Professional Documents
Culture Documents
Amirul Wafi - 205060401111007 - UAS Transed C
Amirul Wafi - 205060401111007 - UAS Transed C
No Qrerata P (%) ln Q ln P
1 16.667 5.541 2.813 100
255.0000
2 150.0000 33.333 5.011 3.507
3 50.0000 50.000 3.912 3.912
4 45.0000 66.667 3.807 4.200
Q (m3/dt)
5 20.0000 83.333 2.996 4.423 10
1
1
40
20
0
0 0.5 1 1.5 2 2
H (m)
C Qs
No Qrerata GRAFIK HUBUN
mg/l ton/hari
1 255.000 153.84 355.00
500
2 125.000 100.37 200.00
450
3 75.000 80.46 62.50
400
4 45.000 71.28 22.50
350
5 35.000 67.65 17.50
22.500 300
6 64.82 10.00
250 f(x) = 0.3439921398748 x^1.2
7.000 61.31
Qs (ton/hari)
7 7.00 R² = 0.908669563743312
8 182.438 120.54 1407.42 200
9 182.945 120.70 1413.27 150
10 188.937 122.66 1483.22 100
11 190.231 123.08 1498.52 50
12 330.594 163.65 3462.56 0
0 50 100
Rating Curve
2 x^1.66585452676959
9
14.02 ppm
Q Muatan Sedimen
255.000 355.000
125.000 200.000
75.000 62.500
45.000 22.500
35.000 17.500
22.5 10.000
7 7.000
1 2 3 4 5 6 7 8
No Elv A ΔH Δv Reservoir caSediment AIncrementa
1 95 0 0 0 0 0
2 95.5 50 0.5 100 100.00 0
3 96 150 0.5 300 400.00 0 0
4 96.5 300 0.5 600 1000.00 0 0
5 97 400 0.5 500 1500.00 0.00 0
6 97.5 600 0.5 1500 3000.00 600.00 300.00
7 98 1200 0.5 6000 9000.00 600.00 300.00
8 99 3100 1 12500 21500.00 600.00 600.00
9 99.5 4400 0.5 8500 30000.00 600.00 300.00
10 100 6200 0.5 10000 40000.00 600.00 300.00
11 124.97 6206 24.97 154888.91 194888.91 400.00 9988.00
12 accuracy >99,5% ----->
El. 106.68 m is the determined new bed load elevation
Total sediment load up to El. 124.97 m at the end of 10 years = 9999.22 ha.m = 10.000 ha.m
Kelas : E No urut. 12