CWP - PKT Project
CWP - PKT Project
A000
R000
B000
A000
B000
Level 1
A000
B000
A000 C000
D000
E000
R000
U000
Description
Process Area
Building Area
Common Area (Road, Ditch, Fence)
Electrical Cable ISBL
Instrument Cable ISBL
Existing Pipe Rack Area
Underground for All Area
B200
B300
A400
A100
R000
A300
B100
A200
Level 2 Description
A100 Process Area 1 - Compressor, LP Condensate, CO2 Cooling and Stripping Area
A200 Process Area 2 - Reformer, Fuel, Demin Water, Condensate, Methanator and Feed / Effluent Area
A300 Process Area 3 - Ammonia Synth Area
A400 Process Area 4 - Air Compressor and AWU Area
B100 Electrical Building Area
B200 Electrical Control Room and Main Office (Existing)
B300 Siwtchgear SWGR-11 (Existing)
C000 Common Area (Road, Ditch, Fence)
D000 Electrical Cable ISBL
E000 Instrument Cable ISBL
R000 Existing Pipe Rack Area
U000 Underground for All Area
B300
B100
R000
A300
A200
BQ Duration
CWP Doc. Description Actual UOM (days)
9832-CWP-3138-A100 Piling 01 63 EA 30
9832-CWP-3138-A200 Piling 02 54 EA 35
9832-CWP-3138-A300 Piling 03 6 EA 6
9832-CWP-3138-A400 Piling 04 5 EA 8
9832-CWP-3138-B000 Piling 05 61 EA 14
9832-CWP-3138-R000 Piling 06 88 EA -
emporary Chemical Shelter, Operation Shelter Alternative Relocation, New Electrical Room, Trafo Yard)
9832-CWP-3147-B100-Substructure Substructure m2
9832-CWP-3165-B100-Superstructure Superstructure m2
9832-CWP-3165-B100-Steel Structure Steel Structure m2
9832-CWP-3165-B100-Exterior Finishing Exterior Finishing m2
9832-CWP-3165-B100-Interior Finishing Interior Finishing m2
9832-CWP-31C-B100-Plumbing & Sanitary Plumbing & Sanitary m2
9832-CWP-31F-B100-Electrical Electrical m2
emporary Chemical Shelter, Operation Shelter Alternative Relocation, New Electrical Room, Trafo Yard)
Transformer Yard
Furniture & Equipment
Lanscaping
Start Date End Date
5/30/2024 6/29/2024
6/29/2024 8/3/2024
8/17/2024 8/23/2024
8/23/2024 8/31/2024
8/3/2024 8/17/2024
N/A N/A
N/A
53
Steam Ejector 0 0 0
0 0 0
Pipe Support 0 0 0
A100 FIWP 01
111-CB,1102-E,Pipe Support,160-C - 106C,Pipe Support,1102-JA/JB,Pipe Support,Pipe Support,1106-C,1103-E,1103-JA/JB,Pipe Sup
#VALUE!
PCWBS FWBS Disc. Required Doc CWP Doc. FIWP Doc
PILING
A100 38 3138 9832-EWP-1338-A100 9832-CWP-3138-A100
ENG FIWP 01
- Piling layout FIWP 02
- Design spec FIWP 03
- MTO
FIWP 04
- Typical Piling
CONS FIWP 05
- Method Statement FIWP 06
A200 38 3138 9832-EWP-1338-A200 9832-CWP-3138-A200
ENG FIWP 01
- Piling layout FIWP 02
- Design spec FIWP 03
- MTO
- Typical Piling
CONS
- Method Statement
- JSA, JRA, Lifting Plan
QC
- ITP
Piling 01 67
111-CB,1102-E,Pipe Support 12 6 6
160-C - 106C,Pipe Support,1102-JA/JB 8 8 0
1102-JA/JB,Pipe Support 21 17 4
1106-C,1103-E,1103-JA/JB,Pipe Support 18 13 5
110x JA/JB, 108-JA/JB, Pipe Support 13 9 4
1102-F,1106-J & Aux,Pipe Support 17 8 9
Piling Rig 1 Piling 02 54
1104-E,1101-E,1101-C 20 3 17
1102-C A/B,1103-C,1104-CA/CB,1107-C 15 4 0
Pipe Support 19 16 12
Piling 03 7
Piling Rig 1 1105-L,Pipe Support 7 7 0
Piling 04 12
Piling Rig 1 1105-F,Pipe Support 12 12 0
Piling Rig 1 Pipe Support 0 0 0
Piling 05 24
Building 0 0 0
Building 0 0 0
Piling 06 88
Start Date End Date Note:
Duration Due Date Productivity = 1
UOM PMS
(days) CWP Piling Rig : 2 uni
PMS Propose PMS Propose
EA 0 5 5-Mar-24 12-Mar-24
EA 0 3/5/2024 3/7/2024
EA 0 3/7/2024 3/9/2024
EA 0 N/A N/A
Note:
Productivity = 1 alat = 2 titik / hari
Piling Rig : 2 unit
EWP Doc.
PCWBS FWBS Disc.
Required Doc
BUILDING
B100 47 3147 9832-EWP-1347-B100
B100 ENG
- Piling layout drawing
- Foundation layout drawing
- Section & detail Foundation
B100
B100
9832-CWP-3147-B100-Substructure Substructure
FIWP 01 Electrical Building + Trafo Yard
9832-CWP-3165-B100-Superstructure Superstructure
- Upper structure (column, beam) FIWP 01 Electrical Building + Trafo Yard
- Roof FIWP 02 Operation Shelter
Steel Structure
FIWP 03 Temporary Chemical Shelter
9832-CWP-3165-B100-Steel Structure Exterior Finishing
- Exterior Wall FIWP 01 Electrical Building + Trafo Yard
- Wall Finishing FIWP 02 Operation Shelter
- Painting
- Waterproofing
FIWP 03 Temporary Chemical Shelter
9832-CWP-3165-B100-Exterior Finishing Interior Finishing
#VALUE! FIWP 01 Electrical Building + Trafo Yard
FIWP 02 Operation Shelter
FIWP 03 Temporary Chemical Shelter
9832-CWP-3165-B100-Interior Finishing Interior Finishing
FIWP 01 Electrical Building + Trafo Yard
FIWP 02 Operation Shelter
FIWP 03 Temporary Chemical Shelter
Substructure 211 m3
Electrical Building + Trafo Yard 99 m3
Earthwork
Foundation Work
Slab
Operation Shelter 62 m3
Earthwork
Foundation Work
Slab
Temporary Chemical Shelter 49 m3
Earthwork
Foundation Work
Slab
Superstructure m2
Electrical Building + Trafo Yard 13 m2
Operation Shelter 5 ton
Steel Structure m2
Temporary Chemical Shelter 4 ton
Exterior Finishing
Electrical Building + Trafo Yard
Operation Shelter
Note:
Productivity = xx
FWBS Discipline EWP Doc. CWP Doc. FIWP Doc
PILING
A100 38 3138 9832-EWP-1338-A100 9832-CWP-3138-A100
FIWP 01
FIWP 02
FIWP 03
FIWP 04
FIWP 05
FIWP 06
A200 38 3138 9832-EWP-1338-A200 9832-CWP-3138-A200
FIWP 01
FIWP 02
FIWP 03
FIWP 04
A300 38 3138 9832-EWP-1338-A300 9832-CWP-3138-A300
FIWP 01
A400 38 3138 9832-EWP-1338-A400 9832-CWP-3138-A400
FIWP 01
FIWP 02
B000 38 3138 9832-EWP-1338-B000 9832-CWP-3138-B000
FIWP 01
FIWP 02
R000 38 3138 9832-EWP-1338-R000 9832-CWP-3138-R000
FOUNDATION
A100 31 9832-EWP-31-A100 9832-CWP-31-A100
FIWP 01
FIWP 02
FIWP 03
FIWP 04
FIWP 05
A200 31 9832-EWP-31-A200 9832-CWP-31-A200
FIWP 01
FIWP 02
FIWP 03
FIWP 04
FIWP 05
A300 31 9832-EWP-31-A300 9832-CWP-31-A300
FIWP 01
A400 31 9832-EWP-31-A400 9832-CWP-31-A400
FIWP 01
B000 31 9832-EWP-31-B000 9832-CWP-31-B000
FIWP 01
FIWP 02
FIWP 03
FIWP 04
FIWP 05
R000 31 9832-EWP-31-R000 9832-CWP-31-R000
Data from PMS
Description BQ Duration
Equipment UOM
(Equipment) (days)
Plan Actual
Piling 01 89 EA 46
Piling Rig 1 111-CB,1102-E,Pipe Support 15 12 EA 6
Piling Rig 1 160-C - 106C,Pipe Support,1102-JA/JB 15 8 EA 4
Piling Rig 1 1102-JA/JB,Pipe Support 15 21 EA 11
Piling Rig 1 1106-C,1103-E,1103-JA/JB,Pipe Support 15 18 EA 9
Piling Rig 1 110x JA/JB, 108-JA/JB, Pipe Support 15 13 EA 7
Piling Rig 1 1102-F,1106-J & Aux,Pipe Support 15 17 EA 9
Piling 02 66 EA 26
Piling Rig 2 1104-E,1101-E,1101-C 17 20 EA 10
Piling Rig 2 1104-JA/JB 17 4 EA 2
Piling Rig 2 1102-C A/B,1103-C,1104-CA/CB,1107-C,1101-JA/JB, 17 28 EA 14
Piling Rig 2 Pipe Support 17 14 EA 7
Piling 03 7 EA 4
Piling Rig 1 1105-L,Pipe Support 7 7 EA 4
Piling 04 12 EA 6
Piling Rig 1 1105-F,Pipe Support 6 12 EA 6
Piling Rig 1 Pipe Support 6 0 EA 0
Piling 05 24 EA 0
Building 12 0 EA 0
Building 12 0 EA 0
Piling 06 88 EA 0
Note:
PMS Due Date Start Date End Date Productivity = 1 alat = 2 titik /
hari
Piling Rig : 2 unit
44 2-Apr-24 2-May-24 8-Jul-24
2-May-24 3-Jun-24
6/3/2024 6/9/2024
6/9/2024 6/22/2024
6/9/2024 6/20/2024
6/20/2024 6/29/2024
6/29/2024 7/10/2024
47 6-Jun-24 13-Aug-24
6/6/2024 6/18/2024
6/18/2024 6/22/2024
6/18/2024 7/4/2024
32 11-Jun-24 27-Jul-24
6/11/2024 6/17/2024
56 7-May-24 29-Jul-24
5/7/2024 5/15/2024
5/15/2024 5/17/2024
5 5-Mar-24 12-Mar-24
3/5/2024 3/7/2024
3/7/2024 3/9/2024
N/A N/A