Professional Documents
Culture Documents
M.O.B.W and M.O.C.W Mod 2 M23
M.O.B.W and M.O.C.W Mod 2 M23
INSTITUTE
P.O Box 210 -30302
E-mail: info@otti.ac.ke ||ollessostechnical@gmail.com ||Website: www.otti.ac.ke
When replying Tel: 020 2395160 ||Mobile: 0719 792792
Please quote
OTTI/ Date:
i) Bill of quantities
ii) Specifications
iii) Measurements
iv) Taking off
v) Girth
(5marks)
b) Distinguish between working up and abstracting. (5
marks)
3.Take off all quantities for the roof and rain water goods on the drawing shown below using
SMM. (30
marks)
4.Take off all of substructure works using CESMM on the underground tank. (30
marks)
No.4