9.0 Insulation resistance test of switchgear Bus Bar at 5000V DC for 1 minute
Value (GΩ)
Section
L1 - E L2 - E L3 - E L1-L2 L2-L3 L1-L3
Value (GΩ)
Se. No
Feeder CB at Close position CB at open position
[1VC1AF000...
L1 - E L2 - E L3 - E L1 (T - B) L2 (T - B) L3 (T - B)
Transformer 01 19595 73 71 73
Transformer 02 19592 70 73 71
Transformer 03 19594 71 73 71
Date : 29-06-2021
Tested By :
Remarks :
Date : 29-06-2021
Tested By :
Op. Time at 2xIs /(s) Op. Time at 3xIs /(ms) Op. Time at 4xIs /(ms)
Phase Set current(Is)
Expect Actual Expect Actual Expect Actual
R 1 1.2 1.153 800 796 600 623
Y 1 1.2 1.139 800 801 600 620
B 1 1.2 1.187 800 804 600 617
Remarks :
Date : 29-06-2021
Tested By :
Phase Injected Current ( A ) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
E
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date : 29-06-2021
Tested By :
Remarks :
Date : 29-06-2021
Tested By :
Phase Injected Current ( A ) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
E
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date : 29-06-2021
Tested By :
Remarks :
Date : 29-06-2021
Tested By :
Phase Injected Current ( A ) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
E
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date : 29-06-2021
Tested By :
Remarks :
Date : 29-06-2021
Tested By :
Phase Injected Current ( A ) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
E
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Remarks :
Date :
Tested By :
Date : 29-06-2021
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 13/10/2020 Date:
Tested By : Witness By:
Remarks : Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 29-06-2021
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 13/10/2020 Date:
Tested By : Witness By:
Remarks : Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 29-06-2021
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 13/10/2020 Date:
Tested By : Witness By:
Date : 29-06-2021
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 13/10/2020 Date:
Tested By : Witness By:
Battery No Voltage
Battery No 01 13.41
Battery No 02 13.36
Battery No 03 13.34
Battery No 04 13.34
Total 53.29
Remarks :
Date : 29-06-2021
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :
Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 13/10/2020 Date:
Tested By : Witness By: