Monthly Maintenance Report

END USER: PRIME CONTRACTOR: CONTRACTOR:

VECTRUS SYSTEM CORPORATION


ASG-KU

Project: LCVKWSC064.
Project Name: LCVKWSC064 Uninterruptible Power Supply (UPS) System Maintenance. Camp Buehring
Date: 24/09/2023

UPS LCV1002968

UPS was cleaned. Moreover, UPS not in service. Inbuilt Batteries are not available in the
UPS.

UPS Name Plate Details


Make: Tripplite
Model: SU3000RTXL3U
Rating: 3KVA
Input voltage: 120V AC
Output Voltage: 120V AC

INSPECTION CHECK LIST

S.NO CHECK LIST REMARKS


CHECK UPS STATUS: Documents status of
1 Not applicable
battery
CHECK UPS ALARMS: Documents events log
2 and display for the alarms/ information on the Not applicable
battery
DIAGNOSE: Trouble shoot reported issues as
3 Not applicable
required.
REPAIR: Replace any defective parts and repair
4 Not applicable
the system as required, including remedial battery.
IMPLEMENT UPDATES: Verify Firmware
5 revisions and system components are updated to Not applicable
manufacturer

NAHDAT VECTRUS

signature signature
Monthly Maintenance Report
END USER: PRIME CONTRACTOR: CONTRACTOR:

VECTRUS SYSTEM CORPORATION


ASG-KU

Project: LCVKWSC064.
Project Name: LCVKWSC064 Uninterruptible Power Supply (UPS) System Maintenance. Camp Buehring
Date: 24/09/2023

TEST: Perform, function test conducted after


6 Not applicable
corrective action is taken.
PERFORM FUNCTIONAL
7 VERIFICATION: Manually measure and Not applicable
record DC voltage and internal battery.
CLEAN: Clean area of general foreign
8 Cleaned.
objects.

Asset Serial Number: 2644NLCPS719400065


BLDG: 9409
Asset Number: LC0004007

Man power
Annual Maintenance performed by Paarthasarthy, Biju Johnson
Quality checked by Saravanan

Equipment used
Multimeter Asset No: GVA12558
Calibration Due Date:18/05/2024