Reference: SD-LTG-SER.

B-01&-02&-03
Subject: LIGHTING -SHOP DRAWING FOR SERVICE BUILDING B
Date: 11/01/2024

HBRC Comments.
Pipes and its accessory’s should be HG-UPVC Same brand

LEGEND, routing details (exposed or embedded) and heights should be mentioned at dwg

Revise no of switches and connection for every circuit

Revise Font printed at dwg

Contractor. To apply wire Color (R, Y, B) at S.D for approval and consider phase Balance

Contractor to coordinate with other systems at Ceiling to avoid any conflict at execution

Separate Switch & power outlet should be provided for Exhaust fans

Switch AND circuit no should be provided for stairs lighting

Last Arch approved should be considered (Doors opening & Toilets) location for switches coordination

V.D calculation & panel schedule should be submitted for final approval

Contactors & Gr-fault CB rate should be submitted for approval.

Cable size and no of fixtures for every circuit subject to V.D Calculation Balanced panel Loads.

Emergency switch should be separate circuit not merged with two gang switch

Final pipe and cable Tray Size Subject to approved filling ratio calculation

Latest arch approved reflects on type for lighting fixture and accessories used.

Contractor should stick To Project specs.

Lux study should be submitted for final approval

HBRC Consultant Name & signature,