ESTA INTERNATIONAL PRIVATE LIMITED

Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Customer : Cinnamon Grand Hotel- Colombo


Installation Under test : 11 KV Electrical System Sheet : 1/19

TEST REPORT

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HV Switchgear Room


Equipment Under test : 11kV Switchgear Sheet : 2/19

1.0 General information

1.1 Feeder/Location : CEB INCOME


1.2 Manufacturer : ABB
1.3 Panel Type : UniSwitch
1.4 Panel Se. No. : 138789
1.5 Circuit Breaker Type : HD 04
1.6 Circuit Breaker Se. No. : 1VC1AF00019593
1.7 CT Data : 200/1 A
1.8 VT Data : 11/0.4kV
1.90 Control/Protection Voltage : 48 V DC
1.10 Spring Charging motor/Other service voltage : 230V AC

2.0 General functional test & visual inspection

2.1 Spring Charging Mechanism Manual Operation OK


2.2 Spring Charging Mechanism Motor Operation OK
2.3 CB Operation Check OK
2.4 ES Operation Check OK
2.5 CB Tripping Check OK
2.6 CB ON/OFF Position Indication OK
2.7 CB Test/Service Position Indication OK
2.8 Earth Switch ON/OFF Indication OK
2.9 CB Trip Indication NA
2.10 CB/ES Interlock Operation Check OK
2.11 Door Interlock Operation Check OK
2.12 Panel Heater Operation Check OK
2.13 Ammeter & Voltmeter Check OK
2.14 Earthing Connection Check OK

Remarks :

Date : 6/29/2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HV Switchgear Room


Equipment Under test : 11kV Switchgear Sheet : 3/19

3.0 General information

3.1 Feeder/Location : OUTGOING TO TRANFORMER 01 And 04


3.2 Manufacturer : ABB
3.3 Panel Type : UniSwitch
3.4 Panel Se. No. : 138790
3.5 Circuit Breaker Type : HD4
3.6 Circuit Breaker Se. No. : 1VC1AF00019595
3.7 CT Data : 100/1 A
3.8 VT Data : NA
3.9 Control/Protection Voltage : 48 V DC
3.10 Spring Charging motor/Other service voltage : 230V AC

4.0 General functional test & visual inspection

4.1 Spring Charging Mechanism Manual Operation OK


4.2 Spring Charging Mechanism Motor Operation OK
4.3 CB Operation Check OK
4.4 ES Operation Check OK
4.5 CB Tripping Check OK
4.6 CB ON/OFF Position Indication OK
4.7 CB Test/Service Position Indication OK
4.8 Earth Switch ON/OFF Indication OK
4.9 CB Trip Indication NA
4.10 CB/ES Interlock Operation Check OK
4.11 Door Interlock Operation Check OK
4.12 Panel Heater Operation Check OK
4.13 Ammeter & Voltmeter Check OK
4.14 Earthing Connection Check OK

Remarks :

Date : 29-06-2020
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HV Switchgear Room


Equipment Under test : 11kV Switchgear Sheet : 4/19

5.0 General information

5.1 Feeder/Location : OUTGOING TO TRANSFORMER 02


5.2 Manufacturer : ABB
5.3 Panel Type : UniSwitch
5.4 Panel Se. No. : 138789
5.5 Circuit Breaker Type : HD4
5.6 Circuit Breaker Se. No. : 1VC1AF00019592
5.7 CT Data : 100/1 A
5.8 VT Data : NA
5.9 Control/Protection Voltage : 48V DC
5.10 Spring Charging motor/Other service voltage : 230V AC

6.0 General functional test & visual inspection

6.1 Spring Charging Mechanism Manual Operation OK


6.2 Spring Charging Mechanism Motor Operation OK
6.3 CB Operation Check OK
6.4 ES Operation Check OK
6.5 CB Tripping Check OK
6.6 CB ON/OFF Position Indication OK
6.7 CB Test/Service Position Indication OK
6.8 Earth Switch ON/OFF Indication OK
6.9 CB Trip Indication NA
6.10 CB/ES Interlock Operation Check OK
6.11 Door Interlock Operation Check OK
6.12 Panel Heater Operation Check OK
6.13 Ammeter & Voltmeter Check OK
6.14 Earthing Connection Check OK

Remarks :

Date : 6/29/2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HV Switchgear Room


Equipment Under test : 11kV Switchgear Sheet : 5/19

7.0 General information

5.1 Feeder/Location : OUTGOING TO TRANSFORMER 03


5.2 Manufacturer : ABB
5.3 Panel Type : UniSwitch
5.4 Panel Se. No. : 138792
5.5 Circuit Breaker Type : HD4
5.6 Circuit Breaker Se. No. : 1VC1AF00019594
5.7 CT Data : 100/1 A
5.8 VT Data : NA
5.9 Control/Protection Voltage : 48V DC
5.10 Spring Charging motor/Other service voltage : 230V AC

8.0 General functional test & visual inspection

8.1 Spring Charging Mechanism Manual Operation OK


8.2 Spring Charging Mechanism Motor Operation OK
8.3 CB Operation Check OK
8.4 ES Operation Check OK
8.5 CB Tripping Check OK
8.6 CB ON/OFF Position Indication OK
8.7 CB Test/Service Position Indication OK
8.8 Earth Switch ON/OFF Indication OK
8.9 CB Trip Indication NA
8.10 CB/ES Interlock Operation Check OK
8.11 Door Interlock Operation Check OK
8.12 Panel Heater Operation Check OK
8.13 Ammeter & Voltmeter Check OK
8.14 Earthing Connection Check OK

Remarks :

Date : 6/29/2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HV Switchgear Room


Equipment Under test : 11 kV Switchgear Sheet : 6/19

9.0 Insulation resistance test of switchgear Bus Bar at 5000V DC for 1 minute

Value (GΩ)
Section
L1 - E L2 - E L3 - E L1-L2 L2-L3 L1-L3

Bus Bar 01 82.6 101.2 113 128 127 132

10.0 Insulation resistance test of circuit breakers at 5000V DC for 1 minute

Value (GΩ)
Se. No
Feeder CB at Close position CB at open position
[1VC1AF000...
L1 - E L2 - E L3 - E L1 (T - B) L2 (T - B) L3 (T - B)

CEB Income 19593 205 195.8 164.6 235 269 265

Transformer 01/04 19595 233 229 179 260 279 251

Transformer 02 19592 96.3 92 102 149 158.4 157

Transformer 03 19594 77.9 78 73.9 119 120 126

11.0 Contact resistance test of circuit breakers at 100 A DC

Se. No Value (µΩ)


Feeder [1VC1AF000… L1 L2 L3
CEB Income 19593 73 73 71

Transformer 01 19595 73 71 73

Transformer 02 19592 70 73 71

Transformer 03 19594 71 73 71

Test instruments used

Insulation resistance tester - Megger MIT 1025 - Se no : 101730321


Programma Micro Ohom Meter - Se no : 4542769
Remarks :

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HV Switchgear Room


Equipment Under test : Protection relay Sheet : 7/19

1.0 General information

1.1 Feeder/Location : CEB Incoming


1.2 Make : ABB
1.3 Type : SPAJ 140C
1.4 Serial no : 560869
1.5 CT ratio : 200/1 A
1.6 Aux voltage : 48 V DC

2.0 Visual inspection

2.1 Physical check for any damages OK


2.2 Model and Type as per drawing OK
2.3 Configured LEDs OK
2.4 Configured output contacts OK

3.0 Existing relay settings

Set Curve Time


Protection
value selected /(TMS)
Earth fault low set 0.15 DT 0.45
Earth fault high set 0.45 DT 0.4
Over current low set 1 NI 0.12
Over current high set 5 DT 0.3

4.0 Measurement test

Phase Current inject (A) Current display


R 1.00 1.00
Y 1.00 1.00
B 1.00 1.00
E 1.00 1

Remarks :

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HT Main Room


Equipment Under test : Protection relay Sheet : 8/19

5.0 Low set over current protection test

Is> = 1 A Curve selected = Normal inverse t/K = 0.12

Op. Time at 2xIs /(s) Op. Time at 3xIs /(ms) Op. Time at 4xIs /(ms)
Phase Set current(Is)
Expect Actual Expect Actual Expect Actual
R 1 1.2 1.153 800 796 600 623
Y 1 1.2 1.139 800 801 600 620
B 1 1.2 1.187 800 804 600 617

6.0 High set over current protection test

Is>> 5.00 A Curve selected = Definite Time t = 0.3


Phase Set current Injected Current Operating Time/(ms)
R 5 5.00 327
Y 5 5.00 318
B 5 5.00 322

7.0 Low set earth fault protection test

Io> = 0.15 A Curve selected = Definite Time t/k = 0.45

Phase Set current (Is) Injected Current Op. Time /(ms)


E 0.15 0.15 500

8.0 High set earth fault protection test

Io>> 0.45 A Curve selected = Definite Time t = 0.4


Phase Set current Injected Current Operating Time/(ms)
E 0.45 0.45 436

9.0 Trip circuit operation PASS

10.0 Relay test PASS

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : '9/21

5.0 Low set over current protection test

Is> = 0.75 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.2s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Normal Inverse t/k = 0.1

Phase Injected Current ( A ) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
E

8.0 High set earth fault protection test

Io>> =0.6 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E 0.6

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 13/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.4s

Phase Injected Current ( A ) Trip Time / s


E

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 15/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.5s

Phase Injected Current ( A ) Trip Time / s


E

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 11/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R 0.78A 1.058 0.670
Y 0.78A 1.051 0.669
B 0.78A 1.054 0.666

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R 6 6.04 0.179
Y 6 6.10 0.150
B 6 6.10 0.147

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.4s

Phase Injected Current ( A ) Trip Time / s


E 0.13 0.5

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.3s


Phase Set current Injected Current Operating Time/(s)
E 0.5 0.51 0.376

9.0 Trip circuit operation OK

10.0 Relay test OK

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HT Main Room


Equipment Under test : Protection relay Sheet : 9/19

1.0 General information

1.1 Feeder/Location : Transformer 01 AND 04


1.2 Make : ABB
1.3 Type : SPAJ 140C
1.4 Serial no : 560870
1.5 CT ratio : 100/1 A
1.6 Aux voltage : 48 V DC

2.0 Visual inspection

2.1 Physical check for any damages OK


2.2 Model and Type as per drawing OK
2.3 Configured LEDs OK
2.4 Configured output contacts OK

3.0 Existing relay settings

Set Curve Time


Protection
value selected /(TMS)
Earth fault low set 0.2 DT 0.45
Earth fault high set 0.4 DT 0.4
Over current low set 1.32 NI 0.1
Over current high set 6.00 DT 0.1

4.0 Measurement test

Phase Current inject (A) Current display (A)


R 1.00 1.00
Y 1.00 1.00
B 1.00 1.01
E 1.00 1.00

Remarks :

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HT Main Room


Equipment Under test : Protection relay Sheet : 10/19

5.0 Low set over current protection test

Is> = 1.32 ACurve selected = Normal inverse t/K = 0.1


Op. Time at 2xIs /(ms) Op. Time at 3xIs /(ms) Op. Time at 4xIs /(ms)
Phase Set current(Is)
Expected Actual Expected Actual Expected Actual
R 1.32 1000 1021 660 659 500 528
Y 1.32 1000 1017 660 662 500 528
B 1.32 1000 1019 660 659 500 528

6.0 High set over current protection test

Is>> 6.00 A Curve selected = Definite Time t = 0.1


Operating Time/(ms)
Phase Set current Injected Current
Expected Actual
R 6.00 6.00 100 144
Y 6.00 6.00 100 138
B 6.00 6.00 100 132

7.0 Low set earth fault protection test

Io> = 0.20 A Curve selected = Definite Time t/k = 0.45

Operating Time /(ms)


Phase Set current (Is) Injected Current
Expected Actual
E 0.2 0.2 450 484

8.0 High set earth fault protection test

Io>> 0.4 A Curve selected =


Definite Time t = 0.4
Operating Time/(ms)
Phase Set current Injected Current
Expected Actual
E 0.4 0.4 400 453

9.0 Trip circuit operation OK

10.0 Relay test OK

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : '9/21

5.0 Low set over current protection test

Is> = 0.75 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.2s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Normal Inverse t/k = 0.1

Phase Injected Current ( A ) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
E

8.0 High set earth fault protection test

Io>> =0.6 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E 0.6

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 13/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.4s

Phase Injected Current ( A ) Trip Time / s


E

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 15/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.5s

Phase Injected Current ( A ) Trip Time / s


E

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 11/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R 0.78A 1.058 0.670
Y 0.78A 1.051 0.669
B 0.78A 1.054 0.666

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R 6 6.04 0.179
Y 6 6.10 0.150
B 6 6.10 0.147

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.4s

Phase Injected Current ( A ) Trip Time / s


E 0.13 0.5

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.3s


Phase Set current Injected Current Operating Time/(s)
E 0.5 0.51 0.376

9.0 Trip circuit operation OK

10.0 Relay test OK

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HV Switchgear Room


Equipment Under test : Protection relay Sheet : 11/19

1.0 General information

1.1 Feeder/Location : Transformer 02


1.2 Make : ABB
1.3 Type : SPAJ 140C
1.4 Serial no : 560872
1.5 CT ratio : 100/1 A
1.6 Aux voltage : 48 V DC

2.0 Visual inspection

2.1 Physical check for any damages OK


2.2 Model and Type as per drawing OK
2.3 Configured LEDs OK
2.4 Configured output contacts OK

3.0 Existing relay settings

Set Curve Time


Protection
value selected /(TMS)
Earth fault low set 0.66 DT 0.1
Earth fault high set 3.10 DT 0.1
Over current low set 0.13 NI 0.45
Over current high set 0.20 DT 0.4

4.0 Measurement test

Phase Current inject (A) Current display


R 1.00 1.00
Y 1.00 1.00
B 1.00 1.00
E 1.00 1.00

Remarks :

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HV Switchgear Room


Equipment Under test : Protection relay Sheet : 12/19

5.0 Low set over current protection test

Is> = 0.66 ACurve selected = Normal inverse t/K = 0.1


Op. Time at 2xIs /(ms) Op. Time at 3xIs /(ms) Op. Time at 4xIs /(ms)
Phase Set current(Is)
Expected Actual Expected Actual Expected Actual
R 0.66 1000 1014 660 654 500 536
Y 0.66 1000 1015 660 663 500 538
B 0.66 1000 1010 660 648 500 536

6.0 High set over current protection test

Is>> 3.10 A Curve selected = Definite Time t = 0.10


Operating Time/(ms)
Phase Set current Injected Current
Expected Actual
R 3.10 3.10 100 118
Y 3.10 3.10 100 119
B 3.10 3.10 100 120

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t/k = 0.45

Operating Time /(ms)


Phase Set current (Is) Injected Current
Expected Actual
E 0.13 0.13 450 464

8.0 High set earth fault protection test

Io>> 0.20 A Curve selected =Definite Time t = 0.4


Operating Time/(ms)
Phase Set current Injected Current
Expected Actual
E 0.20 0.22 400 414

9.0 Trip circuit operation OK

10.0 Relay test OK

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : '9/21

5.0 Low set over current protection test

Is> = 0.75 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.2s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Normal Inverse t/k = 0.1

Phase Injected Current ( A ) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
E

8.0 High set earth fault protection test

Io>> =0.6 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E 0.6

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 13/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.4s

Phase Injected Current ( A ) Trip Time / s


E

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 15/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.5s

Phase Injected Current ( A ) Trip Time / s


E

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 11/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R 0.78A 1.058 0.670
Y 0.78A 1.051 0.669
B 0.78A 1.054 0.666

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R 6 6.04 0.179
Y 6 6.10 0.150
B 6 6.10 0.147

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.4s

Phase Injected Current ( A ) Trip Time / s


E 0.13 0.5

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.3s


Phase Set current Injected Current Operating Time/(s)
E 0.5 0.51 0.376

9.0 Trip circuit operation OK

10.0 Relay test OK

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HV Switchgear Room


Equipment Under test : Protection relay Sheet : 13/19

1.0 General information

1.1 Feeder/Location : Transformer 03


1.2 Make : ABB
1.3 Type : SPAJ 140C
1.4 Serial no : 560871
1.5 CT ratio : 100/1 A
1.6 Aux voltage : 48 V DC

2.0 Visual inspection

2.1 Physical check for any damages OK


2.2 Model and Type as per drawing OK
2.3 Configured LEDs OK
2.4 Configured output contacts OK

3.0 Existing relay settings

Set Curve Time


Protection
value selected /(TMS)
Earth fault low set 0.66 DT 0.1
Earth fault high set 3.10 DT 0.1
Over current low set 0.13 NI 0.45
Over current high set 0.20 DT 0.4

4.0 Measurement test

Phase Current inject (A) Current display


R 1.00 1.00
Y 1.00 1.00
B 1.00 1.00
E 1.00 1.00

Remarks :

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HV Switchgear Room


Equipment Under test : Protection relay Sheet : 14/19

5.0 Low set over current protection test

Is> = 0.66 ACurve selected = Normal inverse t/K = 0.1


Op. Time at 2xIs /(ms) Op. Time at 3xIs /(ms) Op. Time at 4xIs /(ms)
Phase Set current(Is)
Expected Actual Expected Actual Expected Actual
R 0.66 1000 1012 660 656 500 538
Y 0.66 1000 1016 660 663 500 539
B 0.66 1000 1016 660 656 500 537

6.0 High set over current protection test

Is>> 3.10 A Curve selected = Definite Time t = 0.10


Operating Time/(ms)
Phase Set current Injected Current
Expected Actual
R 3.10 3.10 100 126
Y 3.10 3.10 100 138
B 3.10 3.10 100 126

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t/k = 0.45

Operating Time /(ms)


Phase Set current (Is) Injected Current
Expected Actual
E 0.13 0.13 450 468

8.0 High set earth fault protection test

Io>> 0.20 A Curve selected =Definite Time t = 0.4


Operating Time/(ms)
Phase Set current Injected Current
Expected Actual
E 0.20 0.22 400 414

9.0 Trip circuit operation OK

10.0 Relay test OK

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : '9/21

5.0 Low set over current protection test

Is> = 0.75 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.2s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Normal Inverse t/k = 0.1

Phase Injected Current ( A ) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
E

8.0 High set earth fault protection test

Io>> =0.6 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E 0.6

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 13/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.4s

Phase Injected Current ( A ) Trip Time / s


E

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 15/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R
Y
B

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R
Y
B

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.5s

Phase Injected Current ( A ) Trip Time / s


E

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.4s


Phase Set current Injected Current Operating Time/(s)
E

9.0 Trip circuit operation

10.0 Relay test

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Protection relay Sheet : 11/21

5.0 Low set over current protection test

Is> = 0.78 A Curve selected = Normal inverse t/K = 0.1


Phase Set current(Is) Op. Time at 2xIs /(s) Op. Time at 3xIs /(s)
R 0.78A 1.058 0.670
Y 0.78A 1.051 0.669
B 0.78A 1.054 0.666

6.0 High set over current protection test

Is>> =6 A Curve selected = Definite Time t = 0.1s


Phase Set current Injected Current Operating Time/(s)
R 6 6.04 0.179
Y 6 6.10 0.150
B 6 6.10 0.147

7.0 Low set earth fault protection test

Io> = 0.13 A Curve selected = Definite Time t = 0.4s

Phase Injected Current ( A ) Trip Time / s


E 0.13 0.5

8.0 High set earth fault protection test

Io>> =0.5 A Curve selected = Definite Time t = 0.3s


Phase Set current Injected Current Operating Time/(s)
E 0.5 0.51 0.376

9.0 Trip circuit operation OK

10.0 Relay test OK

11.0 Test instruments used

Relay Test Unit - Programma - Sveker 760 - Se No: 4501030

Remarks :

Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : Transformer Area


Equipment Under test : Distribution trasformer 01 Sheet : 15/19

1.0 General information

1.1 Location : Transformer Area


1.2 Manufacture : ABB
1.3 Serial No : 1LES90467
1.4 Capacity : 1000 kVA
1.5 Impedance : 6.02%
1.6 Voltage : 11000/415 V
1.7 Feeder : T/F 1 and 4
1.8 Type : DRY
1.9 Year of Manufacture : 2005
1.10 No. of taps : 5
1.11 Vector Group : Dyn11

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations NOT OK

3.0 Transformer guard test

Guard Type Function


Temperature high Alarm NOT OK
Temperature high Trip NOT OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 41.9
HV - LV
Not possible to carryout
LV - E

Remarks : Temperature Monitoring Device Shoud be replace


Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Distribution trasformer Sheet : 19/21

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Location : Transformer Room
1.3 Manufacture : ABB
1.4 Serial No : 1LKR1232609
1.5 Capacity : 1500/2100 kVA
1.6 Impedance : 5.76/8.06
1.7 Voltage : 11000/415 V
1.8 Feeder : T/F 2
1.9 Type : Dry
1.1 Year of Manufacture : 2016.03
1.11 No. of taps : 5
1.12 Vector Group : Dyn11
1.13 Model :

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 90 OK
Temperature high trip 110 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 491
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Distribution trasformer Sheet : 20/21

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Location : Transformer Room
1.3 Manufacture : ABB
1.4 Serial No : 1LKR1232610
1.5 Capacity : 1500/2100 kVA
1.6 Impedance : 5.83/8.16
1.7 Voltage : 11000/415 V
1.8 Feeder : T/F 3
1.9 Type : Dry
1.1 Year of Manufacture : 2016.03
1.11 No. of taps : 5
1.12 Vector Group : Dyn11
1.13 Model :

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 90 OK
Temperature high trip 110 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 368
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : Transformer Room


Equipment Under test : Distribution trasformer 01 Sheet : 37/45

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Manufacture : ABB
1.3 Serial No : 1LKR18000000482
1.4 Capacity : 2500/3500 kVA
1.5 Impedance : 6.12/8.56
1.6 Voltage : 11000/415 V
1.7 Feeder : T/F 01
1.8 Type : Dry
1.9 Year of Manufacture : 2018-03
1.10 No. of taps : 5
1.11 Vector Group : Dyn11
1.12 Model : CAST RESIN

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 80 OK
Temperature high trip 100 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 44.2
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 13/10/2020 Date:
Tested By : Witness By:

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : Transformer Area


Equipment Under test : Distribution trasformer 02 Sheet : 16/19

1.0 General information

1.1 Location : Transformer Area


1.2 Manufacture : ABB
1.3 Serial No : 1LES90465
1.4 Capacity : 1000 kVA
1.5 Impedance : 5.95%
1.6 Voltage : 11000/415 V
1.7 Feeder : T/F 02
1.8 Type : DRY
1.9 Year of Manufacture : 2005
1.10 No. of taps : 5
1.11 Vector Group : Dyn11

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Function


Temperature high Alarm OK
Temperature high Trip OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 205
HV - LV
Not possible to carryout
LV - E

Remarks : Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Distribution trasformer Sheet : 19/21

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Location : Transformer Room
1.3 Manufacture : ABB
1.4 Serial No : 1LKR1232609
1.5 Capacity : 1500/2100 kVA
1.6 Impedance : 5.76/8.06
1.7 Voltage : 11000/415 V
1.8 Feeder : T/F 2
1.9 Type : Dry
1.1 Year of Manufacture : 2016.03
1.11 No. of taps : 5
1.12 Vector Group : Dyn11
1.13 Model :

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 90 OK
Temperature high trip 110 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 491
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Distribution trasformer Sheet : 20/21

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Location : Transformer Room
1.3 Manufacture : ABB
1.4 Serial No : 1LKR1232610
1.5 Capacity : 1500/2100 kVA
1.6 Impedance : 5.83/8.16
1.7 Voltage : 11000/415 V
1.8 Feeder : T/F 3
1.9 Type : Dry
1.1 Year of Manufacture : 2016.03
1.11 No. of taps : 5
1.12 Vector Group : Dyn11
1.13 Model :

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 90 OK
Temperature high trip 110 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 368
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : Transformer Room


Equipment Under test : Distribution trasformer 01 Sheet : 37/45

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Manufacture : ABB
1.3 Serial No : 1LKR18000000482
1.4 Capacity : 2500/3500 kVA
1.5 Impedance : 6.12/8.56
1.6 Voltage : 11000/415 V
1.7 Feeder : T/F 01
1.8 Type : Dry
1.9 Year of Manufacture : 2018-03
1.10 No. of taps : 5
1.11 Vector Group : Dyn11
1.12 Model : CAST RESIN

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 80 OK
Temperature high trip 100 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 44.2
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 13/10/2020 Date:
Tested By : Witness By:

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : Transformer Area


Equipment Under test : Distribution trasformer 03 Sheet : 17/19

1.0 General information

1.1 Location : Transformer Area


1.2 Manufacture : ABB
1.3 Serial No : 1LES90466
1.4 Capacity : 1000 kVA
1.5 Impedance : 5.98%
1.6 Voltage : 11000/415 V
1.7 Feeder : T/F 1 03
1.8 Type : DRY
1.9 Year of Manufacture : 2005
1.10 No. of taps : 5
1.11 Vector Group : Dyn11

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Function


Temperature high Alarm OK
Temperature high Trip OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 173
HV - LV
Not possible to carryout
LV - E

Remarks : Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Distribution trasformer Sheet : 19/21

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Location : Transformer Room
1.3 Manufacture : ABB
1.4 Serial No : 1LKR1232609
1.5 Capacity : 1500/2100 kVA
1.6 Impedance : 5.76/8.06
1.7 Voltage : 11000/415 V
1.8 Feeder : T/F 2
1.9 Type : Dry
1.1 Year of Manufacture : 2016.03
1.11 No. of taps : 5
1.12 Vector Group : Dyn11
1.13 Model :

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 90 OK
Temperature high trip 110 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 491
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Distribution trasformer Sheet : 20/21

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Location : Transformer Room
1.3 Manufacture : ABB
1.4 Serial No : 1LKR1232610
1.5 Capacity : 1500/2100 kVA
1.6 Impedance : 5.83/8.16
1.7 Voltage : 11000/415 V
1.8 Feeder : T/F 3
1.9 Type : Dry
1.1 Year of Manufacture : 2016.03
1.11 No. of taps : 5
1.12 Vector Group : Dyn11
1.13 Model :

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 90 OK
Temperature high trip 110 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 368
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : Transformer Room


Equipment Under test : Distribution trasformer 01 Sheet : 37/45

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Manufacture : ABB
1.3 Serial No : 1LKR18000000482
1.4 Capacity : 2500/3500 kVA
1.5 Impedance : 6.12/8.56
1.6 Voltage : 11000/415 V
1.7 Feeder : T/F 01
1.8 Type : Dry
1.9 Year of Manufacture : 2018-03
1.10 No. of taps : 5
1.11 Vector Group : Dyn11
1.12 Model : CAST RESIN

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 80 OK
Temperature high trip 100 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 44.2
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 13/10/2020 Date:
Tested By : Witness By:

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : Transformer Area


Equipment Under test : Distribution trasformer 04 Sheet : 18/19

1.0 General information

1.1 Location : Transformer Area


1.2 Manufacture : ABB
1.3 Serial No : 1LKR130473
1.4 Capacity : 1000 kVA
1.5 Impedance : 6.40%
1.6 Voltage : 11000/415 V
1.7 Feeder : T/F 1 and 4
1.8 Type : DRY
1.9 Year of Manufacture : 2013
1.10 No. of taps : 5
1.11 Vector Group : Dyn11

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations NOT OK

3.0 Transformer guard test

Guard Type Function


Temperature high Alarm NOT OK
Temperature high Trip NOT OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 45.6
HV - LV
Not possible to carryout
LV - E

Remarks : Temperature Monitoring Device Shoud be replace


Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Distribution trasformer Sheet : 19/21

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Location : Transformer Room
1.3 Manufacture : ABB
1.4 Serial No : 1LKR1232609
1.5 Capacity : 1500/2100 kVA
1.6 Impedance : 5.76/8.06
1.7 Voltage : 11000/415 V
1.8 Feeder : T/F 2
1.9 Type : Dry
1.1 Year of Manufacture : 2016.03
1.11 No. of taps : 5
1.12 Vector Group : Dyn11
1.13 Model :

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 90 OK
Temperature high trip 110 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 491
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Distribution trasformer Sheet : 20/21

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Location : Transformer Room
1.3 Manufacture : ABB
1.4 Serial No : 1LKR1232610
1.5 Capacity : 1500/2100 kVA
1.6 Impedance : 5.83/8.16
1.7 Voltage : 11000/415 V
1.8 Feeder : T/F 3
1.9 Type : Dry
1.1 Year of Manufacture : 2016.03
1.11 No. of taps : 5
1.12 Vector Group : Dyn11
1.13 Model :

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 90 OK
Temperature high trip 110 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 368
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : Transformer Room


Equipment Under test : Distribution trasformer 01 Sheet : 37/45

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Manufacture : ABB
1.3 Serial No : 1LKR18000000482
1.4 Capacity : 2500/3500 kVA
1.5 Impedance : 6.12/8.56
1.6 Voltage : 11000/415 V
1.7 Feeder : T/F 01
1.8 Type : Dry
1.9 Year of Manufacture : 2018-03
1.10 No. of taps : 5
1.11 Vector Group : Dyn11
1.12 Model : CAST RESIN

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 80 OK
Temperature high trip 100 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 44.2
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 13/10/2020 Date:
Tested By : Witness By:

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : HT Panel Room


Equipment Under test : Battery Charger Sheet : 19/19

1.0 General information

1.1 Location : HT Panel Room


1.2 Manufacture : CHLORIDE
1.3 Serial No : 50919
1.4 Input Current : 4.2 A AC
1.5 Output Current : 10 A DC%
1.6 Voltage : 230 VAC / 48 V DC
1.7 Type : CBC 48110
1.9 Year of Manufacture : 2005

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Ammeter And Voltmeter OK

3.0 Voltage test

Battery No Voltage
Battery No 01 13.41
Battery No 02 13.36
Battery No 03 13.34
Battery No 04 13.34
Total 53.29

Remarks :

Date : 29-06-2021
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Distribution trasformer Sheet : 19/21

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Location : Transformer Room
1.3 Manufacture : ABB
1.4 Serial No : 1LKR1232609
1.5 Capacity : 1500/2100 kVA
1.6 Impedance : 5.76/8.06
1.7 Voltage : 11000/415 V
1.8 Feeder : T/F 2
1.9 Type : Dry
1.1 Year of Manufacture : 2016.03
1.11 No. of taps : 5
1.12 Vector Group : Dyn11
1.13 Model :

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 90 OK
Temperature high trip 110 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 491
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Site : Shangri -La Hotel Colombo


Equipment Under test : Distribution trasformer Sheet : 20/21

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Location : Transformer Room
1.3 Manufacture : ABB
1.4 Serial No : 1LKR1232610
1.5 Capacity : 1500/2100 kVA
1.6 Impedance : 5.83/8.16
1.7 Voltage : 11000/415 V
1.8 Feeder : T/F 3
1.9 Type : Dry
1.1 Year of Manufacture : 2016.03
1.11 No. of taps : 5
1.12 Vector Group : Dyn11
1.13 Model :

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 90 OK
Temperature high trip 110 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 368
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date :
Tested By :

ESTA International Private Limited.


ESTA INTERNATIONAL PRIVATE LIMITED
Site Test Report No: 411/10, Attyagala Mw, Welikada, Rajagiriya

Location : Transformer Room


Equipment Under test : Distribution trasformer 01 Sheet : 37/45

1.0 General information

1.1 Supplier : ESTA International Pvt Ltd


1.2 Manufacture : ABB
1.3 Serial No : 1LKR18000000482
1.4 Capacity : 2500/3500 kVA
1.5 Impedance : 6.12/8.56
1.6 Voltage : 11000/415 V
1.7 Feeder : T/F 01
1.8 Type : Dry
1.9 Year of Manufacture : 2018-03
1.10 No. of taps : 5
1.11 Vector Group : Dyn11
1.12 Model : CAST RESIN

2.0 Visual inspection

Item Description Remarks


2.1 Hardware & Mounting OK
2.2 Terminal & Clamping OK
2.3 Earthing OK
2.4 Control Cable Terminations OK

3.0 Transformer guard test

Guard Type Setting Value Function


Cooling fan On 70 OK
Cooling fan Off 60 OK
Temperature high alarm 80 OK
Temperature high trip 100 OK

4.0 Insulation resistance test for 1minute including HV cables

Phase Voltage (V) Value/ ( GΏ )


HV - E 5000 44.2
HV - LV
LV - E Not possible to carryout

Remarks :
Insulation test of HV-LV and LV-E could not be done due to control wiring on LV side
Date : 13/10/2020 Date:
Tested By : Witness By:

ESTA International Private Limited.