Reference: SD-AC/WH-SER.

B-01&-02
Subject: AC&WH -SHOP DRAWING FOR SERVICE BUILDING B
Date: 10/01/2024

HBRC Comments.

Pipes and its accessory’s should be HG-UPVC Same brand

LEGEND, routing details (exposed or embedded) and heights should be mentioned at dwg

Contractor should provide installation Details for approval.

Cable size and D.S subject to final approved unit load.

Every power outlet for D.S (AC /WH/Dryer) should feed from separate circuit.

Final conduit and Cable Tray size filling ratio be submitted for approval

Contractor should coordinate with last approved other systems to avoid any Conflict at execution

Composite Dwg should be submitted for approval

Contractor to stick to project specs.

S.L.D, V.D calculation & panel schedule should be submitted for final approval

Revise engineers Arch latest approved for ground floor

LC / ELECTRICAL ROOM must be resubmit after furnished for final approval

HBRC Consultant Name & signature,