Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Window schedule

Window Schedule . . . .
Element ID Adm Front New WD - 002 Adm New WD - 001 Adm Washroom New WD - 003 Chimney Mesh WD - 001 ECDE New WD - 001 Home Science Front New WD... . . Kitchen Front New ... . . Science Lab Front New W... Science Lab Store WD... Staffroom New WD ...
Quantity 1 3 1 4 8 3 .. .. 4 .. .. 3 2 4
W x H Size 2,000×1,200 1,500×1,200 900×1,000 3,000×500 1,800×1,200 1,500×1,200 . . 1,500×1,000 . . 1,500×1,200 1,500×1,200 2,000×1,200
. . . .

2D Symbol

3D Back View

IES-04 Window Schedule (1) 1:0.47

Door schedule

. . Door Schedule . . .
Element ID Adm DOO - 001 Adm Washroom DOO - 001 . . ECDE New DOO - 001 . Home Science DOO - 001 Home Science DOO - 002 . Kitchen DOO - 001 Kitchen DOO - 002 . Science Lab DOO - 001 Science Lab DOO - 003 . Staffroom DOO - 002
Quantity 3 1 .. .. 1 . 2 2 .. 1 2 .. 3 2 .. 2
W x H Size 900×2,100 900×2,100 . . 900×2,100 . 1,200×2,100 900×2,100 . 900×2,100 900×2,100 . 1,200×2,100 900×2,100 . 900×2,100
. . . . .

2D Symbol

3D Back View

Material Steel casement Panel door Steel casement Steel casement Panel door Steel casement Panel door Steel casement Panel door Panel door

IES-03 Door Schedule 1:0.45

CLIENT PROJECT TITLE CONSULTANT DRAWING TITLE NOTES

Door & Window Schedule ARCHITECTURAL STRUCTURAL CONSTRUCTION M.E.P


1. All work to be carried out in accordance with Council regulations 1.All workmanship and materials shall be in strict accordance
PROPOSED DESIGN OF KAMUIRU PRIMARY SCHOOL
2. All figured dimensions to be taken in preference to scaled dimensions with all applicable building codes, local codes, rules and
KIRINYAGA COUNTY 1. All black cotton soil to be removed from below all building 1. All slabs at ground level to be poured over 500 gauge
3. All walls below 200 mm to be reinforced with hoop iron at every alternate ordinances.
CHECKED BY: DRAWN BY: and paved surfaces polythene sheeting, on 50mm thick murram blinding layer on
P.O BOX 15-10300 2.Soil,waste vents and rainwater leaders shall be according to
course 2. A single layer of 3-ply bituminous felt to be provided between minimum 300mm approved hardcore fill.
KERUGOYA schedule.
4. Provide damp proof course (D.P.C.) under all walls masonry and r.c. work 2. All soils under slabs and around external foundations to be
3. Walls below 200mm thick to be reinforced with hoop iron at treated against termites
5. P.V. indicates permanent ventilations
Date Date every alternate course
6. All drainage passing under building and drive area to be of 4. All reinforced concrete work to Structural Engineer's
8/1/2024 8/1/2024 pvc pipe and encased in concrete drawings
7. All inspection chambers in drive area to have heavy duty covers 5. Foundation depths to be determined on site and to S.E's
8. Check all dimensions on site approval
SCALE DRAWING NO: 9. All sanitary work to be in accordance with MoH rules and regulations
6. Refer to S.E's details for R.C works and structural members
10. All reinforced concrete work is to be in accordance with str.Eng's
As shown details

GSPublisherVersion 0.0.100.100

You might also like