HVACFinal Report
HVACFinal Report
net/publication/318053958
CITATIONS READS
0 6,063
1 author:
SEE PROFILE
All content following this page was uploaded by Md Raziun Bin Mamtaz on 01 July 2017.
1
Contents
1. Introduction ................................................................................................................ 4
2. Floor Plan..................................................................................................................... 5
2
5.5.2. Manager Room ............................................................................................19
5.5.3. Toilet........................................................................................................... 20
Reference ........................................................................................................................... 25
Appendix ........................................................................................................................... 25
3
1. Introduction
The aim of the project is to develop a complete HVAC (Heating, Ventilating, and Air
Conditioning) design for an international fast food chain’s one story restaurant shop.
This development is a part of the large-scale project of developing Kowloon Cultural
district. The purpose of this project is to draw tourist attraction, leisure suitability,
landmark, and other infrastructural growth.
In this project, the floor plan of the restaurant was drawn considering the functionality,
usability, and location requirement. But most importantly the design requirement of the
rooms was analyzed in the floor plan. Then using Cymap Software application energy
evaluation was performed followed by building design, ducting system design, and
piping system design. The design evaluation analyzed the design requirement for each
of the rooms and based on the lighting, equipment used, people present in the room,
the exposure of the walls faces of the room, and the elements in the faces (window,
doors, etc.)
4
2. Floor Plan
Kitchen room
Dining room
Storage room
Manager office
Toilet (including the changing rooms) for male and female
Plant room to arrange the AHU
The main entrance door on the east side is exposed towards the sun, it has a window on
the side. The north side of the restaurant is partitioned with the neighboring shop, and
so is the south wall of the restaurant which is the kitchen wall. The wall in the west is
exposed to shade.
5
3. Building Design
This design included the process after the floor planning. The chosen room boundary
was profiled with walls’ face features, doors, windows, and other elements conditions.
The 6 rooms the same themed doors, windows, and walls. The materials used in each
room and their U-values can be summarized in the table below.
U Area
Room Type Element Qty.
Value (m²)
Plant
Partition External Wall as Partition 0.24 2.1
Room
Internal
Timber Door 0.63 0.2 1
Door
L1A 2013 Party Wall
Partition 0.03 3
Solid\Sealed\Ins
External
L1A 2013 Wall 0.18 1.1
Wall
Exposed
L1A Exposed Floor 0.13 0.3
Floor
Roof L1A 2013 Roof 0.13 0.3
Manager L1A 2013 Party Wall
Partition 0.03 5.2
Room Solid\Sealed\Ins
Internal
Timber Door 0.63 0.3 1
Door
External
L1A 2013 Wall 0.18 0.7
Wall
Exposed
L1A Exposed Floor 0.13 0.4
Floor
Roof L1A 2013 Roof 0.13 0.4
External L1A 2013 Whole Window
1.4 0.5 1
Window U-value
Toilet
(w/ L1A 2013 Party Wall
Partition 0.03 5.8
Change Solid\Sealed\Ins
Rooms)
Internal
Timber Door 0.63 0.3 1
Door
External
L1A 2013 Wall 0.18 1.6
Wall
Exposed
L1A Exposed Floor 0.13 0.5
Floor
Roof L1A 2013 Roof 0.13 0.5
6
External L1A 2013 Whole Window
1.4 0.3 1
Window U-value
Storage L1A 2013 Party Wall
Partition 0.03 3.4
Room Solid\Sealed\Ins
Internal
Timber Door 0.63 0.3 1
Door
Partition External Wall as Partition 0.24 2.1
External
L1A 2013 Wall 0.18 1.6
Wall
Exposed
L1A Exposed Floor 0.13 0.5
Floor
Roof L1A 2013 Roof 0.13 0.5
Internal
Kitchen Timber Door 0.63 0.6 2
Door
L1A 2013 Party Wall
Partition 0.03 7.7
Solid\Sealed\Ins
External
L1A 2013 Wall 0.18 1.5
Wall
Internal 4mm Toughened Safety
5.7 1 1
Window Glass BS 6206: Class A
Partition External Wall as Partition 0.24 5.7
Exposed
L1A Exposed Floor 0.13 1.4
Floor
Roof L1A 2013 Roof 0.13 1.4
Dining Internal 4mm Toughened Safety
5.7 0.9 1
Room Window Glass BS 6206: Class A
L1A 2013 Party Wall
Partition 0.03 16
Solid\Sealed\Ins
External
Solid Oak Timber Door 2.04 1.1 1
Door
External
L1A 2013 Wall 0.18 2.8
Wall
Internal
Timber Door 0.63 1.2 4
Door
Exposed
L1A Exposed Floor 0.13 4.3
Floor
Roof L1A 2013 Roof 0.13 4.3
External L1A 2013 Whole Window
1.4 0.8 1
Window U-value
7
ac/h and the Mechanical Ventilation was chosen to be 5.100 l/s/p in m3/s [1]. The other
general condition that was selected was 11.67 m2/p of people was averaged over the
period of 1000 to 2100 hours of working hours. This number was chosen by dividing the
area of the restaurant with the expected number of customers, guest, staffs, etc. are
expected to have light activity in the restaurant. The additional light power distributed
to the restaurant was assumed to be 0.6W because of light from the other rooms.
Equipment
Light Power
Room Area (m2) Power Density
Density (W/ m2)
(W/ m2)
Plant Room 32 10 21.85
Manager Room 36 12 1.75
Toilet 55 11 3.06
Storage Room 47 9 1.75
Kitchen 143 13 8.74
Dining Room 433 17 6.56
The other features of the room design are summarized in the table 2. The area was
calculated by Cymap after defining the room dimensions. Then these values have been
scaled up (1:100) from the plan drawing. The lights were assumed for each room by
referring to the standards [2]. The power consumption by using different equipment of
the room was evaluated from the government publication of U.S. Energy Department
[3]. Using the total calculated value, the relative power consumption was evaluated to
assign the power consumption as given in table 2.
4. Energy Analysis
It was decided that the restaurant would not require a heating system, much like many
other buildings in Hong Kong. The Energy analysis consists of analyzing the individual
8
room gains (for July), summary of the room gains, heat gain comparison of the building
(zonal), energy consumption valuation, and temperature variation in each room. The
electricity costs were taken from the standards provided by Hong Kong Electric Limited
and CLP Power Hong Kong Limited. [4, 5]
9
4.1.2. Manager Room
10
Figure 8: Toilet’s temperature for July (One Day)
11
4.1.5. Kitchen
12
4.1.6. Dining Room
Figure 13: Dining Room’s heat gain for July (One Day)
The temperature and gain data for plant room is provided in the appendix (A1) to show
what data was used to make the above graphical representations.
Supply
Jul Aug Sep
Room Latent Air Equivalent
Sensible Sensible Sensible
Name kW Vol. ac/h
kW kW kW
m³/s
Plant
0.04* 0.04 0.03 0.02 0.006 23.3
Room
13
Manager
0.07* 0.07 0.05 0.02 0.01 36.5
Room
Toilet 0.08* 0.07 0.05 0.03 0.011 26.7
Storage
0.05* 0.05 0.03 0.02 0.007 19.4
Room
Kitchen 0.17* 0.16 0.1 0.07 0.023 21.3
Dining
0.59* 0.54 0.37 0.2 0.08 24.5
Room
Figure 15: The heat gain comparison for July, August, and September
14
4.4.1. Fuel Expenditure
Figure 16: Fuel cost in Hong Kong Dollar for each month in year for different usage
Figure 17: Energy (in GJ) for each month by different usage in Restaurant
15
4.4.3. Load distribution
Figure 18: Plant loads (in kW) for July (average day)
The ductwork design of the restaurant is designed in manifold, they are: equipment
(ducting) summary, results of each grilles, air requirements of rooms, design layout of
the ductwork, the noise level and its correction. [6]
16
5.1. Ducting Summary
Table 5: Ducting System Summary of the overall design
Supply Required
No. Room
(m3/s) (m3/s)
1 Plant Room 0.006 0.006
2 Manager Room 0.01 0.01
17
Toilet (w/ Changing
3 0.011 0.011
Room)
4 Storage Room 0.007 0.007
5 Kitchen 0.023 0.023
6 Dining Room 0.08 0.08
18
5.5. Room Noise
5.5.1. Plant Room
19
5.5.3. Toilet
5.5.5. Kitchen
20
5.5.6. Dining Room
The above noise level was analyzed from the tabulated values (A3). And the noise level
of plant room was taken as reference for design selection of attenuator. After inserting
following attenuation:
10 19 25 25 22 17 12
The piping of the ventilation and air conditioning system is designed for only required
rooms. Based on the room sizes this part of the HVAC design includes the design layout,
summarized piping equipment, cooling coil performance analysis, and the flow pipes
summary.
21
6.1. Piping Design Layout
22
6.3. Cooling Coil Performance Evaluation
6.3.1. Cooling coil pressure and output
Table 9: Cooling coil balancing pressure and output results
On
Cooling Off Temp Nominal
Temp
Coil No. (°C) Output (kW)
(°C)
1 7.1 12.9 0.2
2 7.13 12.93 0.2
3 7.1 12.9 0.2
4 7.12 12.92 0.2
Required
Required
Heating Cooling Sensible
No. Room Heating
(kW) (kW) Cooling
(kW)
(kW)
1 Plant Room 0 0.05 0 0.04
2 Manager Room 0 0.06 0 0.07
Toilet (w/
3 Change 0 0.09 0 0.08
Rooms)
4 Storage Room 0 0.07 0.2 0.05
5 Kitchen 0 0.2 0.2 0.17
6 Dining Room 0 0.63 0.4 0.59
23
6.5. Flow Pipes Summary
24
Reference
[1] "Green Building Tech - Natural Ventilation", Gbtech.emsd.gov.hk, 2017. [Online].
Available: http://gbtech.emsd.gov.hk/english/utilize/natural.html. [Accessed: 18- May-
2017].
[6] "Cost to Install Ductwork - Estimates and Prices at Fixr", Fixr.com, 2017. [Online].
Available: https://www.fixr.com/costs/ductwork. [Accessed: 18- May- 2017].
Appendix
A1: Summer Temperature and Heat Gain of Plant Room
Summer Temp.:
25
11 0 -6 13 -7 24.1 22.3
12 0 -9 13 -4 25.1 24.1
13 0 -12 13 -1 26 25.6
14 0 -13 13 0 26.5 26.6
15 0 -14 13 1 26.7 26.9
16 0 -13 13 0 26.6 26.7
17 0 -13 13 0 26.3 26.2
18 0 -11 13 -2 25.9 25.4
19 0 -10 13 -3 25.3 24.4
20 0 -8 13 -5 24.5 23.1
21 0 0 0 0 21.8 21.7
22 0 3 0 -3 20.9 20.2
23 0 5 0 -5 20.1 18.7
24 0 8 0 -8 19.3 17.3
Heat Gain:
26
A2: Cooling Load Distribution
hr Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1
2
3
4
5
6
7
8
9 0 0 0
10 0 0 0.2 0.2 0
11 0 0.1 0.3 0.3 0.1
12 0 0.2 0.4 0.4 0.1
13 0 0.2 0.5 0.5 0.1
14 0.1 0.3 0.6 0.5 0.2
15 0.1 0.3 0.6 0.5 0.2
16 0 0.2 0.5 0.5 0.2
17
18
19
20
21
22
23
24
27
G) Permiss. at
50 45 41 39 36 35 34
Grilles F-E
H) Attenuation
10 19 25 25 22 17 12
Reqd. A-G
Total db(A) at
64
grilles
Manager Room:
28
G) Permiss. at
54 49 45 43 39 38 37
Grilles F-E
H) Attenuation
0 4 10 10 8 3 0
Reqd A-G
Total db(A) at
53
grilles
Storage Room:
Kitchen:
29
F) Values at
61 54 48 44 40 38 37
NR = 45
G) Permiss. at
57 52 48 45 42 40 39
Grilles F-E
H) Attenuation
0 0 0 0 0 0 0
Reqd. A-G
Total db(A) at
39
grilles
Dining Room:
30