Reference: SD-FA-SER.

B-01&-02
Subject: Fire Alarm -SHOP DRAWING FOR SERVICE BUILDING B
Date: 14/01/2024

HBRC Comments.

SLD should be submitted stamped from the supplier

Contractor must coordinate with other System on ceiling

Routing details (exposed or embedded) and heights should be mentioned at dwg

Composite Dwg should be submitted for final approval-

Exposed conduit must be ¾’’ EMT and impeded should be HG-UPVC

Contractor should submits integration and interface with other system "elev, FF, Hvac,...) –

Contractor must adhere To BOQ &Project specs.

LC& Electric room must be submitted for approval after furnished

Cable Size l Type according to manufacturer approval & recommendation

SD should be stamped by supplies and resubmit with material Submittal

Contractor should provide Details for installation for approval.

HBRC Consultant Name & signature,