436.0 0.0 57,309.0 호표 2 전기 4-34

22.9kv동심중성선케이블 22.9kv, FR-CN/CO-W, 1*250㎟ M 35,157.0 12,589.0 0.0 47,746.0 호표 3 전기 4-34

22.9kv동심중성선케이블 22.9kv, FR-CN/CO-W, 1*200㎟ M 29,786.0 10,632.0 0.0 40,418.0 호표 4 전기 4-34

22.9kv동심중성선케이블 22.9kv, FR-CN/CO-W, 1*60㎟ M 12,603.0 4,942.0 0.0 17,545.0 호표 5 전기 4-34

0.6/1kv 난연 전력케이블(F-CV) 1C*150㎟ M 12,401.0 22,849.0 0.0 35,250.0 호표 6 전기 5-11

0.6/1kv 난연 전력케이블(F-CV) 1C*70㎟ M 6,302.0 13,426.0 0.0 19,728.0 호표 7 전기 5-11

0.6/1kv 난연 전력케이블(F-CV) 3C*16㎟ M 4,607.0 10,835.0 0.0 15,442.0 호표 8 전기 5-11

난연 비닐절연접지용전선(F-GV)-관내 0.6/1kv, 35㎟ M 3,085.0 2,366.0 0.0 5,451.0 호표 9 전기 3-38

파상형경질폴리에틸렌전선관-지중포설 175㎜ M 6,700.0 17,031.0 0.0 23,731.0 호표 10 전기 4-31

파상형경질폴리에틸렌전선관-지중포설 150㎜ M 4,192.0 14,178.0 0.0 18,370.0 호표 11 전기 4-31

파상형경질폴리에틸렌전선관-지중포설 125㎜ M 3,033.0 11,411.0 0.0 14,444.0 호표 12 전기 4-31

파상형경질폴리에틸렌전선관-지중포설 100㎜ M 2,070.0 8,558.0 0.0 10,628.0 호표 13 전기 4-31

파상형경질폴리에틸렌전선관-지중포설 80㎜ M 1,554.0 5,792.0 0.0 7,346.0 호표 14 전기 4-31

파상형경질폴리에틸렌전선관-지중포설 40㎜ M 616.0 4,616.0 0.0 5,232.0 호표 15 전기 4-31

경질비닐PVC전선관-매입 HI, 70mm M 4,294.0 63,114.0 0.0 67,408.0 호표 16 전기 5-1


일위대가목록
[태양광발전사업 실시설계 ]

품 명 규 격 단위 재료비 노무비 경 비 합 계 번 호 비 고

케이블 단말접속 자기수축, 23kv, 1C*400㎟ EA 107,750.0 589,578.0 0.0 697,328.0 호표 17 전기 4-37

케이블 단말접속 자기수축, 23kv, 1C*325㎟ EA 106,500.0 589,578.0 0.0 696,078.0 호표 18 전기 4-37

케이블 단말접속 자기수축, 23kv, 1C*250㎟ EA 95,750.0 515,070.0 0.0 610,820.0 호표 19 전기 4-37

케이블 단말접속 자기수축, 23kv, 1C*200㎟ EA 94,000.0 460,000.0 0.0 554,000.0 호표 20 전기 4-37

케이블 단말접속 자기수축, 23kv, 1C*60㎟ EA 55,500.0 278,591.0 0.0 334,091.0 호표 21 전기 4-37

케이블 직선접속 레진주입, 23kv, 1C*400㎟ EA 203,775.0 165,843.0 0.0 369,618.0 호표 22 전기 4-36-1

케이블 직선접속 레진주입, 23kv, 1C*325㎟ EA 169,475.0 165,843.0 0.0 335,318.0 호표 23 전기 4-36-1

케이블 직선접속 레진주입, 23kv, 1C*250㎟ EA 167,416.0 143,897.0 0.0 311,313.0 호표 24 전기 4-36-1

케이블 직선접속 레진주입, 23kv, 1C*200㎟ EA 165,590.0 129,685.0 0.0 295,275.0 호표 25 전기 4-36-1

케이블 직선접속 레진주입, 23kv, 1C*60㎟ EA 122,739.0 81,301.0 0.0 204,040.0 호표 26 전기 4-36-1

러그단자 동관단자 1 HOLE 150㎟ EA 3,841.0 48,054.0 0.0 51,895.0 호표 27 전기 4-37

러그단자 동관단자 1 HOLE 70㎟ EA 1,996.0 33,213.0 0.0 35,209.0 호표 28 전기 4-37

러그단자 동관단자 1 HOLE 35㎟ EA 1,275.0 25,440.0 0.0 26,715.0 호표 29 전기 4-37

러그단자 동관단자 1 HOLE 16㎟ EA 915.0 19,080.0 0.0 19,995.0 호표 30 전기 4-37

관로구방수 ∮175 개소 27,336.0 110,225.0 0.0 137,561.0 호표 31

관로구방수 ∮150 개소 64,191.0 110,225.0 0.0 174,416.0 호표 32


일위대가목록
[태양광발전사업 실시설계 ]

품 명 규 격 단위 재료비 노무비 경 비 합 계 번 호 비 고

관로구방수 ∮125 개소 53,852.0 109,577.0 0.0 163,429.0 호표 33

관로구방수 ∮100 개소 31,759.0 110,225.0 0.0 141,984.0 호표 34

관로구방수 ∮80 개소 45,440.0 109,577.0 0.0 155,017.0 호표 35

전기맨홀(기계) 1100*1800*1000 개소 1,306,787.0 726,532.0 57,747.0 2,091,066.0 호표 36

전기맨홀(기계) 1000*1000*1000 개소 801,787.0 726,532.0 57,747.0 1,586,066.0 호표 37

전기맨홀(기계) 600*600*600 개소 663,742.0 667,716.0 55,355.0 1,386,813.0 호표 38

경고테이프 M 138.0 287.0 0.0 425.0 호표 39

표지기 설치 개 79,707.0 23,580.0 0.0 103,287.0 호표 40 전기 4-46

터파기 쇄석포설 쇄석자갈 M3 19,697.0 4,418.0 907.0 25,022.0 호표 41 토목 5-1-1.2

2kV RHW-2 1C x 250MCM M 22,350.0 22,849.0 0.0 45,199.0 호표 42 전기 5-11

2kV RHW-2 1C x 300MCM M 26,158.0 22,849.0 0.0 49,007.0 호표 43 전기 5-11

파상형경질폴리에틸렌전선관-지중포설 65㎜ M 1,193.0 5,792.0 0.0 6,985.0 호표 44 전기 4-31

러그단자 동관단자 1 HOLE 130㎟ EA 3,841.0 48,054.0 0.0 51,895.0 호표 45 전기 4-37

케이블 직선접속 레진주입, 6.9kv, 1C*150㎟ EA 85,719.0 207,324.0 0.0 293,043.0 호표 46 전기 4-36

케이블 직선접속 레진주입, 6.9kv, 1C*130㎟ EA 85,719.0 207,324.0 0.0 293,043.0 호표 47 전기 4-36

2kV RHW-2 1C x 10AWG M 1,299.0 3,062.0 0.0 4,361.0 호표 48 전기 5-13


일위대가목록
[태양광발전사업 실시설계 ]

품 명 규 격 단위 재료비 노무비 경 비 합 계 번 호 비 고

파상형경질폴리에틸렌전선관-지중포설 30㎜ M 495.0 4,616.0 0.0 5,111.0 호표 49 전기 4-31

파상형경질폴리에틸렌전선관-지중포설 50㎜ M 814.0 4,616.0 0.0 5,430.0 호표 50 전기 4-31

1종금속제가요전선관-노출 고장력, 70mm, 방수 M 8,834.0 42,151.0 0.0 50,985.0 호표 51 전기 5-1

1종금속제가요전선관-구조물 고장력, 70mm, 방수 M 8,834.0 42,151.0 0.0 50,985.0 호표 52 전기 5-1

1종금속제가요전선관-노출 고장력, 54mm, 방수 M 5,829.0 36,741.0 0.0 42,570.0 호표 53 전기 5-1

1종금속제가요전선관-노출 고장력, 16mm, 방수 M 1,231.0 11,721.0 0.0 12,952.0 호표 54 전기 5-1

광역피뢰침 폴 포함 개 2,556,672.0 222,402.0 0.0 2,779,074.0 호표 55 전기 5-42

피뢰침 기초 700*500*1000 개소 42,491.0 129,266.0 1,286.0 173,043.0 호표 56 전기 5-27-2

접지봉 16∮*1800mm 개 5,404.0 34,828.0 0.0 40,232.0 호표 57 전기 3-38

번디클램프 U볼트 동봉용 EA 7,882.0 6,086.0 0.0 13,968.0 호표 58 전기 3-38

슬리브접속 C TYPE SLEEVE 70㎟ EA 2,235.0 21,864.0 0.0 24,099.0 호표 59 전기 3-38

BC-WIRE 70㎟ M 5,754.0 1,803.0 0.0 7,557.0 호표 60 전기 3-38

접지 단자함 1CCT, SUS 개 75,746.0 134,876.0 0.0 210,622.0 호표 61 전기 3-38

탄소접지봉 EA 604,623.0 154,123.0 0.0 758,746.0 호표 62 전기 3-38

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 185㎟ M 14,833.0 3,155.0 0.0 17,988.0 호표 63 전기 3-38

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 150㎟ M 11,862.0 2,479.0 0.0 14,341.0 호표 64 전기 3-38


일위대가목록
[태양광발전사업 실시설계 ]

품 명 규 격 단위 재료비 노무비 경 비 합 계 번 호 비 고

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 120㎟ M 9,770.0 2,479.0 0.0 12,249.0 호표 65 전기 3-38

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 95㎟ M 7,842.0 2,479.0 0.0 10,321.0 호표 66 전기 3-38

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 70㎟ M 5,647.0 1,803.0 0.0 7,450.0 호표 67 전기 3-38

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 25㎟ M 2,222.0 1,577.0 0.0 3,799.0 호표 68 전기 3-38

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 16㎟ M 1,434.0 1,577.0 0.0 3,011.0 호표 69 전기 3-38

난연 비닐절연접지용전선(F-GV)-구조물 0.6/1kv, 16㎟ M 1,434.0 1,577.0 0.0 3,011.0 호표 70 전기 3-38

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 6㎟ M 628.0 1,352.0 0.0 1,980.0 호표 71 전기 3-38

BC-WIRE 95㎟ M 7,954.0 1,803.0 0.0 9,757.0 호표 72 전기 3-38

석연선 6㎟ 120mm EA 384.0 162.0 0.0 546.0 호표 73 전기 3-38

접지봉 14∮*1000mm 개 3,924.0 34,828.0 0.0 38,752.0 호표 74 전기 3-38

접지봉(구조물) 14∮*1000mm 개 3,924.0 34,828.0 0.0 38,752.0 호표 75 전기 3-38

번디클램프(구조물) U볼트 동봉용 EA 7,882.0 6,086.0 0.0 13,968.0 호표 76 전기 3-38

슬리브접속 C TYPE SLEEVE 185㎟ EA 6,025.0 21,864.0 0.0 27,889.0 호표 77 전기 3-38

슬리브접속 C TYPE SLEEVE 150㎟ EA 3,655.0 21,864.0 0.0 25,519.0 호표 78 전기 3-38

슬리브접속 C TYPE SLEEVE 120㎟ EA 3,465.0 21,864.0 0.0 25,329.0 호표 79 전기 3-38

슬리브접속 C TYPE SLEEVE 95㎟ EA 3,115.0 21,864.0 0.0 24,979.0 호표 80 전기 3-38


일위대가목록
[태양광발전사업 실시설계 ]

품 명 규 격 단위 재료비 노무비 경 비 합 계 번 호 비 고

슬리브접속 C TYPE SLEEVE 25㎟ EA 915.0 21,864.0 0.0 22,779.0 호표 81 전기 3-38

슬리브접속 C TYPE SLEEVE 16㎟ EA 985.0 21,864.0 0.0 22,849.0 호표 82 전기 3-38

수막처리동봉 300x1.5x1장 EA 50,655.0 21,864.0 0.0 72,519.0 호표 83 전기 3-38

압착단자 동선용 압착단자 185㎟ EA 1,804.0 3,606.0 0.0 5,410.0 호표 84 전기 3-38

압착단자 동선용 압착단자 150㎟ EA 1,072.0 3,606.0 0.0 4,678.0 호표 85 전기 3-38

압착단자 동선용 압착단자 95㎟ EA 642.0 3,606.0 0.0 4,248.0 호표 86 전기 3-38

압착단자 동선용 압착단자 70㎟ EA 528.0 3,606.0 0.0 4,134.0 호표 87 전기 3-38

압착단자 동선용 압착단자 25㎟ EA 228.0 3,606.0 0.0 3,834.0 호표 88 전기 3-38

압착단자 동선용 압착단자 16㎟ EA 188.0 3,606.0 0.0 3,794.0 호표 89 전기 3-38

압착단자(구조물) 동선용 압착단자 16㎟ EA 188.0 3,606.0 0.0 3,794.0 호표 90 전기 3-38

압착단자 동선용 압착단자 6㎟ EA 142.0 3,606.0 0.0 3,748.0 호표 91 전기 3-38

접지 단자함 10CCT, SUS 개 380,263.0 148,769.0 0.0 529,032.0 호표 92 전기 3-38

접지 단자함 3CCT, SUS 개 140,963.0 148,769.0 0.0 289,732.0 호표 93 전기 3-38

POWDER #115 EA 5,189.0 22,991.0 0.0 28,180.0 호표 94 전기 3-38

POLE LIGHT 5m 이하, 1등 본 1,743,200.0 473,356.0 0.0 2,216,556.0 호표 95 전기 5-27.1

보안등 기초 700*500*1000 개소 42,491.0 129,266.0 1,286.0 173,043.0 호표 96 전기 5-27-2


일위대가목록
[태양광발전사업 실시설계 ]

품 명 규 격 단위 재료비 노무비 경 비 합 계 번 호 비 고

0.6/1kv 난연 전력케이블(F-CV) 3C*25㎟ M 6,934.0 14,133.0 0.0 21,067.0 호표 97 전기 5-11

0.6/1kv 난연 전력케이블(F-CV) 2C*16㎟ M 3,089.0 7,585.0 0.0 10,674.0 호표 98 전기 5-11

러그단자 동관단자 1 HOLE 25㎟ EA 965.0 19,080.0 0.0 20,045.0 호표 99 전기 4-37

ST CABLE TRAY-Straight 600*100*t2.3mm M 50,381.0 97,376.0 0.0 147,757.0 호표 100 전기 5-8

ST CABLE TRAY-Straight 400*100*t2.3mm M 37,994.0 81,146.0 0.0 119,140.0 호표 101 전기 5-8

ST CABLE TRAY-Straight 300*100*t2.3mm M 31,896.0 62,212.0 0.0 94,108.0 호표 102 전기 5-8

ST CABLE TRAY-Straight 150*100*t2.3mm M 18,446.0 62,212.0 0.0 80,658.0 호표 103 전기 5-8

H/V ELBOW[ST] 카/포 600*100 EA 68,621.0 97,376.0 0.0 165,997.0 호표 104 전기 5-8

H/V ELBOW[ST] 카/포 400*100 EA 45,274.0 81,146.0 0.0 126,420.0 호표 105 전기 5-8

H/V ELBOW[ST] 카/포 300*100 EA 35,686.0 62,212.0 0.0 97,898.0 호표 106 전기 5-8

H/V TEE[ST] 카/포 600*100 EA 116,111.0 97,376.0 0.0 213,487.0 호표 107 전기 5-8

TRAY 지지대 W:600 개소 42,455.0 22,493.0 516.0 65,464.0 호표 108

TRAY 지지대 W:400 개소 41,106.0 22,493.0 516.0 64,115.0 호표 109

TRAY 지지대 W:300 개소 40,581.0 22,493.0 516.0 63,590.0 호표 110

TRAY 지지대(벽체) W:150 개소 4,252.0 52,294.0 0.0 56,546.0 호표 111

Inverter 설치 3.0MW 대 61,767.0 2,058,900.0 0.0 2,120,667.0 호표 112 전기 9-1


일위대가목록
[태양광발전사업 실시설계 ]

품 명 규 격 단위 재료비 노무비 경 비 합 계 번 호 비 고

Inverter 설치 1.0MW 대 61,767.0 2,058,900.0 0.0 2,120,667.0 호표 113 전기 9-1

전력조절(접속함) 설치 20회로 이하 면 3,706.0 123,534.0 0.0 127,240.0 호표 114 전기 5-44

접속반 경계석 설치 식 44,030.0 22,493.0 516.0 67,039.0 호표 115

LAP외피광케이블 SM 9/125, 8C M 886.0 3,760.0 0.0 4,646.0 호표 116 통신 4-1-3

0.6/1kv 난연 전력케이블(F-CV) 1C*120㎟ M 10,229.0 19,787.0 0.0 30,016.0 호표 117 전기 5-11

난연 비닐절연접지용전선(F-GV)-관내 0.6/1kv, 70㎟ M 5,674.0 2,704.0 0.0 8,378.0 호표 118 전기 3-38

광케이블 코어접속 일반접속(12코어 이하) 코어당 1,599.0 53,328.0 0.0 54,927.0 호표 119 통신 4-1-2-1

광케이블 시험 및 측정 최종시험 코어당 3,408.0 113,601.0 0.0 117,009.0 호표 120 통신 4-1-2-1

LAP외피광케이블 SM 9/125, 4C M 797.0 3,760.0 0.0 4,557.0 호표 121 통신 4-1-3

네트워크케이블 CAT.5, 4Pr M 413.0 4,890.0 0.0 5,303.0 호표 122 통신 4-3-1

DATA케이블 RS-485 M 7,520.0 5,868.0 0.0 13,388.0 호표 123 통신 4-3-1

1종금속제가요전선관-노출 16mm, 비방수 M 772.0 11,721.0 0.0 12,493.0 호표 124 전기 5-1

관로구방수 ∮40 개소 42,059.0 109,577.0 0.0 151,636.0 호표 125

잡석깔기지정 인력 M3 0.0 2,257.0 0.0 2,257.0 호표 126 토목 5-1-1.2

현장내 잔토처리 소운반. 깔고 고르기 M3 0.0 25,085.0 0.0 25,085.0 호표 127 토목 3-1-3.1

크레인(타이어)(오거장착별도)-통신 10ton HR 6,644.0 65,103.0 23,436.0 95,183.0 호표 128 통신 1-4-5


일위대가목록
[태양광발전사업 실시설계 ]

품 명 규 격 단위 재료비 노무비 경 비 합 계 번 호 비 고

굴삭기(무한궤도). 0.7㎥ HR 17,471.0 38,972.0 21,214.0 77,657.0 호표 129 토목 9-2.3(0201)

플레이트 콤팩터. 1.5ton HR 1,552.0 25,683.0 546.0 27,781.0 호표 130 토목 9-2,3(1730)

래머. 80kg HR 996.0 25,683.0 440.0 27,119.0 호표 131 토목 9-2,3(1630)

굴삭기(무한궤도). 0.2㎥ HR 7,468.0 8,119.0 12,464.0 28,051.0 호표 132 토목 9-2.3(0201)

진동롤러(핸드가이드식). 0.7ton HR 3,068.0 25,683.0 1,649.0 30,400.0 호표 133 토목 9-2,3(1305)

레디믹스트콘크리트 인력운반 타설 무근구조물 M3 0.0 42,603.0 852.0 43,455.0 호표 134 토목 6-1-1.1

합판거푸집 설치 및 해체 간단 6회, 수직고 7m까지 M2 8,342.0 22,703.0 227.0 31,272.0 호표 135 건축 6-3-1

합판거푸집 - 자재비 6회 M2 8,342.0 0.0 0.0 8,342.0 호표 136 건축 6-3-1

합판거푸집 - 인력투입 간단, 수직고 7m까지 M2 0.0 22,703.0 227.0 22,930.0 호표 137 건축 6-3-1

트럭탑재형 크레인. 5ton HR 7,555.0 33,064.0 8,721.0 49,340.0 호표 138 토목 9-2,3(2105)

덤프트럭. 2.5ton HR 4,940.0 33,064.0 5,743.0 43,747.0 호표 139 토목 9-2,3(0602)

지게차. 2.5ton HR 6,765.0 8,119.0 3,692.0 18,576.0 호표 140 토목 9-2,3(2502)


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

22.9kv동심중성선케이블 22.9kv, FR-CN/CO-W, 1*400㎟ M 전기 4-34 ( 호표 1 )

전력케이블 22.9kv동심중성선케이블, 난연, FR-CNCO-W, 1*400㎟ M 1 62,631.00 62,631.0 0.00 0.0 0.00 0.0 62,631.00 62,631.0 52FDB29

잡재료비 배관배선의 2% 식 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

보통인부 일반공사 직종 인 0.0299 0.00 0.0 125,427.00 3,750.2 0.00 0.0 125,427.00 3,750.2 52FDB29

특고압케이블전공 일반공사 직종 인 0.0299 0.00 0.0 323,944.00 9,685.9 0.00 0.0 323,944.00 9,685.9 52FDB29

공구손료 인력품의 3% 식 1 403.08 403.0 0.00 0.0 0.00 0.0 403.00 403.0 52FDB29

[ 합 계 ] 63,034.0 13,436.0 0.0 76,470.0 TOTAL

22.9kv동심중성선케이블 22.9kv, FR-CN/CO-W, 1*325㎟ M 전기 4-34 ( 호표 2 )

전력케이블 22.9kv동심중성선케이블, 난연, FR-CNCO-W, 1*325㎟ M 1 43,470.00 43,470.0 0.00 0.0 0.00 0.0 43,470.00 43,470.0 52FDB29

잡재료비 배관배선의 2% 식 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

보통인부 일반공사 직종 인 0.0299 0.00 0.0 125,427.00 3,750.2 0.00 0.0 125,427.00 3,750.2 52FDB29

특고압케이블전공 일반공사 직종 인 0.0299 0.00 0.0 323,944.00 9,685.9 0.00 0.0 323,944.00 9,685.9 52FDB29

공구손료 인력품의 3% 식 1 403.08 403.0 0.00 0.0 0.00 0.0 403.00 403.0 52FDB29

[ 합 계 ] 43,873.0 13,436.0 0.0 57,309.0 TOTAL

22.9kv동심중성선케이블 22.9kv, FR-CN/CO-W, 1*250㎟ M 전기 4-34 ( 호표 3 )

22.9KV동심중성선케이블 22.9kv동심중성선케이블, FR-CNCO-W, 수밀형무독성난연, 22.9kv, 250㎟ M 1 34,780.00 34,780.0 0.00 0.0 0.00 0.0 34,780.00 34,780.0 52FDB29

잡재료비 배관배선의 2% 식 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

보통인부 일반공사 직종 인 0.028015 0.00 0.0 125,427.00 3,513.8 0.00 0.0 125,427.00 3,513.8 52FDB29

특고압케이블전공 일반공사 직종 인 0.028015 0.00 0.0 323,944.00 9,075.2 0.00 0.0 323,944.00 9,075.2 52FDB29

공구손료 인력품의 3% 식 1 377.67 377.6 0.00 0.0 0.00 0.0 377.60 377.6 52FDB29

[ 합 계 ] 35,157.0 12,589.0 0.0 47,746.0 TOTAL

22.9kv동심중성선케이블 22.9kv, FR-CN/CO-W, 1*200㎟ M 전기 4-34 ( 호표 4 )


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

전력케이블 22.9kv동심중성선케이블, 난연, FR-CNCO-W, 1*200㎟ M 1 28,890.00 28,890.0 0.00 0.0 0.00 0.0 28,890.00 28,890.0 52FDB29

잡재료비 배관배선의 2% 식 1 577.80 577.8 0.00 0.0 0.00 0.0 577.80 577.8 52FDB29

보통인부 일반공사 직종 인 0.02366 0.00 0.0 125,427.00 2,967.6 0.00 0.0 125,427.00 2,967.6 52FDB29

특고압케이블전공 일반공사 직종 인 0.02366 0.00 0.0 323,944.00 7,664.5 0.00 0.0 323,944.00 7,664.5 52FDB29

공구손료 인력품의 3% 식 1 318.96 318.9 0.00 0.0 0.00 0.0 318.90 318.9 52FDB29

[ 합 계 ] 29,786.0 10,632.0 0.0 40,418.0 TOTAL

22.9kv동심중성선케이블 22.9kv, FR-CN/CO-W, 1*60㎟ M 전기 4-34 ( 호표 5 )

전력케이블 22.9kv동심중성선케이블, 난연, FR-CNCO-W, 1*60㎟ M 1 12,211.00 12,211.0 0.00 0.0 0.00 0.0 12,211.00 12,211.0 52FDB29

잡재료비 배관배선의 2% 식 1 244.22 244.2 0.00 0.0 0.00 0.0 244.20 244.2 52FDB29

보통인부 일반공사 직종 인 0.010998 0.00 0.0 125,427.00 1,379.4 0.00 0.0 125,427.00 1,379.4 52FDB29

특고압케이블전공 일반공사 직종 인 0.010998 0.00 0.0 323,944.00 3,562.7 0.00 0.0 323,944.00 3,562.7 52FDB29

공구손료 인력품의 3% 식 1 148.26 148.2 0.00 0.0 0.00 0.0 148.20 148.2 52FDB29

[ 합 계 ] 12,603.0 4,942.0 0.0 17,545.0 TOTAL

0.6/1kv 난연 전력케이블(F-CV) 1C*150㎟ M 전기 5-11 ( 호표 6 )

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 1C*150㎟ M 1 11,486.00 11,486.0 0.00 0.0 0.00 0.0 11,486.00 11,486.0 52FDB29

잡재료비 배관배선의 2% 식 1 229.72 229.7 0.00 0.0 0.00 0.0 229.70 229.7 52FDB29

저압케이블전공 일반공사 직종 인 0.097 0.00 0.0 235,560.00 22,849.3 0.00 0.0 235,560.00 22,849.3 52FDB29

공구손료 인력품의 3% 식 1 685.47 685.4 0.00 0.0 0.00 0.0 685.40 685.4 52FDB29

[ 합 계 ] 12,401.0 22,849.0 0.0 35,250.0 TOTAL

0.6/1kv 난연 전력케이블(F-CV) 1C*70㎟ M 전기 5-11 ( 호표 7 )

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 1C*70㎟ M 1 5,784.00 5,784.0 0.00 0.0 0.00 0.0 5,784.00 5,784.0 52FDB29

잡재료비 배관배선의 2% 식 1 115.68 115.6 0.00 0.0 0.00 0.0 115.60 115.6 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

저압케이블전공 일반공사 직종 인 0.057 0.00 0.0 235,560.00 13,426.9 0.00 0.0 235,560.00 13,426.9 52FDB29

공구손료 인력품의 3% 식 1 402.80 402.8 0.00 0.0 0.00 0.0 402.80 402.8 52FDB29

[ 합 계 ] 6,302.0 13,426.0 0.0 19,728.0 TOTAL

0.6/1kv 난연 전력케이블(F-CV) 3C*16㎟ M 전기 5-11 ( 호표 8 )

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 3C*16㎟ M 1 4,199.00 4,199.0 0.00 0.0 0.00 0.0 4,199.00 4,199.0 52FDB29

잡재료비 배관배선의 2% 식 1 83.98 83.9 0.00 0.0 0.00 0.0 83.90 83.9 52FDB29

저압케이블전공 일반공사 직종 인 0.046 0.00 0.0 235,560.00 10,835.7 0.00 0.0 235,560.00 10,835.7 52FDB29

공구손료 인력품의 3% 식 1 325.07 325.0 0.00 0.0 0.00 0.0 325.00 325.0 52FDB29

[ 합 계 ] 4,607.0 10,835.0 0.0 15,442.0 TOTAL

난연 비닐절연접지용전선(F-GV)-관내 0.6/1kv, 35㎟ M 전기 3-38 ( 호표 9 )

접지용비닐절연전선 접지용비닐절연전선, F-GV, 35㎟ M 1 2,955.00 2,955.0 0.00 0.0 0.00 0.0 2,955.00 2,955.0 52FDB29

잡재료비 배관배선의 2% 식 1 59.10 59.1 0.00 0.0 0.00 0.0 59.10 59.1 52FDB29

내선전공 일반공사 직종 인 0.0105 0.00 0.0 225,408.00 2,366.7 0.00 0.0 225,408.00 2,366.7 52FDB29

공구손료 인력품의 3% 식 1 71.00 71.0 0.00 0.0 0.00 0.0 71.00 71.0 52FDB29

[ 합 계 ] 3,085.0 2,366.0 0.0 5,451.0 TOTAL

파상형경질폴리에틸렌전선관-지중포설 175㎜ M 전기 4-31 ( 호표 10 )

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 175mm M 1 5,290.00 5,290.0 0.00 0.0 0.00 0.0 5,290.00 5,290.0 52FDB29

전선관부속품비 전선관의 15% 식 1 793.50 793.5 0.00 0.0 0.00 0.0 793.50 793.5 52FDB29

잡재료비 배관배선의 2% 식 1 105.80 105.8 0.00 0.0 0.00 0.0 105.80 105.8 52FDB29

배전전공 일반공사 직종 인 0.023 0.00 0.0 336,973.00 7,750.3 0.00 0.0 336,973.00 7,750.3 52FDB29

보통인부 일반공사 직종 인 0.074 0.00 0.0 125,427.00 9,281.5 0.00 0.0 125,427.00 9,281.5 52FDB29

공구손료 인력품의 3% 식 1 510.95 510.9 0.00 0.0 0.00 0.0 510.90 510.9 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

[ 합 계 ] 6,700.0 17,031.0 0.0 23,731.0 TOTAL

파상형경질폴리에틸렌전선관-지중포설 150㎜ M 전기 4-31 ( 호표 11 )

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 150mm M 1 3,220.00 3,220.0 0.00 0.0 0.00 0.0 3,220.00 3,220.0 52FDB29

전선관부속품비 전선관의 15% 식 1 483.00 483.0 0.00 0.0 0.00 0.0 483.00 483.0 52FDB29

잡재료비 배관배선의 2% 식 1 64.40 64.4 0.00 0.0 0.00 0.0 64.40 64.4 52FDB29

배전전공 일반공사 직종 인 0.019 0.00 0.0 336,973.00 6,402.4 0.00 0.0 336,973.00 6,402.4 52FDB29

보통인부 일반공사 직종 인 0.062 0.00 0.0 125,427.00 7,776.4 0.00 0.0 125,427.00 7,776.4 52FDB29

공구손료 인력품의 3% 식 1 425.36 425.3 0.00 0.0 0.00 0.0 425.30 425.3 52FDB29

[ 합 계 ] 4,192.0 14,178.0 0.0 18,370.0 TOTAL

파상형경질폴리에틸렌전선관-지중포설 125㎜ M 전기 4-31 ( 호표 12 )

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 125mm M 1 2,300.00 2,300.0 0.00 0.0 0.00 0.0 2,300.00 2,300.0 52FDB29

전선관부속품비 전선관의 15% 식 1 345.00 345.0 0.00 0.0 0.00 0.0 345.00 345.0 52FDB29

잡재료비 배관배선의 2% 식 1 46.00 46.0 0.00 0.0 0.00 0.0 46.00 46.0 52FDB29

배전전공 일반공사 직종 인 0.016 0.00 0.0 336,973.00 5,391.5 0.00 0.0 336,973.00 5,391.5 52FDB29

보통인부 일반공사 직종 인 0.048 0.00 0.0 125,427.00 6,020.4 0.00 0.0 125,427.00 6,020.4 52FDB29

공구손료 인력품의 3% 식 1 342.35 342.3 0.00 0.0 0.00 0.0 342.30 342.3 52FDB29

[ 합 계 ] 3,033.0 11,411.0 0.0 14,444.0 TOTAL

파상형경질폴리에틸렌전선관-지중포설 100㎜ M 전기 4-31 ( 호표 13 )

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 100mm M 1 1,550.00 1,550.0 0.00 0.0 0.00 0.0 1,550.00 1,550.0 52FDB29

전선관부속품비 전선관의 15% 식 1 232.50 232.5 0.00 0.0 0.00 0.0 232.50 232.5 52FDB29

잡재료비 배관배선의 2% 식 1 31.00 31.0 0.00 0.0 0.00 0.0 31.00 31.0 52FDB29

배전전공 일반공사 직종 인 0.012 0.00 0.0 336,973.00 4,043.6 0.00 0.0 336,973.00 4,043.6 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

보통인부 일반공사 직종 인 0.036 0.00 0.0 125,427.00 4,515.3 0.00 0.0 125,427.00 4,515.3 52FDB29

공구손료 인력품의 3% 식 1 256.76 256.7 0.00 0.0 0.00 0.0 256.70 256.7 52FDB29

[ 합 계 ] 2,070.0 8,558.0 0.0 10,628.0 TOTAL

파상형경질폴리에틸렌전선관-지중포설 80㎜ M 전기 4-31 ( 호표 14 )

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 80mm M 1 1,180.00 1,180.0 0.00 0.0 0.00 0.0 1,180.00 1,180.0 52FDB29

전선관부속품비 전선관의 15% 식 1 177.00 177.0 0.00 0.0 0.00 0.0 177.00 177.0 52FDB29

잡재료비 배관배선의 2% 식 1 23.60 23.6 0.00 0.0 0.00 0.0 23.60 23.6 52FDB29

배전전공 일반공사 직종 인 0.009 0.00 0.0 336,973.00 3,032.7 0.00 0.0 336,973.00 3,032.7 52FDB29

보통인부 일반공사 직종 인 0.022 0.00 0.0 125,427.00 2,759.3 0.00 0.0 125,427.00 2,759.3 52FDB29

공구손료 인력품의 3% 식 1 173.76 173.7 0.00 0.0 0.00 0.0 173.70 173.7 52FDB29

[ 합 계 ] 1,554.0 5,792.0 0.0 7,346.0 TOTAL

파상형경질폴리에틸렌전선관-지중포설 40㎜ M 전기 4-31 ( 호표 15 )

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 40mm M 1 409.00 409.0 0.00 0.0 0.00 0.0 409.00 409.0 52FDB29

전선관부속품비 전선관의 15% 식 1 61.35 61.3 0.00 0.0 0.00 0.0 61.30 61.3 52FDB29

잡재료비 배관배선의 2% 식 1 8.18 8.1 0.00 0.0 0.00 0.0 8.10 8.1 52FDB29

배전전공 일반공사 직종 인 0.007 0.00 0.0 336,973.00 2,358.8 0.00 0.0 336,973.00 2,358.8 52FDB29

보통인부 일반공사 직종 인 0.018 0.00 0.0 125,427.00 2,257.6 0.00 0.0 125,427.00 2,257.6 52FDB29

공구손료 인력품의 3% 식 1 138.49 138.4 0.00 0.0 0.00 0.0 138.40 138.4 52FDB29

[ 합 계 ] 616.0 4,616.0 0.0 5,232.0 TOTAL

경질비닐PVC전선관-매입 HI, 70mm M 전기 5-1 ( 호표 16 )

경질비닐전선관 경질비닐전선관, HI, 70mm M 1 2,052.00 2,052.0 0.00 0.0 0.00 0.0 2,052.00 2,052.0 52FDB29

전선관부속품비 전선관의 15% 식 1 307.80 307.8 0.00 0.0 0.00 0.0 307.80 307.8 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

잡재료비 배관배선의 2% 식 1 41.04 41.0 0.00 0.0 0.00 0.0 41.00 41.0 52FDB29

내선전공 일반공사 직종 인 0.28 0.00 0.0 225,408.00 63,114.2 0.00 0.0 225,408.00 63,114.2 52FDB29

공구손료 인력품의 3% 식 1 1,893.42 1,893.4 0.00 0.0 0.00 0.0 1,893.40 1,893.4 52FDB29

[ 합 계 ] 4,294.0 63,114.0 0.0 67,408.0 TOTAL

케이블 단말접속 자기수축, 23kv, 1C*400㎟ EA 전기 4-37 ( 호표 17 )

케이블단말접속자재 케이블단말접속자재, 자기수축, 23kv, 1C*400㎟ KIT 1 107,750.00 107,750.0 0.00 0.0 0.00 0.0 107,750.00 107,750.0 52FDB29

특고압케이블전공 일반공사 직종 인 1.82 0.00 0.0 323,944.00 589,578.0 0.00 0.0 323,944.00 589,578.0 52FDB29

공구손료 인력품의 3% 식 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

[ 합 계 ] 107,750.0 589,578.0 0.0 697,328.0 TOTAL

케이블 단말접속 자기수축, 23kv, 1C*325㎟ EA 전기 4-37 ( 호표 18 )

케이블단말접속자재 케이블단말접속자재, 자기수축, 23kv, 1C*325㎟ KIT 1 106,500.00 106,500.0 0.00 0.0 0.00 0.0 106,500.00 106,500.0 52FDB29

특고압케이블전공 일반공사 직종 인 1.82 0.00 0.0 323,944.00 589,578.0 0.00 0.0 323,944.00 589,578.0 52FDB29

공구손료 인력품의 3% 식 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

[ 합 계 ] 106,500.0 589,578.0 0.0 696,078.0 TOTAL

케이블 단말접속 자기수축, 23kv, 1C*250㎟ EA 전기 4-37 ( 호표 19 )

케이블단말접속자재 케이블단말접속자재, 자기수축, 23kv, 1C*250㎟ KIT 1 95,750.00 95,750.0 0.00 0.0 0.00 0.0 95,750.00 95,750.0 52FDB29

특고압케이블전공 일반공사 직종 인 1.59 0.00 0.0 323,944.00 515,070.9 0.00 0.0 323,944.00 515,070.9 52FDB29

공구손료 인력품의 3% 식 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

[ 합 계 ] 95,750.0 515,070.0 0.0 610,820.0 TOTAL

케이블 단말접속 자기수축, 23kv, 1C*200㎟ EA 전기 4-37 ( 호표 20 )

케이블단말접속자재 케이블단말접속자재, 자기수축, 23kv, 1C*200㎟ KIT 1 94,000.00 94,000.0 0.00 0.0 0.00 0.0 94,000.00 94,000.0 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

특고압케이블전공 일반공사 직종 인 1.42 0.00 0.0 323,944.00 460,000.4 0.00 0.0 323,944.00 460,000.4 52FDB29

공구손료 인력품의 3% 식 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

[ 합 계 ] 94,000.0 460,000.0 0.0 554,000.0 TOTAL

케이블 단말접속 자기수축, 23kv, 1C*60㎟ EA 전기 4-37 ( 호표 21 )

케이블단말접속자재 케이블단말접속자재, 자기수축, 23kv, 1C*60㎟ KIT 1 55,500.00 55,500.0 0.00 0.0 0.00 0.0 55,500.00 55,500.0 52FDB29

특고압케이블전공 일반공사 직종 인 0.86 0.00 0.0 323,944.00 278,591.8 0.00 0.0 323,944.00 278,591.8 52FDB29

공구손료 인력품의 3% 식 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

[ 합 계 ] 55,500.0 278,591.0 0.0 334,091.0 TOTAL

케이블 직선접속 레진주입, 23kv, 1C*400㎟ EA 전기 4-36-1 ( 호표 22 )

케이블직선접속자재 케이블직선접속자재, 레진주입, 23kv, 1C*400㎟ KIT 1 198,800.00 198,800.0 0.00 0.0 0.00 0.0 198,800.00 198,800.0 52FDB29

보통인부 일반공사 직종 인 0.16 0.00 0.0 125,427.00 20,068.3 0.00 0.0 125,427.00 20,068.3 52FDB29

특고압케이블전공 일반공사 직종 인 0.45 0.00 0.0 323,944.00 145,774.8 0.00 0.0 323,944.00 145,774.8 52FDB29

공구손료 인력품의 3% 식 1 4,975.29 4,975.2 0.00 0.0 0.00 0.0 4,975.20 4,975.2 52FDB29

[ 합 계 ] 203,775.0 165,843.0 0.0 369,618.0 TOTAL

케이블 직선접속 레진주입, 23kv, 1C*325㎟ EA 전기 4-36-1 ( 호표 23 )

케이블직선접속자재 케이블직선접속자재, 레진주입, 23kv, 1C*325㎟ KIT 1 164,500.00 164,500.0 0.00 0.0 0.00 0.0 164,500.00 164,500.0 52FDB29

보통인부 일반공사 직종 인 0.16 0.00 0.0 125,427.00 20,068.3 0.00 0.0 125,427.00 20,068.3 52FDB29

특고압케이블전공 일반공사 직종 인 0.45 0.00 0.0 323,944.00 145,774.8 0.00 0.0 323,944.00 145,774.8 52FDB29

공구손료 인력품의 3% 식 1 4,975.29 4,975.2 0.00 0.0 0.00 0.0 4,975.20 4,975.2 52FDB29

[ 합 계 ] 169,475.0 165,843.0 0.0 335,318.0 TOTAL

케이블 직선접속 레진주입, 23kv, 1C*250㎟ EA 전기 4-36-1 ( 호표 24 )


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

케이블직선접속자재 케이블직선접속자재, 레진주입, 23kv, 1C*250㎟ KIT 1 163,100.00 163,100.0 0.00 0.0 0.00 0.0 163,100.00 163,100.0 52FDB29

보통인부 일반공사 직종 인 0.14 0.00 0.0 125,427.00 17,559.7 0.00 0.0 125,427.00 17,559.7 52FDB29

특고압케이블전공 일반공사 직종 인 0.39 0.00 0.0 323,944.00 126,338.1 0.00 0.0 323,944.00 126,338.1 52FDB29

공구손료 인력품의 3% 식 1 4,316.93 4,316.9 0.00 0.0 0.00 0.0 4,316.90 4,316.9 52FDB29

[ 합 계 ] 167,416.0 143,897.0 0.0 311,313.0 TOTAL

케이블 직선접속 레진주입, 23kv, 1C*200㎟ EA 전기 4-36-1 ( 호표 25 )

케이블직선접속자재 케이블직선접속자재, 레진주입, 23kv, 1C*200㎟ KIT 1 161,700.00 161,700.0 0.00 0.0 0.00 0.0 161,700.00 161,700.0 52FDB29

보통인부 일반공사 직종 인 0.13 0.00 0.0 125,427.00 16,305.5 0.00 0.0 125,427.00 16,305.5 52FDB29

특고압케이블전공 일반공사 직종 인 0.35 0.00 0.0 323,944.00 113,380.4 0.00 0.0 323,944.00 113,380.4 52FDB29

공구손료 인력품의 3% 식 1 3,890.57 3,890.5 0.00 0.0 0.00 0.0 3,890.50 3,890.5 52FDB29

[ 합 계 ] 165,590.0 129,685.0 0.0 295,275.0 TOTAL

케이블 직선접속 레진주입, 23kv, 1C*60㎟ EA 전기 4-36-1 ( 호표 26 )

케이블직선접속자재 케이블직선접속자재, 레진주입, 23kv, 1C*60㎟ KIT 1 120,300.00 120,300.0 0.00 0.0 0.00 0.0 120,300.00 120,300.0 52FDB29

보통인부 일반공사 직종 인 0.08 0.00 0.0 125,427.00 10,034.1 0.00 0.0 125,427.00 10,034.1 52FDB29

특고압케이블전공 일반공사 직종 인 0.22 0.00 0.0 323,944.00 71,267.6 0.00 0.0 323,944.00 71,267.6 52FDB29

공구손료 인력품의 3% 식 1 2,439.05 2,439.0 0.00 0.0 0.00 0.0 2,439.00 2,439.0 52FDB29

[ 합 계 ] 122,739.0 81,301.0 0.0 204,040.0 TOTAL

러그단자 동관단자 1 HOLE 150㎟ EA 전기 4-37 ( 호표 27 )

러그단자 러그단자, 동관단자, 1홀, 150㎟ 개 1 2,400.00 2,400.0 0.00 0.0 0.00 0.0 2,400.00 2,400.0 52FDB29

저압케이블전공 일반공사 직종 인 0.204 0.00 0.0 235,560.00 48,054.2 0.00 0.0 235,560.00 48,054.2 52FDB29

공구손료 인력품의 3% 식 1 1,441.62 1,441.6 0.00 0.0 0.00 0.0 1,441.60 1,441.6 52FDB29

[ 합 계 ] 3,841.0 48,054.0 0.0 51,895.0 TOTAL


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

러그단자 동관단자 1 HOLE 70㎟ EA 전기 4-37 ( 호표 28 )

러그단자 러그단자, 동관단자, 1홀, 70㎟ 개 1 1,000.00 1,000.0 0.00 0.0 0.00 0.0 1,000.00 1,000.0 52FDB29

저압케이블전공 일반공사 직종 인 0.141 0.00 0.0 235,560.00 33,213.9 0.00 0.0 235,560.00 33,213.9 52FDB29

공구손료 인력품의 3% 식 1 996.41 996.4 0.00 0.0 0.00 0.0 996.40 996.4 52FDB29

[ 합 계 ] 1,996.0 33,213.0 0.0 35,209.0 TOTAL

러그단자 동관단자 1 HOLE 35㎟ EA 전기 4-37 ( 호표 29 )

러그단자 러그단자, 동관단자, 1홀, 35㎟ 개 1 512.00 512.0 0.00 0.0 0.00 0.0 512.00 512.0 52FDB29

저압케이블전공 일반공사 직종 인 0.108 0.00 0.0 235,560.00 25,440.4 0.00 0.0 235,560.00 25,440.4 52FDB29

공구손료 인력품의 3% 식 1 763.21 763.2 0.00 0.0 0.00 0.0 763.20 763.2 52FDB29

[ 합 계 ] 1,275.0 25,440.0 0.0 26,715.0 TOTAL

러그단자 동관단자 1 HOLE 16㎟ EA 전기 4-37 ( 호표 30 )

러그단자 러그단자, 동관단자, 1홀, 16㎟ 개 1 343.00 343.0 0.00 0.0 0.00 0.0 343.00 343.0 52FDB29

저압케이블전공 일반공사 직종 인 0.081 0.00 0.0 235,560.00 19,080.3 0.00 0.0 235,560.00 19,080.3 52FDB29

공구손료 인력품의 3% 식 1 572.40 572.4 0.00 0.0 0.00 0.0 572.40 572.4 52FDB29

[ 합 계 ] 915.0 19,080.0 0.0 19,995.0 TOTAL

관로구방수 ∮175 개소 ( 호표 31 )

관구밀폐기 관구밀폐기, 실링가스켓, D175 개 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

관구밀폐기 관구밀폐기, 이종연결관, ∮175mm 개 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

전선관부속품비 전선관의 15% 식 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

잡재료비 배관배선의 2% 식 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

통신용발포지수제 통신용발포지수제, 수밀보호테이프 개 1 2,300.00 2,300.0 0.00 0.0 0.00 0.0 2,300.00 2,300.0 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

통신용발포지수제 통신용발포지수제, 발포지수제, D150이하 개 1 21,730.00 21,730.0 0.00 0.0 0.00 0.0 21,730.00 21,730.0 52FDB29

보통인부 일반공사 직종 인 0.328 0.00 0.0 125,427.00 41,140.0 0.00 0.0 125,427.00 41,140.0 52FDB29

저압케이블전공 일반공사 직종 인 0.076 0.00 0.0 235,560.00 17,902.5 0.00 0.0 235,560.00 17,902.5 52FDB29

특고압케이블전공 일반공사 직종 인 0.158 0.00 0.0 323,944.00 51,183.1 0.00 0.0 323,944.00 51,183.1 52FDB29

공구손료 인력품의 3% 식 1 3,306.76 3,306.7 0.00 0.0 0.00 0.0 3,306.70 3,306.7 52FDB29

[ 합 계 ] 27,336.0 110,225.0 0.0 137,561.0 TOTAL

관로구방수 ∮150 개소 ( 호표 32 )

관구밀폐기 관구밀폐기, 실링가스켓, D150 개 1 25,200.00 25,200.0 0.00 0.0 0.00 0.0 25,200.00 25,200.0 52FDB29

관구밀폐기 관구밀폐기, 이종연결관, ∮150mm 개 1 6,300.00 6,300.0 0.00 0.0 0.00 0.0 6,300.00 6,300.0 52FDB29

전선관부속품비 전선관의 15% 식 1 4,725.00 4,725.0 0.00 0.0 0.00 0.0 4,725.00 4,725.0 52FDB29

잡재료비 배관배선의 2% 식 1 630.00 630.0 0.00 0.0 0.00 0.0 630.00 630.0 52FDB29

통신용발포지수제 통신용발포지수제, 수밀보호테이프 개 1 2,300.00 2,300.0 0.00 0.0 0.00 0.0 2,300.00 2,300.0 52FDB29

통신용발포지수제 통신용발포지수제, 발포지수제, D150이하 개 1 21,730.00 21,730.0 0.00 0.0 0.00 0.0 21,730.00 21,730.0 52FDB29

보통인부 일반공사 직종 인 0.328 0.00 0.0 125,427.00 41,140.0 0.00 0.0 125,427.00 41,140.0 52FDB29

저압케이블전공 일반공사 직종 인 0.076 0.00 0.0 235,560.00 17,902.5 0.00 0.0 235,560.00 17,902.5 52FDB29

특고압케이블전공 일반공사 직종 인 0.158 0.00 0.0 323,944.00 51,183.1 0.00 0.0 323,944.00 51,183.1 52FDB29

공구손료 인력품의 3% 식 1 3,306.76 3,306.7 0.00 0.0 0.00 0.0 3,306.70 3,306.7 52FDB29

[ 합 계 ] 64,191.0 110,225.0 0.0 174,416.0 TOTAL

관로구방수 ∮125 개소 ( 호표 33 )

관구밀폐기 관구밀폐기, 실링가스켓, D100 개 1 17,640.00 17,640.0 0.00 0.0 0.00 0.0 17,640.00 17,640.0 52FDB29

관구밀폐기 관구밀폐기, 이종연결관, ∮125mm 개 1 5,040.00 5,040.0 0.00 0.0 0.00 0.0 5,040.00 5,040.0 52FDB29

전선관부속품비 전선관의 15% 식 1 3,402.00 3,402.0 0.00 0.0 0.00 0.0 3,402.00 3,402.0 52FDB29

잡재료비 배관배선의 2% 식 1 453.60 453.6 0.00 0.0 0.00 0.0 453.60 453.6 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

통신용발포지수제 통신용발포지수제, 수밀보호테이프 개 1 2,300.00 2,300.0 0.00 0.0 0.00 0.0 2,300.00 2,300.0 52FDB29

통신용발포지수제 통신용발포지수제, 발포지수제, D150이하 개 1 21,730.00 21,730.0 0.00 0.0 0.00 0.0 21,730.00 21,730.0 52FDB29

보통인부 일반공사 직종 인 0.328 0.00 0.0 125,427.00 41,140.0 0.00 0.0 125,427.00 41,140.0 52FDB29

저압케이블전공 일반공사 직종 인 0.076 0.00 0.0 235,560.00 17,902.5 0.00 0.0 235,560.00 17,902.5 52FDB29

특고압케이블전공 일반공사 직종 인 0.156 0.00 0.0 323,944.00 50,535.2 0.00 0.0 323,944.00 50,535.2 52FDB29

공구손료 인력품의 3% 식 1 3,287.33 3,287.3 0.00 0.0 0.00 0.0 3,287.30 3,287.3 52FDB29

[ 합 계 ] 53,852.0 109,577.0 0.0 163,429.0 TOTAL

관로구방수 ∮100 개소 ( 호표 34 )

관구밀폐기 관구밀폐기, 실링가스켓, D200 개 1 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

관구밀폐기 관구밀폐기, 이종연결관, ∮100mm 개 1 3,780.00 3,780.0 0.00 0.0 0.00 0.0 3,780.00 3,780.0 52FDB29

전선관부속품비 전선관의 15% 식 1 567.00 567.0 0.00 0.0 0.00 0.0 567.00 567.0 52FDB29

잡재료비 배관배선의 2% 식 1 75.60 75.6 0.00 0.0 0.00 0.0 75.60 75.6 52FDB29

통신용발포지수제 통신용발포지수제, 수밀보호테이프 개 1 2,300.00 2,300.0 0.00 0.0 0.00 0.0 2,300.00 2,300.0 52FDB29

통신용발포지수제 통신용발포지수제, 발포지수제, D150이하 개 1 21,730.00 21,730.0 0.00 0.0 0.00 0.0 21,730.00 21,730.0 52FDB29

보통인부 일반공사 직종 인 0.328 0.00 0.0 125,427.00 41,140.0 0.00 0.0 125,427.00 41,140.0 52FDB29

저압케이블전공 일반공사 직종 인 0.076 0.00 0.0 235,560.00 17,902.5 0.00 0.0 235,560.00 17,902.5 52FDB29

특고압케이블전공 일반공사 직종 인 0.158 0.00 0.0 323,944.00 51,183.1 0.00 0.0 323,944.00 51,183.1 52FDB29

공구손료 인력품의 3% 식 1 3,306.76 3,306.7 0.00 0.0 0.00 0.0 3,306.70 3,306.7 52FDB29

[ 합 계 ] 31,759.0 110,225.0 0.0 141,984.0 TOTAL

관로구방수 ∮80 개소 ( 호표 35 )

관구밀폐기 관구밀폐기, 실링가스켓, D80 개 1 12,470.00 12,470.0 0.00 0.0 0.00 0.0 12,470.00 12,470.0 52FDB29

관구밀폐기 관구밀폐기, 이종연결관, ∮80mm 개 1 3,020.00 3,020.0 0.00 0.0 0.00 0.0 3,020.00 3,020.0 52FDB29

전선관부속품비 전선관의 15% 식 1 2,323.50 2,323.5 0.00 0.0 0.00 0.0 2,323.50 2,323.5 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

잡재료비 배관배선의 2% 식 1 309.80 309.8 0.00 0.0 0.00 0.0 309.80 309.8 52FDB29

통신용발포지수제 통신용발포지수제, 수밀보호테이프 개 1 2,300.00 2,300.0 0.00 0.0 0.00 0.0 2,300.00 2,300.0 52FDB29

통신용발포지수제 통신용발포지수제, 발포지수제, D150이하 개 1 21,730.00 21,730.0 0.00 0.0 0.00 0.0 21,730.00 21,730.0 52FDB29

보통인부 일반공사 직종 인 0.328 0.00 0.0 125,427.00 41,140.0 0.00 0.0 125,427.00 41,140.0 52FDB29

저압케이블전공 일반공사 직종 인 0.076 0.00 0.0 235,560.00 17,902.5 0.00 0.0 235,560.00 17,902.5 52FDB29

특고압케이블전공 일반공사 직종 인 0.156 0.00 0.0 323,944.00 50,535.2 0.00 0.0 323,944.00 50,535.2 52FDB29

공구손료 인력품의 3% 식 1 3,287.33 3,287.3 0.00 0.0 0.00 0.0 3,287.30 3,287.3 52FDB29

[ 합 계 ] 45,440.0 109,577.0 0.0 155,017.0 TOTAL

전기맨홀(기계) 1100*1800*1000 개소 ( 호표 36 )

맨홀(뚜껑포함) 1100*1800*1000 조 1 1,220,000.00 1,220,000.0 0.00 0.0 0.00 0.0 1,220,000.00 1,220,000.0 52FDB29

터파기/토사 보통, 굴삭기 0.7m3 90%, 인력10% M3 7.695 266.00 2,046.8 3,103.00 23,877.5 323.00 2,485.4 3,692.00 28,409.7 산근 1

되메우기/토사, 두께 10cm 보통, 굴삭기 0.7m3+플레이트콤팩터 1.5ton+인력 10% M3 6.303 349.00 2,199.7 6,012.00 37,893.6 290.00 1,827.8 6,651.00 41,921.1 산근 4

잡석깔기지정 인력 M3 0.392 0.00 0.0 2,257.00 884.7 0.00 0.0 2,257.00 884.7 호표 126

잡석 잡석, 서울, 도착도, 지정용 M3 0.4312 27,000.00 11,642.4 0.00 0.0 0.00 0.0 27,000.00 11,642.4 52FDB29

현장내 잔토처리 소운반. 깔고 고르기 M3 1.392 0.00 0.0 25,085.00 34,918.3 0.00 0.0 25,085.00 34,918.3 호표 127

전기용행어 케이블받침대, 75*40*5*750mm 개 2 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

전기용행어 케이블걸이, 걸이쇠, 2조 개 4 2,725.00 10,900.0 0.00 0.0 0.00 0.0 2,725.00 10,900.0 52FDB29

앵커볼트 앵커볼트, M16*300mm 개 4 713.00 2,852.0 0.00 0.0 0.00 0.0 713.00 2,852.0 52FDB29

접지봉 접지봉, 14∮*1000mm 개 1 2,880.00 2,880.0 0.00 0.0 0.00 0.0 2,880.00 2,880.0 52FDB29

볼트형커넥터 볼트형커넥터, U볼트형, ∮16mm 개 1 2,820.00 2,820.0 0.00 0.0 0.00 0.0 2,820.00 2,820.0 52FDB29

접지용비닐절연전선 접지용비닐절연전선, F-GV, 35㎟ M 7.26 2,955.00 21,453.3 0.00 0.0 0.00 0.0 2,955.00 21,453.3 52FDB29

잡재료비 배관배선의 2% 식 1 429.06 429.0 0.00 0.0 0.00 0.0 429.00 429.0 52FDB29

크레인(타이어)(오거장착별도)-통신 10ton HR 2.28 6,644.00 15,148.3 65,103.00 148,434.8 23,436.00 53,434.0 95,183.00 217,017.1 호표 128

작업반장 일반공사 직종 인 0.28 0.00 0.0 153,186.00 42,892.0 0.00 0.0 153,186.00 42,892.0 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

보통인부 일반공사 직종 인 0.478 0.00 0.0 125,427.00 59,954.1 0.00 0.0 125,427.00 59,954.1 52FDB29

특별인부 일반공사 직종 인 0.8 0.00 0.0 152,019.00 121,615.2 0.00 0.0 152,019.00 121,615.2 52FDB29

비계공 일반공사 직종 인 0.53 0.00 0.0 224,359.00 118,910.2 0.00 0.0 224,359.00 118,910.2 52FDB29

줄눈공 일반공사 직종 인 0.03 0.00 0.0 146,786.00 4,403.5 0.00 0.0 146,786.00 4,403.5 52FDB29

내선전공 일반공사 직종 인 0.173 0.00 0.0 225,408.00 38,995.5 0.00 0.0 225,408.00 38,995.5 52FDB29

저압케이블전공 일반공사 직종 인 0.398 0.00 0.0 235,560.00 93,752.8 0.00 0.0 235,560.00 93,752.8 52FDB29

공구손료 인력품의 3% 식 1 14,415.69 14,415.6 0.00 0.0 0.00 0.0 14,415.60 14,415.6 52FDB29

[ 합 계 ] 1,306,787.0 726,532.0 57,747.0 2,091,066.0 TOTAL

전기맨홀(기계) 1000*1000*1000 개소 ( 호표 37 )

맨홀 1000*1000*1000 조 1 220,000.00 220,000.0 0.00 0.0 0.00 0.0 220,000.00 220,000.0 52FDB29

맨홀 뚜껑 1120*620*132 조 1 495,000.00 495,000.0 0.00 0.0 0.00 0.0 495,000.00 495,000.0 52FDB29

터파기/토사 보통, 굴삭기 0.7m3 90%, 인력10% M3 7.695 266.00 2,046.8 3,103.00 23,877.5 323.00 2,485.4 3,692.00 28,409.7 산근 1

되메우기/토사, 두께 10cm 보통, 굴삭기 0.7m3+플레이트콤팩터 1.5ton+인력 10% M3 6.303 349.00 2,199.7 6,012.00 37,893.6 290.00 1,827.8 6,651.00 41,921.1 산근 4

잡석깔기지정 인력 M3 0.392 0.00 0.0 2,257.00 884.7 0.00 0.0 2,257.00 884.7 호표 126

잡석 잡석, 서울, 도착도, 지정용 M3 0.4312 27,000.00 11,642.4 0.00 0.0 0.00 0.0 27,000.00 11,642.4 52FDB29

현장내 잔토처리 소운반. 깔고 고르기 M3 1.392 0.00 0.0 25,085.00 34,918.3 0.00 0.0 25,085.00 34,918.3 호표 127

전기용행어 케이블받침대, 75*40*5*750mm 개 2 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

전기용행어 케이블걸이, 걸이쇠, 2조 개 4 2,725.00 10,900.0 0.00 0.0 0.00 0.0 2,725.00 10,900.0 52FDB29

앵커볼트 앵커볼트, M16*300mm 개 4 713.00 2,852.0 0.00 0.0 0.00 0.0 713.00 2,852.0 52FDB29

접지봉 접지봉, 14∮*1000mm 개 1 2,880.00 2,880.0 0.00 0.0 0.00 0.0 2,880.00 2,880.0 52FDB29

볼트형커넥터 볼트형커넥터, U볼트형, ∮16mm 개 1 2,820.00 2,820.0 0.00 0.0 0.00 0.0 2,820.00 2,820.0 52FDB29

접지용비닐절연전선 접지용비닐절연전선, F-GV, 35㎟ M 7.26 2,955.00 21,453.3 0.00 0.0 0.00 0.0 2,955.00 21,453.3 52FDB29

잡재료비 배관배선의 2% 식 1 429.06 429.0 0.00 0.0 0.00 0.0 429.00 429.0 52FDB29

크레인(타이어)(오거장착별도)-통신 10ton HR 2.28 6,644.00 15,148.3 65,103.00 148,434.8 23,436.00 53,434.0 95,183.00 217,017.1 호표 128
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

작업반장 일반공사 직종 인 0.28 0.00 0.0 153,186.00 42,892.0 0.00 0.0 153,186.00 42,892.0 52FDB29

보통인부 일반공사 직종 인 0.478 0.00 0.0 125,427.00 59,954.1 0.00 0.0 125,427.00 59,954.1 52FDB29

특별인부 일반공사 직종 인 0.8 0.00 0.0 152,019.00 121,615.2 0.00 0.0 152,019.00 121,615.2 52FDB29

비계공 일반공사 직종 인 0.53 0.00 0.0 224,359.00 118,910.2 0.00 0.0 224,359.00 118,910.2 52FDB29

줄눈공 일반공사 직종 인 0.03 0.00 0.0 146,786.00 4,403.5 0.00 0.0 146,786.00 4,403.5 52FDB29

내선전공 일반공사 직종 인 0.173 0.00 0.0 225,408.00 38,995.5 0.00 0.0 225,408.00 38,995.5 52FDB29

저압케이블전공 일반공사 직종 인 0.398 0.00 0.0 235,560.00 93,752.8 0.00 0.0 235,560.00 93,752.8 52FDB29

공구손료 인력품의 3% 식 1 14,415.69 14,415.6 0.00 0.0 0.00 0.0 14,415.60 14,415.6 52FDB29

[ 합 계 ] 801,787.0 726,532.0 57,747.0 1,586,066.0 TOTAL

전기맨홀(기계) 600*600*600 개소 ( 호표 38 )

맨홀 600*600*600 조 1 90,000.00 90,000.0 0.00 0.0 0.00 0.0 90,000.00 90,000.0 52FDB29

맨홀 뚜껑 1120*620*132 조 1 495,000.00 495,000.0 0.00 0.0 0.00 0.0 495,000.00 495,000.0 52FDB29

터파기/토사 보통, 굴삭기 0.7m3 90%, 인력10% M3 3.3322 266.00 886.3 3,103.00 10,339.8 323.00 1,076.3 3,692.00 12,302.4 산근 1

되메우기/토사, 두께 10cm 보통, 굴삭기 0.7m3+플레이트콤팩터 1.5ton+인력 10% M3 2.9162 349.00 1,017.7 6,012.00 17,532.1 290.00 845.6 6,651.00 19,395.4 산근 4

잡석깔기지정 인력 M3 0.2 0.00 0.0 2,257.00 451.4 0.00 0.0 2,257.00 451.4 호표 126

잡석 잡석, 서울, 도착도, 지정용 M3 0.22 27,000.00 5,940.0 0.00 0.0 0.00 0.0 27,000.00 5,940.0 52FDB29

현장내 잔토처리 소운반. 깔고 고르기 M3 0.416 0.00 0.0 25,085.00 10,435.3 0.00 0.0 25,085.00 10,435.3 호표 127

전기용행어 케이블받침대, 75*40*5*750mm 개 2 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 52FDB29

전기용행어 케이블걸이, 걸이쇠, 2조 개 4 2,725.00 10,900.0 0.00 0.0 0.00 0.0 2,725.00 10,900.0 52FDB29

앵커볼트 앵커볼트, M16*300mm 개 4 713.00 2,852.0 0.00 0.0 0.00 0.0 713.00 2,852.0 52FDB29

접지봉 접지봉, 14∮*1000mm 개 1 2,880.00 2,880.0 0.00 0.0 0.00 0.0 2,880.00 2,880.0 52FDB29

볼트형커넥터 볼트형커넥터, U볼트형, ∮16mm 개 1 2,820.00 2,820.0 0.00 0.0 0.00 0.0 2,820.00 2,820.0 52FDB29

접지용비닐절연전선 접지용비닐절연전선, F-GV, 35㎟ M 7.26 2,955.00 21,453.3 0.00 0.0 0.00 0.0 2,955.00 21,453.3 52FDB29

잡재료비 배관배선의 2% 식 1 429.06 429.0 0.00 0.0 0.00 0.0 429.00 429.0 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

크레인(타이어)(오거장착별도)-통신 10ton HR 2.28 6,644.00 15,148.3 65,103.00 148,434.8 23,436.00 53,434.0 95,183.00 217,017.1 호표 128

작업반장 일반공사 직종 인 0.28 0.00 0.0 153,186.00 42,892.0 0.00 0.0 153,186.00 42,892.0 52FDB29

보통인부 일반공사 직종 인 0.478 0.00 0.0 125,427.00 59,954.1 0.00 0.0 125,427.00 59,954.1 52FDB29

특별인부 일반공사 직종 인 0.8 0.00 0.0 152,019.00 121,615.2 0.00 0.0 152,019.00 121,615.2 52FDB29

비계공 일반공사 직종 인 0.53 0.00 0.0 224,359.00 118,910.2 0.00 0.0 224,359.00 118,910.2 52FDB29

줄눈공 일반공사 직종 인 0.03 0.00 0.0 146,786.00 4,403.5 0.00 0.0 146,786.00 4,403.5 52FDB29

내선전공 일반공사 직종 인 0.173 0.00 0.0 225,408.00 38,995.5 0.00 0.0 225,408.00 38,995.5 52FDB29

저압케이블전공 일반공사 직종 인 0.398 0.00 0.0 235,560.00 93,752.8 0.00 0.0 235,560.00 93,752.8 52FDB29

공구손료 인력품의 3% 식 1 14,415.69 14,415.6 0.00 0.0 0.00 0.0 14,415.60 14,415.6 52FDB29

[ 합 계 ] 663,742.0 667,716.0 55,355.0 1,386,813.0 TOTAL

경고테이프 M ( 호표 39 )

경고테이프 M 1 130.00 130.0 0.00 0.0 0.00 0.0 130.00 130.0 52FDB29

특고압케이블전공 일반공사 직종 인 0.0005 0.00 0.0 323,944.00 161.9 0.00 0.0 323,944.00 161.9 52FDB29

보통인부 일반공사 직종 인 0.001 0.00 0.0 125,427.00 125.4 0.00 0.0 125,427.00 125.4 52FDB29

공구손료 인력품의 3% 식 1 8.61 8.6 0.00 0.0 0.00 0.0 8.60 8.6 52FDB29

[ 합 계 ] 138.0 287.0 0.0 425.0 TOTAL

표지기 설치 개 전기 4-46 ( 호표 40 )

지중선로표지주 EA 1 79,000.00 79,000.0 0.00 0.0 0.00 0.0 79,000.00 79,000.0 52FDB29

전기공사산업기사 기타 직종 인 0.07 0.00 0.0 211,437.00 14,800.5 0.00 0.0 211,437.00 14,800.5 52FDB29

보통인부 일반공사 직종 인 0.07 0.00 0.0 125,427.00 8,779.8 0.00 0.0 125,427.00 8,779.8 52FDB29

공구손료 인력품의 3% 식 1 707.40 707.4 0.00 0.0 0.00 0.0 707.40 707.4 52FDB29

[ 합 계 ] 79,707.0 23,580.0 0.0 103,287.0 TOTAL


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

터파기 쇄석포설 쇄석자갈 M3 토목 5-1-1.2 ( 호표 41 )

쇄석자갈 #57, 25mm ㎥ 1 19,000.00 19,000.0 0.00 0.0 0.00 0.0 19,000.00 19,000.0 529712F

보통인부 일반공사 직종 인 0.016 0.00 0.0 125,427.00 2,006.8 0.00 0.0 125,427.00 2,006.8 529712F

굴삭기(무한궤도) 0.2㎥ HR 0.063 7,468.00 470.4 8,119.00 511.4 12,464.00 785.2 28,051.00 1,767.0 호표 132

진동롤러(핸드가이드식) 0.7ton HR 0.074 3,068.00 227.0 25,683.00 1,900.5 1,649.00 122.0 30,400.00 2,249.5 호표 133

[ 합 계 ] 19,697.0 4,418.0 907.0 25,022.0 TOTAL

2kV RHW-2 1C x 250MCM M 전기 5-11 ( 호표 42 )

2kV RHW-2 1C x 250MCM M 1.03 20,622.00 21,240.6 0.00 0.0 0.00 0.0 20,622.00 21,240.6 52FDB29

잡재료비 배관배선의 2% 식 1 424.81 424.8 0.00 0.0 0.00 0.0 424.80 424.8 52FDB29

저압케이블전공 일반공사 직종 인 0.097 0.00 0.0 235,560.00 22,849.3 0.00 0.0 235,560.00 22,849.3 52FDB29

공구손료 인력품의 3% 식 1 685.47 685.4 0.00 0.0 0.00 0.0 685.40 685.4 52FDB29

[ 합 계 ] 22,350.0 22,849.0 0.0 45,199.0 TOTAL

2kV RHW-2 1C x 300MCM M 전기 5-11 ( 호표 43 )

2kV RHW-2 1C x 300MCM M 1.03 24,246.00 24,973.3 0.00 0.0 0.00 0.0 24,246.00 24,973.3 52FDB29

잡재료비 배관배선의 2% 식 1 499.46 499.4 0.00 0.0 0.00 0.0 499.40 499.4 52FDB29

저압케이블전공 일반공사 직종 인 0.097 0.00 0.0 235,560.00 22,849.3 0.00 0.0 235,560.00 22,849.3 52FDB29

공구손료 인력품의 3% 식 1 685.47 685.4 0.00 0.0 0.00 0.0 685.40 685.4 52FDB29

[ 합 계 ] 26,158.0 22,849.0 0.0 49,007.0 TOTAL

파상형경질폴리에틸렌전선관-지중포설 65㎜ M 전기 4-31 ( 호표 44 )

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 65mm M 1 872.00 872.0 0.00 0.0 0.00 0.0 872.00 872.0 52FDB29

전선관부속품비 전선관의 15% 식 1 130.80 130.8 0.00 0.0 0.00 0.0 130.80 130.8 52FDB29

잡재료비 배관배선의 2% 식 1 17.44 17.4 0.00 0.0 0.00 0.0 17.40 17.4 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

배전전공 일반공사 직종 인 0.009 0.00 0.0 336,973.00 3,032.7 0.00 0.0 336,973.00 3,032.7 52FDB29

보통인부 일반공사 직종 인 0.022 0.00 0.0 125,427.00 2,759.3 0.00 0.0 125,427.00 2,759.3 52FDB29

공구손료 인력품의 3% 식 1 173.76 173.7 0.00 0.0 0.00 0.0 173.70 173.7 52FDB29

[ 합 계 ] 1,193.0 5,792.0 0.0 6,985.0 TOTAL

러그단자 동관단자 1 HOLE 130㎟ EA 전기 4-37 ( 호표 45 )

러그단자 러그단자, 동관단자, 1홀, 150㎟ 개 1 2,400.00 2,400.0 0.00 0.0 0.00 0.0 2,400.00 2,400.0 52FDB29

저압케이블전공 일반공사 직종 인 0.204 0.00 0.0 235,560.00 48,054.2 0.00 0.0 235,560.00 48,054.2 52FDB29

공구손료 인력품의 3% 식 1 1,441.62 1,441.6 0.00 0.0 0.00 0.0 1,441.60 1,441.6 52FDB29

[ 합 계 ] 3,841.0 48,054.0 0.0 51,895.0 TOTAL

케이블 직선접속 레진주입, 6.9kv, 1C*150㎟ EA 전기 4-36 ( 호표 46 )

케이블직선접속자재 케이블직선접속자재, 레진주입, 6.9kv1C×150㎟ kit 1 79,500.00 79,500.0 0.00 0.0 0.00 0.0 79,500.00 79,500.0 52FDB29

특고압케이블전공 일반공사 직종 인 0.64 0.00 0.0 323,944.00 207,324.1 0.00 0.0 323,944.00 207,324.1 52FDB29

공구손료 인력품의 3% 식 1 6,219.72 6,219.7 0.00 0.0 0.00 0.0 6,219.70 6,219.7 52FDB29

[ 합 계 ] 85,719.0 207,324.0 0.0 293,043.0 TOTAL

케이블 직선접속 레진주입, 6.9kv, 1C*130㎟ EA 전기 4-36 ( 호표 47 )

케이블직선접속자재 케이블직선접속자재, 레진주입, 6.9kv1C×150㎟ kit 1 79,500.00 79,500.0 0.00 0.0 0.00 0.0 79,500.00 79,500.0 52FDB29

특고압케이블전공 일반공사 직종 인 0.64 0.00 0.0 323,944.00 207,324.1 0.00 0.0 323,944.00 207,324.1 52FDB29

공구손료 인력품의 3% 식 1 6,219.72 6,219.7 0.00 0.0 0.00 0.0 6,219.70 6,219.7 52FDB29

[ 합 계 ] 85,719.0 207,324.0 0.0 293,043.0 TOTAL

2kV RHW-2 1C x 10AWG M 전기 5-13 ( 호표 48 )

2kV RHW-2 1C x 10AWG M 1.03 1,150.00 1,184.5 0.00 0.0 0.00 0.0 1,150.00 1,184.5 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

잡재료비 배관배선의 2% 식 1 23.69 23.6 0.00 0.0 0.00 0.0 23.60 23.6 52FDB29

저압케이블전공 일반공사 직종 인 0.013 0.00 0.0 235,560.00 3,062.2 0.00 0.0 235,560.00 3,062.2 52FDB29

공구손료 인력품의 3% 식 1 91.86 91.8 0.00 0.0 0.00 0.0 91.80 91.8 52FDB29

[ 합 계 ] 1,299.0 3,062.0 0.0 4,361.0 TOTAL

파상형경질폴리에틸렌전선관-지중포설 30㎜ M 전기 4-31 ( 호표 49 )

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 30mm M 1 305.00 305.0 0.00 0.0 0.00 0.0 305.00 305.0 52FDB29

전선관부속품비 전선관의 15% 식 1 45.75 45.7 0.00 0.0 0.00 0.0 45.70 45.7 52FDB29

잡재료비 배관배선의 2% 식 1 6.10 6.1 0.00 0.0 0.00 0.0 6.10 6.1 52FDB29

배전전공 일반공사 직종 인 0.007 0.00 0.0 336,973.00 2,358.8 0.00 0.0 336,973.00 2,358.8 52FDB29

보통인부 일반공사 직종 인 0.018 0.00 0.0 125,427.00 2,257.6 0.00 0.0 125,427.00 2,257.6 52FDB29

공구손료 인력품의 3% 식 1 138.49 138.4 0.00 0.0 0.00 0.0 138.40 138.4 52FDB29

[ 합 계 ] 495.0 4,616.0 0.0 5,111.0 TOTAL

파상형경질폴리에틸렌전선관-지중포설 50㎜ M 전기 4-31 ( 호표 50 )

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 50mm M 1 578.00 578.0 0.00 0.0 0.00 0.0 578.00 578.0 52FDB29

전선관부속품비 전선관의 15% 식 1 86.70 86.7 0.00 0.0 0.00 0.0 86.70 86.7 52FDB29

잡재료비 배관배선의 2% 식 1 11.56 11.5 0.00 0.0 0.00 0.0 11.50 11.5 52FDB29

배전전공 일반공사 직종 인 0.007 0.00 0.0 336,973.00 2,358.8 0.00 0.0 336,973.00 2,358.8 52FDB29

보통인부 일반공사 직종 인 0.018 0.00 0.0 125,427.00 2,257.6 0.00 0.0 125,427.00 2,257.6 52FDB29

공구손료 인력품의 3% 식 1 138.49 138.4 0.00 0.0 0.00 0.0 138.40 138.4 52FDB29

[ 합 계 ] 814.0 4,616.0 0.0 5,430.0 TOTAL

1종금속제가요전선관-노출 고장력, 70mm, 방수 M 전기 5-1 ( 호표 51 )

1종금속제가요전선관 1종금속제가요전선관, 70mm, 고장력/방수 M 1 6,470.00 6,470.0 0.00 0.0 0.00 0.0 6,470.00 6,470.0 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

전선관부속품비 전선관의 15% 식 1 970.50 970.5 0.00 0.0 0.00 0.0 970.50 970.5 52FDB29

잡재료비 배관배선의 2% 식 1 129.40 129.4 0.00 0.0 0.00 0.0 129.40 129.4 52FDB29

내선전공 일반공사 직종 인 0.187 0.00 0.0 225,408.00 42,151.2 0.00 0.0 225,408.00 42,151.2 52FDB29

공구손료 인력품의 3% 식 1 1,264.53 1,264.5 0.00 0.0 0.00 0.0 1,264.50 1,264.5 52FDB29

[ 합 계 ] 8,834.0 42,151.0 0.0 50,985.0 TOTAL

1종금속제가요전선관-구조물 고장력, 70mm, 방수 M 전기 5-1 ( 호표 52 )

1종금속제가요전선관 1종금속제가요전선관, 70mm, 고장력/방수 M 1 6,470.00 6,470.0 0.00 0.0 0.00 0.0 6,470.00 6,470.0 52FDB29

전선관부속품비 전선관의 15% 식 1 970.50 970.5 0.00 0.0 0.00 0.0 970.50 970.5 52FDB29

잡재료비 배관배선의 2% 식 1 129.40 129.4 0.00 0.0 0.00 0.0 129.40 129.4 52FDB29

내선전공 일반공사 직종 인 0.187 0.00 0.0 225,408.00 42,151.2 0.00 0.0 225,408.00 42,151.2 52FDB29

공구손료 인력품의 3% 식 1 1,264.53 1,264.5 0.00 0.0 0.00 0.0 1,264.50 1,264.5 52FDB29

[ 합 계 ] 8,834.0 42,151.0 0.0 50,985.0 TOTAL

1종금속제가요전선관-노출 고장력, 54mm, 방수 M 전기 5-1 ( 호표 53 )

1종금속제가요전선관 1종금속제가요전선관, 고장력후렉시블전선관, 54mm, 방수 M 1 4,040.00 4,040.0 0.00 0.0 0.00 0.0 4,040.00 4,040.0 52FDB29

전선관부속품비 전선관의 15% 식 1 606.00 606.0 0.00 0.0 0.00 0.0 606.00 606.0 52FDB29

잡재료비 배관배선의 2% 식 1 80.80 80.8 0.00 0.0 0.00 0.0 80.80 80.8 52FDB29

내선전공 일반공사 직종 인 0.163 0.00 0.0 225,408.00 36,741.5 0.00 0.0 225,408.00 36,741.5 52FDB29

공구손료 인력품의 3% 식 1 1,102.24 1,102.2 0.00 0.0 0.00 0.0 1,102.20 1,102.2 52FDB29

[ 합 계 ] 5,829.0 36,741.0 0.0 42,570.0 TOTAL

1종금속제가요전선관-노출 고장력, 16mm, 방수 M 전기 5-1 ( 호표 54 )

1종금속제가요전선관 1종금속제가요전선관, 고장력후렉시블전선관, 16mm, 방수 M 1 752.00 752.0 0.00 0.0 0.00 0.0 752.00 752.0 52FDB29

전선관부속품비 전선관의 15% 식 1 112.80 112.8 0.00 0.0 0.00 0.0 112.80 112.8 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

잡재료비 배관배선의 2% 식 1 15.04 15.0 0.00 0.0 0.00 0.0 15.00 15.0 52FDB29

내선전공 일반공사 직종 인 0.052 0.00 0.0 225,408.00 11,721.2 0.00 0.0 225,408.00 11,721.2 52FDB29

공구손료 인력품의 3% 식 1 351.63 351.6 0.00 0.0 0.00 0.0 351.60 351.6 52FDB29

[ 합 계 ] 1,231.0 11,721.0 0.0 12,952.0 TOTAL

광역피뢰침 폴 포함 개 전기 5-42 ( 호표 55 )

피뢰침 피뢰침, 고압펄스식, 폴포함, 보호반경 107m 개 1 2,550,000.00 2,550,000.0 0.00 0.0 0.00 0.0 2,550,000.00 2,550,000.0 52FDB29

배전전공 일반공사 직종 인 0.66 0.00 0.0 336,973.00 222,402.1 0.00 0.0 336,973.00 222,402.1 52FDB29

공구손료 인력품의 3% 식 1 6,672.06 6,672.0 0.00 0.0 0.00 0.0 6,672.00 6,672.0 52FDB29

[ 합 계 ] 2,556,672.0 222,402.0 0.0 2,779,074.0 TOTAL

피뢰침 기초 700*500*1000 개소 전기 5-27-2 ( 호표 56 )

터파기/토사 보통, 굴삭기 0.7m3 70%, 인력30% M3 0.652 207.00 134.9 8,000.00 5,216.0 251.00 163.6 8,458.00 5,514.5 산근 5

되메우기/토사, 두께 15cm 보통, 굴삭기 0.7m3+래머 80kg M3 0.35 443.00 155.0 6,345.00 2,220.7 362.00 126.7 7,150.00 2,502.4 산근 2

현장내 잔토처리 소운반. 깔고 고르기 M3 0.28 0.00 0.0 25,085.00 7,023.8 0.00 0.0 25,085.00 7,023.8 호표 127

레디믹스트콘크리트 인력운반 타설 무근구조물 M3 0.28 0.00 0.0 42,603.00 11,928.8 852.00 238.5 43,455.00 12,167.3 호표 134

합판거푸집 설치 및 해체 간단 6회, 수직고 7m까지 M2 3.34 8,342.00 27,862.2 22,703.00 75,828.0 227.00 758.1 31,272.00 104,448.3 호표 135

앵커볼트 앵커볼트, M25*600mm 개 4 3,382.00 13,528.0 0.00 0.0 0.00 0.0 3,382.00 13,528.0 52FDB29

내선전공 일반공사 직종 인 0.12 0.00 0.0 225,408.00 27,048.9 0.00 0.0 225,408.00 27,048.9 52FDB29

공구손료 인력품의 3% 식 1 811.46 811.4 0.00 0.0 0.00 0.0 811.40 811.4 52FDB29

[ 합 계 ] 42,491.0 129,266.0 1,286.0 173,043.0 TOTAL

접지봉 16∮*1800mm 개 전기 3-38 ( 호표 57 )

접지봉 접지봉, 16∮*1800mm 개 1 4,360.00 4,360.0 0.00 0.0 0.00 0.0 4,360.00 4,360.0 52FDB29

내선전공 일반공사 직종 인 0.11 0.00 0.0 225,408.00 24,794.8 0.00 0.0 225,408.00 24,794.8 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

보통인부 일반공사 직종 인 0.08 0.00 0.0 125,427.00 10,034.1 0.00 0.0 125,427.00 10,034.1 52FDB29

공구손료 인력품의 3% 식 1 1,044.86 1,044.8 0.00 0.0 0.00 0.0 1,044.80 1,044.8 52FDB29

[ 합 계 ] 5,404.0 34,828.0 0.0 40,232.0 TOTAL

번디클램프 U볼트 동봉용 EA 전기 3-38 ( 호표 58 )

번디클램프 U볼트 동봉용 EA 1 7,700.00 7,700.0 0.00 0.0 0.00 0.0 7,700.00 7,700.0 52FDB29

내선전공 일반공사 직종 인 0.027 0.00 0.0 225,408.00 6,086.0 0.00 0.0 225,408.00 6,086.0 52FDB29

공구손료 인력품의 3% 식 1 182.58 182.5 0.00 0.0 0.00 0.0 182.50 182.5 52FDB29

[ 합 계 ] 7,882.0 6,086.0 0.0 13,968.0 TOTAL

슬리브접속 C TYPE SLEEVE 70㎟ EA 전기 3-38 ( 호표 59 )

슬리브접속 C TYPE SLEEVE 70㎟ EA 1 1,580.00 1,580.0 0.00 0.0 0.00 0.0 1,580.00 1,580.0 52FDB29

내선전공 일반공사 직종 인 0.097 0.00 0.0 225,408.00 21,864.5 0.00 0.0 225,408.00 21,864.5 52FDB29

공구손료 인력품의 3% 식 1 655.93 655.9 0.00 0.0 0.00 0.0 655.90 655.9 52FDB29

[ 합 계 ] 2,235.0 21,864.0 0.0 24,099.0 TOTAL

BC-WIRE 70㎟ M 전기 3-38 ( 호표 60 )

BC-WIRE 70㎟ M 1 5,700.00 5,700.0 0.00 0.0 0.00 0.0 5,700.00 5,700.0 52FDB29

내선전공 일반공사 직종 인 0.008 0.00 0.0 225,408.00 1,803.2 0.00 0.0 225,408.00 1,803.2 52FDB29

공구손료 인력품의 3% 식 1 54.09 54.0 0.00 0.0 0.00 0.0 54.00 54.0 52FDB29

[ 합 계 ] 5,754.0 1,803.0 0.0 7,557.0 TOTAL

접지 단자함 1CCT, SUS 개 전기 3-38 ( 호표 61 )

풀박스 풀박스, 접지단자함, 1CCT, 스테인리스 개 1 71,700.00 71,700.0 0.00 0.0 0.00 0.0 71,700.00 71,700.0 52FDB29

통신내선공 일반공사 직종 인 0.66 0.00 0.0 204,358.00 134,876.2 0.00 0.0 204,358.00 134,876.2 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

공구손료 인력품의 3% 식 1 4,046.28 4,046.2 0.00 0.0 0.00 0.0 4,046.20 4,046.2 52FDB29

[ 합 계 ] 75,746.0 134,876.0 0.0 210,622.0 TOTAL

탄소접지봉 EA 전기 3-38 ( 호표 62 )

탄소접지봉 EA 1 600,000.00 600,000.0 0.00 0.0 0.00 0.0 600,000.00 600,000.0 52FDB29

내선전공 일반공사 직종 인 0.351 0.00 0.0 225,408.00 79,118.2 0.00 0.0 225,408.00 79,118.2 52FDB29

보통인부 일반공사 직종 인 0.598 0.00 0.0 125,427.00 75,005.3 0.00 0.0 125,427.00 75,005.3 52FDB29

공구손료 인력품의 3% 식 1 4,623.70 4,623.7 0.00 0.0 0.00 0.0 4,623.70 4,623.7 52FDB29

[ 합 계 ] 604,623.0 154,123.0 0.0 758,746.0 TOTAL

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 185㎟ M 전기 3-38 ( 호표 63 )

접지용비닐절연전선 접지용비닐절연전선, F-GV, 185㎟ M 1 14,450.00 14,450.0 0.00 0.0 0.00 0.0 14,450.00 14,450.0 52FDB29

잡재료비 배관배선의 2% 식 1 289.00 289.0 0.00 0.0 0.00 0.0 289.00 289.0 52FDB29

내선전공 일반공사 직종 인 0.014 0.00 0.0 225,408.00 3,155.7 0.00 0.0 225,408.00 3,155.7 52FDB29

공구손료 인력품의 3% 식 1 94.67 94.6 0.00 0.0 0.00 0.0 94.60 94.6 52FDB29

[ 합 계 ] 14,833.0 3,155.0 0.0 17,988.0 TOTAL

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 150㎟ M 전기 3-38 ( 호표 64 )

접지용비닐절연전선 접지용비닐절연전선, F-GV, 150㎟ M 1 11,557.00 11,557.0 0.00 0.0 0.00 0.0 11,557.00 11,557.0 52FDB29

잡재료비 배관배선의 2% 식 1 231.14 231.1 0.00 0.0 0.00 0.0 231.10 231.1 52FDB29

내선전공 일반공사 직종 인 0.011 0.00 0.0 225,408.00 2,479.4 0.00 0.0 225,408.00 2,479.4 52FDB29

공구손료 인력품의 3% 식 1 74.38 74.3 0.00 0.0 0.00 0.0 74.30 74.3 52FDB29

[ 합 계 ] 11,862.0 2,479.0 0.0 14,341.0 TOTAL

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 120㎟ M 전기 3-38 ( 호표 65 )


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

접지용비닐절연전선 접지용비닐절연전선, F-GV, 120㎟ M 1 9,506.00 9,506.0 0.00 0.0 0.00 0.0 9,506.00 9,506.0 52FDB29

잡재료비 배관배선의 2% 식 1 190.12 190.1 0.00 0.0 0.00 0.0 190.10 190.1 52FDB29

내선전공 일반공사 직종 인 0.011 0.00 0.0 225,408.00 2,479.4 0.00 0.0 225,408.00 2,479.4 52FDB29

공구손료 인력품의 3% 식 1 74.38 74.3 0.00 0.0 0.00 0.0 74.30 74.3 52FDB29

[ 합 계 ] 9,770.0 2,479.0 0.0 12,249.0 TOTAL

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 95㎟ M 전기 3-38 ( 호표 66 )

접지용비닐절연전선 접지용비닐절연전선, F-GV, 95㎟ M 1 7,616.00 7,616.0 0.00 0.0 0.00 0.0 7,616.00 7,616.0 52FDB29

잡재료비 배관배선의 2% 식 1 152.32 152.3 0.00 0.0 0.00 0.0 152.30 152.3 52FDB29

내선전공 일반공사 직종 인 0.011 0.00 0.0 225,408.00 2,479.4 0.00 0.0 225,408.00 2,479.4 52FDB29

공구손료 인력품의 3% 식 1 74.38 74.3 0.00 0.0 0.00 0.0 74.30 74.3 52FDB29

[ 합 계 ] 7,842.0 2,479.0 0.0 10,321.0 TOTAL

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 70㎟ M 전기 3-38 ( 호표 67 )

접지용비닐절연전선 접지용비닐절연전선, F-GV, 70㎟ M 1 5,484.00 5,484.0 0.00 0.0 0.00 0.0 5,484.00 5,484.0 52FDB29

잡재료비 배관배선의 2% 식 1 109.68 109.6 0.00 0.0 0.00 0.0 109.60 109.6 52FDB29

내선전공 일반공사 직종 인 0.008 0.00 0.0 225,408.00 1,803.2 0.00 0.0 225,408.00 1,803.2 52FDB29

공구손료 인력품의 3% 식 1 54.09 54.0 0.00 0.0 0.00 0.0 54.00 54.0 52FDB29

[ 합 계 ] 5,647.0 1,803.0 0.0 7,450.0 TOTAL

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 25㎟ M 전기 3-38 ( 호표 68 )

접지용비닐절연전선 접지용비닐절연전선, F-GV, 25㎟ M 1 2,133.00 2,133.0 0.00 0.0 0.00 0.0 2,133.00 2,133.0 52FDB29

잡재료비 배관배선의 2% 식 1 42.66 42.6 0.00 0.0 0.00 0.0 42.60 42.6 52FDB29

내선전공 일반공사 직종 인 0.007 0.00 0.0 225,408.00 1,577.8 0.00 0.0 225,408.00 1,577.8 52FDB29

공구손료 인력품의 3% 식 1 47.33 47.3 0.00 0.0 0.00 0.0 47.30 47.3 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

[ 합 계 ] 2,222.0 1,577.0 0.0 3,799.0 TOTAL

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 16㎟ M 전기 3-38 ( 호표 69 )

접지용비닐절연전선 접지용비닐절연전선, F-GV, 16㎟ M 1 1,360.00 1,360.0 0.00 0.0 0.00 0.0 1,360.00 1,360.0 52FDB29

잡재료비 배관배선의 2% 식 1 27.20 27.2 0.00 0.0 0.00 0.0 27.20 27.2 52FDB29

내선전공 일반공사 직종 인 0.007 0.00 0.0 225,408.00 1,577.8 0.00 0.0 225,408.00 1,577.8 52FDB29

공구손료 인력품의 3% 식 1 47.33 47.3 0.00 0.0 0.00 0.0 47.30 47.3 52FDB29

[ 합 계 ] 1,434.0 1,577.0 0.0 3,011.0 TOTAL

난연 비닐절연접지용전선(F-GV)-구조물 0.6/1kv, 16㎟ M 전기 3-38 ( 호표 70 )

접지용비닐절연전선 접지용비닐절연전선, F-GV, 16㎟ M 1 1,360.00 1,360.0 0.00 0.0 0.00 0.0 1,360.00 1,360.0 52FDB29

잡재료비 배관배선의 2% 식 1 27.20 27.2 0.00 0.0 0.00 0.0 27.20 27.2 52FDB29

내선전공 일반공사 직종 인 0.007 0.00 0.0 225,408.00 1,577.8 0.00 0.0 225,408.00 1,577.8 52FDB29

공구손료 인력품의 3% 식 1 47.33 47.3 0.00 0.0 0.00 0.0 47.30 47.3 52FDB29

[ 합 계 ] 1,434.0 1,577.0 0.0 3,011.0 TOTAL

난연 비닐절연접지용전선(F-GV)-직매 0.6/1kv, 6㎟ M 전기 3-38 ( 호표 71 )

접지용비닐절연전선 접지용비닐절연전선, F-GV, 6㎟ M 1 576.00 576.0 0.00 0.0 0.00 0.0 576.00 576.0 52FDB29

잡재료비 배관배선의 2% 식 1 11.52 11.5 0.00 0.0 0.00 0.0 11.50 11.5 52FDB29

내선전공 일반공사 직종 인 0.006 0.00 0.0 225,408.00 1,352.4 0.00 0.0 225,408.00 1,352.4 52FDB29

공구손료 인력품의 3% 식 1 40.57 40.5 0.00 0.0 0.00 0.0 40.50 40.5 52FDB29

[ 합 계 ] 628.0 1,352.0 0.0 1,980.0 TOTAL

BC-WIRE 95㎟ M 전기 3-38 ( 호표 72 )

BC-WIRE 95㎟ M 1 7,900.00 7,900.0 0.00 0.0 0.00 0.0 7,900.00 7,900.0 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

내선전공 일반공사 직종 인 0.008 0.00 0.0 225,408.00 1,803.2 0.00 0.0 225,408.00 1,803.2 52FDB29

공구손료 인력품의 3% 식 1 54.09 54.0 0.00 0.0 0.00 0.0 54.00 54.0 52FDB29

[ 합 계 ] 7,954.0 1,803.0 0.0 9,757.0 TOTAL

석연선 6㎟ 120mm EA 전기 3-38 ( 호표 73 )

석연선 6㎟ EA 1 380.00 380.0 0.00 0.0 0.00 0.0 380.00 380.0 52FDB29

내선전공 일반공사 직종 인 0.00072 0.00 0.0 225,408.00 162.2 0.00 0.0 225,408.00 162.2 52FDB29

공구손료 인력품의 3% 식 1 4.86 4.8 0.00 0.0 0.00 0.0 4.80 4.8 52FDB29

[ 합 계 ] 384.0 162.0 0.0 546.0 TOTAL

접지봉 14∮*1000mm 개 전기 3-38 ( 호표 74 )

접지봉 접지봉, 14∮*1000mm 개 1 2,880.00 2,880.0 0.00 0.0 0.00 0.0 2,880.00 2,880.0 52FDB29

내선전공 일반공사 직종 인 0.11 0.00 0.0 225,408.00 24,794.8 0.00 0.0 225,408.00 24,794.8 52FDB29

보통인부 일반공사 직종 인 0.08 0.00 0.0 125,427.00 10,034.1 0.00 0.0 125,427.00 10,034.1 52FDB29

공구손료 인력품의 3% 식 1 1,044.86 1,044.8 0.00 0.0 0.00 0.0 1,044.80 1,044.8 52FDB29

[ 합 계 ] 3,924.0 34,828.0 0.0 38,752.0 TOTAL

접지봉(구조물) 14∮*1000mm 개 전기 3-38 ( 호표 75 )

접지봉 접지봉, 14∮*1000mm 개 1 2,880.00 2,880.0 0.00 0.0 0.00 0.0 2,880.00 2,880.0 52FDB29

내선전공 일반공사 직종 인 0.11 0.00 0.0 225,408.00 24,794.8 0.00 0.0 225,408.00 24,794.8 52FDB29

보통인부 일반공사 직종 인 0.08 0.00 0.0 125,427.00 10,034.1 0.00 0.0 125,427.00 10,034.1 52FDB29

공구손료 인력품의 3% 식 1 1,044.86 1,044.8 0.00 0.0 0.00 0.0 1,044.80 1,044.8 52FDB29

[ 합 계 ] 3,924.0 34,828.0 0.0 38,752.0 TOTAL

번디클램프(구조물) U볼트 동봉용 EA 전기 3-38 ( 호표 76 )


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

번디클램프 U볼트 동봉용 EA 1 7,700.00 7,700.0 0.00 0.0 0.00 0.0 7,700.00 7,700.0 52FDB29

내선전공 일반공사 직종 인 0.027 0.00 0.0 225,408.00 6,086.0 0.00 0.0 225,408.00 6,086.0 52FDB29

공구손료 인력품의 3% 식 1 182.58 182.5 0.00 0.0 0.00 0.0 182.50 182.5 52FDB29

[ 합 계 ] 7,882.0 6,086.0 0.0 13,968.0 TOTAL

슬리브접속 C TYPE SLEEVE 185㎟ EA 전기 3-38 ( 호표 77 )

슬리브접속 C TYPE SLEEVE 185㎟ EA 1 5,370.00 5,370.0 0.00 0.0 0.00 0.0 5,370.00 5,370.0 52FDB29

내선전공 일반공사 직종 인 0.097 0.00 0.0 225,408.00 21,864.5 0.00 0.0 225,408.00 21,864.5 52FDB29

공구손료 인력품의 3% 식 1 655.93 655.9 0.00 0.0 0.00 0.0 655.90 655.9 52FDB29

[ 합 계 ] 6,025.0 21,864.0 0.0 27,889.0 TOTAL

슬리브접속 C TYPE SLEEVE 150㎟ EA 전기 3-38 ( 호표 78 )

슬리브접속 C TYPE SLEEVE 150㎟ EA 1 3,000.00 3,000.0 0.00 0.0 0.00 0.0 3,000.00 3,000.0 52FDB29

내선전공 일반공사 직종 인 0.097 0.00 0.0 225,408.00 21,864.5 0.00 0.0 225,408.00 21,864.5 52FDB29

공구손료 인력품의 3% 식 1 655.93 655.9 0.00 0.0 0.00 0.0 655.90 655.9 52FDB29

[ 합 계 ] 3,655.0 21,864.0 0.0 25,519.0 TOTAL

슬리브접속 C TYPE SLEEVE 120㎟ EA 전기 3-38 ( 호표 79 )

슬리브접속 C TYPE SLEEVE 120㎟ EA 1 2,810.00 2,810.0 0.00 0.0 0.00 0.0 2,810.00 2,810.0 52FDB29

내선전공 일반공사 직종 인 0.097 0.00 0.0 225,408.00 21,864.5 0.00 0.0 225,408.00 21,864.5 52FDB29

공구손료 인력품의 3% 식 1 655.93 655.9 0.00 0.0 0.00 0.0 655.90 655.9 52FDB29

[ 합 계 ] 3,465.0 21,864.0 0.0 25,329.0 TOTAL

슬리브접속 C TYPE SLEEVE 95㎟ EA 전기 3-38 ( 호표 80 )

슬리브접속 C TYPE SLEEVE 95㎟ EA 1 2,460.00 2,460.0 0.00 0.0 0.00 0.0 2,460.00 2,460.0 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

내선전공 일반공사 직종 인 0.097 0.00 0.0 225,408.00 21,864.5 0.00 0.0 225,408.00 21,864.5 52FDB29

공구손료 인력품의 3% 식 1 655.93 655.9 0.00 0.0 0.00 0.0 655.90 655.9 52FDB29

[ 합 계 ] 3,115.0 21,864.0 0.0 24,979.0 TOTAL

슬리브접속 C TYPE SLEEVE 25㎟ EA 전기 3-38 ( 호표 81 )

슬리브접속 C TYPE SLEEVE 25㎟ EA 1 260.00 260.0 0.00 0.0 0.00 0.0 260.00 260.0 52FDB29

내선전공 일반공사 직종 인 0.097 0.00 0.0 225,408.00 21,864.5 0.00 0.0 225,408.00 21,864.5 52FDB29

공구손료 인력품의 3% 식 1 655.93 655.9 0.00 0.0 0.00 0.0 655.90 655.9 52FDB29

[ 합 계 ] 915.0 21,864.0 0.0 22,779.0 TOTAL

슬리브접속 C TYPE SLEEVE 16㎟ EA 전기 3-38 ( 호표 82 )

슬리브접속 C TYPE SLEEVE 16㎟ EA 1 330.00 330.0 0.00 0.0 0.00 0.0 330.00 330.0 52FDB29

내선전공 일반공사 직종 인 0.097 0.00 0.0 225,408.00 21,864.5 0.00 0.0 225,408.00 21,864.5 52FDB29

공구손료 인력품의 3% 식 1 655.93 655.9 0.00 0.0 0.00 0.0 655.90 655.9 52FDB29

[ 합 계 ] 985.0 21,864.0 0.0 22,849.0 TOTAL

수막처리동봉 300x1.5x1장 EA 전기 3-38 ( 호표 83 )

수막처리동봉 300x1.5x1장 EA 1 50,000.00 50,000.0 0.00 0.0 0.00 0.0 50,000.00 50,000.0 52FDB29

내선전공 일반공사 직종 인 0.097 0.00 0.0 225,408.00 21,864.5 0.00 0.0 225,408.00 21,864.5 52FDB29

공구손료 인력품의 3% 식 1 655.93 655.9 0.00 0.0 0.00 0.0 655.90 655.9 52FDB29

[ 합 계 ] 50,655.0 21,864.0 0.0 72,519.0 TOTAL

압착단자 동선용 압착단자 185㎟ EA 전기 3-38 ( 호표 84 )

압착단자 압착단자, 터미널, 185㎟ 개 1 1,696.00 1,696.0 0.00 0.0 0.00 0.0 1,696.00 1,696.0 52FDB29

내선전공 일반공사 직종 인 0.016 0.00 0.0 225,408.00 3,606.5 0.00 0.0 225,408.00 3,606.5 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

공구손료 인력품의 3% 식 1 108.19 108.1 0.00 0.0 0.00 0.0 108.10 108.1 52FDB29

[ 합 계 ] 1,804.0 3,606.0 0.0 5,410.0 TOTAL

압착단자 동선용 압착단자 150㎟ EA 전기 3-38 ( 호표 85 )

압착단자 압착단자, 터미널, 150㎟ 개 1 964.00 964.0 0.00 0.0 0.00 0.0 964.00 964.0 52FDB29

내선전공 일반공사 직종 인 0.016 0.00 0.0 225,408.00 3,606.5 0.00 0.0 225,408.00 3,606.5 52FDB29

공구손료 인력품의 3% 식 1 108.19 108.1 0.00 0.0 0.00 0.0 108.10 108.1 52FDB29

[ 합 계 ] 1,072.0 3,606.0 0.0 4,678.0 TOTAL

압착단자 동선용 압착단자 95㎟ EA 전기 3-38 ( 호표 86 )

압착단자 압착단자, 터미널, 95㎟ 개 1 534.00 534.0 0.00 0.0 0.00 0.0 534.00 534.0 52FDB29

내선전공 일반공사 직종 인 0.016 0.00 0.0 225,408.00 3,606.5 0.00 0.0 225,408.00 3,606.5 52FDB29

공구손료 인력품의 3% 식 1 108.19 108.1 0.00 0.0 0.00 0.0 108.10 108.1 52FDB29

[ 합 계 ] 642.0 3,606.0 0.0 4,248.0 TOTAL

압착단자 동선용 압착단자 70㎟ EA 전기 3-38 ( 호표 87 )

압착단자 압착단자, 터미널, 70㎟ 개 1 420.00 420.0 0.00 0.0 0.00 0.0 420.00 420.0 52FDB29

내선전공 일반공사 직종 인 0.016 0.00 0.0 225,408.00 3,606.5 0.00 0.0 225,408.00 3,606.5 52FDB29

공구손료 인력품의 3% 식 1 108.19 108.1 0.00 0.0 0.00 0.0 108.10 108.1 52FDB29

[ 합 계 ] 528.0 3,606.0 0.0 4,134.0 TOTAL

압착단자 동선용 압착단자 25㎟ EA 전기 3-38 ( 호표 88 )

압착단자 압착단자, 터미널, 25㎟ 개 1 120.00 120.0 0.00 0.0 0.00 0.0 120.00 120.0 52FDB29

내선전공 일반공사 직종 인 0.016 0.00 0.0 225,408.00 3,606.5 0.00 0.0 225,408.00 3,606.5 52FDB29

공구손료 인력품의 3% 식 1 108.19 108.1 0.00 0.0 0.00 0.0 108.10 108.1 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

[ 합 계 ] 228.0 3,606.0 0.0 3,834.0 TOTAL

압착단자 동선용 압착단자 16㎟ EA 전기 3-38 ( 호표 89 )

압착단자 압착단자, 터미널, 16㎟ 개 1 80.00 80.0 0.00 0.0 0.00 0.0 80.00 80.0 52FDB29

내선전공 일반공사 직종 인 0.016 0.00 0.0 225,408.00 3,606.5 0.00 0.0 225,408.00 3,606.5 52FDB29

공구손료 인력품의 3% 식 1 108.19 108.1 0.00 0.0 0.00 0.0 108.10 108.1 52FDB29

[ 합 계 ] 188.0 3,606.0 0.0 3,794.0 TOTAL

압착단자(구조물) 동선용 압착단자 16㎟ EA 전기 3-38 ( 호표 90 )

압착단자 압착단자, 터미널, 16㎟ 개 1 80.00 80.0 0.00 0.0 0.00 0.0 80.00 80.0 52FDB29

내선전공 일반공사 직종 인 0.016 0.00 0.0 225,408.00 3,606.5 0.00 0.0 225,408.00 3,606.5 52FDB29

공구손료 인력품의 3% 식 1 108.19 108.1 0.00 0.0 0.00 0.0 108.10 108.1 52FDB29

[ 합 계 ] 188.0 3,606.0 0.0 3,794.0 TOTAL

압착단자 동선용 압착단자 6㎟ EA 전기 3-38 ( 호표 91 )

압착단자 압착단자, 터미널, 6㎟ 개 1 34.00 34.0 0.00 0.0 0.00 0.0 34.00 34.0 52FDB29

내선전공 일반공사 직종 인 0.016 0.00 0.0 225,408.00 3,606.5 0.00 0.0 225,408.00 3,606.5 52FDB29

공구손료 인력품의 3% 식 1 108.19 108.1 0.00 0.0 0.00 0.0 108.10 108.1 52FDB29

[ 합 계 ] 142.0 3,606.0 0.0 3,748.0 TOTAL

접지 단자함 10CCT, SUS 개 전기 3-38 ( 호표 92 )

풀박스 풀박스, 접지단자함, 10CCT, 스테인리스 개 1 375,800.00 375,800.0 0.00 0.0 0.00 0.0 375,800.00 375,800.0 52FDB29

내선전공 일반공사 직종 인 0.66 0.00 0.0 225,408.00 148,769.2 0.00 0.0 225,408.00 148,769.2 52FDB29

공구손료 인력품의 3% 식 1 4,463.07 4,463.0 0.00 0.0 0.00 0.0 4,463.00 4,463.0 52FDB29

[ 합 계 ] 380,263.0 148,769.0 0.0 529,032.0 TOTAL


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

접지 단자함 3CCT, SUS 개 전기 3-38 ( 호표 93 )

풀박스 풀박스, 접지단자함, 3CCT, 스테인리스 개 1 136,500.00 136,500.0 0.00 0.0 0.00 0.0 136,500.00 136,500.0 52FDB29

내선전공 일반공사 직종 인 0.66 0.00 0.0 225,408.00 148,769.2 0.00 0.0 225,408.00 148,769.2 52FDB29

공구손료 인력품의 3% 식 1 4,463.07 4,463.0 0.00 0.0 0.00 0.0 4,463.00 4,463.0 52FDB29

[ 합 계 ] 140,963.0 148,769.0 0.0 289,732.0 TOTAL

POWDER #115 EA 전기 3-38 ( 호표 94 )

POWDER(WELD METAL) #115 EA 1 4,500.00 4,500.0 0.00 0.0 0.00 0.0 4,500.00 4,500.0 52FDB29

내선전공 일반공사 직종 인 0.102 0.00 0.0 225,408.00 22,991.6 0.00 0.0 225,408.00 22,991.6 52FDB29

공구손료 인력품의 3% 식 1 689.74 689.7 0.00 0.0 0.00 0.0 689.70 689.7 52FDB29

[ 합 계 ] 5,189.0 22,991.0 0.0 28,180.0 TOTAL

POLE LIGHT 5m 이하, 1등 본 전기 5-27.1 ( 호표 95 )

보안등기구 LED 50W EA 1 546,000.00 546,000.0 0.00 0.0 0.00 0.0 546,000.00 546,000.0 52FDB29

철제보안등주 5M, 1등용 본 1 1,183,000.00 1,183,000.0 0.00 0.0 0.00 0.0 1,183,000.00 1,183,000.0 52FDB29

내선전공 일반공사 직종 인 2.1 0.00 0.0 225,408.00 473,356.8 0.00 0.0 225,408.00 473,356.8 52FDB29

공구손료 인력품의 3% 식 1 14,200.70 14,200.7 0.00 0.0 0.00 0.0 14,200.70 14,200.7 52FDB29

[ 합 계 ] 1,743,200.0 473,356.0 0.0 2,216,556.0 TOTAL

보안등 기초 700*500*1000 개소 전기 5-27-2 ( 호표 96 )

터파기/토사 보통, 굴삭기 0.7m3 70%, 인력30% M3 0.652 207.00 134.9 8,000.00 5,216.0 251.00 163.6 8,458.00 5,514.5 산근 5

되메우기/토사, 두께 15cm 보통, 굴삭기 0.7m3+래머 80kg M3 0.35 443.00 155.0 6,345.00 2,220.7 362.00 126.7 7,150.00 2,502.4 산근 2

현장내 잔토처리 소운반. 깔고 고르기 M3 0.28 0.00 0.0 25,085.00 7,023.8 0.00 0.0 25,085.00 7,023.8 호표 127

레디믹스트콘크리트 인력운반 타설 무근구조물 M3 0.28 0.00 0.0 42,603.00 11,928.8 852.00 238.5 43,455.00 12,167.3 호표 134
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

합판거푸집 설치 및 해체 간단 6회, 수직고 7m까지 M2 3.34 8,342.00 27,862.2 22,703.00 75,828.0 227.00 758.1 31,272.00 104,448.3 호표 135

앵커볼트 앵커볼트, M25*600mm 개 4 3,382.00 13,528.0 0.00 0.0 0.00 0.0 3,382.00 13,528.0 52FDB29

내선전공 일반공사 직종 인 0.12 0.00 0.0 225,408.00 27,048.9 0.00 0.0 225,408.00 27,048.9 52FDB29

공구손료 인력품의 3% 식 1 811.46 811.4 0.00 0.0 0.00 0.0 811.40 811.4 52FDB29

[ 합 계 ] 42,491.0 129,266.0 1,286.0 173,043.0 TOTAL

0.6/1kv 난연 전력케이블(F-CV) 3C*25㎟ M 전기 5-11 ( 호표 97 )

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 3C*25㎟ M 1 6,383.00 6,383.0 0.00 0.0 0.00 0.0 6,383.00 6,383.0 52FDB29

잡재료비 배관배선의 2% 식 1 127.66 127.6 0.00 0.0 0.00 0.0 127.60 127.6 52FDB29

저압케이블전공 일반공사 직종 인 0.06 0.00 0.0 235,560.00 14,133.6 0.00 0.0 235,560.00 14,133.6 52FDB29

공구손료 인력품의 3% 식 1 424.00 424.0 0.00 0.0 0.00 0.0 424.00 424.0 52FDB29

[ 합 계 ] 6,934.0 14,133.0 0.0 21,067.0 TOTAL

0.6/1kv 난연 전력케이블(F-CV) 2C*16㎟ M 전기 5-11 ( 호표 98 )

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 2C*16㎟ M 1 2,806.00 2,806.0 0.00 0.0 0.00 0.0 2,806.00 2,806.0 52FDB29

잡재료비 배관배선의 2% 식 1 56.12 56.1 0.00 0.0 0.00 0.0 56.10 56.1 52FDB29

저압케이블전공 일반공사 직종 인 0.0322 0.00 0.0 235,560.00 7,585.0 0.00 0.0 235,560.00 7,585.0 52FDB29

공구손료 인력품의 3% 식 1 227.55 227.5 0.00 0.0 0.00 0.0 227.50 227.5 52FDB29

[ 합 계 ] 3,089.0 7,585.0 0.0 10,674.0 TOTAL

러그단자 동관단자 1 HOLE 25㎟ EA 전기 4-37 ( 호표 99 )

러그단자 러그단자, 동관단자, 1홀, 25㎟ 개 1 393.00 393.0 0.00 0.0 0.00 0.0 393.00 393.0 52FDB29

저압케이블전공 일반공사 직종 인 0.081 0.00 0.0 235,560.00 19,080.3 0.00 0.0 235,560.00 19,080.3 52FDB29

공구손료 인력품의 3% 식 1 572.40 572.4 0.00 0.0 0.00 0.0 572.40 572.4 52FDB29

[ 합 계 ] 965.0 19,080.0 0.0 20,045.0 TOTAL


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

ST CABLE TRAY-Straight 600*100*t2.3mm M 전기 5-8 ( 호표 100 )

케이블트레이 카/포 Straight, 스틸, 600*100*t2.3mm M 1 47,460.00 47,460.0 0.00 0.0 0.00 0.0 47,460.00 47,460.0 52FDB29

내선전공 일반공사 직종 인 0.432 0.00 0.0 225,408.00 97,376.2 0.00 0.0 225,408.00 97,376.2 52FDB29

공구손료 인력품의 3% 식 1 2,921.28 2,921.2 0.00 0.0 0.00 0.0 2,921.20 2,921.2 52FDB29

[ 합 계 ] 50,381.0 97,376.0 0.0 147,757.0 TOTAL

ST CABLE TRAY-Straight 400*100*t2.3mm M 전기 5-8 ( 호표 101 )

케이블트레이 카/포 Straight, 스틸, 400*100*t2.3mm M 1 35,560.00 35,560.0 0.00 0.0 0.00 0.0 35,560.00 35,560.0 52FDB29

내선전공 일반공사 직종 인 0.36 0.00 0.0 225,408.00 81,146.8 0.00 0.0 225,408.00 81,146.8 52FDB29

공구손료 인력품의 3% 식 1 2,434.40 2,434.4 0.00 0.0 0.00 0.0 2,434.40 2,434.4 52FDB29

[ 합 계 ] 37,994.0 81,146.0 0.0 119,140.0 TOTAL

ST CABLE TRAY-Straight 300*100*t2.3mm M 전기 5-8 ( 호표 102 )

케이블트레이 카/포 Straight, 스틸, 300*100*t2.3mm M 1 30,030.00 30,030.0 0.00 0.0 0.00 0.0 30,030.00 30,030.0 52FDB29

내선전공 일반공사 직종 인 0.276 0.00 0.0 225,408.00 62,212.6 0.00 0.0 225,408.00 62,212.6 52FDB29

공구손료 인력품의 3% 식 1 1,866.37 1,866.3 0.00 0.0 0.00 0.0 1,866.30 1,866.3 52FDB29

[ 합 계 ] 31,896.0 62,212.0 0.0 94,108.0 TOTAL

ST CABLE TRAY-Straight 150*100*t2.3mm M 전기 5-8 ( 호표 103 )

케이블트레이 카/포 Straight, 스틸, 150*100*t2.3mm M 1 16,580.00 16,580.0 0.00 0.0 0.00 0.0 16,580.00 16,580.0 52FDB29

내선전공 일반공사 직종 인 0.276 0.00 0.0 225,408.00 62,212.6 0.00 0.0 225,408.00 62,212.6 52FDB29

공구손료 인력품의 3% 식 1 1,866.37 1,866.3 0.00 0.0 0.00 0.0 1,866.30 1,866.3 52FDB29

[ 합 계 ] 18,446.0 62,212.0 0.0 80,658.0 TOTAL


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

H/V ELBOW[ST] 카/포 600*100 EA 전기 5-8 ( 호표 104 )

H/V ELBOW[ST] 카/포 600*100 EA 1 65,700.00 65,700.0 0.00 0.0 0.00 0.0 65,700.00 65,700.0 52FDB29

내선전공 일반공사 직종 인 0.432 0.00 0.0 225,408.00 97,376.2 0.00 0.0 225,408.00 97,376.2 52FDB29

공구손료 인력품의 3% 식 1 2,921.28 2,921.2 0.00 0.0 0.00 0.0 2,921.20 2,921.2 52FDB29

[ 합 계 ] 68,621.0 97,376.0 0.0 165,997.0 TOTAL

H/V ELBOW[ST] 카/포 400*100 EA 전기 5-8 ( 호표 105 )

H/V ELBOW[ST] 카/포 400*100 EA 1 42,840.00 42,840.0 0.00 0.0 0.00 0.0 42,840.00 42,840.0 52FDB29

내선전공 일반공사 직종 인 0.36 0.00 0.0 225,408.00 81,146.8 0.00 0.0 225,408.00 81,146.8 52FDB29

공구손료 인력품의 3% 식 1 2,434.40 2,434.4 0.00 0.0 0.00 0.0 2,434.40 2,434.4 52FDB29

[ 합 계 ] 45,274.0 81,146.0 0.0 126,420.0 TOTAL

H/V ELBOW[ST] 카/포 300*100 EA 전기 5-8 ( 호표 106 )

H/V ELBOW[ST] 카/포 300*100 EA 1 33,820.00 33,820.0 0.00 0.0 0.00 0.0 33,820.00 33,820.0 52FDB29

내선전공 일반공사 직종 인 0.276 0.00 0.0 225,408.00 62,212.6 0.00 0.0 225,408.00 62,212.6 52FDB29

공구손료 인력품의 3% 식 1 1,866.37 1,866.3 0.00 0.0 0.00 0.0 1,866.30 1,866.3 52FDB29

[ 합 계 ] 35,686.0 62,212.0 0.0 97,898.0 TOTAL

H/V TEE[ST] 카/포 600*100 EA 전기 5-8 ( 호표 107 )

H/V TEE[ST] 카/포 600*100 EA 1 113,190.00 113,190.0 0.00 0.0 0.00 0.0 113,190.00 113,190.0 52FDB29

내선전공 일반공사 직종 인 0.432 0.00 0.0 225,408.00 97,376.2 0.00 0.0 225,408.00 97,376.2 52FDB29

공구손료 인력품의 3% 식 1 2,921.28 2,921.2 0.00 0.0 0.00 0.0 2,921.20 2,921.2 52FDB29

[ 합 계 ] 116,111.0 97,376.0 0.0 213,487.0 TOTAL

TRAY 지지대 W:600 개소 ( 호표 108 )


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

케이블트레이피팅및액세서리 케이블트레이부속품, U Channel, 41*41*t2.6mm M 0.7 5,250.00 3,675.0 0.00 0.0 0.00 0.0 5,250.00 3,675.0 52FDB29

전산볼트 전산볼트, 스테인리스강, M16*1000mm 개 2 7,971.00 15,942.0 0.00 0.0 0.00 0.0 7,971.00 15,942.0 52FDB29

육각너트 육각너트, 스테인리스, M16 개 2 379.20 758.4 0.00 0.0 0.00 0.0 379.20 758.4 52FDB29

케미컬 앵커 캡슐식 SET 2 8,000.00 16,000.0 0.00 0.0 0.00 0.0 8,000.00 16,000.0 52FDB29

스텐평와셔 호칭경 16mm 개 2 73.24 146.4 0.00 0.0 0.00 0.0 73.20 146.4 52FDB29

콘크리트보차도경계블록(광주) SC형, 15*15*15*100cm, 51.8kg EA 1 5,000.00 5,000.0 0.00 0.0 0.00 0.0 5,000.00 5,000.0 공장상차도

보차도 및 도로 경계블록 설치 15*15*15*100cm, 직선구간 EA 1 447.00 447.0 6,264.00 6,264.0 516.00 516.0 7,227.00 7,227.0 산근 6

내선전공 일반공사 직종 인 0.072 0.00 0.0 225,408.00 16,229.3 0.00 0.0 225,408.00 16,229.3 52FDB29

공구손료 인력품의 3% 식 1 486.87 486.8 0.00 0.0 0.00 0.0 486.80 486.8 52FDB29

[ 합 계 ] 42,455.0 22,493.0 516.0 65,464.0 TOTAL

TRAY 지지대 W:400 개소 ( 호표 109 )

케이블트레이피팅및액세서리 케이블트레이부속품, U Channel, 41*41*t2.6mm M 0.5 5,250.00 2,625.0 0.00 0.0 0.00 0.0 5,250.00 2,625.0 52FDB29

전산볼트 전산볼트, 스테인리스강, M16*1000mm 개 2 7,971.00 15,942.0 0.00 0.0 0.00 0.0 7,971.00 15,942.0 52FDB29

육각너트 육각너트, 스테인리스, M16 개 2 379.20 758.4 0.00 0.0 0.00 0.0 379.20 758.4 52FDB29

케미컬 앵커 캡슐식 SET 2 8,000.00 16,000.0 0.00 0.0 0.00 0.0 8,000.00 16,000.0 52FDB29

스텐평와셔 호칭경 16mm 개 2 73.24 146.4 0.00 0.0 0.00 0.0 73.20 146.4 52FDB29

콘크리트보차도경계블록(광주) SC형, 15*15*15*100cm, 51.8kg EA 1 5,000.00 5,000.0 0.00 0.0 0.00 0.0 5,000.00 5,000.0 공장상차도

보차도 및 도로 경계블록 설치 15*15*15*100cm, 직선구간 EA 1 447.00 447.0 6,264.00 6,264.0 516.00 516.0 7,227.00 7,227.0 산근 6

내선전공 일반공사 직종 인 0.072 0.00 0.0 225,408.00 16,229.3 0.00 0.0 225,408.00 16,229.3 52FDB29

공구손료 인력품의 3% 식 1 187.92 187.9 0.00 0.0 0.00 0.0 187.90 187.9 52FDB29

[ 합 계 ] 41,106.0 22,493.0 516.0 64,115.0 TOTAL

TRAY 지지대 W:300 개소 ( 호표 110 )

케이블트레이피팅및액세서리 케이블트레이부속품, U Channel, 41*41*t2.6mm M 0.4 5,250.00 2,100.0 0.00 0.0 0.00 0.0 5,250.00 2,100.0 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

전산볼트 전산볼트, 스테인리스강, M16*1000mm 개 2 7,971.00 15,942.0 0.00 0.0 0.00 0.0 7,971.00 15,942.0 52FDB29

육각너트 육각너트, 스테인리스, M16 개 2 379.20 758.4 0.00 0.0 0.00 0.0 379.20 758.4 52FDB29

케미컬 앵커 캡슐식 SET 2 8,000.00 16,000.0 0.00 0.0 0.00 0.0 8,000.00 16,000.0 52FDB29

스텐평와셔 호칭경 16mm 개 2 73.24 146.4 0.00 0.0 0.00 0.0 73.20 146.4 52FDB29

콘크리트보차도경계블록(광주) SC형, 15*15*15*100cm, 51.8kg EA 1 5,000.00 5,000.0 0.00 0.0 0.00 0.0 5,000.00 5,000.0 공장상차도

보차도 및 도로 경계블록 설치 15*15*15*100cm, 직선구간 EA 1 447.00 447.0 6,264.00 6,264.0 516.00 516.0 7,227.00 7,227.0 산근 6

내선전공 일반공사 직종 인 0.072 0.00 0.0 225,408.00 16,229.3 0.00 0.0 225,408.00 16,229.3 52FDB29

공구손료 인력품의 3% 식 1 187.92 187.9 0.00 0.0 0.00 0.0 187.90 187.9 52FDB29

[ 합 계 ] 40,581.0 22,493.0 516.0 63,590.0 TOTAL

TRAY 지지대(벽체) W:150 개소 ( 호표 111 )

케이블트레이피팅및액세서리 케이블트레이부속품, U Channel, 41*41*t2.6mm M 0.25 5,250.00 1,312.5 0.00 0.0 0.00 0.0 5,250.00 1,312.5 52FDB29

세트앵커 세트앵커, M10*L75mm 개 2 530.00 1,060.0 0.00 0.0 0.00 0.0 530.00 1,060.0 52FDB29

육각너트 육각너트, M10 개 2 132.70 265.4 0.00 0.0 0.00 0.0 132.70 265.4 52FDB29

스텐평와셔 호칭경 10mm 개 2 22.78 45.5 0.00 0.0 0.00 0.0 22.70 45.5 52FDB29

내선전공 일반공사 직종 인 0.232 0.00 0.0 225,408.00 52,294.6 0.00 0.0 225,408.00 52,294.6 52FDB29

공구손료 인력품의 3% 식 1 1,568.83 1,568.8 0.00 0.0 0.00 0.0 1,568.80 1,568.8 52FDB29

[ 합 계 ] 4,252.0 52,294.0 0.0 56,546.0 TOTAL

Inverter 설치 3.0MW 대 전기 9-1 ( 호표 112 )

플랜트전공 일반공사 직종 인 10 0.00 0.0 205,890.00 2,058,900.0 0.00 0.0 205,890.00 2,058,900.0 52FDB29

공구손료 인력품의 3% 식 1 61,767.00 61,767.0 0.00 0.0 0.00 0.0 61,767.00 61,767.0 52FDB29

[ 합 계 ] 61,767.0 2,058,900.0 0.0 2,120,667.0 TOTAL

Inverter 설치 1.0MW 대 전기 9-1 ( 호표 113 )


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

플랜트전공 일반공사 직종 인 10 0.00 0.0 205,890.00 2,058,900.0 0.00 0.0 205,890.00 2,058,900.0 52FDB29

공구손료 인력품의 3% 식 1 61,767.00 61,767.0 0.00 0.0 0.00 0.0 61,767.00 61,767.0 52FDB29

[ 합 계 ] 61,767.0 2,058,900.0 0.0 2,120,667.0 TOTAL

전력조절(접속함) 설치 20회로 이하 면 전기 5-44 ( 호표 114 )

플랜트전공 일반공사 직종 인 0.6 0.00 0.0 205,890.00 123,534.0 0.00 0.0 205,890.00 123,534.0 52FDB29

공구손료 인력품의 3% 식 1 3,706.02 3,706.0 0.00 0.0 0.00 0.0 3,706.00 3,706.0 52FDB29

[ 합 계 ] 3,706.0 123,534.0 0.0 127,240.0 TOTAL

접속반 경계석 설치 식 ( 호표 115 )

케이블트레이피팅및액세서리 케이블트레이부속품, U Channel, 41*41*t2.6mm M 1 5,250.00 5,250.0 0.00 0.0 0.00 0.0 5,250.00 5,250.0 52FDB29

전산볼트 전산볼트, 스테인리스강, M16*1000mm 개 2 7,971.00 15,942.0 0.00 0.0 0.00 0.0 7,971.00 15,942.0 52FDB29

육각너트 육각너트, 스테인리스, M16 개 2 379.20 758.4 0.00 0.0 0.00 0.0 379.20 758.4 52FDB29

케미컬 앵커 캡슐식 SET 2 8,000.00 16,000.0 0.00 0.0 0.00 0.0 8,000.00 16,000.0 52FDB29

스텐평와셔 호칭경 16mm 개 2 73.24 146.4 0.00 0.0 0.00 0.0 73.20 146.4 52FDB29

콘크리트보차도경계블록(광주) SC형, 15*15*15*100cm, 51.8kg EA 1 5,000.00 5,000.0 0.00 0.0 0.00 0.0 5,000.00 5,000.0 공장상차도

보차도 및 도로 경계블록 설치 15*15*15*100cm, 직선구간 EA 1 447.00 447.0 6,264.00 6,264.0 516.00 516.0 7,227.00 7,227.0 산근 6

내선전공 일반공사 직종 인 0.072 0.00 0.0 225,408.00 16,229.3 0.00 0.0 225,408.00 16,229.3 52FDB29

공구손료 인력품의 3% 식 1 486.87 486.8 0.00 0.0 0.00 0.0 486.80 486.8 52FDB29

[ 합 계 ] 44,030.0 22,493.0 516.0 67,039.0 TOTAL

LAP외피광케이블 SM 9/125, 8C M 통신 4-1-3 ( 호표 116 )

옥외광섬유케이블 LAP외피광케이블, 광케이블, SM 9/125, 8C M 1 759.00 759.0 0.00 0.0 0.00 0.0 759.00 759.0 52FDB29

잡재료비 배관배선의 2% 식 1 15.18 15.1 0.00 0.0 0.00 0.0 15.10 15.1 52FDB29

특별인부 일반공사 직종 인 0.0046 0.00 0.0 152,019.00 699.2 0.00 0.0 152,019.00 699.2 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

광케이블설치사 광전자 직종 인 0.0092 0.00 0.0 332,790.00 3,061.6 0.00 0.0 332,790.00 3,061.6 52FDB29

공구손료 인력품의 3% 식 1 112.82 112.8 0.00 0.0 0.00 0.0 112.80 112.8 52FDB29

[ 합 계 ] 886.0 3,760.0 0.0 4,646.0 TOTAL

0.6/1kv 난연 전력케이블(F-CV) 1C*120㎟ M 전기 5-11 ( 호표 117 )

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 1C*120㎟ M 1 9,447.00 9,447.0 0.00 0.0 0.00 0.0 9,447.00 9,447.0 52FDB29

잡재료비 배관배선의 2% 식 1 188.94 188.9 0.00 0.0 0.00 0.0 188.90 188.9 52FDB29

저압케이블전공 일반공사 직종 인 0.084 0.00 0.0 235,560.00 19,787.0 0.00 0.0 235,560.00 19,787.0 52FDB29

공구손료 인력품의 3% 식 1 593.61 593.6 0.00 0.0 0.00 0.0 593.60 593.6 52FDB29

[ 합 계 ] 10,229.0 19,787.0 0.0 30,016.0 TOTAL

난연 비닐절연접지용전선(F-GV)-관내 0.6/1kv, 70㎟ M 전기 3-38 ( 호표 118 )

접지용비닐절연전선 접지용비닐절연전선, F-GV, 70㎟ M 1 5,484.00 5,484.0 0.00 0.0 0.00 0.0 5,484.00 5,484.0 52FDB29

잡재료비 배관배선의 2% 식 1 109.68 109.6 0.00 0.0 0.00 0.0 109.60 109.6 52FDB29

내선전공 일반공사 직종 인 0.012 0.00 0.0 225,408.00 2,704.8 0.00 0.0 225,408.00 2,704.8 52FDB29

공구손료 인력품의 3% 식 1 81.14 81.1 0.00 0.0 0.00 0.0 81.10 81.1 52FDB29

[ 합 계 ] 5,674.0 2,704.0 0.0 8,378.0 TOTAL

광케이블 코어접속 일반접속(12코어 이하) 코어당 통신 4-1-2-1 ( 호표 119 )

광케이블설치사 광전자 직종 인 0.11 0.00 0.0 332,790.00 36,606.9 0.00 0.0 332,790.00 36,606.9 52FDB29

특별인부 일반공사 직종 인 0.11 0.00 0.0 152,019.00 16,722.0 0.00 0.0 152,019.00 16,722.0 52FDB29

공구손료 인력품의 3% 식 1 1,599.86 1,599.8 0.00 0.0 0.00 0.0 1,599.80 1,599.8 52FDB29

[ 합 계 ] 1,599.0 53,328.0 0.0 54,927.0 TOTAL

광케이블 시험 및 측정 최종시험 코어당 통신 4-1-2-1 ( 호표 120 )


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

광케이블설치사 광전자 직종 인 0.25 0.00 0.0 332,790.00 83,197.5 0.00 0.0 332,790.00 83,197.5 52FDB29

특별인부 일반공사 직종 인 0.2 0.00 0.0 152,019.00 30,403.8 0.00 0.0 152,019.00 30,403.8 52FDB29

공구손료 인력품의 3% 식 1 3,408.03 3,408.0 0.00 0.0 0.00 0.0 3,408.00 3,408.0 52FDB29

[ 합 계 ] 3,408.0 113,601.0 0.0 117,009.0 TOTAL

LAP외피광케이블 SM 9/125, 4C M 통신 4-1-3 ( 호표 121 )

옥외광섬유케이블 LAP외피광케이블, 광케이블, SM 9/125, 4C M 1 671.00 671.0 0.00 0.0 0.00 0.0 671.00 671.0 52FDB29

잡재료비 배관배선의 2% 식 1 13.42 13.4 0.00 0.0 0.00 0.0 13.40 13.4 52FDB29

특별인부 일반공사 직종 인 0.0046 0.00 0.0 152,019.00 699.2 0.00 0.0 152,019.00 699.2 52FDB29

광케이블설치사 광전자 직종 인 0.0092 0.00 0.0 332,790.00 3,061.6 0.00 0.0 332,790.00 3,061.6 52FDB29

공구손료 인력품의 3% 식 1 112.82 112.8 0.00 0.0 0.00 0.0 112.80 112.8 52FDB29

[ 합 계 ] 797.0 3,760.0 0.0 4,557.0 TOTAL

네트워크케이블 CAT.5, 4Pr M 통신 4-3-1 ( 호표 122 )

네트워크케이블 UTP Cat. 5E, 4P M 1 262.00 262.0 0.00 0.0 0.00 0.0 262.00 262.0 52FDB29

잡재료비 배관배선의 2% 식 1 5.24 5.2 0.00 0.0 0.00 0.0 5.20 5.2 52FDB29

통신케이블공 일반공사 직종 인 0.015 0.00 0.0 326,000.00 4,890.0 0.00 0.0 326,000.00 4,890.0 52FDB29

공구손료 인력품의 3% 식 1 146.70 146.7 0.00 0.0 0.00 0.0 146.70 146.7 52FDB29

[ 합 계 ] 413.0 4,890.0 0.0 5,303.0 TOTAL

DATA케이블 RS-485 M 통신 4-3-1 ( 호표 123 )

RS-485 1P*24AWG M 1 7,200.00 7,200.0 0.00 0.0 0.00 0.0 7,200.00 7,200.0 52FDB29

잡재료비 배관배선의 2% 식 1 144.00 144.0 0.00 0.0 0.00 0.0 144.00 144.0 52FDB29

통신케이블공 일반공사 직종 인 0.018 0.00 0.0 326,000.00 5,868.0 0.00 0.0 326,000.00 5,868.0 52FDB29

공구손료 인력품의 3% 식 1 176.04 176.0 0.00 0.0 0.00 0.0 176.00 176.0 52FDB29
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

[ 합 계 ] 7,520.0 5,868.0 0.0 13,388.0 TOTAL

1종금속제가요전선관-노출 16mm, 비방수 M 전기 5-1 ( 호표 124 )

1종금속제가요전선관 1종금속제가요전선관, 16mm, 비방수 M 1 360.00 360.0 0.00 0.0 0.00 0.0 360.00 360.0 52FDB29

전선관부속품비 전선관의 15% 식 1 54.00 54.0 0.00 0.0 0.00 0.0 54.00 54.0 52FDB29

잡재료비 배관배선의 2% 식 1 7.20 7.2 0.00 0.0 0.00 0.0 7.20 7.2 52FDB29

내선전공 일반공사 직종 인 0.052 0.00 0.0 225,408.00 11,721.2 0.00 0.0 225,408.00 11,721.2 52FDB29

공구손료 인력품의 3% 식 1 351.63 351.6 0.00 0.0 0.00 0.0 351.60 351.6 52FDB29

[ 합 계 ] 772.0 11,721.0 0.0 12,493.0 TOTAL

관로구방수 ∮40 개소 ( 호표 125 )

관구밀폐기 관구밀폐기, 실링가스켓, D50 개 1 10,080.00 10,080.0 0.00 0.0 0.00 0.0 10,080.00 10,080.0 52FDB29

관구밀폐기 관구밀폐기, 이종연결관, ∮50mm 개 1 2,520.00 2,520.0 0.00 0.0 0.00 0.0 2,520.00 2,520.0 52FDB29

전선관부속품비 전선관의 15% 식 1 1,890.00 1,890.0 0.00 0.0 0.00 0.0 1,890.00 1,890.0 52FDB29

잡재료비 배관배선의 2% 식 1 252.00 252.0 0.00 0.0 0.00 0.0 252.00 252.0 52FDB29

통신용발포지수제 통신용발포지수제, 수밀보호테이프 개 1 2,300.00 2,300.0 0.00 0.0 0.00 0.0 2,300.00 2,300.0 52FDB29

통신용발포지수제 통신용발포지수제, 발포지수제, D150이하 개 1 21,730.00 21,730.0 0.00 0.0 0.00 0.0 21,730.00 21,730.0 52FDB29

보통인부 일반공사 직종 인 0.328 0.00 0.0 125,427.00 41,140.0 0.00 0.0 125,427.00 41,140.0 52FDB29

저압케이블전공 일반공사 직종 인 0.076 0.00 0.0 235,560.00 17,902.5 0.00 0.0 235,560.00 17,902.5 52FDB29

특고압케이블전공 일반공사 직종 인 0.156 0.00 0.0 323,944.00 50,535.2 0.00 0.0 323,944.00 50,535.2 52FDB29

공구손료 인력품의 3% 식 1 3,287.33 3,287.3 0.00 0.0 0.00 0.0 3,287.30 3,287.3 52FDB29

[ 합 계 ] 42,059.0 109,577.0 0.0 151,636.0 TOTAL

잡석깔기지정 인력 M3 토목 5-1-1.2 ( 호표 126 )

보통인부 일반공사 직종 인 0.018 0.00 0.0 125,427.00 2,257.6 0.00 0.0 125,427.00 2,257.6 52B4025
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

[ 합 계 ] 0.0 2,257.0 0.0 2,257.0 TOTAL

현장내 잔토처리 소운반. 깔고 고르기 M3 토목 3-1-3.1 ( 호표 127 )

보통인부 일반공사 직종 인 0.2 0.00 0.0 125,427.00 25,085.4 0.00 0.0 125,427.00 25,085.4 52B412B

[ 합 계 ] 0.0 25,085.0 0.0 25,085.0 TOTAL

크레인(타이어)(오거장착별도)-통신 10ton HR 통신 1-4-5 ( 호표 128 )

크레인(타이어)(오거장착별도) 10ton 대 0.2232 0.00 0.0 0.00 0.0 105,000.00 23,436.0 105,000.00 23,436.0 천원

경유 경유, 저유황 L 3.8 1,234.54 4,691.2 0.00 0.0 0.00 0.0 1,234.50 4,691.2 55A5020

건설기계운전사 일반공사 직종 인 1 0.00 0.0 38,972.70 38,972.7 0.00 0.0 38,972.70 38,972.7 55A5020

보통인부 일반공사 직종 인 1 0.00 0.0 26,130.60 26,130.6 0.00 0.0 26,130.60 26,130.6 55A5020

공구손료 인력품의 3% 식 1 1,953.09 1,953.0 0.00 0.0 0.00 0.0 1,953.00 1,953.0 55A5020

[ 합 계 ] 6,644.0 65,103.0 23,436.0 95,183.0 TOTAL

굴삭기(무한궤도). 0.7㎥ HR 토목 9-2.3(0201) ( 호표 129 )

굴삭기(무한궤도) 0.7㎥ 대 0.2085 0.00 0.0 0.00 0.0 101,750.00 21,214.8 101,750.00 21,214.8 천원

경유 경유, 저유황 L 11.6 1,234.54 14,320.6 0.00 0.0 0.00 0.0 1,234.50 14,320.6 55A5020

잡재료 주연료비의 22% 식 1 3,150.53 3,150.5 0.00 0.0 0.00 0.0 3,150.50 3,150.5 55A5020

건설기계운전사 일반공사 직종 인 1 0.00 0.0 38,972.70 38,972.7 0.00 0.0 38,972.70 38,972.7 55A5020

[ 합 계 ] 17,471.0 38,972.0 21,214.0 77,657.0 TOTAL

플레이트 콤팩터. 1.5ton HR 토목 9-2,3(1730) ( 호표 130 )

플레이트 콤팩터 1.5ton 대 0.3708 0.00 0.0 0.00 0.0 1,473.00 546.1 1,473.00 546.1 천원

공업용휘발유 공업용휘발유, 무연 L 1 1,293.63 1,293.6 0.00 0.0 0.00 0.0 1,293.60 1,293.6 55A5020

잡재료 주연료비의 20% 식 1 258.72 258.7 0.00 0.0 0.00 0.0 258.70 258.7 55A5020
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

일반기계운전사 일반공사 직종 인 1 0.00 0.0 25,683.70 25,683.7 0.00 0.0 25,683.70 25,683.7 55A5020

[ 합 계 ] 1,552.0 25,683.0 546.0 27,781.0 TOTAL

래머. 80kg HR 토목 9-2,3(1630) ( 호표 131 )

래머 80kg 대 0.3708 0.00 0.0 0.00 0.0 1,188.00 440.5 1,188.00 440.5 천원

공업용휘발유 공업용휘발유, 무연 L 0.7 1,293.63 905.5 0.00 0.0 0.00 0.0 1,293.60 905.5 55A5020

잡재료 주연료비의 10% 식 1 90.55 90.5 0.00 0.0 0.00 0.0 90.50 90.5 55A5020

일반기계운전사 일반공사 직종 인 1 0.00 0.0 25,683.70 25,683.7 0.00 0.0 25,683.70 25,683.7 55A5020

[ 합 계 ] 996.0 25,683.0 440.0 27,119.0 TOTAL

굴삭기(무한궤도). 0.2㎥ HR 토목 9-2.3(0201) ( 호표 132 )

굴삭기(무한궤도) 0.2㎥ 대 0.2085 0.00 0.0 0.00 0.0 59,780.00 12,464.1 59,780.00 12,464.1 천원

경유 경유, 저유황 L 5 1,234.54 6,172.7 0.00 0.0 0.00 0.0 1,234.50 6,172.7 55A5020

잡재료 주연료비의 21% 식 1 1,296.26 1,296.2 0.00 0.0 0.00 0.0 1,296.20 1,296.2 55A5020

건설기계운전사 일반공사 직종 인 0.208333 0.00 0.0 38,972.70 8,119.2 0.00 0.0 38,972.70 8,119.2 55A5020

[ 합 계 ] 7,468.0 8,119.0 12,464.0 28,051.0 TOTAL

진동롤러(핸드가이드식). 0.7ton HR 토목 9-2,3(1305) ( 호표 133 )

진동롤러(핸드가이드식) 0.7ton 대 0.2825 0.00 0.0 0.00 0.0 5,838.00 1,649.2 5,838.00 1,649.2 천원

경유 경유, 저유황 L 2.2 1,234.54 2,715.9 0.00 0.0 0.00 0.0 1,234.50 2,715.9 55A5020

잡재료 주연료비의 13% 식 1 353.06 353.0 0.00 0.0 0.00 0.0 353.00 353.0 55A5020

일반기계운전사 일반공사 직종 인 1 0.00 0.0 25,683.70 25,683.7 0.00 0.0 25,683.70 25,683.7 55A5020

[ 합 계 ] 3,068.0 25,683.0 1,649.0 30,400.0 TOTAL

레디믹스트콘크리트 인력운반 타설 무근구조물 M3 토목 6-1-1.1 ( 호표 134 )


[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

콘크리트공 일반공사 직종 인 0.12 0.00 0.0 198,242.00 23,789.0 0.00 0.0 198,242.00 23,789.0 52B4722

보통인부 일반공사 직종 인 0.15 0.00 0.0 125,427.00 18,814.0 0.00 0.0 125,427.00 18,814.0 52B4722

공구손료 인력품의 2% 식 1 0.00 0.0 0.00 0.0 852.06 852.0 852.00 852.0 52B4722

[ 합 계 ] 0.0 42,603.0 852.0 43,455.0 TOTAL

합판거푸집 설치 및 해체 간단 6회, 수직고 7m까지 M2 건축 6-3-1 ( 호표 135 )

합판거푸집 - 자재비 6회 M2 1 8,342.00 8,342.0 0.00 0.0 0.00 0.0 8,342.00 8,342.0 호표 136

합판거푸집 - 인력투입 간단, 수직고 7m까지 M2 1 0.00 0.0 22,703.00 22,703.0 227.00 227.0 22,930.00 22,930.0 호표 137

[ 합 계 ] 8,342.0 22,703.0 227.0 31,272.0 TOTAL

합판거푸집 - 자재비 6회 M2 건축 6-3-1 ( 호표 136 )

내수합판 내수합판, 1급, 12*1220*2440mm M2 1.03 8,419.00 8,671.5 0.00 0.0 0.00 0.0 8,419.00 8,671.5 금액제외

각재 각재, 외송 M3 0.038 376,675.00 14,313.6 0.00 0.0 0.00 0.0 376,675.00 14,313.6 금액제외

적용비율 주재료비의 32.7% 식 1 7,516.12 7,516.1 0.00 0.0 0.00 0.0 7,516.10 7,516.1 52B4722

소모자재(박리재 등) 주재료비의 11% 식 1 826.77 826.7 0.00 0.0 0.00 0.0 826.70 826.7 52B4722

[ 합 계 ] 8,342.0 0.0 0.0 8,342.0 TOTAL

합판거푸집 - 인력투입 간단, 수직고 7m까지 M2 건축 6-3-1 ( 호표 137 )

형틀목공 일반공사 직종 인 0.1 0.00 0.0 201,951.00 20,195.1 0.00 0.0 201,951.00 20,195.1 52B4722

보통인부 일반공사 직종 인 0.02 0.00 0.0 125,427.00 2,508.5 0.00 0.0 125,427.00 2,508.5 52B4722

공구손료 인력품의 1% 식 1 0.00 0.0 0.00 0.0 227.03 227.0 227.00 227.0 52B4722

[ 합 계 ] 0.0 22,703.0 227.0 22,930.0 TOTAL

트럭탑재형 크레인. 5ton HR 토목 9-2,3(2105) ( 호표 138 )

트럭탑재형 크레인 5ton 대 0.2598 0.00 0.0 0.00 0.0 33,571.00 8,721.7 33,571.00 8,721.7 천원
[태양광발전사업 실시설계 ]

재 료 비 노 무 비 경 비 합 계
품 명 규 격 단위 수량 비 고
단 가 금 액 단 가 금 액 단 가 금 액 단 가 금 액

경유 경유, 저유황 L 5.1 1,234.54 6,296.1 0.00 0.0 0.00 0.0 1,234.50 6,296.1 55A5020

잡재료 주연료비의 20% 식 1 1,259.22 1,259.2 0.00 0.0 0.00 0.0 1,259.20 1,259.2 55A5020

화물차운전사 일반공사 직종 인 1 0.00 0.0 33,064.10 33,064.1 0.00 0.0 33,064.10 33,064.1 55A5020

[ 합 계 ] 7,555.0 33,064.0 8,721.0 49,340.0 TOTAL

덤프트럭. 2.5ton HR 토목 9-2,3(0602) ( 호표 139 )

덤프트럭 2.5ton 대 0.2967 0.00 0.0 0.00 0.0 19,358.00 5,743.5 19,358.00 5,743.5 천원

경유 경유, 저유황 L 2.9 1,234.54 3,580.1 0.00 0.0 0.00 0.0 1,234.50 3,580.1 55A5020

잡재료 주연료비의 38% 식 1 1,360.43 1,360.4 0.00 0.0 0.00 0.0 1,360.40 1,360.4 55A5020

화물차운전사 일반공사 직종 인 1 0.00 0.0 33,064.10 33,064.1 0.00 0.0 33,064.10 33,064.1 55A5020

[ 합 계 ] 4,940.0 33,064.0 5,743.0 43,747.0 TOTAL

지게차. 2.5ton HR 토목 9-2,3(2502) ( 호표 140 )

지게차 2.5ton 대 0.15 0.00 0.0 0.00 0.0 24,617.00 3,692.5 24,617.00 3,692.5 천원

경유 경유, 저유황 L 4 1,234.54 4,938.1 0.00 0.0 0.00 0.0 1,234.50 4,938.1 55A5020

잡재료 주연료비의 37% 식 1 1,827.09 1,827.0 0.00 0.0 0.00 0.0 1,827.00 1,827.0 55A5020

건설기계운전사 일반공사 직종 인 0.208333 0.00 0.0 38,972.70 8,119.2 0.00 0.0 38,972.70 8,119.2 55A5020

[ 합 계 ] 6,765.0 8,119.0 3,692.0 18,576.0 TOTAL


중기단가목록
[태양광발전사업 실시설계 ]

품 명 규 격 단위 재료비 노무비 경 비 합 계 번 호 비 고

터파기/토사 보통, 굴삭기 0.7m3 90%, 인력10% M3 266 3,103 323 3,692 산근 1 5

되메우기/토사, 두께 15cm 보통, 굴삭기 0.7m3+래머 80kg M3 443 6,345 362 7,150 산근 2 5

자재 운반 2.5ton 트럭, 운반거리 L=10km TON 12,799 12,799 산근 3 5

되메우기/토사, 두께 10cm 보통, 굴삭기 0.7m3+플레이트콤팩터 1.5ton+인력 10% M3 349 6,012 290 6,651 산근 4 5

터파기/토사 보통, 굴삭기 0.7m3 70%, 인력30% M3 207 8,000 251 8,458 산근 5 5

보차도 및 도로 경계블록 설치 15*15*15*100cm, 직선구간 EA 447 6,264 516 7,227 산근 6 5


중기단가산출서
[태양광발전사업 실시설계 ]

산 출 내 역 재료비 노무비 경 비 합 계 비 고

터파기/토사 보통, 굴삭기 0.7m3 90%, 인력10% M3 토목 8-5 ( 산근 1 ) 5


5
굴삭기(무한궤도),0.7㎥90%+인력10% M3 5
5
Q1 바켓용량(M3) =0.70 5
K 바켓계수(양호1.1,보통0.90,불량0.70,파쇄암0.55) = 0.90 5
F 토량환산계수(1/L) = 1/1.25= 0.8 5
E1 터파기에 대하여 -0.05 =0.05 5
E 작업효율사질토(양호0.85,보통0.70,불량0.55) = 0.70-E1= 0.65 5
CM 1회 싸이클시간(135˚SEC) =20 5
Q 시간당 작업량 (M3/HR) = 3600*Q1*K*F*E/CM/0.9= 65.52 5
5
재료비: 17471 / 65.52 = 266.6 266.6 266.6 5
노무비: 38972 / 65.52 = 594.8 594.8 594.8 5
경 비: 21214 / 65.52 = 323.7 323.7 323.7 5
소 계 266.6 594.8 323.7 1,185.1 5
5
0-1m,보통인부0.2인*10% 5
125427*0.2*0.1 = 2508.5 2,508.5 2,508.5 5
소 계 2,508.5 2,508.5 5
총 계 266 3,103 323 3,692

되메우기/토사, 두께 15cm 보통, 굴삭기 0.7m3+래머 80kg M3 토목 8-5+13 ( 산근 2 ) 5


5
1.굴삭기 (무한궤도)0.7㎥M3 5
Q1 바켓용량(M3) = 0.7 5
중기단가산출서
[태양광발전사업 실시설계 ]

산 출 내 역 재료비 노무비 경 비 합 계 비 고

k 바켓계수 = 1.1 5
L1 흐트러진상태 =1.25 5
C 다져진상태 =0.875 5
F 토량환산계(C/L) =C/L1= 0.7 5
E 작업효율(양호0.9,보통0.75,불량0.6) = 0.75 5
CM 1회 싸이클시간(90˚SEC) =18 5
Q 시간당 작업량 (M3/HR) = 3600*Q1*K*F*E/CM= 80.85 5
재료비: 17471 / 80.85 = 216 216.0 216.0 5
노무비: 38972 / 80.85 = 482 482.0 482.0 5
경 비: 21214 / 80.85 = 262.3 262.3 262.3 5
소 계 216.0 482.0 262.3 960.3 5
5
2.래머,80kg 5
A 1회당 유호 다짐면적(M2) =0.28*0.33= 0.0924 5
N 1시간당 타격회수(회/HR) =36000 5
H 다짐두께(M) =0.15 5
L1 흐트러진상태 =1.25 5
F 토량환산계(L1/L1) =L1/L1= 1 5
E 작업효율(양호0.7,보통0.5,불량0.3) = 0.5 5
P 중복 다짐회수(회) =57 5
Q 시간당 작업량(M3/HR) =A*N*H*F*E/P= 4.38 5
재료비: 996 / 4.38 = 227.3 227.3 227.3 5
노무비: 25683 / 4.38 = 5863.6 5,863.6 5,863.6 5
경 비: 440 / 4.38 = 100.4 100.4 100.4 5
소 계 227.3 5,863.6 100.4 6,191.3 5
5
중기단가산출서
[태양광발전사업 실시설계 ]

산 출 내 역 재료비 노무비 경 비 합 계 비 고

합 계 443.3 6,345.6 362.7 7,151.6 5


총 계 443 6,345 362 7,150

자재 운반 2.5ton 트럭, 운반거리 L=10km TON 토목 8-10 ( 산근 3 ) 5


5
운반거리 L=10KM 덤프트럭(2.5톤) 톤당 5
5
차량속도= 25/V1,25/V2,40KM/V3,40KM/V4,25KM/V5,25KM/V6 5
생산공장 ○-----------------0-------------0--------○10KM 5
운반거리=공 장L1=0.0KM,시내L2=9.5KM,공사장L3=0.5KM 5
5
1.덤프트럭2.5톤(경비) 5
T 적재용량(KG) =2500 5
R1 단위중량(KG) =1000 5
Q1 1회 적재량(매) =T/R1= 2.5 5
f 토량 환산계수 =1 5
E 작업효율 =0.9 5
5
L1 공 장내 운반거리(KM) =0.0 5
L2 도로주행 운반거리(KM) =9.5 5
L3 공사장내 운반거리(KM) =0.5 5
V1 하치장내적재운반속도(KM/HR) =25 5
V2 하치장내공차운반속도(KM/HR) =25 5
V3 도로주행적재운반속도(KM/HR) =40 5
V4 도로주행공차운반속도(KM/HR) =40 5
V5 공사장내적재운반속도(KM/HR) =25 5
중기단가산출서
[태양광발전사업 실시설계 ]

산 출 내 역 재료비 노무비 경 비 합 계 비 고

V6 공사장내공차운반속도(KM/HR) =25 5
5
T1 적재시간(MIN) =1.1666 5
T2 왕복시간(MIN) =((L1/V1)+(L1/V2)+(L2/V3)+(L2/V4)+(L3/V5)+(L3/V6))*60= 30.9 5
T3 적하시간(MIN) =1.1666 5
T4 적재대기시간(MIN) =0.42 5
T5 적재함덮개 및 해체시간(MIN) =3.77 5
T6 세륜시간 (MIN) =1.5 5
5
CM 1회 싸이클 시간(MIN) =T1+T2+T3+T4+T5+T6= 38.92 5
Q 시간당 작업량(1000매/HR) =60*Q1*F*E/CM= 3.47 5
재료비: 4940 / 3.47 = 1423.6 1,423.6 1,423.6 5
노무비: 33064 / 3.47 = 9528.5 9,528.5 9,528.5 5
경 비: 5743 / 3.47 = 1655 1,655.0 1,655.0 5
소 계 12,607.1 12,607.1 5
5
2.지게차 하역 2.5TON(경비) 5
T0 적재용량(KG) =2500 5
R1 단위중량 (KG) =1000 5
Q1 적재량(톤) =T0/R1= 2.5 5
F 환산계수 =1 5
E 작업효율(양호) =0.75 5
M 계수( 타이1.8) =1.8 5
I 편도 주행거리(M) =20 5
T1 적재하는데 소요시간(초) =20 5
T2 운반기계가 도착되는 시간(초) =14 5
중기단가산출서
[태양광발전사업 실시설계 ]

산 출 내 역 재료비 노무비 경 비 합 계 비 고

N 적(재)하회수 =T/T0= 1 5
CM 1회싸이클시간(초) =((M*I)+T1+T2)= 70 5
CM1 적(재)하시간(초) =((M*I)+T1+T2)*N= 70 5
CM2 적(재)하시간(MIN) =(CM*N)/60= 1.1666 5
Q 시간당 작업량(1톤/HR) =3600*Q1*F*E/CM= 96.43 5
재료비: 6765/96.43 = 70.1 70.1 70.1 5
노무비: 8119/96.43 = 84.1 84.1 84.1 5
경 비: 3692/96.43 = 38.2 38.2 38.2 5
소 계 192.4 192.4 5
총 계 12,799 12,799

되메우기/토사, 두께 10cm 보통, 굴삭기 0.7m3+플레이트콤팩터 1.5ton+인력 10% M3 토목 8-5+12 ( 산근 4 ) 5


5
1.굴삭기 (무한궤도)0.7㎥M3 5
Q1 바켓용량(M3) = 0.7 5
k 바켓계수 = 1.1 5
L1 흐트러진상태 =1.25 5
C 다져진상태 =0.875 5
F 토량환산계(C/L) =C/L1= 0.7 5
E 작업효율(양호0.9,보통0.75,불량0.6) = 0.75 5
CM 1회 싸이클시간(90˚SEC) =18 5
Q 시간당 작업량 (M3/HR) = 3600*Q1*K*F*E/CM/0.9= 89.83 5
재료비: 17471 / 89.83 = 194.4 194.4 194.4 5
노무비: 38972 / 89.83 = 433.8 433.8 433.8 5
경 비: 21214 / 89.83 = 236.1 236.1 236.1 5
소 계 194.4 433.8 236.1 864.3 5
중기단가산출서
[태양광발전사업 실시설계 ]

산 출 내 역 재료비 노무비 경 비 합 계 비 고

5
2.보통인부(되메우기 0.1+인력흙다짐 0.14)0.24인*10% 5
노무비: 125427*0.24*0.1 = 3010.2 3,010.2 3,010.2 5
소 계 3,010.2 3,010.2 5
5
3.플레이트콤팩터,1.5톤 5
V 다짐속도(KM/HR) =1 5
W 유효 다짐 폭(M) =0.45 5
D 다짐두께(M) =0.1 5
E 작업효율(양호0.8,보통0.6,불량0.4) = 0.6 5
L1 흐트러진상태 =1.25 5
F 토량환산계(L1/L1) =L1/L1= 1 5
N 소요 다짐회수 =3 5
Q 시간당 작업량(M3/HR) =1000*V*W*D*E*F/N/0.9= 10 5
재료비: 1552 / 10 = 155.2 155.2 155.2 5
노무비: 25683 / 10 = 2568.3 2,568.3 2,568.3 5
경 비: 546 / 10 = 54.6 54.6 54.6 5
소 계 155.2 2,568.3 54.6 2,778.1 5
5
합 계 349.6 6,012.3 290.7 6,652.6 5
총 계 349 6,012 290 6,651

터파기/토사 보통, 굴삭기 0.7m3 70%, 인력30% M3 토목 8-5 ( 산근 5 ) 5


5
굴삭기(무한궤도),0.7㎥70%+인력30% M3 5
5
중기단가산출서
[태양광발전사업 실시설계 ]

산 출 내 역 재료비 노무비 경 비 합 계 비 고

Q1 바켓용량(M3) =0.70 5
K 바켓계수(양호1.1,보통0.90,불량0.70,파쇄암0.55) = 0.90 5
F 토량환산계수(1/L) = 1/1.25= 0.8 5
E1 터파기에 대하여 -0.05 =0.05 5
E 작업효율사질토(양호0.85,보통0.70,불량0.55) = 0.70-E1= 0.65 5
CM 1회 싸이클시간(135˚SEC) =20 5
Q 시간당 작업량 (M3/HR) = 3600*Q1*K*F*E/CM/0.7= 84.24 5
5
재료비: 17471 / 84.24 = 207.3 207.3 207.3 5
노무비: 38972 / 84.24 = 462.6 462.6 462.6 5
경 비: 21214 / 84.24 = 251.8 251.8 251.8 5
소 계 207.3 462.6 251.8 921.7 5
5
인력터파기,0-1m,보통인부0.2인*30% 5
Q 시간당 작업량 (M3/HR) = 1/8/0.2/0.3= 2.08 5
5
보통인부 1인/8HR*작업시간 5
노무비: 125427*1/8/2.08 = 7537.6 7,537.6 7,537.6 5
소 계 7,537.6 7,537.6 5
총 계 207 8,000 251 8,458

보차도 및 도로 경계블록 설치 15*15*15*100cm, 직선구간 EA 토목 10-5-3.2 ( 산근 6 ) 5


5
5
QQ 1일시공량(EA/일) =135 5
Q 시간당 작업량(EA/HR) =QQ/8/1.0= 16.88 5
중기단가산출서
[태양광발전사업 실시설계 ]

산 출 내 역 재료비 노무비 경 비 합 계 비 고

5
◈배치인원 5
5
1.인력 5
보통인부 1인/8HR*작업시간 5
노무비: 125427*1/8/16.88 = 928.8 928.8 928.8 5
특별인부 3인/8HR*작업시간 5
노무비: 152019*3/8/16.88 = 3377.1 3,377.1 3,377.1 5
소 계 4,305.9 4,305.9 5
5
◈사용기계 5
5
2.트럭탑재형 크레인, 5톤 1대 5
재료비: 7555 / 16.88 = 447.5 447.5 447.5 5
노무비: 33064 / 16.88 = 1958.7 1,958.7 1,958.7 5
경 비: 8721 / 16.88 = 516.6 516.6 516.6 5
소 계 447.5 1,958.7 516.6 2,922.8 5
5
총 계 447 6,264 516 7,227
단가대비표
[태양광발전사업 실시설계 ]

재 료 비 경 비
품 명 규격 단위 노무비 번 호 비 고
조달청가격 PAGE 거래가격 PAGE 유통물가 PAGE 조사가격1 PAGE 조사가격2 PAGE 적용단가 조달청가격 거래가격 유통물가 조사가격1 조사가격2 적용단가

굴삭기(무한궤도) 0.2㎥ 대 59,780.00 59,780.00 자재 1 천원

굴삭기(무한궤도) 0.7㎥ 대 101,750.00 101,750.00 자재 2 천원

덤프트럭 2.5ton 대 19,358.00 19,358.00 자재 3 천원

진동롤러(핸드가이드식) 0.7ton 대 5,838.00 5,838.00 자재 4 천원

래머 80kg 대 1,188.00 1,188.00 자재 5 천원

플레이트 콤팩터 1.5ton 대 1,473.00 1,473.00 자재 6 천원

크레인(타이어)(오거장착별도) 10ton 대 105,000.00 105,000.00 자재 7 천원

트럭탑재형 크레인 5ton 대 33,571.00 33,571.00 자재 8 천원

지게차 2.5ton 대 24,617.00 24,617.00 자재 9 천원

잡석 잡석, 서울, 도착도, 지정용 M3 27,000.00 90 27,000.00 자재 10

내수합판 내수합판, 1급, 12*1220*2440mm M2 8,419.00 9,708.41 620 8,902.17 417 8,419.00 자재 11

경유 경유, 저유황 L 1,234.54 1435 1,289.00 1237 1,234.54 자재 12

공업용휘발유 공업용휘발유, 무연 L 1,293.63 1435 1,386.00 1237 1,293.63 자재 13

접지용비닐절연전선 접지용비닐절연전선, F-GV, 6㎟ M 576.00 739.00 962 752.00 863 576.00 자재 14

접지용비닐절연전선 접지용비닐절연전선, F-GV, 16㎟ M 1,360.00 1,630.00 962 1,729.00 863 1,360.00 자재 15

접지용비닐절연전선 접지용비닐절연전선, F-GV, 25㎟ M 2,133.00 2,550.00 962 2,664.00 863 2,133.00 자재 16

접지용비닐절연전선 접지용비닐절연전선, F-GV, 35㎟ M 2,955.00 3,670.00 962 3,761.00 863 2,955.00 자재 17

접지용비닐절연전선 접지용비닐절연전선, F-GV, 70㎟ M 5,484.00 7,251.00 962 7,209.00 863 5,484.00 자재 18

접지용비닐절연전선 접지용비닐절연전선, F-GV, 95㎟ M 7,616.00 9,798.00 962 9,706.00 863 7,616.00 자재 19

접지용비닐절연전선 접지용비닐절연전선, F-GV, 120㎟ M 9,506.00 11,660.00 962 11,877.00 863 9,506.00 자재 20

접지용비닐절연전선 접지용비닐절연전선, F-GV, 150㎟ M 11,557.00 14,694.00 962 14,446.00 863 11,557.00 자재 21

접지용비닐절연전선 접지용비닐절연전선, F-GV, 185㎟ M 14,450.00 18,095.00 962 17,794.00 863 14,450.00 자재 22

네트워크케이블 UTP Cat. 5E, 4P M 262.00 470.00 970 470.00 878 262.00 자재 23

RS-485 1P*24AWG M 7,200.00 875 7,200.00 자재 24

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 1C*70㎟ M 5,784.00 5,917.00 961 7,732.00 864 5,784.00 자재 25

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 1C*120㎟ M 9,447.00 9,818.00 961 12,263.00 864 9,447.00 자재 26

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 1C*150㎟ M 11,486.00 11,933.00 961 14,907.00 864 11,486.00 자재 27

2kV RHW-2 1C x 250MCM M 20,622.00 20,622.00 자재 28

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 2C*16㎟ M 2,806.00 2,929.00 961 4,028.00 864 2,806.00 자재 29

2kV RHW-2 1C x 300MCM M 24,246.00 24,246.00 자재 30

2kV RHW-2 1C x 10AWG M 1,150.00 1,150.00 자재 31

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 3C*16㎟ M 4,199.00 4,339.00 961 6,023.00 864 4,199.00 자재 32

600V폴리에틸렌케이블 600V폴리에틸렌케이블, 0.6/1kv, F-CV, 3C*25㎟ M 6,383.00 6,736.00 961 9,356.00 864 6,383.00 자재 33

22.9KV동심중성선케이블 22.9kv동심중성선케이블, FR-CNCO-W, 수밀형무독성난연, 22.9kv, 250㎟ M 34,780.00 47,681.00 964 44,841.00 865 34,780.00 자재 34

전력케이블 22.9kv동심중성선케이블, 난연, FR-CNCO-W, 1*60㎟ M 12,211.00 16,743.00 964 15,735.00 865 12,211.00 자재 35

전력케이블 22.9kv동심중성선케이블, 난연, FR-CNCO-W, 1*200㎟ M 28,890.00 39,607.00 964 37,245.00 865 28,890.00 자재 36

전력케이블 22.9kv동심중성선케이블, 난연, FR-CNCO-W, 1*325㎟ M 43,470.00 59,596.00 964 56,045.00 865 43,470.00 자재 37
단가대비표
[태양광발전사업 실시설계 ]

재 료 비 경 비
품 명 규격 단위 노무비 번 호 비 고
조달청가격 PAGE 거래가격 PAGE 유통물가 PAGE 조사가격1 PAGE 조사가격2 PAGE 적용단가 조달청가격 거래가격 유통물가 조사가격1 조사가격2 적용단가

전력케이블 22.9kv동심중성선케이블, 난연, FR-CNCO-W, 1*400㎟ M 62,631.00 물자1082 62,631.00 자재 38

옥외광섬유케이블 LAP외피광케이블, 광케이블, SM 9/125, 4C M 671.00 671.00 자재 39

옥외광섬유케이블 LAP외피광케이블, 광케이블, SM 9/125, 8C M 759.00 759.00 자재 40

각재 각재, 외송 M3 376,675.00 449,101.79 125 389,221.55 73 376,675.00 자재 41

맨홀 1000*1000*1000 조 220,000.00 물가자료 211 220,000.00 자재 42

맨홀 600*600*600 조 90,000.00 물가자료 211 90,000.00 자재 43

맨홀 뚜껑 1120*620*132 조 495,000.00 물가자료 211 495,000.00 자재 44

맨홀(뚜껑포함) 1100*1800*1000 조 1,220,000.00 1,220,000.00 자재 45

콘크리트보차도경계블록(광주) SC형, 15*15*15*100cm, 51.8kg EA 5,000.00 194 5,000.00 자재 46 공장상차도

앵커볼트 앵커볼트, M16*300mm 개 713.00 750.00 83 750.00 53 713.00 자재 47

앵커볼트 앵커볼트, M25*600mm 개 3,382.00 3,560.00 83 3,382.00 자재 48

전산볼트 전산볼트, 스테인리스강, M16*1000mm 개 10,900.00 81 7,971.00 51 7,971.00 자재 49

육각너트 육각너트, M10 개 132.70 물가정보95 132.70 자재 50

육각너트 육각너트, 스테인리스, M16 개 379.20 85 379.80 56 379.20 자재 51

스텐평와셔 호칭경 16mm 개 73.24 물가정보90 73.24 자재 52

스텐평와셔 호칭경 10mm 개 22.78 물가정보90 22.78 자재 53

세트앵커 세트앵커, M10*L75mm 개 530.00 물가정보92 530.00 자재 54

케미컬 앵커 캡슐식 SET 8,000.00 54 8,000.00 자재 55

태양광 Module 390W 매 156,000.00 156,000.00 자재 56

Dummy Module Dummy 매 167,875.00 167,875.00 자재 57

Inverter 3.0MW 대 150,000,000.00 150,000,000.00 자재 58

Inverter 1.0MW 대 69,000,000.00 69,000,000.00 자재 59

PV 모니터링 식 238,930,010.00 238,930,010.00 자재 60

태양광 구조물 일반형 28매 EA 2,657,000.00 2,657,000.00 자재 61

ESS 설비 74MW, 286MWh 식 123,230,000,000.00 123,230,000,000.00 자재 62

154kV 변전소 식 6,307,000,000.00 6,307,000,000.00 자재 63

PV 수배전반 LOCAL전기실-A, B 식 1,051,515,000.00 1,051,515,000.00 자재 64

PV 수배전반 LOCAL전기실-C, D 식 702,975,000.00 702,975,000.00 자재 65

PV 수배전반 LOCAL전기실-E, F 식 989,556,000.00 989,556,000.00 자재 66

PV 수배전반 LOCAL전기실-G, H 식 989,556,000.00 989,556,000.00 자재 67

보안등기구 LED 50W EA 546,000.00 1003 546,000.00 자재 68

철제보안등주 5M, 1등용 본 1,183,000.00 1003 1,183,000.00 자재 69

가로등 방수 접속함 누전차단기(ELB)내장형 EA 55,000.00 55,000.00 자재 70

수배전반 임대 식 24,000,000.00 24,000,000.00 자재 71

MC4 커넥터 6㎟(1500V) SET 7,800.00 7,800.00 자재 72

지선자재SET 지선, 턴버클, 클립외(SUS) SET 96,000.00 물가정보 812 96,000.00 자재 73

접속반 24ch 면 4,752,000.00 4,752,000.00 자재 74


단가대비표
[태양광발전사업 실시설계 ]

재 료 비 경 비
품 명 규격 단위 노무비 번 호 비 고
조달청가격 PAGE 거래가격 PAGE 유통물가 PAGE 조사가격1 PAGE 조사가격2 PAGE 적용단가 조달청가격 거래가격 유통물가 조사가격1 조사가격2 적용단가

변압기 예비 EA 44,906,000.00 44,906,000.00 자재 75

기상센서 식 9,559,000.00 9,559,000.00 자재 76

CCTV 옥외 고정형(66EA) 식 180,091,560.00 180,091,560.00 자재 77

통합 모니터링 식 14,300,000.00 14,300,000.00 자재 78

태양광 구조물 일반형 56매 EA 5,107,000.00 5,107,000.00 자재 79

태양광 구조물 음지형 56매 EA 5,364,000.00 5,364,000.00 자재 80

태양광 구조물 음지형 28매 EA 2,792,000.00 2,792,000.00 자재 81

사무실 임시전력 식 100,000,000.00 100,000,000.00 자재 82

분전반 225AF/225AT 면 2,000,000.00 2,000,000.00 자재 83

태양광 Module 395W 매 167,875.00 167,875.00 자재 84

태양광 Module 380W 매 152,000.00 152,000.00 자재 85

TR 간선공사 식 110,000,000.00 110,000,000.00 자재 86

스탠밴드 9" EA 2,200.00 2,200.00 자재 87

풀박스 풀박스, 접지단자함, 1CCT, 스테인리스 개 71,700.00 83,000.00 1064 114,000.00 961 71,700.00 자재 88

풀박스 풀박스, 접지단자함, 3CCT, 스테인리스 개 136,500.00 158,000.00 1064 217,500.00 961 136,500.00 자재 89

풀박스 풀박스, 접지단자함, 10CCT, 스테인리스 개 375,800.00 375,800.00 자재 90

통신용발포지수제 통신용발포지수제, 발포지수제, D150이하 개 21,730.00 21,730.00 자재 91

통신용발포지수제 통신용발포지수제, 수밀보호테이프 개 2,300.00 2,300.00 자재 92

경고테이프 M 184.00 1107 130.00 553 130.00 자재 93

케이블단말접속자재 케이블단말접속자재, 자기수축, 23kv, 1C*60㎟ KIT 55,500.00 222,000.00 988 222,000.00 885 55,500.00 자재 94

케이블단말접속자재 케이블단말접속자재, 자기수축, 23kv, 1C*200㎟ KIT 94,000.00 376,000.00 988 376,000.00 885 94,000.00 자재 95

케이블단말접속자재 케이블단말접속자재, 자기수축, 23kv, 1C*250㎟ KIT 95,750.00 383,000.00 988 383,000.00 885 95,750.00 자재 96

케이블단말접속자재 케이블단말접속자재, 자기수축, 23kv, 1C*325㎟ KIT 106,500.00 426,000.00 988 426,000.00 885 106,500.00 자재 97

케이블단말접속자재 케이블단말접속자재, 자기수축, 23kv, 1C*400㎟ KIT 107,750.00 431,000.00 988 431,000.00 885 107,750.00 자재 98

케이블직선접속자재 케이블직선접속자재, 레진주입, 23kv, 1C*60㎟ KIT 120,300.00 171,800.00 988 171,800.00 885 120,300.00 자재 99

케이블직선접속자재 케이블직선접속자재, 레진주입, 23kv, 1C*200㎟ KIT 161,700.00 231,000.00 988 231,000.00 885 161,700.00 자재 100

케이블직선접속자재 케이블직선접속자재, 레진주입, 23kv, 1C*250㎟ KIT 163,100.00 233,000.00 988 233,000.00 885 163,100.00 자재 101

케이블직선접속자재 케이블직선접속자재, 레진주입, 23kv, 1C*325㎟ KIT 164,500.00 235,000.00 988 235,000.00 885 164,500.00 자재 102

케이블직선접속자재 케이블직선접속자재, 레진주입, 23kv, 1C*400㎟ KIT 198,800.00 284,900.00 988 284,900.00 885 198,800.00 자재 103

케이블직선접속자재 케이블직선접속자재, 레진주입, 6.9kv1C×150㎟ kit 79,500.00 113,500.00 988 113,500.00 885 79,500.00 자재 104

볼트형커넥터 볼트형커넥터, U볼트형, ∮16mm 개 2,820.00 5,250.00 961 2,820.00 자재 105

압착단자 압착단자, 터미널, 6㎟ 개 34.00 52.00 986 52.00 887 34.00 자재 106

압착단자 압착단자, 터미널, 16㎟ 개 80.00 150.00 986 150.00 887 80.00 자재 107

압착단자 압착단자, 터미널, 25㎟ 개 120.00 225.00 986 225.00 887 120.00 자재 108

압착단자 압착단자, 터미널, 70㎟ 개 420.00 787.00 986 787.00 887 420.00 자재 109

압착단자 압착단자, 터미널, 95㎟ 개 534.00 997.00 986 997.00 887 534.00 자재 110

압착단자 압착단자, 터미널, 150㎟ 개 964.00 1,802.00 986 1,802.00 887 964.00 자재 111
단가대비표
[태양광발전사업 실시설계 ]

재 료 비 경 비
품 명 규격 단위 노무비 번 호 비 고
조달청가격 PAGE 거래가격 PAGE 유통물가 PAGE 조사가격1 PAGE 조사가격2 PAGE 적용단가 조달청가격 거래가격 유통물가 조사가격1 조사가격2 적용단가

압착단자 압착단자, 터미널, 185㎟ 개 1,696.00 3,172.00 986 3,172.00 887 1,696.00 자재 112

러그단자 러그단자, 동관단자, 1홀, 16㎟ 개 343.00 629.00 986 629.00 887 343.00 자재 113

러그단자 러그단자, 동관단자, 1홀, 25㎟ 개 393.00 720.00 986 720.00 887 393.00 자재 114

러그단자 러그단자, 동관단자, 1홀, 35㎟ 개 512.00 936.00 986 936.00 887 512.00 자재 115

러그단자 러그단자, 동관단자, 1홀, 70㎟ 개 1,000.00 1,783.00 986 1,783.00 887 1,000.00 자재 116

러그단자 러그단자, 동관단자, 1홀, 150㎟ 개 2,400.00 4,213.00 986 4,213.00 887 2,400.00 자재 117

접지봉 접지봉, 14∮*1000mm 개 2,880.00 3,500.00 1064 3,900.00 961 2,880.00 자재 118

접지봉 접지봉, 16∮*1800mm 개 4,360.00 5,400.00 1064 6,900.00 961 4,360.00 자재 119

피뢰침 피뢰침, 고압펄스식, 폴포함, 보호반경 107m 개 2,550,000.00 6,000,000.00 1064 2,550,000.00 자재 120

접지 저항 저감제 아스론 10kg 포 50,000.00 1064 10,500.00 961 10,500.00 자재 121

웰딩접지공구 MOLD"-", "+", "T" EA 57,000.00 물가정보 1207 57,000.00 자재 122

HANDLE CLAMPMEDIUM EA 49,500.00 물가정보 1207 49,500.00 자재 123

POWDER(WELD METAL) #115 EA 4,500.00 물가정보 1207 4,500.00 자재 124

전기용행어 케이블걸이, 걸이쇠, 2조 개 2,725.00 1107 2,725.00 자재 125

전기용행어 케이블받침대, 75*40*5*750mm 개 자재 126

케이블트레이 카/포 Straight, 스틸, 600*100*t2.3mm M 47,460.00 896 47,460.00 자재 127

케이블트레이 카/포 Straight, 스틸, 400*100*t2.3mm M 35,560.00 896 35,560.00 자재 128

케이블트레이 카/포 Straight, 스틸, 300*100*t2.3mm M 30,030.00 896 30,030.00 자재 129

케이블트레이 카/포 Straight, 스틸, 150*100*t2.3mm M 16,580.00 896 16,580.00 자재 130

H/V ELBOW[ST] 카/포 600*100 EA 65,700.00 896 65,700.00 자재 131

H/V ELBOW[ST] 카/포 400*100 EA 42,840.00 896 42,840.00 자재 132

H/V ELBOW[ST] 카/포 300*100 EA 33,820.00 896 33,820.00 자재 133

H/V TEE[ST] 카/포 600*100 EA 113,190.00 896 113,190.00 자재 134

케이블트레이피팅및액세서리 케이블트레이부속품, Joint connector, 아연도, 100*t2.3mm EA 949.00 1,360.00 901 949.00 자재 135

케이블트레이피팅및액세서리 케이블트레이부속품, Shank bolt and nut, 스테인리스 EA 313.00 520.00 901 313.00 자재 136

케이블트레이피팅및액세서리 케이블트레이부속품, Bonding jumper, 38㎟ EA 1,983.00 1,983.00 자재 137

케이블트레이피팅및액세서리 케이블트레이부속품, U Channel, 41*41*t2.6mm M 5,250.00 5,250.00 자재 138

경질비닐전선관 경질비닐전선관, HI, 70mm M 2,052.00 3,359.00 991 2,492.00 890 2,052.00 자재 139

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 30mm M 305.00 391.00 992 393.00 890 305.00 자재 140

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 40mm M 409.00 563.00 992 589.00 890 409.00 자재 141

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 50mm M 578.00 750.00 992 739.00 890 578.00 자재 142

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 65mm M 872.00 1,250.00 992 982.00 890 872.00 자재 143

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 80mm M 1,180.00 1,719.00 992 1,374.00 890 1,180.00 자재 144

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 100mm M 1,550.00 2,188.00 992 2,067.00 890 1,550.00 자재 145

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 125mm M 2,300.00 3,204.00 992 2,945.00 890 2,300.00 자재 146

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 150mm M 3,220.00 3,906.00 992 4,123.00 890 3,220.00 자재 147

파상형경질폴리에틸렌전선관 파상형경질폴리에틸렌전선관, 175mm M 5,290.00 7,500.00 992 5,891.00 890 5,290.00 자재 148
단가대비표
[태양광발전사업 실시설계 ]

재 료 비 경 비
품 명 규격 단위 노무비 번 호 비 고
조달청가격 PAGE 거래가격 PAGE 유통물가 PAGE 조사가격1 PAGE 조사가격2 PAGE 적용단가 조달청가격 거래가격 유통물가 조사가격1 조사가격2 적용단가

1종금속제가요전선관 1종금속제가요전선관, 16mm, 비방수 M 360.00 1,200.00 993 1,200.00 891 360.00 자재 149

1종금속제가요전선관 1종금속제가요전선관, 고장력후렉시블전선관, 16mm, 방수 M 752.00 1,680.00 993 1,680.00 891 752.00 자재 150

1종금속제가요전선관 1종금속제가요전선관, 고장력후렉시블전선관, 54mm, 방수 M 4,040.00 8,970.00 993 8,970.00 891 4,040.00 자재 151

1종금속제가요전선관 1종금속제가요전선관, 70mm, 고장력/방수 M 6,470.00 10,710.00 993 10,710.00 891 6,470.00 자재 152

관구밀폐기 관구밀폐기, 실링가스켓, D50 개 10,080.00 10,080.00 자재 153

관구밀폐기 관구밀폐기, 실링가스켓, D80 개 12,470.00 12,470.00 자재 154

관구밀폐기 관구밀폐기, 실링가스켓, D100 개 17,640.00 17,640.00 자재 155

관구밀폐기 관구밀폐기, 실링가스켓, D150 개 25,200.00 25,200.00 자재 156

관구밀폐기 관구밀폐기, 실링가스켓, D175 개 자재 157

관구밀폐기 관구밀폐기, 실링가스켓, D200 개 자재 158

관구밀폐기 관구밀폐기, 이종연결관, ∮50mm 개 2,520.00 2,520.00 자재 159

관구밀폐기 관구밀폐기, 이종연결관, ∮80mm 개 3,020.00 3,020.00 자재 160

관구밀폐기 관구밀폐기, 이종연결관, ∮100mm 개 3,780.00 3,780.00 자재 161

관구밀폐기 관구밀폐기, 이종연결관, ∮150mm 개 6,300.00 6,300.00 자재 162

관구밀폐기 관구밀폐기, 이종연결관, ∮125mm 개 5,040.00 5,040.00 자재 163

관구밀폐기 관구밀폐기, 이종연결관, ∮175mm 개 자재 164

탄소접지봉 EA 600,000.00 물가정보812 600,000.00 자재 165

슬리브접속 C TYPE SLEEVE 70㎟ EA 1,580.00 961 1,580.00 자재 166

번디클램프 U볼트 동봉용 EA 7,700.00 물가정보812 7,700.00 자재 167

BC-WIRE 70㎟ M 5,700.00 물가정보703 5,700.00 자재 168

수막처리동봉 300x1.5x1장 EA 50,000.00 물가정보812 50,000.00 자재 169

석연선 6㎟ EA 380.00 380.00 자재 170

슬리브접속 C TYPE SLEEVE 185㎟ EA 5,370.00 961 5,370.00 자재 171

슬리브접속 C TYPE SLEEVE 150㎟ EA 3,000.00 961 3,000.00 자재 172

슬리브접속 C TYPE SLEEVE 25㎟ EA 260.00 961 260.00 자재 173

슬리브접속 C TYPE SLEEVE 16㎟ EA 330.00 961 330.00 자재 174

사용전검사 식 168,850,000.00 168,850,000.00 자재 175

정밀안전진단 식 317,900,000.00 317,900,000.00 자재 176

슬리브접속 C TYPE SLEEVE 95㎟ EA 2,460.00 961 2,460.00 자재 177

지중선로표지주 EA 79,000.00 물자 1087 79,000.00 자재 178

BC-WIRE 95㎟ M 7,900.00 물가정보1089 7,900.00 자재 179

슬리브접속 C TYPE SLEEVE 120㎟ EA 2,810.00 물가정보 1207 2,810.00 자재 180

쇄석자갈 #57, 25mm ㎥ 19,000.00 물가정보 104 19,000.00 자재 181

작업반장 일반공사 직종 인 153,186.00 노임 1 B

보통인부 일반공사 직종 인 125,427.00 노임 2 B

특별인부 일반공사 직종 인 152,019.00 노임 3 B

비계공 일반공사 직종 인 224,359.00 노임 4 B


단가대비표
[태양광발전사업 실시설계 ]

재 료 비 경 비
품 명 규격 단위 노무비 번 호 비 고
조달청가격 PAGE 거래가격 PAGE 유통물가 PAGE 조사가격1 PAGE 조사가격2 PAGE 적용단가 조달청가격 거래가격 유통물가 조사가격1 조사가격2 적용단가

형틀목공 일반공사 직종 인 201,951.00 노임 5 B

콘크리트공 일반공사 직종 인 198,242.00 노임 6 B

줄눈공 일반공사 직종 인 146,786.00 노임 7 B

건설기계운전사 일반공사 직종 인 187,069.00 노임 8 B

화물차운전사 일반공사 직종 인 158,708.00 노임 9 B

일반기계운전사 일반공사 직종 인 123,282.00 노임 10 B

내선전공 일반공사 직종 인 225,408.00 노임 11 B

특고압케이블전공 일반공사 직종 인 323,944.00 노임 12 B

저압케이블전공 일반공사 직종 인 235,560.00 노임 13 B

배전전공 일반공사 직종 인 336,973.00 노임 14 B

플랜트전공 일반공사 직종 인 205,890.00 노임 15 B

통신내선공 일반공사 직종 인 204,358.00 노임 16 B

통신케이블공 일반공사 직종 인 326,000.00 노임 17 B

광케이블설치사 광전자 직종 인 332,790.00 노임 18 B

전기공사산업기사 기타 직종 인 211,437.00 노임 19 B

You might also like