NPLPL - Sie - SS - CS-04 SH 3 of 3 R5

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

The reproduction,transmission or use of this document or its contents

liable for damages. All rights,including rights created by patent,grant


is not permitted without express written authority. Offenders will be

or registration of a utility model or design, are reserved.

A A

B B

C C

Maneesh Digitally signed by Maneesh Kumar


DN: cn=Maneesh Kumar, c=IN,
o=Siemens Limited, ou=SI DS PA SOL,
email=kumar.maneesh@siemens.com

Kumar Reason: G F C
Date: 2024.01.08 10:24:20 +05'30'

D D

E E

F F

NAME SIGN DATE


PREPARED BY: ASHARAD 20.10.2023
CHECKED BY: ASHARAD 20.10.2023
SIGNED BY: SIEMENS 20.10.2023

DEVELOPER :
NEWFOUND PROPERTIES & LEASING PVT. LTD.
CONSULTANT :
AECOM ASIA LTD
G G
EPC CONTRACTOR
SIEMENS LTD.
PROJECT
220KV GIS SUBSTATION
SUBSTATION
220/33kV & 220/22KV GIS SUBSTATION AT
JUINAGAR (EAST), NAVI MUMBAI
TITLE
H GA AND RC DETAILS OF RETAINING WALL H

R5 ALL SECTIONS ARE REVISED 20.10.23 R2 REVISED AS PER CLIENT COMMENTS 10.07.23 Date 19.06.23 CLIENT : NEWFOUND PROPERTIES & LEASING PVT. LTD.
DESCRIPTION:-
R4 SECTION-2-2 DELETED & REVISED AS MARKED 04.09.23 R1 REVISED AS PER CLIENT COMMENTS 07.07.23 Prep. XXX CONSULTANT: AECOM ASIA LTD. Siemens Ltd. DRAWING NO. NPLPL – SIE- SS- CS-04
WORK:-
R3 REVISED AS PER CLIENT COMMENTS 13.07.23 R0 SUBMISSION FOR APPROVAL 19.06.23 Ckd. XXX
DETAILS:- W.O. Drg.No.:-
Issue Remarks Date Issue Remarks Date Name Norm Original/Replacement for/Replaced by:-