Braddock Well Pad ES DRWG Set

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

ARM Group Inc.

ET - BRADDOCK WELL PAD

Engineers and Scientists


www.armgroup.net
PERMITTEE:
SOIL EROSION AND SEDIMENT
MERRION OIL & GAS
CONTACT: RYAN DAVIS POLLUTION CONTROL PLAN
PERMIT NO. PAD0200114
610 REILLY AVENUE
FARMINGTON, NM 87401
(505) 402-5998 A ONE CA
VANI L
L

LS
SY
1

YST
PENN
-8

EAST PITTSBURGH BOROUGH,


0

EM
0
-2
4
2
-1

05/31/2018 TRANT
ARM
7
CA

By
!
7

NORTH BRADDOCK BOROUGH,


LB
IG
6
L

EF O D
RE YOU

10/22/2018

Date
PENNSYLVANIA
ONE CALL SYSTEM
PA. ACT 287 OF 1974 AS AMENDED BY ACT 121 OF 2008
REQUIRES THREE WORKING DAYS NOTICE
NORTH VERSAILLES TOWNSHIP,

REVISED PER PADEP COMMENTS


SERIAL # 20171993045

DURING DESIGN, TRANT CORPORATION PERFORMED A PA ONE CALL INQUIRY FOR THE PROPOSED
PROJECT AREA. ALL UNDERGROUND UTILITY OWNERS THAT RESPONDED TO THE PA ONE CALL HAVE
BEEN CONTACTED AND THEIR REPORTED UTILITIES ADDED TO PLANS BASED ON INFORMATION
ALLEGHENY COUNTY, PENNSYLVANIA

Revision
PROVIDED BY THE UTILITY. HOWEVER, IN VIOLATION OF LAWS OF THE COMMONWEALTH OF

PADEP SUBMISSION
PENNSYLVANIA, NOT ALL UNDERGROUND UTILITY OWNERS ARE REGISTERED WITH THE PA ONE CALL
SYSTEM. NEITHER THE PERMIT OPERATOR, ARM GROUP INC., NOR THE PROFESSIONAL ENGINEER
SIGNING THESE PLANS CERTIFIES THAT THE FOLLOWING DEPICTS UNDERGROUND UTILITIES OWNED
BY THOSE NOT REGISTERED WITH THE PA ONE CALL SYSTEM. MAY 2018
GENERAL UTILITY & ACT 187 INFORMATION
OCTOBER 2018

No.
1
0
1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE
NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL LIST OF SHEETS
DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO SHEET NO. DESCRIPTION

AS NOTED
10/22/2018
BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S C701 EXISTING CONDITIONS OVERLAY MAP

180539
FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. C702 EXISTING CONDITIONS & SOILS PLAN
C703A E&S EXISTING CONDITIONS AND LIMIT OF DISTURBANCE PLAN

2. CONTRACTOR SHALL NOTIFY THE PA ONE CALL SYSTEM NOT LESS THAN THREE (3) DAYS PRIOR TO C703B E&S EXISTING CONDITIONS AND LIMIT OF DISTURBANCE PLAN
C704A E&S GRADING AND DRAINAGE PLAN

project no.
CONSTRUCTION. THE CONTRACTOR SHALL PLACE THE CALL AND REFERENCE. THE SERIAL NUMBER GIVEN,

scale
PROPOSED

date
AND PROVIDE AN APPROXIMATE DATE AND TIME THAT DIGGING WILL OCCUR. THE ONE CALL SYSTEM WILL C704B E&S GRADING AND DRAINAGE PLAN
WATERLINE
AGAIN NOTIFY THE PUBLIC UTILITIES IN THE AREA. PUBLIC UTILITIES WILL THEN COORDINATE DIRECTLY WITH C705A E&S CONTROL PLAN

THE CONTRACTOR FOR ACTUAL FIELD LOCATIONS. C705B E&S CONTROL PLAN
C705C E&S CONTROL PLAN

MDR
KGJ
W

QZ
C706 E&S CONSTRUCTION DETAILS PROPOSED WELL PAD

G
C707 E&S CONSTRUCTION DETAILS G W
ELECTRIC: WATER: C708 E&S CONSTRUCTION DETAILS
PROPOSED GAS LINE
DUQUENSE LIGHT COMPANY WILKINSBURG PENN JT WATER AUTHORITY C709 CONSTRUCTION DETAILS

graphic scale
2645 NEW BEAVER AVE. 2200 ROBINSON BLVD.

designed
C710 CONSTRUCTION DETAILS

checked

drawn
PITTSBURGH, PA 15233 WILKINSBURG, PA 15221
ATTN: JOHN ANDZELIK ATTN: TOM SORCE
EMAIL: JANDZELIK@DUQLIGHT.COM EMAIL: TSORCE@WPJWA.COM

EROSION AND SEDIMENT CONTROL PLAN

ALLEGHENY COUNTY, PENNSYLVANIA


NORTH VERSAILLES TOWNSHIP,
NORTH BRADDOCK BOROUGH,
TELEPHONE: PUBLIC SEWER:

EAST PITTSBURGH BOROUGH,


VERIZON PENNSYLVANIA LLC ALLEGHENY COUNTY SANITARY AUTHORITY
15 E MONTEGOMERY AVE. 3300 PREBLE AVE. PITTSBURGH, PA 15233 LEGEND

PITTSBURGH, PA 15212 ATTN: KEN BABIN


ATTN: OFFICE PERSONNEL NOTE: LEGEND IS TYPICAL, NOT ALL OBJECTS IN LEGEND APPEAR IN PLAN.
AND DESCRIPTOR
1550
GAS: EXISTING CONTOURS 1490
PROPOSED CONTOURS Base map from the following USGS 71 2 minute quadrangles: Braddock dated 1960 and photorevised 1979.
CABLE: PEOPLES NATURAL GAS
FEMA FLOODPLAIN PROPOSED LIMIT OF DISTUBANCE
CENTURYLINK FORMERLY EMBARQ 261 CENTER ST.
LOCATION MAP

COVER SHEET
700 W MINERAL AVE. MCKEESPORT, PA 15132 50' FLOODWAY >> PROPOSED CHANNEL
SCALE: 1" = 2000'
GRID NO: UT00-D27.34 ATTN: DON ZOMBEK PROPOSED WATER FEATURES
FEMA FLOODWAY
LITTLETON, CO 80120 EMAIL: DON.ZOMBEK@PEOPLES-GAS.COM

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-COVER SHEET.dwg Plotted: October 19, 2018
EXISTING MAPPED WATERCOURSE PROPOSED WELL PAD
ATTN: GEORGE MCELVAIN
EXISTING STRUCTURE
EMAIL: GEORGE.MCELVAIN@CENTURYLINK.COM BOROUGH:
PROPOSED TEMPORARY TANK PREPARED BY:
EAST PITTSBURGH BOROUGH EXISTING VEGETATION

ET - BRADDOCK WELL PAD


W W PROPOSED WATERLINE
COMCAST CABLEVISION 813 LINDEN AVE. EXISTING PROPERTY LINE
G G PROPOSED GASLINE ARM Group Inc.

MERRION OIL & GAS


2300 ELDO ROAD EAST PITTSBURGH, PA 15112
EXISTING MUNICIPAL BOUNDARIES
MONROEVILLE, PA 15146 ATTN: LORI FRUNCEK PROPOSED SLOPE STABILIZATION
X EXISTING FENCE WE A L T
Engineers and Scientists
ATTN: KEVIN MYERS EMAIL: EPPDCHEIF@EASTPITTSBURGHBORO.COM ON H
PROPOSED ROCK CONSTRUCTION
M
REGISTERED
www.armgroup.net

M
OE OE EXISTING OVERHEAD ELECTRIC LINE

O
EMAIL: KEVIN_MYERS@CABLE.COMCAST.COM ENTRANCE WITH WASH RACK

CO

F
PROFESSIONAL
EXISTING ELECTRIC POLE
PROPOSED ACCESS ROAD TESSA MICHELE ANTOLICK
G G G EXISTING GAS LINE
2548 Park Center Boulevard ● State College, PA 16801
ENGINEER
12 12 12 PROPOSED 12" FILTER SOCK Ph: (814) 272-0455 Fax: (814) 272-0467

A
No. PE077667

E
W W W EXISTING WATER LINE N

I
N N
S Y L V A
24 24 24 PROPOSED 24" FILTER SOCK HEADQUARTERS:
EXISTING CULVERT
PROPOSED CULVERT 1129 West Governor Road ● Hershey, PA 17033-0797
EXISTING WALL
DIV DIV PROPOSED DIVERSION BERM This Drawing shall not be used for tender or construction unless sealed. Ph: (717) 533-8600 Fax: (717) 533-8605

drawing title
EXISTING RAILLINE

project title
I do hereby certify to the best of my knowledge, information and
PROPOSED GRAVEL belief, that the Erosion and Sediment Control and Site Restoration
EXISTING SLAG PILE Plan and Post Construction BMPs are true and correct, represent THIS DRAWING SET WAS ORIGINALLY PRODUCED IN COLOR. NON-COLOR REPRODUCTIONS
PROPOSED INLET actual field conditions and are in accordance with the 25 Pa. Code DO NOT SUFFICIENTLY DIFFERENTIATE AMONG FEATURES DEPICTED IN THIS DRAWING SET.
Chapters 78 and 102 of the Department's rules and regulations. I
WeB EXISTING SOIL BOUNDARY

Sheet
am aware that there are significant penalties for submitting false THIS DRAWING, ITS CONTENTS, AND EACH COMPONENT OF THIS DRAWING ARE THE
AND DESCRIPTOR information, including the possibility of fine and imprisonment.

1
PROPERTY OF AND PROPRIETARY TO ARM GROUP INC. AND SHALL NOT BE REPRODUCED
OR USED IN ANY MANNER EXCEPT FOR THE PURPOSE IDENTIFIED ON THE TITLE BLOCK,
AND ONLY BY OR ON BEHALF OF THIS CLIENT FOR THE IDENTIFIED PROJECT UNLESS
TESSA MICHELE ANTOLICK, PE - 077667 OTHERWISE AUTHORIZED BY THE EXPRESS, WRITTEN CONSENT OF ARM GROUP INC.
ARM Group Inc.
NOTES:
1. THE BASE MAP HAS BEEN CREATED USING SURVEY DATA (WITHIN
LIMIT OF DISTURBANCE) PROVIDED BY TRANT CORPORATION,
DATED 05/31/2018, SUPPLEMENTED BY AERIAL PHOTOGRAPHY OF
PAMAP TILES 40001380PAS PROVIDED BY TRANT CORPORATION.
SITE TOPOGRAPHY IS SUBJECT TO CHANGE DUE TO ACTIVE
STOCKPILE BY US STEEL.

Engineers and Scientists


2. AERIAL IMAGE ON SHEET C701 WAS PROVIDED BY AERIAL

www.armgroup.net
PHOTOGRAPHY OF PAMAP TILES 40001380PAS DATED 2010.
3. PROPERTY LINES INFORMATION OF ALLEGHENY COUNTY ARE
PROVIDED BY TRANT CORPORATION. THIS BASEMAP IS NOT THE
RESULT OF AN ACTUAL FIELD SURVEY OF PROPERTIES SHOWN
AND SHOULD NOT BE USED AS SUCH.
4. THIS PLAN IS IN THE PENNSYLVANIA STATE PLANE SOUTH, NORTH
BEL AMERICAN DATUM 1983 (NAD 83) COORDINATE SYSTEM.
LA 5. SLOPE AREAS 3:1 OR GREATER BROUGHT TO FINISH GRADE ARE
VEN
UE TO BE STABILIZED WITH ROCK OR SEEDED WITH MULCH APPLIED
TO SLOPES AS SPECIFIED ON DETAIL SHEETS.
6. EXISTING RAILROAD TRACKS WITHIN WELL PAD PROJECT AREA
WILL BE REMOVED.
7. THE TEMPORARY WATER STORAGE TANK DIMENSIONS AND

F)
LAYOUT ARE DISPLAYED FOR ILLUSTRATIVE PURPOSES ONLY.

(WW
THE FINAL TANK DIMENSIONS AND LAYOUT WILL BE DETERMINED
PRIOR TO CONSTRUCTION. THE OPEN-TOP TANKS ARE NOT

EEK
ACCOUNTED FOR IN THE PCSM CALCULATIONS. THE ENTIRE TANK
AREA IS MODELED AS A 'GRAVEL' COVER TYPE TO ACCOUNT FOR

CR
RUNOFF BEFORE THE TANKS ARE ERECTED.

TLE
LEGEND

UR
NOTE: LEGEND IS TYPICAL, NOT ALL OBJECTS IN LEGEND APPEAR IN PLAN.

T
TO
1550
EXISTING CONTOURS

5
449
FEMA FLOODPLAIN

B6
ING

TRI
BUILD
DECK
50' FLOODWAY
WV

FEMA FLOODWAY

05/31/2018 TRANT
X

ARM

By
FE
EXISTING MAPPED WATERCOURSE

GH
NC
E

H
W
AL

UG
OU
L

10/22/2018
EXISTING STRUCTURE

RO
OR

Date
X
EXISTING VEGETATION

BO
KB
STORM MH

GH
OC
RIM: 745.04
INV: 732.44 EXISTING PROPERTY LINE

SUR
DD
EXISTING MUNICIPAL BOUNDARIES

BRA

REVISED PER PADEP COMMENTS


ITT
X
NO
RTH X EXISTING FENCE

TP
RTH
NO B
RTH RADD
OC

EAS
VER KB OE OE EXISTING OVERHEAD ELECTRIC LINE

NO
SAI
LLE OROU W
X
ST GH AL

Revision
L
OW EXISTING ELECTRIC POLE

PADEP SUBMISSION
NSH CON
CRE
OE
IP TE W G
ALL AS MA OE
GW RKE
R OE G G G EXISTING GAS LINE

WALL
BUIL
DIN
G CO GW GV GV
GV GV

NC W G
RE OE CONCR

RETE
W

GV
GAS ETE CU
TE W W W EXISTING WATER LINE

GV
W BLDG GATE
740 G X
WV

W CONC
RB
AL
G ORW ETE C

CONC
L URB
OE E G
G WAL
MI
LL W EXISTING CULVERT
G GGAS MARK

INER
L W
WAL AR E W ER

OORS
L EH
OU O GATE BR

ONTA
G A
770 DD
SE
BOX TOWER
W EXISTING WALL

ITH D
CAR G
WAL S (S X OC

ING C
L TOR
G
GG

TRA
AGE)
E KA

No.
ILER
O W VE EXISTING RAILLINE

SHED
SHIPP

1
0
CO

OE
760 NU

OE
X NC
RE
TE G E(

G
WALL X BL
OC
GA
SR
CO W SM
-20
GG

KW
EXISTING SLAG PILE
NC X WV
WV

AR
RE AL WV

KE
TE
WA
L R 83)
LL
0 GW
75
36

OE
OE
WeB
Ø
CO

GA EXISTING SOIL BOUNDARY


GG
KE

SM

G
X
GW

600
AR AND DESCRIPTOR
OV

KE

10/22/2018
STEPS
R
E

CONCRETE WALL ROOM CONCRETE WA

1" = 200'
N

LL
1490
GA

UNDER

180539
PROPOSED CONTOURS
S

TRACKS

OE
OE
LI
NE
GG

CH
AIN
CONCRETE HW
EA

E
-LI PROPOSED LIMIT OF DISTUBANCE

AT
48"Ø PIPE OUTFALL 15"Ø GAS FEMA 100-YR FLOODPLAIN ST NK C

G
FE H
INV: 713.80
PIT
8"

PIPELINE BRIDGE X AI
G S LIN G12"Ø

NC
G

N
TS E
A

-L
NO
TURTLE CREEK (WWF) R BU IN
K
>> PROPOSED CHANNEL
15

TH RG FE
E

N
VE HB

400
C
GA

E
FEMA 100-YR FLOODPLAIN RS OR
S

AIL PROPOSED WATER FEATURES

project no.
OU
G

LIN

SCALE IN FEET
AS

LES GH
E
LIN

scale
TO

date
ES

W NS
PROPOSED PERMIT HIP PROPOSED WELL PAD
BOUNDARY/ LIMIT OF
DISTURBANCE

200
PROPOSED TEMPORARY TANK
(13.4 ACRES)

MDR
W W PROPOSED WATERLINE

KGJ

QZ
G G PROPOSED GASLINE

PROPOSED SLOPE STABILIZATION

0
graphic scale
PROPOSED ROCK CONSTRUCTION

designed
ENTRANCE WITH WASH RACK

checked

drawn
PROPOSED ACCESS ROAD

12 12 12 PROPOSED 12" FILTER SOCK

EROSION AND SEDIMENT CONTROL PLAN

ALLEGHENY COUNTY, PENNSYLVANIA


24 24 24 PROPOSED 24" FILTER SOCK

EXISTING CONDITIONS OVERLAY MAP

NORTH VERSAILLES TOWNSHIP,


NORTH BRADDOCK BOROUGH,
EAST PITTSBURGH BOROUGH,
PROPOSED CULVERT

DIV DIV PROPOSED DIVERSION BERM

PROPOSED GRAVEL

PROPOSED INLET

N
ST BR ORT
AD H
WE FLIN H BO DO
F G RO CK
MI OU UG
R H
BO CIT
DU Y O
TY

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C701&C702.dwg Plotted: October 19, 2018
CI F QU
ES
F
O SNE NE ON
WE A L T
H
E M
NO

QU REGISTERED

M
U

O
RT

CO

F
PROFESSIONAL

ET - BRADDOCK WELL PAD


H
VE

TESSA MICHELE ANTOLICK


RS
CI

MERRION OIL & GAS


AI
TY

ENGINEER
LL

P
OF

A
No. PE077667
E

E
S

I
DU

N N
TO

S Y L V A
QU

W
NS
ESN

M
HI

O
E

This Drawing shall not be used for tender or construction unless sealed.
O
N (W
G W
AH F

I do hereby certify to the best of my knowledge, information and


belief, that the Erosion and Sediment Control and Site Restoration
EL )
A

Plan and Post Construction BMPs are true and correct, represent
R

actual field conditions and are in accordance with the 25 Pa. Code
IV

Chapters 78 and 102 of the Department's rules and regulations. I


ER

am aware that there are significant penalties for submitting false


information, including the possibility of fine and imprisonment.

drawing title

project title
TESSA MICHELE ANTOLICK, PE - 077667

C701
Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
ARM Group Inc.
1030 NOTES:
1020 SmD 1. THE BASE MAP HAS BEEN CREATED USING SURVEY DATA (WITHIN
LIMIT OF DISTURBANCE) PROVIDED BY TRANT CORPORATION,
1010 DATED 05/31/2018, SUPPLEMENTED BY AERIAL PHOTOGRAPHY OF
PAMAP TILES 40001380PAS PROVIDED BY TRANT CORPORATION.
10 SITE TOPOGRAPHY IS SUBJECT TO CHANGE DUE TO ACTIVE
00 0
980 98 STOCKPILE BY US STEEL.
990

Engineers and Scientists


97 2. AERIAL IMAGE ON SHEET C701 WAS PROVIDED BY AERIAL

www.armgroup.net
0 PHOTOGRAPHY OF PAMAP TILES 40001380PAS DATED 2010.
8
860870 80 890 900 910 920 930 940950960 3. PROPERTY LINES INFORMATION OF ALLEGHENY COUNTY ARE
850 PROVIDED BY TRANT CORPORATION. THIS BASEMAP IS NOT THE
RESULT OF AN ACTUAL FIELD SURVEY OF PROPERTIES SHOWN
AND SHOULD NOT BE USED AS SUCH.
UCB 4. THIS PLAN IS IN THE PENNSYLVANIA STATE PLANE SOUTH, NORTH
BEL AMERICAN DATUM 1983 (NAD 83) COORDINATE SYSTEM.
UCB LA
VEN 5. SLOPE AREAS 3:1 OR GREATER BROUGHT TO FINISH GRADE ARE
UE TO BE STABILIZED WITH ROCK OR SEEDED WITH MULCH APPLIED
780 870 TO SLOPES AS SPECIFIED ON DETAIL SHEETS.
95 6. EXISTING RAILROAD TRACKS WITHIN WELL PAD PROJECT AREA
0 WILL BE REMOVED.
870 7. THE TEMPORARY WATER STORAGE TANK DIMENSIONS AND

F)
LAYOUT ARE DISPLAYED FOR ILLUSTRATIVE PURPOSES ONLY.

(WW
880
THE FINAL TANK DIMENSIONS AND LAYOUT WILL BE DETERMINED
760 PRIOR TO CONSTRUCTION. THE OPEN-TOP TANKS ARE NOT

EEK
820 83 ACCOUNTED FOR IN THE PCSM CALCULATIONS. THE ENTIRE TANK
0 840 85 880
0 860 870 AREA IS MODELED AS A 'GRAVEL' COVER TYPE TO ACCOUNT FOR

CR
810 RUNOFF BEFORE THE TANKS ARE ERECTED.
94
0

TLE
800
LEGEND

UR
790 NOTE: LEGEND IS TYPICAL, NOT ALL OBJECTS IN LEGEND APPEAR IN PLAN.

T
TO
930 1550
EXISTING CONTOURS

5
449
760 FEMA FLOODPLAIN

840
B6

850
92

860
0

870
ING

TRI
BUILD

880
DECK
790 50' FLOODWAY

90890
0
WV

URB FEMA FLOODWAY

05/31/2018 TRANT
780

ARM

By
770

FE
EXISTING MAPPED WATERCOURSE

GH
NC
E

H
W

7900
AL

78

UG
OU
L

882100

10/22/2018
EXISTING STRUCTURE

80
910

83 0

RO
OR
8400

Date
X
EXISTING VEGETATION

BO
KB
STORM MH

GH
OC
RIM: 745.04
INV: 732.44 EXISTING PROPERTY LINE

SUR
DD
UB
EXISTING MUNICIPAL BOUNDARIES

BRA

REVISED PER PADEP COMMENTS


ITT
900

890
X
NO 880
RTH 890 X EXISTING FENCE

TP
RTH
NO B GQF
RTH RADD

0
88

88
OC 0

EAS
VER K B 770 OE OE EXISTING OVERHEAD ELECTRIC LINE

NO
SAI
LLE OROU

0
X 870 8708

77
W
ST GH AL 60

Revision
OW L 860 EXISTING ELECTRIC POLE

PADEP SUBMISSION
NSH 780 OE 840 850

85
CON
CRE
IP TE W G 83

0
GW ALL AS MA
RKE OE 840
0

82
URB R OE G G G EXISTING GAS LINE

WALL
BUIL
GW 820 830

0
DIN CO
GV GV

G
GV GV

NC W G
780 RE OE CONCR

RETE
W

GV
GAS ETE CU
TE
810 W W W EXISTING WATER LINE

GV
W BLDG GATE G X
WV

W CONC
RB
AL
G ORW ETE C

CONC
L URB
OE E G 800
G MI
LL W 790 EXISTING CULVERT
G WAL
770 GGAS MARK

INER
W
L WAL AR E 770
W ER

OORS
L EH
OU O GATE BR 780

ONTA
BOX SE G A DD EXISTING WALL
TOWER
W

ITH D
CAR G
WAL S (S X OC

ING C
L TOR
G
GG

TRA
AGE)
760 E KA

No.
ILER
O W VE EXISTING RAILLINE

SHED
SHIPP

1
0
CO

OE
NU

OE
X NC
RE
TE G E(

G
WALL X BL
OC
GA
SR
CO W SM
-20
GG

KW
EXISTING SLAG PILE
NC X WV
WV

AR
RE AL WV

KE
760
TE
WA
L R 83)
LL
GW
UB
36

OE
OE
WeB
Ø
CO

GA EXISTING SOIL BOUNDARY


GG
KE

SM

G
X
GW

600
AR AND DESCRIPTOR
OV

KE

10/22/2018
STEPS
R
E

CONCRETE WALL ROOM CONCRETE WA

1" = 200'
N

LL
1490
GA

UNDER

180539
PROPOSED CONTOURS
S

TRACKS

OE
OE
LI
NE
GG

UB 730 CH

770
AIN

0
CONCRETE HW
EA

E
-LI PROPOSED LIMIT OF DISTUBANCE

76
AT
48"Ø PIPE OUTFALL 15"Ø GAS FEMA 100-YR FLOODPLAIN ST NK C

G
FE H
INV: 713.80
PIT
8"

PIPELINE BRIDGE X AI
G S LIN G12"Ø

NC
G

N
TS E
A

-L
NO
W TURTLE CREEK (WWF) R BU IN
K
750 >> PROPOSED CHANNEL
15

TH RG FE
E

N
VE HB

400
C
GA

E
FEMA 100-YR FLOODPLAIN RS OR
S

AIL PROPOSED WATER FEATURES

project no.
OU
G

LIN

SCALE IN FEET
AS

LES GH
E
LIN

760

scale
TO

date
ES

770
W NS
PROPOSED PERMIT UB HIP PROPOSED WELL PAD
W BOUNDARY/ LIMIT OF 770 760
760 0
DISTURBANCE 78
770

200
770 760 PROPOSED TEMPORARY TANK
(13.4 ACRES)
0
78

MDR
0 740 W W PROPOSED WATERLINE

KGJ
77
0 W 75

QZ
0
770 76
770 G G PROPOSED GASLINE

PROPOSED SLOPE STABILIZATION

0
780
0
790 73

graphic scale
PROPOSED ROCK CONSTRUCTION

designed
ENTRANCE WITH WASH RACK

checked

drawn
800
810
730 PROPOSED ACCESS ROAD
820
830 12 12 12 PROPOSED 12" FILTER SOCK

EROSION AND SEDIMENT CONTROL PLAN


840

ALLEGHENY COUNTY, PENNSYLVANIA


24 24 24 PROPOSED 24" FILTER SOCK
850

NORTH VERSAILLES TOWNSHIP,


NORTH BRADDOCK BOROUGH,
EXISTING CONDITIONS & SOILS PLAN
EAST PITTSBURGH BOROUGH,
860 PROPOSED CULVERT
870
880 DIV DIV PROPOSED DIVERSION BERM
890
900
910 PROPOSED GRAVEL
940 930
W 950

92
960 PROPOSED INLET

0
970
980

N
ST BR ORT
AD H
WE FLIN H BO DO
F G RO CK
MI OU UG
R H
BO CIT
DU Y O
TY

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C701&C702.dwg Plotted: October 19, 2018
CI F QU
ES
F
O SNE NE ON
WE A L T
H
E M
NO

QU REGISTERED

M
U

O
RT

CO

F
PROFESSIONAL

ET - BRADDOCK WELL PAD


H
VE

TESSA MICHELE ANTOLICK


RS
CI

MERRION OIL & GAS


AI
TY

ENGINEER
LL

P
OF

A
No. PE077667
E

E
S

I
DU

N N
TO

S Y L V A
QU

W
NS
ESN

M
HI

O
E

This Drawing shall not be used for tender or construction unless sealed.
O
N (W
G W
AH F

I do hereby certify to the best of my knowledge, information and


belief, that the Erosion and Sediment Control and Site Restoration
EL )
A

Plan and Post Construction BMPs are true and correct, represent
R

actual field conditions and are in accordance with the 25 Pa. Code
IV

Chapters 78 and 102 of the Department's rules and regulations. I


ER

am aware that there are significant penalties for submitting false


information, including the possibility of fine and imprisonment.

drawing title

project title
TESSA MICHELE ANTOLICK, PE - 077667

C702
UB

Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
ARM Group Inc.
NOTES:
1. THE BASE MAP HAS BEEN CREATED USING SURVEY DATA (WITHIN
91 LIMIT OF DISTURBANCE) PROVIDED BY TRANT CORPORATION,
0
DATED 05/31/2018, SUPPLEMENTED BY AERIAL PHOTOGRAPHY OF
PAMAP TILES 40001380PAS PROVIDED BY TRANT CORPORATION.
SITE TOPOGRAPHY IS SUBJECT TO CHANGE DUE TO ACTIVE
STOCKPILE BY US STEEL.

Engineers and Scientists


2. AERIAL IMAGE ON SHEET C701 WAS PROVIDED BY AERIAL

www.armgroup.net
7 80

PHOTOGRAPHY OF PAMAP TILES 40001380PAS DATED 2010.


3. PROPERTY LINES INFORMATION OF ALLEGHENY COUNTY ARE

790
PROVIDED BY TRANT CORPORATION. THIS BASEMAP IS NOT THE

800
RESULT OF AN ACTUAL FIELD SURVEY OF PROPERTIES SHOWN

820
810
AND SHOULD NOT BE USED AS SUCH.

830
4. THIS PLAN IS IN THE PENNSYLVANIA STATE PLANE SOUTH, NORTH
AMERICAN DATUM 1983 (NAD 83) COORDINATE SYSTEM.

840
5. SLOPE AREAS 3:1 OR GREATER BROUGHT TO FINISH GRADE ARE
TO BE STABILIZED WITH ROCK OR SEEDED WITH MULCH APPLIED
TO SLOPES AS SPECIFIED ON DETAIL SHEETS.
6. EXISTING RAILROAD TRACKS WITHIN WELL PAD PROJECT AREA
WILL BE REMOVED.
7. THE TEMPORARY WATER STORAGE TANK DIMENSIONS AND
LAYOUT ARE DISPLAYED FOR ILLUSTRATIVE PURPOSES ONLY.
THE FINAL TANK DIMENSIONS AND LAYOUT WILL BE DETERMINED
PRIOR TO CONSTRUCTION. THE OPEN-TOP TANKS ARE NOT
ACCOUNTED FOR IN THE PCSM CALCULATIONS. THE ENTIRE TANK
AREA IS MODELED AS A 'GRAVEL' COVER TYPE TO ACCOUNT FOR
RUNOFF BEFORE THE TANKS ARE ERECTED.
900
LEGEND
780

H
890 NOTE: LEGEND IS TYPICAL, NOT ALL OBJECTS IN LEGEND APPEAR IN PLAN.

G
OU

GH
77 880 1550
EXISTING CONTOURS
0
R

OU
76 BO
75 0 870

R
0 APPROXIMATE

BO
8
CK

85 0 6 FEMA FLOODPLAIN
LOCATION OF 840
DO

H 810 0
RG
OVERHEAD WIRES 820 83
D

0 50' FLOODWAY
X 800
BRA

TSU

780
740

OE 790 FEMA FLOODWAY


PIT
RTH
OE

05/31/2018 TRANT
X OE

ARM
CONC. VAULT

By
T

OE
NO

EXISTING MAPPED WATERCOURSE


EAS

OE
GW OE

10/22/2018
EXISTING STRUCTURE
GW OE

Date
OE HIGH-TENSION
CON GW GAS OE EXISTING VEGETATION

OE
CRE GW MAR OE 770 ELEC.TOWER
TE W KER OE
ALL GW OE 760 EXISTING PROPERTY LINE

OE
GW GV GV
OE
GW
ALL
GV GV
X W 750 EXISTING MUNICIPAL BOUNDARIES
G G G W OE

REVISED PER PADEP COMMENTS


G

G
ETE W

GAS
X
W CHAIN-LINK FENCE

O
CO
G G OE G W OE

E
OE X EXISTING FENCE
OE
GV

BLDG G W C7O
NC G W BRADDO 4 NCRETE C
CK AVE0
GV

RE E G OE URB
O G X X W
R

TE G WV
NUE (SR OE OE EXISTING OVERHEAD ELECTRIC LINE
GATE W -2083)
CONC

O
G OE
W W

E
X
CONC

Revision
AL G W RETE
G

O EXISTING ELECTRIC POLE

PADEP SUBMISSION
CURB
X
L X
G W E
G WOE
OE UE G W G G G EXISTING GAS LINE
E OE
X G W
CHAIN-LINK FENCE O OE G
UE W
G

OE X
G W W W EXISTING WATER LINE
OE W
G W
E
O

X
G
W
GAS EXISTING CULVERT
MEAD G MAR
APPROXIMATE OW
X W KER
E G EXISTING WALL

ER
G LOCATION OF GAS O GATE W
PIPELINE G

NTAIN

No.
X
W EXISTING RAILLINE

1
0
DOOR
70 E G
7 G O W
MATCH LINE SHEET C-703B

MI G EXISTING SLAG PILE

OE
W
X
LL

ING C

WITH

OE
W
G E G
AR O W WeB EXISTING SOIL BOUNDARY
E HO G

180
AND DESCRIPTOR

SHIPP
CONCRETE W

SHED

10/22/2018
G X
U E

OE
SE O G 1490

1" = 60'
BLOCK WALL

180539
OE
PROPOSED CONTOURS
W
X

CE
X G
E
G

O X
X
W PROPOSED LIMIT OF DISTUBANCE

FEN
X
CO

OE
X
NC G

OE
>>

X
X RE W PROPOSED CHANNEL

INK
E TE G
O

120
GA
X
BL
OC
G

SM PROPOSED WATER FEATURES

IN-L
X

project no.
KW W

SCALE IN FEET
OE
CO G AR

OE
WV

AL
WV

KE

scale
NC

CHA

date
RE L X
WV

W R
TE PROPOSED WELL PAD
WA G
G

L W

OE
L

OE
X
G

60
W PROPOSED TEMPORARY TANK

MDR
G

W W PROPOSED WATERLINE

OE

KGJ
W

QZ
OE
X
SWITCH G

0
G G PROPOSED GASLINE

74
W
G

OE
G

PROPOSED SLOPE STABILIZATION

OE
OE X W
GA

0
EA SWITCH SM
CONCRETE WALL OE ST G
ROOM PIT AR
STEPS

graphic scale
PROPOSED ROCK CONSTRUCTION

E&S EXISTING CONDITIONS AND LIMIT OF DISTURBANCE PLAN


CONCRETE TS KE
UNDER BU

designed
OE
R ENTRANCE WITH WASH RACK

checked
WALL

OE
RG

drawn
NO
G

TRACKS RT HB X W G
HV OR
OE

ER OU PROPOSED ACCESS ROAD


SA G H
ILL

OE
ES

OE
TO
G

12 12 12 PROPOSED 12" FILTER SOCK


WN
FEMA 100-YR FLOODPLAIN SH

EROSION AND SEDIMENT CONTROL PLAN


OE

ALLEGHENY COUNTY, PENNSYLVANIA


740 IP 24 24 24 PROPOSED 24" FILTER SOCK

OE

NORTH VERSAILLES TOWNSHIP,


OE

NORTH BRADDOCK BOROUGH,


CH

EAST PITTSBURGH BOROUGH,


X
AIN PROPOSED CULVERT

E
15"Ø GAS 730

AT
-LI
N

G
PIPELINE BRIDGE KF DIV DIV PROPOSED DIVERSION BERM
EN
APPROXIMATE CE X X
LOCATION OF C PROPOSED GRAVEL
H
AI
OVERHEAD WIRES FE N
PERMIT BOUNDARY/ TURTLE CREEK N -LIN PROPOSED INLET
(WWF) C
LIMIT OF E K
DISTURBANCE
(13.4 ACRES)

730
740
FEMA 100-YR FLOODPLAIN 750
760

WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C703.dwg Plotted: October 19, 2018
H
M
REGISTERED

O
CO

F
PROFESSIONAL

ET - BRADDOCK WELL PAD


TESSA MICHELE ANTOLICK
770

MERRION OIL & GAS


ENGINEER

A
No. PE077667

E
N

I
N N
S Y L V A

770

760 This Drawing shall not be used for tender or construction unless sealed.

I do hereby certify to the best of my knowledge, information and


belief, that the Erosion and Sediment Control and Site Restoration
Plan and Post Construction BMPs are true and correct, represent
actual field conditions and are in accordance with the 25 Pa. Code
Chapters 78 and 102 of the Department's rules and regulations. I
760 am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment.

770

drawing title

project title
770
TESSA MICHELE ANTOLICK, PE - 077667

C703A
Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
770 or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
ARM Group Inc.
NOTES:

830

84
82

0
800

0
770 1. THE BASE MAP HAS BEEN CREATED USING SURVEY DATA (WITHIN

810
79
760
LIMIT OF DISTURBANCE) PROVIDED BY TRANT CORPORATION,

0
0 78
79 DATED 05/31/2018, SUPPLEMENTED BY AERIAL PHOTOGRAPHY OF

0
0

76
0
77 PAMAP TILES 40001380PAS PROVIDED BY TRANT CORPORATION.

0
75

ROUGH
F) E O
SITE TOPOGRAPHY IS SUBJECT TO CHANGE DUE TO ACTIVE

H
EK
W CR 5 T
780 780 STOCKPILE BY US STEEL.

Engineers and Scientists


G
(W LE 49
2. AERIAL IMAGE ON SHEET C701 WAS PROVIDED BY AERIAL

BOROU

www.armgroup.net
770

T 4
PHOTOGRAPHY OF PAMAP TILES 40001380PAS DATED 2010.

R B6
X
760 3. PROPERTY LINES INFORMATION OF ALLEGHENY COUNTY ARE

BO
TU RI
X PROVIDED BY TRANT CORPORATION. THIS BASEMAP IS NOT THE

T
RESULT OF AN ACTUAL FIELD SURVEY OF PROPERTIES SHOWN

URGH
K
X AND SHOULD NOT BE USED AS SUCH.

C
770 FEN 4. THIS PLAN IS IN THE PENNSYLVANIA STATE PLANE SOUTH, NORTH
CE

O
0
780 AMERICAN DATUM 1983 (NAD 83) COORDINATE SYSTEM.

75

D
X

S
5. SLOPE AREAS 3:1 OR GREATER BROUGHT TO FINISH GRADE ARE

AD

TT
770 TO BE STABILIZED WITH ROCK OR SEEDED WITH MULCH APPLIED
X

I
RTH BR
OE

P
TO SLOPES AS SPECIFIED ON DETAIL SHEETS.
WAL 760 6. EXISTING RAILROAD TRACKS WITHIN WELL PAD PROJECT AREA

ST
L X OE
STORM MH 750 WILL BE REMOVED.

EA
7. THE TEMPORARY WATER STORAGE TANK DIMENSIONS AND
RIM: 745.04

OE

NO
X LAYOUT ARE DISPLAYED FOR ILLUSTRATIVE PURPOSES ONLY.
PERMIT BOUNDARY/
INV: 732.44 GW THE FINAL TANK DIMENSIONS AND LAYOUT WILL BE DETERMINED
76 GW PRIOR TO CONSTRUCTION. THE OPEN-TOP TANKS ARE NOT
LIMIT OF X
GW ALL

740
0 ACCOUNTED FOR IN THE PCSM CALCULATIONS. THE ENTIRE TANK
DISTURBANCE 760 EW
X NC RET AREA IS MODELED AS A 'GRAVEL' COVER TYPE TO ACCOUNT FOR
(13.4 ACRES) CO RUNOFF BEFORE THE TANKS ARE ERECTED.
CHAIN-LINK FENCE X X
X X X LEGEND
NOTE: LEGEND IS TYPICAL, NOT ALL OBJECTS IN LEGEND APPEAR IN PLAN.

770 WALL 1550


EXISTING CONTOURS

780

MA
FEMA FLOODPLAIN
CONCRET
E WALL

TC
0
79
0

H
76

50' FLOODWAY

LIN
760 FEMA FLOODWAY

ES

05/31/2018 TRANT
ARM
CK

By
HE
EXISTING MAPPED WATERCOURSE
DE
NG

ET

10/22/2018
DI
EXISTING STRUCTURE
IL 770

C-7

Date
770
W
V

BU EXISTING VEGETATION

03A
EXISTING PROPERTY LINE

7 80
770
0

780 EXISTING MUNICIPAL BOUNDARIES


76

UGH

REVISED PER PADEP COMMENTS


770 BORO
O C K EXISTING FENCE
DD X

0
H BRA HIP

77
NORT L E S T OWNS
SAIL OE OE EXISTING OVERHEAD ELECTRIC LINE
H VER
NORT

Revision
EXISTING ELECTRIC POLE

PADEP SUBMISSION
0

0
78

77
G G G EXISTING GAS LINE

760
W W W EXISTING WATER LINE

EXISTING CULVERT

MAT C-703A
EXISTING WALL

No.
EXISTING RAILLINE

1
0
CH L
EXISTING SLAG PILE

INE S
WeB

64495 EEK
EXISTING SOIL BOUNDARY

TO

180
AND DESCRIPTOR

10/22/2018
LE CR

H
1490

TURT WF)

1" = 60'

180539
PROPOSED CONTOURS

EET
(W
PROPOSED LIMIT OF DISTUBANCE

R I B
>> PROPOSED CHANNEL

T
BUILDING

120
PROPOSED WATER FEATURES

project no.

SCALE IN FEET
0
76

scale
BOX CARS (STORAGE)

date
750 PROPOSED WELL PAD

60
PROPOSED TEMPORARY TANK

MDR
W W PROPOSED WATERLINE

KGJ

QZ
WALL TRAILER
G G PROPOSED GASLINE
WALL
WALL 740
PROPOSED SLOPE STABILIZATION

0
G
WALL

graphic scale
G PROPOSED ROCK CONSTRUCTION

E&S EXISTING CONDITIONS AND LIMIT OF DISTURBANCE PLAN


designed
G ENTRANCE WITH WASH RACK

checked

drawn
G
G 730
G PROPOSED ACCESS ROAD
G CONCRETE HW
G 48"Ø PIPE OUTFALL 12 12 12 PROPOSED 12" FILTER SOCK
G INV: 713.80

EROSION AND SEDIMENT CONTROL PLAN

ALLEGHENY COUNTY, PENNSYLVANIA


G 24 24 24 PROPOSED 24" FILTER SOCK
G

NORTH VERSAILLES TOWNSHIP,


NORTH BRADDOCK BOROUGH,
EAST PITTSBURGH BOROUGH,
G PROPOSED CULVERT
G PERMIT BOUNDARY/
G LIMIT OF DIV DIV PROPOSED DIVERSION BERM
G DISTURBANCE
G (13.4 ACRES
) PROPOSED GRAVEL
G
G PROPOSED INLET

G
G
36 730
Ø
GCO
G
KE
OV
G E
G N
GA
GS L
G INE 750
G 0
G 73

G WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C703.dwg Plotted: October 19, 2018
H
G M
REGISTERED

O
CO
G

F
PROFESSIONAL

ET - BRADDOCK WELL PAD


G
TESSA MICHELE ANTOLICK
G G G

MERRION OIL & GAS


740

760
EK

G ENGINEER

A
W RE

No. PE077667

E
8" N

I
GA G G 770 N N
(W E C

0 S Y L V A
F)

SL 73
750

IN
E G 15
RT


750

12
TU

G "Ø G GA This Drawing shall not be used for tender or construction unless sealed.
12 S
"Ø GG GA LI I do hereby certify to the best of my knowledge, information and
G G S N
G E belief, that the Erosion and Sediment Control and Site Restoration
AS Plan and Post Construction BMPs are true and correct, represent
0 actual field conditions and are in accordance with the 25 Pa. Code
Chapters 78 and 102 of the Department's rules and regulations. I
75

am aware that there are significant penalties for submitting false


information, including the possibility of fine and imprisonment.

drawing title
750

project title
780
TESSA MICHELE ANTOLICK, PE - 077667

C703B
Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
ARM Group Inc.
NOTES:
1. THE BASE MAP HAS BEEN CREATED USING SURVEY DATA (WITHIN
91 LIMIT OF DISTURBANCE) PROVIDED BY TRANT CORPORATION,
0
DATED 05/31/2018, SUPPLEMENTED BY AERIAL PHOTOGRAPHY OF
PAMAP TILES 40001380PAS PROVIDED BY TRANT CORPORATION.
SITE TOPOGRAPHY IS SUBJECT TO CHANGE DUE TO ACTIVE
STOCKPILE BY US STEEL.

Engineers and Scientists


2. AERIAL IMAGE ON SHEET C701 WAS PROVIDED BY AERIAL

www.armgroup.net
7 80

PHOTOGRAPHY OF PAMAP TILES 40001380PAS DATED 2010.


3. PROPERTY LINES INFORMATION OF ALLEGHENY COUNTY ARE

790
PROVIDED BY TRANT CORPORATION. THIS BASEMAP IS NOT THE

800
RESULT OF AN ACTUAL FIELD SURVEY OF PROPERTIES SHOWN

820
810
AND SHOULD NOT BE USED AS SUCH.

830
4. THIS PLAN IS IN THE PENNSYLVANIA STATE PLANE SOUTH, NORTH
AMERICAN DATUM 1983 (NAD 83) COORDINATE SYSTEM.

840
5. SLOPE AREAS 3:1 OR GREATER BROUGHT TO FINISH GRADE ARE
TO BE STABILIZED WITH ROCK OR SEEDED WITH MULCH APPLIED
TO SLOPES AS SPECIFIED ON DETAIL SHEETS.

GH
6. EXISTING RAILROAD TRACKS WITHIN WELL PAD PROJECT AREA

H
UG
WILL BE REMOVED.

OU
7. THE TEMPORARY WATER STORAGE TANK DIMENSIONS AND

RO
OR
LAYOUT ARE DISPLAYED FOR ILLUSTRATIVE PURPOSES ONLY.

BO
THE FINAL TANK DIMENSIONS AND LAYOUT WILL BE DETERMINED

KB
PRIOR TO CONSTRUCTION. THE OPEN-TOP TANKS ARE NOT

GH
OC
ACCOUNTED FOR IN THE PCSM CALCULATIONS. THE ENTIRE TANK

SUR
AREA IS MODELED AS A 'GRAVEL' COVER TYPE TO ACCOUNT FOR

DD
RUNOFF BEFORE THE TANKS ARE ERECTED.
900

BRA

IT T
LEGEND

TP
RTH
780
890 NOTE: LEGEND IS TYPICAL, NOT ALL OBJECTS IN LEGEND APPEAR IN PLAN.

EAS
NO
77 880 1550
EXISTING CONTOURS
0
76 EXISTING TRACKS
75 0 CONNECT TO 870
0 (SEE NOTE 6)
PRODUCTION CHAIN-LINK FENCE 8 6 FEMA FLOODPLAIN
85 0
EQUIPMENT APPROXIMATE
810 840
LOCATION OF 0
LAT:N40° 23' 37.20" 820 83 50' FLOODWAY
X OVERHEAD WIRES 800 0
LONG:W79° 50' 47.40" 780
740

1 END BURIED GASLINE (TYP.) 790


5 OE FEMA FLOODWAY
W +00
OE

STA: 27+78

05/31/2018 TRANT
X OE

ARM
CONC. VAULT

By
OE EXISTING MAPPED WATERCOURSE
W CON OE CONCRETE
GW CRE OE TOP ELEVATION:
WAL TE BLOCK WALL

10/22/2018
EXISTING STRUCTURE
GW L OE 745'

Date
W OE
GW GAS OE EXISTING VEGETATION

OE
MAR OE 770
GW KER OE HIGH-TENSION PROPOSED
00

GW OE 760 EXISTING PROPERTY LINE


ELEC.TOWER GRAVEL ROAD
16+

OE
PRO GW GV GV
PC-3 OE
GW
W

ALL

DU
GV GV

W 750 TO BE INSTALLED
EQU CTION EXISTING MUNICIPAL BOUNDARIES
X
G G W OE ON GRADE
GA G

REVISED PER PADEP COMMENTS


CON IPMENT GATE
G

S G
ETE W

X
W

O
TAIN BLDG
G G OE G W OE

E
OE X EXISTING FENCE
OE

>>
GV

M G W
+7
8 AREA ENT G W 740
GV

27 E OE
W

O G X G
X W
R

G OE OE EXISTING OVERHEAD ELECTRIC LINE


73
WV

W
CONC

O
G OE
8 W

E
X
G CONC

Revision
G W RETE

2%
G

O EXISTING ELECTRIC POLE

PADEP SUBMISSION
CURB
X
G W E BRADDO TEMPORARY WATER STORAGE TANKS AND ASSOCIATED TANK
>> X G CK AVE

74
00 OE WOE NUE
W

+ G UE G W (SR-208 ACCESS ROAD TO BE CONSTRUCTED ON EXISTING GRADE. G G G EXISTING GAS LINE


27
0

0
X G 3)
17+0

E OE OE W FINISH GRADING WITHIN THE TANK AREA SHALL BE COMPLETED


O G

742
UE W GATE
G

OE X
G >> 10' OE G W
G
AS NECESSARY (0.5% - 1.0%) TO CONVEY POSITIVE DRAINAGE W W W EXISTING WATER LINE
E W TOWARDS THE DIVERSION BERM PROPOSED SOUTH OF THE
O

X
G GAS
W

6%
74 TANK AREA EXISTING CULVERT
W
744 2
744

>> MAR
G

315' PC G
-1C
X W KER
3H:1V E G PROPOSED EXISTING WALL
20' O W
750

G
G CHAIN-LINK FENCE TEMPORARY
00

74
760

No.
X
6>> W EXISTING RAILLINE

1
0
26+
W

0 E 10' G FRESHWATER TANK


G

744
77
>>
G O WET POND W (TYP.)
ELEV G EXISTING SLAG PILE
. 747

OE
.21'± BERM 745' W (SEE NOTE 7)
X
G18+00

OE
G E BOT. EL: 741' G
O
>>PC-1A
>>

W WeB
W

EXISTING SOIL BOUNDARY

742
POOL EL: 742' G

180
CO W AND DESCRIPTOR

10/22/2018
G X
1%

744
E

OE
O NC G 1490
>>

1" = 60'

180539
OE
FOREBAY PROPOSED RE PROPOSED CONTOURS

FEN -LINK
MATCH LINE SHEET C-704B

TE W
BOTTOM X EMERGENCY BL G

CE
X O
W
G

E
G

CENTER OF O EL: 742.5' X


XSPILLWAY
CK X
W PROPOSED LIMIT OF DISTUBANCE

IN
00

VEG FILTER STRIP @1% WA

OE
X G

CHA
25+

PROPOSED PAD L

OE
L
1% >>

X
X W PROPOSED CHANNEL
LAT:N40° 23' 35.42" 172'E
748

O PROPOSED G

120
746

GA
X
LONG:W79° 50' 45.90"
G

Ø105' SM PROPOSED WATER FEATURES


W

project no.
STONE W

SCALE IN FEET
742

OE
G AR
0

OE
19+0

WV

LANDING
WV

KE

scale

date
WV

BERM
X W R
TRENCH Ø73' PROPOSED WELL PAD
G

0
DRAIN
1V

+9
742 W

OE
W

OE

29
3H:

20+00 (PC-1B) 744 X


G

60
W W PROPOSED TEMPORARY TANK
W
>>
21+00
W 28+00
W ELEV 744

W
0 Ø73' G
27+0 W

MDR
29+00
G

22+00 W W PROPOSED WATERLINE

OE
W W W

KGJ
747.2 . PC-2 74
W2 W

QZ
OE
W W W X
W 1±' W
W 23+00 746 >> >> G

0
25+00 26+00 DIV
>> G G PROPOSED GASLINE

74
W W W
W 24+00 W W W W DIV
W W DIV G

OE
W
G

PROPOSED SLOPE STABILIZATION

OE
OE Ø73' X W
GA

0
SWITCH SWITCH DIV SM
CONCRETE WALL OE PROPOSED
G
ROOM AR
STEPS

graphic scale
DIV PROPOSED ROCK CONSTRUCTION
CONCRETE SKIMMER PROPOSED KE
UNDER

designed
OE
R ENTRANCE WITH WASH RACK

checked
WALL

OE
BASIN OUTLET DIV

drawn
G

TRACKS SEDIMENT TRAP PROPOSED PROPOSED X W G


EL.: 740.5 Ø73'
OE

DRAINAGE AREA: PROPOSED


OUTLET ANTI-SEEP DIV
PROPOSED CONNECT TO PROPOSED ACCESS ROAD
5.0 ACRES FOREBAY
RISER WITH COLLAR DIV
CHANNEL

OE
OE
BERM (13' FROM TEMPORARY TANKS
TRASH RACK CUL-DE-SAC
G

(TYP.) DIV 12 12 12 PROPOSED 12" FILTER SOCK


RISER) LAT:N40° 23' 34.74"

EROSION AND SEDIMENT CONTROL PLAN


OE

ALLEGHENY COUNTY, PENNSYLVANIA


740 LONG:W79° 50' 36.52" DIV 24 24 24 PROPOSED 24" FILTER SOCK
FEMA 100-YR FLOODPLAIN

OE
END ABOVE GROUND

NORTH VERSAILLES TOWNSHIP,


OE

NORTH BRADDOCK BOROUGH,


CH

EAST PITTSBURGH BOROUGH,


DIV

E&S GRADING AND DRAINAGE PLAN


X
730 WATERLINE AIN PROPOSED CULVERT
15"Ø GAS -LI

E
PIPELINE DIV N

AT
KF DIV DIV PROPOSED DIVERSION BERM
EN

G
BRIDGE
APPROXIMATE CE X X

PERMIT BOUNDARY/ LOCATION OF C PROPOSED GRAVEL


H
EA TEMPORARY AI
LIMIT OF APPROXIMATE OVERHEAD WIRES ST FE N
TURTLE CREEK PIT DIVERSION BERM N -LIN PROPOSED INLET
DISTURBANCE LOCATION OF GAS TS C
(WWF) NO BU E K
PIPELINE RT RG SEDIMENT TRAP DRAINAGE AREA
HV HB
ER OR
SA O
ILL UG
ES H
TO
WN
SH
FEMA 100-YR FLOODPLAIN IP
730
740
750
760

WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C704.dwg Plotted: October 19, 2018
H
M
REGISTERED

O
CO

F
PROFESSIONAL

ET - BRADDOCK WELL PAD


TESSA MICHELE ANTOLICK
770

MERRION OIL & GAS


ENGINEER

A
No. PE077667

E
N

I
N N
S Y L V A

770

760 This Drawing shall not be used for tender or construction unless sealed.

I do hereby certify to the best of my knowledge, information and


belief, that the Erosion and Sediment Control and Site Restoration
Plan and Post Construction BMPs are true and correct, represent
actual field conditions and are in accordance with the 25 Pa. Code
Chapters 78 and 102 of the Department's rules and regulations. I
760 am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment.

770

drawing title

project title
770
TESSA MICHELE ANTOLICK, PE - 077667

C704A
Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
770 or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
OU
BORO
CK B O R

ARM Group Inc.


NOTES:

URGH
830

84
82

O
800

0
770 1.
THE BASE MAP HAS BEEN CREATED USING SURVEY DATA (WITHIN

810
79

D
760

S
LIMIT OF DISTURBANCE) PROVIDED BY TRANT CORPORATION,

D
0

T
0 78
79 DATED 05/31/2018, SUPPLEMENTED BY AERIAL PHOTOGRAPHY OF

T
A
0

76
0

I
77 PAMAP TILES 40001380PAS PROVIDED BY TRANT CORPORATION.

BR
0

P
75

F) E O
SITE TOPOGRAPHY IS SUBJECT TO CHANGE DUE TO ACTIVE

EAST
EK
W CR 5 T
780

NORTH
780 STOCKPILE BY US STEEL.

Engineers and Scientists


(W LE 49
6+00 2. AERIAL IMAGE ON SHEET C701 WAS PROVIDED BY AERIAL

www.armgroup.net
5+00 7+00 770

T 4
W W CONNECT TO PHOTOGRAPHY OF PAMAP TILES 40001380PAS DATED 2010.

R B6
W W W W
X
4+00 W 760 3. PROPERTY LINES INFORMATION OF ALLEGHENY COUNTY ARE
CHAIN-LINK FENCE PRODUCTION

TU RI
W W X8+0 PROVIDED BY TRANT CORPORATION. THIS BASEMAP IS NOT THE

T
W W 0 EQUIPMENTRESULT OF AN ACTUAL FIELD SURVEY OF PROPERTIES SHOWN
W

0
W W X LAT:N40° 23'AND
37.20"
SHOULD NOT BE USED AS SUCH.

3+0
770 PROPOSED W FEN LONG:W79° 50' 47.40"
4. THIS PLAN IS IN THE PENNSYLVANIA STATE PLANE SOUTH, NORTH
9+0C
0E

0
WATER LINE 780 AMERICAN DATUM 1983 (NAD 83) COORDINATE SYSTEM.

75
W X END BURIED GASLINE
5. SLOPE AREAS 3:1 OR GREATER BROUGHT TO FINISH GRADE ARE
(ABOVEGROUND STA: 27+78 TO BE STABILIZED WITH ROCK OR SEEDED WITH MULCH APPLIED
W 770

W
SEGMENTS TO BE X 1
W 0+0
0 OE TO SLOPES AS SPECIFIED ON DETAIL SHEETS.
INSTALLED ON WAL 760 6. EXISTING RAILROAD TRACKS WITHIN WELL PAD PROJECT AREA
L W X OE
GRADE) STORM MH E WILL BE REMOVED.
750
RET 7. THE TEMPORARY WATER STORAGE TANK DIMENSIONS AND

MA
RIM: 745.04 N C
W CO ALL

OE
11+

W
0X0 LAYOUT ARE DISPLAYED FOR ILLUSTRATIVE PURPOSES ONLY.
INV: 732.44 W GW

TC
PERMIT BOUNDARY/ W THE FINAL TANK DIMENSIONS AND LAYOUT WILL BE DETERMINED
LIMIT OF 76 W GW PRIOR TO CONSTRUCTION. THE OPEN-TOP TANKS ARE NOT

W +00

HL
X
GW

740
0 ACCOUNTED FOR IN THE PCSM CALCULATIONS. THE ENTIRE TANK
DISTURBANCE W 12+

2
760 00 AREA IS MODELED AS A 'GRAVEL' COVER TYPE TO ACCOUNT FOR

IN
(13.4 ACRES) X RUNOFF BEFORE THE TANKS ARE ERECTED.
W

ES
W 13X+00 X
X X X

HE
W LEGEND
W 14+00
W NOTE: LEGEND IS TYPICAL, NOT ALL OBJECTS IN LEGEND APPEAR IN PLAN.

ET
W 15+00

W
W W
770 WALL W 1550
EXISTING CONTOURS

C-
W

8
+7
16+00
70
780

27
4A
FEMA FLOODPLAIN
W
0
1+0

W
0

G
79
0
76

50' FLOODWAY
CK
DE
W

FEMA FLOODWAY

G
760

W
NG

05/31/2018 TRANT
00

ARM
I

27+

By
ILD EXISTING MAPPED WATERCOURSE
BU
W

10/22/2018
EXISTING STRUCTURE

G
0
17+0
W
770

Date
770
0

V EXISTING VEGETATION
0+0

3H:1
V
W
W

G
EXISTING PROPERTY LINE

760
W
7 80
770
0

780 EXISTING MUNICIPAL BOUNDARIES


76

REVISED PER PADEP COMMENTS


770 GH
OROU

26+00
CK B X EXISTING FENCE

70
ADDO

7G
H B R HIP

W
CONNECT TO NORT E S T OWNS OE OE EXISTING OVERHEAD ELECTRIC LINE
SAIL L
EXISTING US STEEL H VER

00
NORT

Revision
G18+
HYDRANT EXISTING ELECTRIC POLE

PADEP SUBMISSION
LAT:N40° 23' 43.21" 0

0
78

W
77
LONG:W79° 51' 04.83" G G G EXISTING GAS LINE

760

G18+00
W W W EXISTING WATER LINE

G
W
EXISTING CULVERT

W
EXISTING WALL

MAT T C-704A
SHWEE

No.
EXISTING RAILLINE

1
0
G
25+00
EXISTING SLAG PILE

CH L
WeB

TRIB 6 CREEK
EXISTING SOIL BOUNDARY

G
O

INE
W
19+00

180
4495 T
AND DESCRIPTOR

10/22/2018
TURTL F)
1490

1" = 60'

180539
PROPOSED CONTOURS

( W
E
W

G
PROPOSED LIMIT OF DISTUBANCE

W
W
BUILDING 0 >> PROPOSED CHANNEL
+0

120
24 PROPOSED WATER FEATURES
G

project no.

SCALE IN FEET
0
76

scale

date
23+00 G PROPOSED WELL PAD
750 G
BOX CARS (STORAGE) 22+00 G
21+00 G G
20+00 G G
G G
TRAILER

60
19+00 G PROPOSED TEMPORARY TANK
G G
G 9+00 18+00 G
G

MDR
W W PROPOSED WATERLINE

KGJ
G 17+00 G

QZ
10+00 12+00 WALL G G
G 11+00 16+00 G
G G G G G G 13+00 G
G G 15+00 G G G G PROPOSED GASLINE
G

WALL G G 14+00 G G
G G G
8+00

WALL WALL 740


PROPOSED SLOPE STABILIZATION

0
G G

graphic scale
G PROPOSED ROCK CONSTRUCTION

designed
G ENTRANCE WITH WASH RACK

checked
G CONCRETE

drawn
G
G HW 48"Ø PIPE
7+0 G
G
OUTFALL 730 PROPOSED ACCESS ROAD
0
GG INV: 713.80
G 12 12 12 PROPOSED 12" FILTER SOCK
G

EROSION AND SEDIMENT CONTROL PLAN

ALLEGHENY COUNTY, PENNSYLVANIA


G G
24 24 24 PROPOSED 24" FILTER SOCK
G

NORTH VERSAILLES TOWNSHIP,


6+

NORTH BRADDOCK BOROUGH,


EAST PITTSBURGH BOROUGH,
00 G PROPOSED

E&S GRADING AND DRAINAGE PLAN


G PROPOSED CULVERT
G GAS LINE PERMIT BOUNDARY/
G G LIMIT OF DIV DIV PROPOSED DIVERSION BERM
G DISTURBANCE
G G (13.4 ACRES
) PROPOSED GRAVEL
5+ G
00
G PROPOSED INLET
G
G
G 730
GG
4G
36
+0 Ø
0 GG CO
G KE
GOV
G
G N
E 750
GA
GS 0
LI 73
G
3+ G
00 NE
G CONNECT TO WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C704.dwg Plotted: October 19, 2018
H
G
G
EXISTING US STEEL M
REGISTERED

M
GAS LINE

O
EK

CO
G

F
PROFESSIONAL

ET - BRADDOCK WELL PAD


G G INFRASTUCTURE F) E
W CR
LAT:N40° 23' 31.06" TESSA MICHELE ANTOLICK
G
(W LE

2+ G G

MERRION OIL & GAS


LONG:W79° 51' 02.78"
740

00 G 760
RT

G ENGINEER

A
TU

No. PE077667

E
N

I
8" G G G 770 N N
GA 0 S Y L V A
73
750

S LIN G 1+
G
E 00 15

750

G 12 G
12 "Ø G AS
G This Drawing shall not be used for tender or construction unless sealed.
"Ø GG GA LI
N I do hereby certify to the best of my knowledge, information and
G G S G E belief, that the Erosion and Sediment Control and Site Restoration
AS G Plan and Post Construction BMPs are true and correct, represent
0 actual field conditions and are in accordance with the 25 Pa. Code
0+ Chapters 78 and 102 of the Department's rules and regulations. I
75
00 am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment.

drawing title
750

project title
780
TESSA MICHELE ANTOLICK, PE - 077667

C704B
Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
ARM Group Inc.
NOTES:
1. THE BASE MAP HAS BEEN CREATED USING SURVEY DATA (WITHIN
91 LIMIT OF DISTURBANCE) PROVIDED BY TRANT CORPORATION,
0
DATED 05/31/2018, SUPPLEMENTED BY AERIAL PHOTOGRAPHY OF
PAMAP TILES 40001380PAS PROVIDED BY TRANT CORPORATION.
SITE TOPOGRAPHY IS SUBJECT TO CHANGE DUE TO ACTIVE
STOCKPILE BY US STEEL.

Engineers and Scientists


2. AERIAL IMAGE ON SHEET C701 WAS PROVIDED BY AERIAL

www.armgroup.net
7 80

PHOTOGRAPHY OF PAMAP TILES 40001380PAS DATED 2010.


3. PROPERTY LINES INFORMATION OF ALLEGHENY COUNTY ARE

790
PROVIDED BY TRANT CORPORATION. THIS BASEMAP IS NOT THE

800
RESULT OF AN ACTUAL FIELD SURVEY OF PROPERTIES SHOWN

820
810
AND SHOULD NOT BE USED AS SUCH.

830
4. THIS PLAN IS IN THE PENNSYLVANIA STATE PLANE SOUTH, NORTH
AMERICAN DATUM 1983 (NAD 83) COORDINATE SYSTEM.

K
840

BRA ORTH

H
BO DOC
5. SLOPE AREAS 3:1 OR GREATER BROUGHT TO FINISH GRADE ARE

RO RGH
UG
TO BE STABILIZED WITH ROCK OR SEEDED WITH MULCH APPLIED

H
PIT AST

UG
RO
D
TO SLOPES AS SPECIFIED ON DETAIL SHEETS.

TSU
6. EXISTING RAILROAD TRACKS WITHIN WELL PAD PROJECT AREA

E
WILL BE REMOVED.

BO
7. THE TEMPORARY WATER STORAGE TANK DIMENSIONS AND
LAYOUT ARE DISPLAYED FOR ILLUSTRATIVE PURPOSES ONLY.
THE FINAL TANK DIMENSIONS AND LAYOUT WILL BE DETERMINED
PRIOR TO CONSTRUCTION. THE OPEN-TOP TANKS ARE NOT
ACCOUNTED FOR IN THE PCSM CALCULATIONS. THE ENTIRE TANK
AREA IS MODELED AS A 'GRAVEL' COVER TYPE TO ACCOUNT FOR
EXISTING TRACKS
RUNOFF BEFORE THE TANKS ARE ERECTED.
(SEE NOTE 6) 900
LEGEND
780
890 NOTE: LEGEND IS TYPICAL, NOT ALL OBJECTS IN LEGEND APPEAR IN PLAN.

77 880 1550
EXISTING CONTOURS
0
76
75 0 870
0 CHAIN-LINK APPROXIMATE
8
85 0 6 FEMA FLOODPLAIN
FENCE LOCATION OF
810 840
OVERHEAD 0
820 83 50' FLOODWAY
X WIRES 800 0
780
(TYP.)
740

1
5 OE 790 FEMA FLOODWAY
W +00 PROPOSED ENTRANCE 1
OE

05/31/2018 TRANT
X OE

ARM
PROPOSED ROCK PAVED TO EXTENT OF

By
OE EXISTING MAPPED WATERCOURSE
CONSTRUCTION TURNING RADIUS CONCRETE
W CON OE
CRE ENTRANCE 1 BLOCK TOP
GW OE

10/22/2018
W TE WALL ELEVATION: EXISTING STRUCTURE
A
GW LL OE (WITH WASH RACK)

Date
W OE 745'
GW GA RIP-RAP
OE EXISTING VEGETATION

OE
BROAD
GW MAR S APRON
OE
OE BASED DIP
770
KER PROPOSED ROCK
00

GW OE 760 EXISTING PROPERTY LINE


16+

OE
PRO GW GV GV
PC-3 OE HIGH-TENSION CONSTRUCTION
GW SS-1
W

ALL
GV GV

DU W 750 ENTRANCE 2
EQU CTION EXISTING MUNICIPAL BOUNDARIES
X
GGAS G G W OE ELEC.TOWER
CONC.

REVISED PER PADEP COMMENTS


CON IPMENT GATE
G

G (WITH WASH RACK)


ETE W

BLDG
X
W SS-2

O
TATO GG OE G W VAULT OE

E
CONNECT INME OE BRADDO X EXISTING FENCE
OE

>>
GV

8 NT 12 G W
+ 7 A R E G W CK AVE
NUE
GV

27 PRODUCTION A EQUIPMENT E OE
W

O G X GX W (SR-208
R

LAT:N40° 23' 37.20" 12 G 3) OE OE EXISTING OVERHEAD ELECTRIC LINE


73
WV

W
CONC

O
12 G OE
8 W

E
X
G LONG:W79° 50' 47.40" CONC TEMPORARY WATER STORAGE TANKS AND ASSOCIATED

Revision
G W RETE

2%
G

O EXISTING ELECTRIC POLE

PADEP SUBMISSION
CURB
X
G W E 740 TANK ACCESS ROAD TO BE CONSTRUCTED ON EXISTING
>> X G PROPOSED

74
00 12 WOE
OE GRADE. FINISH GRADING WITHIN THE TANK AREA SHALL BE
W

+ G UE G W GRAVEL ROAD G G G EXISTING GAS LINE


27
0

0
12 X G
17+0

E OE OE W COMPLETED AS NECESSARY (0.5% - 1.0%) TO CONVEY


O G INSTALLED ON

742
12
UE W GATE
G

OE X
POSITIVE DRAINAGE TOWARDS THE DIVERSION BERM
G >> PC 10'
12
12 OE G W
G
GRADE W W W EXISTING WATER LINE
-1C E 12 W PROPOSED SOUTH OF THE TANK AREA
O

X
G GAS
W

6%
74 EXISTING CULVERT
W
744 2
744

12
>> MAR
G

G
315' X W KER PROPOSED
3H:1V G EXISTING WALL

12
E CHAIN-LINK
20' O W
750

G
G TEMPORARY
SS-3 FENCE
00

74
760

No.
X
6>> W FRESHWATER EXISTING RAILLINE

1
0
26+
W

E 10' G
70
G

744
TANK
>>
7 G O WET POND W
CENTER OF G EXISTING SLAG PILE
747.2 (TYP.)

OE
BERM 745' W
X
PROPOSED PAD
MATCH LINE SHEET C-705B&C-705C G18+00

1 ±

OE
G E BOT. EL: 741' G (SEE NOTE 7)
O
LAT:N40° 23' 35.42"
>>PC-1A
>>

W WeB
W

EXISTING SOIL BOUNDARY

12
742
LONG:W79° 50' 45.90" POOL EL: 742' SS-4 G
FOREBAY

180
W AND DESCRIPTOR

10/22/2018
G X

744
E CO

OE
O BOTTOM G 1490
>>

1" = 60'
NC

180539
OE
PROPOSED RE
PROPOSED CONTOURS
VEG W

12

FEN -LINK
EL: 742.5' X EMERGENCY TE
1% FILTER X BL G
W
G

X CE
G

X OC
X
W PROPOSED LIMIT OF DISTUBANCE
O XSPILLWAY
00

STRIP

IN
KW

OE
X G
25+

12
OE
AL

CHA
1% @1% X L W >> PROPOSED CHANNEL
E
748

O 172' PROPOSED G

120
746

GA
X
STONE
G

Ø105' SM PROPOSED WATER FEATURES


W

project no.
12
W

SCALE IN FEET
742

OE
G AR
0

LANDING

OE
19+0

WV
WV

KE

scale

date
PROPOSED BERM
WV

CONCRETE X W R
GRAVEL Ø73' PROPOSED WELL PAD
TRENCH G

0
1V

+9
ROAD 742 W

OE
W

DRAIN

OE

29
3H:

20+00
(PC-1B) 744 X
G

60
W W PROPOSED TEMPORARY TANK
W
>>
21+00
W 747.2 28+00
W 744

W
1± 0 Ø73' G
27+0 W

MDR
29+00
G

22+00 W W PROPOSED WATERLINE

OE
W W W

KGJ
PC-2 74
W2 W

QZ
OE
W 12 12 12 W W X
W W
W 23+00 746 >> >> 12 12 G

0
26+00 12
25+00 DIV
>> G G PROPOSED GASLINE

74
W W 12 W
W 24+00 W W W W 12 DIV
W W 12
G
CONCRETE WALL DIV

OE
W
G

12 PROPOSED SLOPE STABILIZATION

OE
OE 12 Ø73' X W
GA
SWITCH

0
SWITCH 12 DIV SM
ROOM OE PROPOSED 12
G
AR
STEPS

graphic scale
DIV PROPOSED ROCK CONSTRUCTION
UNDER CONCRETE SKIMMER PROPOSED 12 KE

designed
OE
R ENTRANCE WITH WASH RACK

checked
WALL

OE
TRACKS PROPOSED OUTLET BASIN 12 DIV

drawn
G

PROPOSED PROPOSED SS-5 12


X W G
CHANNEL EL.: 740.5 Ø73'
OE

APPROXIMATE PROPOSED
OUTLET ANTI-SEEP 12 DIV
3H:1V SLOPE (TYP.) CONNECT TO PROPOSED ACCESS ROAD
LOCATION OF FOREBAY
RISER WITH COLLAR 12 DIV
TEMPORARY TANKS

OE
TO BE CONCRETE

OE
GAS PIPELINE BERM (13' FROM 12
TRASH RACK
G

DIV 12 12 12 PROPOSED 12" FILTER SOCK


STABILIZED RISER) 12 WASHOUT

EROSION AND SEDIMENT CONTROL PLAN


OE

ALLEGHENY COUNTY, PENNSYLVANIA


(SEE NOTE 5) 740 12
DIV 24 24 24 PROPOSED 24" FILTER SOCK
FEMA 100-YR FLOODPLAIN

OE
12

NORTH VERSAILLES TOWNSHIP,


OE

NORTH BRADDOCK BOROUGH,


EAST PITTSBURGH BOROUGH,
DIV SS-6 X

E
730 12 SS-7 PROPOSED CULVERT
15"Ø GAS

AT
G
PIPELINE APPROXIMATE 12 DIV CH DIV DIV PROPOSED DIVERSION BERM
BRIDGE LOCATION OF TEMPORARY AI
12
FE N-LI X X
OVERHEAD WIRES DIVERSION BERM 12 NC NK C PROPOSED GRAVEL

12
E H
1 2 AI
FE N
PERMIT BOUNDARY/ TURTLE CREEK 12
N -LIN PROPOSED INLET
(WWF) C
LIMIT OF E K
EA

E&S CONTROL PLAN


DISTURBANCE ST
P
(13.4 ACRES) BO ITTSB
RO U
NO
RT UG RGH
H H
FEMA 100-YR FLOODPLAIN TO VERS
WN A
730 SH ILLES
IP
740
750
760

WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C705.dwg Plotted: October 19, 2018
H
M
REGISTERED

O
CO

F
PROFESSIONAL

ET - BRADDOCK WELL PAD


TESSA MICHELE ANTOLICK
770

MERRION OIL & GAS


ENGINEER

A
No. PE077667

E
N

I
N N
S Y L V A

770

760 This Drawing shall not be used for tender or construction unless sealed.

I do hereby certify to the best of my knowledge, information and


belief, that the Erosion and Sediment Control and Site Restoration
Plan and Post Construction BMPs are true and correct, represent
actual field conditions and are in accordance with the 25 Pa. Code
Chapters 78 and 102 of the Department's rules and regulations. I
760 am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment.

770

drawing title

project title
770
TESSA MICHELE ANTOLICK, PE - 077667

C705A
Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
770 or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
BR A

ARM Group Inc.


NOTES:

830

84
82
TRANSITION TO

0
800

0
770 1. THE BASE MAP HAS BEEN CREATED USING SURVEY DATA (WITHIN

810
ABOVE GROUND

79
760
LIMIT OF DISTURBANCE) PROVIDED BY TRANT CORPORATION,

0
79
0 WATERLINE 78 DATED 05/31/2018, SUPPLEMENTED BY AERIAL PHOTOGRAPHY OF

0
0

76
LAT:N40° 23' 45.18" 0
77 PAMAP TILES 40001380PAS PROVIDED BY TRANT CORPORATION.

0
75

F) E O
LONG:W79° 51' 01.85" SITE TOPOGRAPHY IS SUBJECT TO CHANGE DUE TO ACTIVE

EK
W CR 5 T
0 78 STOCKPILE BY US STEEL.
780

Engineers and Scientists


(W LE 49
6+00 2. AERIAL IMAGE ON SHEET C701 WAS PROVIDED BY AERIAL

www.armgroup.net
5+00 7+00 770

T 4
W W PHOTOGRAPHY OF PAMAP TILES 40001380PAS DATED 2010.

770

R B6
SS-11 W W W W
X
3. PROPERTY LINES INFORMATION OF ALLEGHENY COUNTY ARE
4+00 W 760

TU RI
W W

MA
X8+0 PROVIDED BY TRANT CORPORATION. THIS BASEMAP IS NOT THE

T
W W 0
W RESULT OF AN ACTUAL FIELD SURVEY OF PROPERTIES SHOWN

0
W

T
W X AND SHOULD NOT BE USED AS SUCH.

3+0
FEN

CH
770 W 9+0C 4. THIS PLAN IS IN THE PENNSYLVANIA STATE PLANE SOUTH, NORTH
0E

0
780 AMERICAN DATUM 1983 (NAD 83) COORDINATE SYSTEM.

75
762 W X

L
5. SLOPE AREAS 3:1 OR GREATER BROUGHT TO FINISH GRADE ARE

12

IN
W 770 TO BE STABILIZED WITH ROCK OR SEEDED WITH MULCH APPLIED
766

W
76
X 1

ES
762
PROPOSED 0+0 OE TO SLOPES AS SPECIFIED ON DETAIL SHEETS.

4
WAL W 0 760 6. EXISTING RAILROAD TRACKS WITHIN WELL PAD PROJECT AREA
WATER LINE L OE

HE
W X STORM MH 750 WILL BE REMOVED.
PERMIT BOUNDARY/ EXISTING RAIL TRACKS TE

12
7. THE TEMPORARY WATER STORAGE TANK DIMENSIONS AND
W RIM: 745.04 CRE

OE
(ABANDONED) 11+
CON ALL W

W
LIMIT OF LAYOUT ARE DISPLAYED FOR ILLUSTRATIVE PURPOSES ONLY.

TC
0X0
W INV: 732.44 W G THE FINAL TANK DIMENSIONS AND LAYOUT WILL BE DETERMINED
DISTURBANCE W
G

-7 0
76 W PRIOR TO CONSTRUCTION. THE OPEN-TOP TANKS ARE NOT

W +020
(13.4 ACRES) X
GW

740
0

2 1
12+ ACCOUNTED FOR IN THE PCSM CALCULATIONS. THE ENTIRE TANK

5A
760 W 00 AREA IS MODELED AS A 'GRAVEL' COVER TYPE TO ACCOUNT FOR
W X NT THE TANKS ARE ERECTED.
RUNOFF BEFORE
E
IPM

12
SS-10 W 13X+00 X
CHAIN-LINK W X X X O EQ "U LEGEND
FENCE W W
14+00
C T T NLEGEND
. 2 0 IS0"TYPICAL, NOT ALL OBJECTS IN LEGEND APPEAR IN PLAN.
W 15+00 E IO 7
NOTE:
.4

W
NN UCT 23' 3 0' 471550
12
CONCRET W W
770 E WALL W O
C OD 40° ° 5 EXISTING CONTOURS
W
PR T:N :W79

8
+7
SS-9

16+00
780 LA NG

27
0 12

LO FEMA FLOODPLAIN
W
1+0

W
0

G
79
0
76

50' FLOODWAY
SS-8 G
W

DIN FEMA FLOODWAY

G
760
IL CK

05/31/2018 TRANT
00

ARM
BU DE

27+

By
TR RTLEWF)
EXISTING MAPPED WATERCOURSE

TU (W
12

IB
W

10/22/2018
EXISTING STRUCTURE

64 CRE

G
0
17+0
W
770

49
02

Date
770
0+0 1

V EXISTING VEGETATION

5 T EK
W

3H:1
V
W
W

G
EXISTING PROPERTY LINE

760
W
7 80
770
0

EXISTING MUNICIPAL BOUNDARIES


CK780
76

ADDO

REVISED PER PADEP COMMENTS


770 H B R

26+00
CONNECT BURIED NORT ROUGH X EXISTING FENCE

70
BO

7G
WATER LINE TO LLES

W
EXISTING US STEEL T H V ERSAI OE OE EXISTING OVERHEAD ELECTRIC LINE
NOR WNSHIP

00
HYDRANT TO

Revision
G18+
EXISTING ELECTRIC POLE

PADEP SUBMISSION
LAT:N40° 23' 43.21"
0

0
78

W
LONG:W79° 51' 04.83" PLAN VIEW

77
G G G EXISTING GAS LINE
0 60 120 180

760
W W W EXISTING WATER LINE
SCALE IN FEET

G
W
EXISTING CULVERT

EXISTING WALL

No.
EXISTING RAILLINE

1
0
EXISTING SLAG PILE

TRANSITION TO ABOVE WeB


GROUND WATERLINE
EXISTING SOIL BOUNDARY
AND DESCRIPTOR

AS NOTED
10/22/2018
1490

180539
PROPOSED CONTOURS
CONNECT BURIED
WATER LINE TO
STA. 3+04.54

PROPOSED LIMIT OF DISTUBANCE


EXISTING US STEEL
800
HYDRANT
800 >> PROPOSED CHANNEL
STA. 0+00.00 PROPOSED ABOVEGROUND WATERLINE
ELEVATION IN FEET

ELEVATION IN FEET
PROPOSED WATER FEATURES

project no.
775 775

scale

date
W W W W W W W
W W W W W W W W W W W W W W W W W PROPOSED WELL PAD
W W W W W W W
750 750
3' MIN
APPROXIMATE EXISTING GROUND PROPOSED TEMPORARY TANK
725 PROPOSED BURIED WATER LINE 725

MDR
W W PROPOSED WATERLINE

KGJ

QZ
700 700 G G PROPOSED GASLINE
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50
PROPOSED SLOPE STABILIZATION

PROFILE VIEW

graphic scale
PROPOSED ROCK CONSTRUCTION
0 60 120 180 0 60 120 180

designed
ENTRANCE WITH WASH RACK

checked

drawn
HORIZONTAL SCALE IN FEET VERTICAL SCALE IN FEET
PROPOSED ACCESS ROAD

12 12 12 PROPOSED 12" FILTER SOCK

EROSION AND SEDIMENT CONTROL PLAN

ALLEGHENY COUNTY, PENNSYLVANIA


24 24 24 PROPOSED 24" FILTER SOCK

NORTH VERSAILLES TOWNSHIP,


NORTH BRADDOCK BOROUGH,
EAST PITTSBURGH BOROUGH,
800 800 PROPOSED CULVERT
PROPOSED ABOVEGROUND WATERLINE
ELEVATION IN FEET

ELEVATION IN FEET
DIV DIV PROPOSED DIVERSION BERM
775 W W 775
W W W PROPOSED GRAVEL
W W W W W W
W W W W W W W W
750 W W W W W W W W W W W W 750 PROPOSED INLET

APPROXIMATE EXISTING GROUND


725 725

E&S CONTROL PLAN


EXISTING WALL
700 700
13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00

PROFILE VIEW
0 60 120 180 0 60 120 180

HORIZONTAL SCALE IN FEET VERTICAL SCALE IN FEET


WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C705.dwg Plotted: October 19, 2018
H
M
REGISTERED

O
CO
TEMPORARY TANKS

F
CONNECT TO

PROFESSIONAL

ET - BRADDOCK WELL PAD


TESSA MICHELE ANTOLICK

MERRION OIL & GAS


STA. 29+89.90

ENGINEER
800 800

A
No. PE077667

E
N

I
ELEVATION IN FEET

ELEVATION IN FEET

N N
S Y L V A
775 PROPOSED ABOVEGROUND WATERLINE 775

750 W W W W W W
750 This Drawing shall not be used for tender or construction unless sealed.
W W W W W W
I do hereby certify to the best of my knowledge, information and
725 725 belief, that the Erosion and Sediment Control and Site Restoration
APPROXIMATE EXISTING GROUND Plan and Post Construction BMPs are true and correct, represent
actual field conditions and are in accordance with the 25 Pa. Code
Chapters 78 and 102 of the Department's rules and regulations. I
700 700 am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment.
25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00

drawing title
PROFILE VIEW

project title
TESSA MICHELE ANTOLICK, PE - 077667
0 60 120 180 0 60 120 180

C705B
HORIZONTAL SCALE IN FEET VERTICAL SCALE IN FEET

Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
G18+00

ARM Group Inc.


W
NOTES:
1. THE BASE MAP HAS BEEN CREATED USING SURVEY DATA (WITHIN

G
LIMIT OF DISTURBANCE) PROVIDED BY TRANT CORPORATION,

MAT T C-705A
W
S
25+00
HEE W
DATED 05/31/2018, SUPPLEMENTED BY AERIAL PHOTOGRAPHY OF
PAMAP TILES 40001380PAS PROVIDED BY TRANT CORPORATION.
SITE TOPOGRAPHY IS SUBJECT TO CHANGE DUE TO ACTIVE

CH L
STOCKPILE BY US STEEL.

Engineers and Scientists


G
2. AERIAL IMAGE ON SHEET C701 WAS PROVIDED BY AERIAL

19+00

www.armgroup.net
PHOTOGRAPHY OF PAMAP TILES 40001380PAS DATED 2010.

INE
3. PROPERTY LINES INFORMATION OF ALLEGHENY COUNTY ARE
PROVIDED BY TRANT CORPORATION. THIS BASEMAP IS NOT THE
RESULT OF AN ACTUAL FIELD SURVEY OF PROPERTIES SHOWN
TRANSITION TO

G
W
AND SHOULD NOT BE USED AS SUCH.
BURIED GAS LINE W 4. THIS PLAN IS IN THE PENNSYLVANIA STATE PLANE SOUTH, NORTH
LAT:N40° 23' 37.23" AMERICAN DATUM 1983 (NAD 83) COORDINATE SYSTEM.
LONG:W79° 51' 09.58" BUILDING + 00 5. SLOPE AREAS 3:1 OR GREATER BROUGHT TO FINISH GRADE ARE
24 TO BE STABILIZED WITH ROCK OR SEEDED WITH MULCH APPLIED
G 12
0 TO SLOPES AS SPECIFIED ON DETAIL SHEETS.
76
6. EXISTING RAILROAD TRACKS WITHIN WELL PAD PROJECT AREA
SS-14 SS-15 23+00 G 12 WILL BE REMOVED.
750 G
BOX CARS (STORAGE) 22+00 G 12
7. THE TEMPORARY WATER STORAGE TANK DIMENSIONS AND
21+00 G G 12 LAYOUT ARE DISPLAYED FOR ILLUSTRATIVE PURPOSES ONLY.
G 12 12
20+00 G G 12 12 THE FINAL TANK DIMENSIONS AND LAYOUT WILL BE DETERMINED
TRAILER 19+00 G G 12 12 12
PRIOR TO CONSTRUCTION. THE OPEN-TOP TANKS ARE NOT
G G 12 12
G 9+00 18+00 G 12 12 ACCOUNTED FOR IN THE PCSM CALCULATIONS. THE ENTIRE TANK
G 12 12
AREA IS MODELED AS A 'GRAVEL' COVER TYPE TO ACCOUNT FOR
G 756 17+00 G G 12 12
10+00 11+00 12+00 WALL 16+00 G G 12 12 RUNOFF BEFORE THE TANKS ARE ERECTED.
G G G G 12 12
12 G G G G G 13+00 15+00 G G 12 12
G 12
G

12 12 12 12 12 WALL
12 12 12 G G 14+00 G G 12 12 LEGEND
12 12 G G G 12
8+00

12 12
12 12 12 12 12 12 12 WALL 740 NOTE: LEGEND IS TYPICAL, NOT ALL OBJECTS IN LEGEND APPEAR IN PLAN.

G 12
12
WALL 1550
G 750 SS-17 EXISTING CONTOURS
G 12
G G 2 CONCRETE HW
G 12 74 SS-16 FEMA FLOODPLAIN
G SS-13 48"Ø PIPE
730

74
G 12
7+0 G 742 OUTFALL

2
0
GG 12 INV: 713.80 50' FLOODWAY
G 744
G 12
G G FEMA FLOODWAY
PERMIT BOUNDARY/

05/31/2018 TRANT
12

ARM
6+ G LIMIT OF

By
00 G G PROPOSED EXISTING MAPPED WATERCOURSE
TRANSITION TO 12
GAS LINE DISTURBANCE
G
BRIDGE (13.4 ACRES
)

10/22/2018
G EXISTING STRUCTURE
G 12
LAT:N40° 23' 36.70"

Date
G
LONG:W79° 51' 09.78" G 12 EXISTING VEGETATION
74

G
5+ 746
6

0 0 G EXISTING PROPERTY LINE


12
G
G
G 12 EXISTING MUNICIPAL BOUNDARIES

REVISED PER PADEP COMMENTS


G 730
G G 12 X EXISTING FENCE
748
4G +0 12
0 OE OE EXISTING OVERHEAD ELECTRIC LINE
G
G
G

Revision
3612 TRANSITION TO EXISTING ELECTRIC POLE

PADEP SUBMISSION
GGØ
C ABOVE GROUND GAS
G OK12 750
E LINE G G G EXISTING GAS LINE
G OV LAT:N40° 23' 32.38" 0
3+ G E1N 73
G
2 LONG:W79° 51' 04.36" W W W EXISTING WATER LINE
0 0 GA 74
G S12 8 EXISTING CULVERT
G LIN
G SS-12 K
E1 EE
74 G 2 CR ) EXISTING WALL
8 G 748 E F
TL W
G

No.
12 CONNECT BURIED EXISTING RAILLINE

1
0
G R
U ( W
2+ G G GASLINE TO T
740

00 G G 12 760
EXISTING SLAG PILE
8" 12 EXISTING US STEEL
GA GAS LINE
S GL G 770
G
IN
12
INFRASTUCTURE 0 WeB
73 EXISTING SOIL BOUNDARY
750

E G
G 1+0 AND DESCRIPTOR

AS NOTED
LAT:N40° 23' 31.06"

10/22/2018
0 12 15 1490
LONG:W79° 51' 02.78"
750

180539
12 PROPOSED CONTOURS
G "Ø G G G
12 G 12 AS PROPOSED LIMIT OF DISTUBANCE
"Ø GG AS LI
G G G12 NE >>

8
A PROPOSED CHANNEL

74
G
S

75
0
PROPOSED WATER FEATURES

0
0+

project no.
4 746

75
00

scale

date
74
PROPOSED WELL PAD

750

780
PLAN VIEW PROPOSED TEMPORARY TANK
0 60 120 180

MDR
W W PROPOSED WATERLINE

KGJ

QZ
SCALE IN FEET
G G PROPOSED GASLINE

PROPOSED SLOPE STABILIZATION

TRANSITION TO BRIDGE

TRANSITION TO BURIED
TRANSITION TO ABOVE

graphic scale
PROPOSED ROCK CONSTRUCTION
GAS LINE

designed
ENTRANCE WITH WASH RACK

checked

drawn
CONNECT BURIED
GASLINE TO EXISTING US PROPOSED ACCESS ROAD
STA. 1+83.65

STA. 8+47.95
STA. 7+92.17
800 STEEL GAS LINE 800
INFRASTUCTURE 12 12 12 PROPOSED 12" FILTER SOCK
GROUND

GAS LINE
PROPOSED ABOVEGROUND GAS LINE
ELEVATION IN FEET

ELEVATION IN FEET
STA. 0+00.00

EROSION AND SEDIMENT CONTROL PLAN

ALLEGHENY COUNTY, PENNSYLVANIA


775 775 24 24 24 PROPOSED 24" FILTER SOCK
PROPOSED BURIED GAS LINE

NORTH VERSAILLES TOWNSHIP,


3' MIN

NORTH BRADDOCK BOROUGH,


EAST PITTSBURGH BOROUGH,
G G PROPOSED CULVERT
750 G G G G G G G G G G G G G G G G G G G G G G 750
G

G G G G G G G G G G G G
DIV DIV PROPOSED DIVERSION BERM

725 APPROXIMATE EXISTING GROUND 725 PROPOSED GRAVEL


PROPOSED BURIED GAS LINE
PROPOSED INLET
700 700
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50

E&S CONTROL PLAN


PROFILE VIEW
0 60 120 180 0 60 120 180

HORIZONTAL SCALE IN FEET VERTICAL SCALE IN FEET

WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C705.dwg Plotted: October 19, 2018
H
M
REGISTERED

O
CO

F
PROFESSIONAL

ET - BRADDOCK WELL PAD


TESSA MICHELE ANTOLICK
CONNECT TO

MERRION OIL & GAS


PRODUCTION ENGINEER
800 800

A
No. PE077667
EQUIPMENT

E
N

I
N
ELEVATION IN FEET

ELEVATION IN FEET
N
APPROXIMATE EXISTING GROUND STA. 27+77.51 S Y L V A
775 3' MIN 775
G
G G G G
G G G G G G G G G G G G G G G G G G G G
750 G G G G G G G G 750 This Drawing shall not be used for tender or construction unless sealed.

I do hereby certify to the best of my knowledge, information and


725 725 belief, that the Erosion and Sediment Control and Site Restoration
Plan and Post Construction BMPs are true and correct, represent
PROPOSED BURIED GAS LINE actual field conditions and are in accordance with the 25 Pa. Code
Chapters 78 and 102 of the Department's rules and regulations. I
700 700 am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment.
15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00

drawing title

project title
TESSA MICHELE ANTOLICK, PE - 077667
PROFILE VIEW

C705C
0 60 120 180 0 60 120 180

HORIZONTAL SCALE IN FEET VERTICAL SCALE IN FEET

Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
CONFIDENTIAL
ARM Group Inc.
30 TO 55 GALLON BARREL WITH 1 IN DIA. PERFORATIONS AT 6 IN. HORIZONTAL AND 6 IN.
VERTICAL SPACING
CHANNEL SCHEDULE PLACE 2 IN. x 2 IN. VERTICAL WOOD SLATS @ 6 IN. HORIZONTAL SPACING AROUND THE
BARREL
PLACEMENT VEG. SLOPE D W DESIGN VELOCITY d f W + 4' TEMPORARY OR PERMANENT RISER
CHANNEL LINING THICKNESS RET. (%) (ft.) (ft.) Z FLOW (cfs) (fps) (ft.) (ft.) W (SEE NOTE 2) WRAP FILTER FABRIC AROUND THE BARREL AND SLATS

Engineers and Scientists


SYNTHETIC ROAD SLOPE VARIES

www.armgroup.net
PC-1A NA NA 1.0% 1.5 2 2 4.9 1.87 0.747 0.753
MAT (SEE NOTE 1)

PC-1A VEGETATED NA C 1.0% 1.5 2 2 4.9 1.43 0.898 0.602

CONC.
PC-1B NA NA 2.0% 1.1 1 0 3.4 5.84 0.584 0.516
TRENCH DRAIN PUMP
SYNTHETIC PENNDOT CLASS 3, TYPE B 4" (MIN.) PENNDOT NO. 2A MODIFIED OR
PC-1C NA NA 1.0% 1.5 2 2 3.4 1.63 0.638 0.862 WOVEN GEOTEXTILE BENEATH ROAD
MAT AASHTO 3 (PENNDOT 3A)
6" (MIN.) PENNDOT NO. 4 AGGREGATE TOP COAT
AGGREGATE BASE COAT (ROLLED AND COMPACTED) CLEAN-OUT ELEV.
PC-1C VEGETATED NA C 1.0% 1.5 2 2 3.4 1.43 0.898 0.602 (ROLLED AND COMPACTED)

SYNTHETIC NOTE:
PC-2 NA NA 1.0% 1.5 2 2 2.1 1.37 0.510 0.990
MAT
1. IN CASES WHERE THE ACCESS ROAD IS ACCOMPANIED BY A GRASS-LINED CHANNEL, THE AASHTO #57
ROAD SHALL BE GRADED AT A SLOPE OF 2% TOWARDS THE CHANNEL. IN ALL OTHER CASES,
PC-2 VEGETATED NA C 1.0% 1.5 2 2 2.1 1.43 0.898 0.602 THE ACCESS ROAD SHALL BE CROWNED WITH A 2% SLOPE.
2. SEE PLAN VIEW SHEET FOR EXACT ACCESS ROAD WIDTH.
SYNTHETIC BASIN BOTTOM
PC-3 NA NA 1.0% 1.5 2 2 6.1 2.04 0.823 0.677
MAT ACCESS ROAD
NOT TO SCALE NOTES:
PC-3 VEGETATED NA C 1.0% 1.5 2 2 6.1 1.55 0.989 0.511
DEWATERING FACILITY SHALL BE INSTALLED IMMEDIATELY UPON COMPLETION OF
DIVERSION SYNTHETIC BASIN/TRAP.
NA NA 0.2% 2.5 2 2 6.0 1.25 1.125 1.375
BERM MAT
PRIOR TO INITIATING OPERATION OF DEWATERING FACILITY, ALL ACCUMULATED SEDIMENT
DIVERSION SHALL BE CLEANED FROM THE INSIDE OF THE BARREL.
VEGETATED NA C 0.2% 2.5 2 2 6.0 0.61 1.777 0.723
BERM
DEWATERING FACILITY SHALL BE CONTINUOUSLY MONITORED DURING OPERATION. IF FOR
ANY REASON THE DEWATERING FACILITY CEASES TO FUNCTION PROPERLY, IT SHALL BE

05/31/2018 TRANT
ANTI-SEEP COLLAR SCHEDULE

ARM
IMMEDIATELY SHUT DOWN AND NOT RESTARTED UNTIL THE PROBLEM HAS BEEN

By
CORRECTED.
f NUMBER STANDARD CONSTRUCTION DETAIL #7-18

10/22/2018
COLLAR SIZE (FT.) OF
D SEDIMENT STORAGE DEWATERING FACILITY

Date
1 1 COLLARS
Z d Z NOT TO SCALE
POND 1 5.75 x 5.75 1
W INSTALL SOIL REINFORCEMENT MAT

REVISED PER PADEP COMMENTS


PER MANUFACTURER'S SPECIFICATIONS
UPPER HALF
CHANNEL DETAIL 4'-0" + D(MIN)

CORRUGATED

Revision
SHOP RIVET METAL

PADEP SUBMISSION
3" SPACING
f BAND
WELD
D MASTIC MATERIAL
1 1
Z d Z
CORRUGATED BAND
FOR CLASS I PIPE.
PROVIDE 3/16" GALVANIZED FLAT
WIDE SLOTS IN

1/2" LIP
W SHEET METAL BAND

No.
LAP AREA.

1
0
FOR CLASS II PIPE
PROVIDE 1/2"
1'-0"
HOLE IN LAP
AREA
ECM SHALL BE NAG-S150 OR APPROVED EQUIVIALENT OPPOSITE
CONCRETE WASHOUT SIDES.

AS NOTED
10/22/2018
NOT TO SCALE RIPRAPPED/GABION CHANNEL DETAIL

180539
1/2" GALVANIZED
SHOP WELD
BAND TO 2'-0" ROD WITH LUGS. DIVERSION BERM
PIPE ARCH TWO REQUIRED NOT TO SCALE
PER COLLAR.

AASHTO #1 ROCK Ww

project no.
56' MIN. LOWER HALF
EXTENDING 25' MIN. ON
EXISTING GRADE

scale
COLLECTOR CHANNEL BOTH APPROACHES TO

date
6' WTE
DISCHARGING TO SEDIMENT 25' MIN. 25' MIN. WASH RACK
MIN. Ww
BASIN, SEDIMENT TRAP,
VEGETATED FILTER STRIP,
Z3 Z4 ANTI-SEEPAGE COLLAR DETAIL
A 1 1
OR 24" FILTER SOCK 10' (MIN.)
SEDIMENT TRAP Dl
B B WCE
GEOTEXTILE
EXISTING
ROADWAY

LRt

MDR
KGJ
20' OR TOTAL

QZ
WIDTH OF ACCESS WEIR WARNING RIBBON COMPACTED BACKFILL
Dw
SECTION Z-Z TOTAL DIP LENGTH 100'
(12" MINIMUM MATERIAL
48" MIN. DEPTH)
RIPRAP OUTLET DISSIPATOR MINIMUM DEPTH 12"
PROPOSED
10' (MIN.) A WASH RACK PLAN VIEW PIPELINE
20' 80'

graphic scale
PLAN VIEW Z
Pl

designed

checked
WTE

drawn
DIP ALIGNED STRAIGHT
WCE ACROSS ROAD

AASHTO #1 ROCK 6" PADOT 2A MODIFIED STONE


(ONLY WHEN IN ROCK)

EROSION AND SEDIMENT CONTROL PLAN


EARTHEN PLUG

ALLEGHENY COUNTY, PENNSYLVANIA


Z Z5 BOTTOM OF TRENCH
RIPRAP LINING WHEN NOT IN ROCK

NORTH VERSAILLES TOWNSHIP,


8" MIN. 1

NORTH BRADDOCK BOROUGH,


Cd

EAST PITTSBURGH BOROUGH,


LRt 3% OUT SLOPE
6"
NOTES:
PENNDOT CLASS 3, TYPE B
SECTION A-A GEOTEXTILE Dl 1. DIPS SHALL BE ORIENTED SO AS TO DISCHARGE TO THE LOW SIDE OF THE ROADWAY. BOTTOM OF TRENCH SAND BACKFILL
WOVEN GEOTEXTILE

E&S CONSTRUCTION DETAILS


WHEN IN ROCK VARIES
REINFORCED 2. DIPS SHALL BE INSPECTED DAILY. DAMAGED OR NON-FUNCTIONING DIPS SHALL BE
CONCRETE OR REPAIRED BY THE END OF THE WORKDAY. NOTES:
AASHTO #1 ROCK 6' MIN.
WELDED STEEL PIPE 1. PIPE BEDDING WILL BE PLACED BENEATH THE PIPELINE A MINIMUM OF 6" THICK IN AREAS OF EXPOSED
RIPRAP OUTLET DISSIPATOR STONE.
DRt 2. PIPELINE WILL BE PLACED IN THE TRENCH AND BACKFILLED USING EXISTING MATERIALS.
BROAD-BASED DIP 2. WARNING RIBBON WILL BE PLACED A MINIMUM OF 12" BELOW THE EXISTING SURFACE GRADE.
EMBANKMENT SECTION ALONG EMERGENCY SPILLWAY NOT TO SCALE
TYPICAL TRENCH SECTION
PENNDOT CLASS 3, TYPE B DRAIN SPACE
NOT TO SCALE
WOVEN GEOTEXTILE SECTION B-B WEIR LINING CHANNEL DISSIPATOR
BASIN TOP CREST RIPRAP RIPRAP
WIDTH RIPRAP DEPTH LENGTH WIDTH RIPRAP
NO. Z3 Z4 ELEV ELEV THICK. Z5 THICK.
Ww SIZE Cd DI Dw SIZE
(FT) (FT) WTE WCE LRt (FT) DRt
REMOVE TOPSOIL PRIOR TO INSTALLATION OF ROCK CONSTRUCTION ENTRANCE. EXTEND (FT) (R-_) (FT) (FT) (FT) (R-_)
(FT) (FT) (IN) (IN)
ROCK OVER FULL WIDTH OF ENTRANCE.
(2"x2"x60") WOODEN CONSTRUCTION STAKES PLACE 10' O.C.
POND 1 2 2 745.00 743.50 25 R-4 18 2 1.5 15 32 R-4 18 (WRAPPED TOGETHER WITH 16 GAUGE WIRE TIE)
RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE REMOVAL BMP PRIOR TO WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C707.dwg Plotted: October 19, 2018
H
ENTERING ROCK CONSTRUCTION ENTRANCE. M
12" DIA. FILTER SOCK REGISTERED

O
CO
NOTES: (DURASOXX OR APPROVED BY

F
WASH RACK - SHALL BE 20 FEET WIDE MINIMUM, DESIGNED AND CONSTRUCTED TO PROFESSIONAL

ET - BRADDOCK WELL PAD


12" (MIN.) OWNER / ENGINEER)
ACCOMMODATE ANTICIPATED CONSTRUCTION VEHICLE TRAFFIC, AND HAVE A WATER
DIMENSION PI SHALL BE 5' MINIMUM. TESSA MICHELE ANTOLICK
SUPPLY AVAILABLE TO WASH THE WHEELS OF VEHICLES LEAVING THE SITE. 18" DIA. FILTER SOCK
DISPLACED RIPRAP WITHIN THE SPILLWAY AND/OR OUTLET CHANNEL SHALL BE REPLACED IMMEDIATELY.

MERRION OIL & GAS


(DURASOXX OR APPROVED BY BLOWN OR PLACED
PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. OWNER / ENGINEER) FILTER MEDIA ENGINEER

A
No. PE077667
STANDARD CONSTRUCTION DETAIL #7-12

E
N

I
MAINTENANCE: ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY N N
S Y L V A
MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE
MAINTAINED ON SITE FOR THIS PURPOSE. DRAIN SPACE UNDER WASH RACK SHALL BE KEPT SEDIMENT BASIN EMERGENCY SPILLWAY
OPEN AT ALL TIMES. DAMAGE TO THE WASH RACK SHALL BE REPAIRED PRIOR TO FURTHER
USE OF THE RACK ALL SEDIMENT DEPOSITS ON PAVED ROADWAYS SHALL BE REMOVED AND
WITH RIPRAP LINING 18 IN. MIN.
(UNDISTURBED
REMOVE BRUSH AND
WOODY DEBRIS
RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. WASHING THE ROADWAY OR NOT TO SCALE GROUND) This Drawing shall not be used for tender or construction unless sealed.
SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER
COURSES IN NOT ACCEPTABLE. I do hereby certify to the best of my knowledge, information and
(2"x2"x42") WOODEN CONSTRUCTION STAKES PLACE 10' O.C., belief, that the Erosion and Sediment Control and Site Restoration
STARTING 5' FROM ANGLED STAKES, TYP. Plan and Post Construction BMPs are true and correct, represent
WASHING - WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO
PUBLIC RIGHTS-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA actual field conditions and are in accordance with the 25 Pa. Code
NOTES:
Chapters 78 and 102 of the Department's rules and regulations. I
STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING
1. SEDIMENT ACCUMULATION SHALL NOT EXCEED 1/3 THE TOTAL HEIGHT OF THE TRAP. am aware that there are significant penalties for submitting false
DEVICE.
information, including the possibility of fine and imprisonment.
2. ENDS OF THE TRAP SHALL BE A MINIMUM OF 1 FOOT HIGHER IN ELEVATION THAN THE
MID-SECTION, WHICH SHALL BE LOCATED AT THE POINT OF DISCHARGE.

drawing title

project title
STANDARD CONSTRUCTION DETAIL #3-1 TESSA MICHELE ANTOLICK, PE - 077667
ROCK CONSTRUCTION ENTRANCE FILTER SOCK SEDIMENT TRAP

C707
NOT TO SCALE NOT TO SCALE

Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
ARM Group Inc.
CONSTRUCTION SEQUENCE All joints shall be watertight.
PERMANENT SEEDING SCHEDULE STEEP SLOPES OVER 10 FEET HIGH FERTILIZER & LIMING RATES
PROGRAM OF OPERATIONS
ROCK CONSTRUCTION ENTRANCE INSTALLATION: Seed will be applied by approved hydro seeding methods to areas that are graded to final section, for steep slopes over 10 feet in height which will
Remove topsoil prior to installation of rock construction entrance. Extend rock over full width of entrance. not be disturbed, Using a mixture of crown vetch, at a rate of 10 pounds per acre and perennial ryegrass, at a rate of 20 pounds per acre. Liming of soil
STAGE 1 shall be per soil testing or 6 ton of agricultural grade limestone per acre and fertilizer added per soil testing or at a rate of 100 lb. of Nitrogen (N) 200 lb.
1) Access to site will be via Braddock Avenue. of Phosphate (P/2 O/5) and 200 lb. of Potash (K/2 O) per acre or as indicated by soil testing. Apply 3 tons of straw mulch per acre to produce a loose

Engineers and Scientists


Runoff shall be diverted from roadway to a suitable sediment removal BMP prior to entering rock construction entrance.
2) Access and construction disturbance of the site shall be kept to a minimum for installation of Best Management Practices [BMP] facilities. Sediment layer of .75 to 1.0 inch deep or paper mulch per manufacturer's specifications.

www.armgroup.net
shall not be permitted to enter waters of the Commonwealth. No organic material is to be buried on site. For construction between October and March use straw blanket applied at a rate of 3 ton per acre.
3) The extent of the disturbance as well as the duration between initial disturbance and final stabilization shall be minimized with the following Mountable berm shall be installed whenever optional culvert pipe is used and proper pipe cover as specified by manufacturer is not otherwise provided.
techniques: Pipe shall be sized appropriately for size of ditch be crossed.
MULCHING SEEDED AREAS.
a Erosion Control Blanketing and seeding are to be done as soon as possible after final grades are reached, Immediately after seeding or within 48 hours after seeding is completed. Place straw, wood cellulose over topsoil areas. Use hay, straw or wood
b immediate vegetative stabilization of disturbed areas upon temporary cessation of work for 4 days or longer, Rock construction entrances shall befitted with wash racks to be ABACT for special protection watersheds.
cellulose on other areas as indicated in specifications PENNDOT 408, 805.3
c a maximum of 15000 square feet of disturbed area may reach final grade before initiating seeding and mulching operations,
ROCK APRON INSTALLATION:
d limiting the disturbance to one watershed at a time, ACCD EROSION & SEDIMENT CONTROL PLAN STANDARD NOTES
e limit the total length of excavated trench to less than the length of utility line which can be placed and back filled at end of workday, All aprons shall be constructed to the dimensions shown. Terminal widths shall be adjusted as necessary to match receiving channels.
f only 50 lineal feet of open trench at the end of the workday, 1. All earth disturbances, including clearing and grubbing as well as cuts and fills shall be done in accordance with the approved E&S plan. A copy
BMP MAINTENANCE of the approved drawings (stamped, signed and dated by the reviewing agency) must be available at the project site at all times. The reviewing agency
4) Excavate area for installation of the Rock Construction Entrance #1 and #2. Lay geotextile at edge of existing pavement. Install stone base per
construction entrance detail. Stockpile additional stone for maintenance of entrance. Construction equipment and material will be delivered to the site shall be notified of any changes to the approved plan prior to implementation of those changes. The reviewing agency may require a written submittal
via this entrance. PROJECT AREA MAINTENANCE of those changes for review and approval at its discretion.
5) Install 12” silt socks. Areas within the project, not in the immediate work area, will be interim seeded, if necessary, to avoid problems with accelerated erosion. This will
2. At least 7 days prior to starting any earth disturbance activities, including clearing and grubbing, the owner and/or operator shall invite all
include any temporary grading, channels, etc. Sedimentation control will be achieved by limiting the total amount of disturbance to the site on a
contractors, the landowner, appropriate municipal officials, the E&S plan preparer, the PCSM plan preparer, the licensed professional responsible for
scheduled basis. Sedimentation Basin and silt socks will be provided to intercept the runoff from site prior to the discharge to waters of the
STAGE 2 oversight of critical stages of implementation of the PCSM plan, and a representative from the local conservation district to an on-site preconstruction
Commonwealth.
6) Begin earthwork and installation of Pond 1 and Forebay. meeting.
7) As embankment is formed, install permanent outlet structure (do not install dewatering orifices in permanent structure), install pipe, anti-seep 3. At least 3 days prior to starting any earth disturbance activities, or expanding into an area previously unmarked, the Pennsylvania One Call
ROCK CONSTRUCTION ENTRANCE MAINTENANCE:
collar, skimmer as per Construction Detail #7-2, rock apron RA-100, and create the berm. A geo-technical engineer shall verify soils are suitable System Inc. shall be notified at 1-800-242-1776 for the location of existing underground utilities.
for trap embankments. Strict adherence to the Geotechnical report is to be followed during the Trap installation. Install impermeable PVC liner. Structure's thickness will be constantly maintained to the specified dimension by adding rock. A stockpile of rock material will be maintained at the site
Sediment Trap Storage Dewatering Facility must be installed at the time of Trap installation as per Standard Construction Detail #8-2. (Critical for this purpose. At the end of each construction workday, all sediment deposited on public roadways, will be removed and returned to the site. 4. All earth disturbance activities shall proceed in accordance with the sequence provided on the plan drawings. Deviation from that sequence must
Stages are in bold text). Washing with water is not permitted. If excessive amounts of sediment are being deposited on roadway, extend length of rock construction entrance by be approved in writing from the local conservation district or by the Department prior to implementation.
50 foot increments until condition is alleviated. 5. Areas to be filled are to be cleared, grubbed, and stripped of topsoil to remove trees, vegetation, roots and other objectionable material.
8) Install Sediment Trap Outlet Basin as per Construction Detail #8-6.
9) Install Emergency Spillway as per construction details. (Critical Stage) 6. Clearing, grubbing, and topsoil stripping shall be limited to those areas described in each stage of the construction sequence. General site
EROSION CONTROL BLANKET MAINTENANCE:
10) Install Clean Out Stake as per plan and details. clearing, grubbing and topsoil stripping may not commence in any stage or phase of the project until the E&S BMPs specified by the BMP sequence for

05/31/2018 TRANT
Blanketed areas shall be inspected weekly and after each runoff event until perennial vegetation is established to minimum uniform 70% coverage

ARM
11) Install Channels 1-3 and diversion berm. that stage or phase have been installed and are functioning as described in this E&S plan.

By
throughout the blanketed area. Damaged or displaced blankets shall be restored or replaced within 4 calendar days.
12) Install Trench Drain within Channel 1. Trench drain is to be installed the length of the proposed roadway that crosses over said channel. 7. At no time shall construction vehicles be allowed to enter areas outside the limit of disturbance boundaries shown on the plan maps. These areas
Location of trench drain can be found on sheet C705.

10/22/2018
SEDIMENT TRAPS MAINTENANCE: must be clearly marked and fenced off before clearing and grubbing operations begin.
13) All exposed embankment slopes should be limed, fertilized, seeded and mulched. Permanent vegetative ground cover should be established upon

Date
All sediment traps shall be inspected on at least a weekly basis and after each runoff event. 8. Topsoil required for the establishment of vegetation shall be stockpiled at the location(s) shown on the plan maps(s) in the amount necessary to
completion of basin construction.
complete the finish grading of all exposed areas that are to be stabilized by vegetation. Each stockpile shall be protected in the manner shown on the
Access for sediment removal and other required maintenance activities shall be provided. plan drawings. Stockpile heights shall not exceed 35 feet. Stockpile slopes shall be 2H:1V or flatter.
STAGE 3
9. Immediately upon discovering unforeseen circumstances posing the potential for accelerated erosion and/or sediment pollution, the operator shall
14) Excavate/place fill on site until design grade has been established for site. Immediately stabilize fill slopes every ten feet of vertical elevation by

REVISED PER PADEP COMMENTS


A clean out stake shall be placed near the center of each trap. Accumulated sediment shall be removed when it has reached the elevation indicated on implement appropriate best management practices to minimize the potential for erosion and sediment pollution and notify the local conservation district
seeding per permanent seeding schedule. All slope areas, brought to finish grade are to be stabilized with rock or seeded with mulch applied to
the clean out stake and the trap restored to its original dimensions. Dispose of materials removed from the trap in the manner described in the E&S plan. and/or the regional office of the Department.
slopes as specified on detail sheet.
15) Install erosion control matting on seeded areas greater than 3:1 slope. 10. All building materials and wastes shall be removed from the site and recycled or disposed of in accordance with the Department's Solid Waste
16) Install proposed gravel road and cul-de-sac. Check embankments, spillways, and outlets for erosion, piping and settlement. Clogged or damaged spillways and/or embankments shall be Management Regulations at 25 Pa. Code 260.1 et seq., 271.1, and 287.1 et. seq. No building materials or wastes or unused building materials shall be

Revision
immediately restored to design specifications. burned, buried, dumped, or discharged at the site.

PADEP SUBMISSION
17) Install concrete washout in cul-de-sac.
18) Install water and gas lines. 11. All off-site waste and borrow areas must have an E&S plan approved by the Allegheny County Conservation District or the Department fully
19) All disturbed areas and sub areas are to be stabilized as soon as possible upon reaching finished grade as per the specifications. Displaced riprap within the spillway or outlet protection shall be replaced immediately. implemented prior to being activated.
12. The contractor is responsible for ensuring that any material brought on site is clean fill. Form FP-001 must be retained by the property owner for
STAGE 4 - Erosion Control Removal and Conversions Accumulated sediment shall be removed and disturbed areas inside the trap shall be stabilized before conversion to a storm water management facility. any fill material affected by a spill or release of a regulated substance but qualifying as clean fill due to analytical testing. Clean fill includes soil, rock,
To assist in removing sediment, which may be saturated, a device such as shown in standard construction detail #7-18 may be used to dewater the stone, dredged material, used asphalt and brick, block or concrete from construction and demolition activities that is separate from other waste and
1) Concrete Washout facility to be removed at completion of construction. Disposal of the waste is to be handled by an experienced contractor sediment prior to its removal.
following the appropriate rules and regulations. recognizable as such. The contractor is responsible for performing environmental due diligence regarding the import of clean fill as defined as:
investigative techniques, including, but not limited to, visual property inspections, electronic database searches, review of ownership and use history of
2) When a uniform 70% perennial vegetative cover stabilizes drainage area to Sediment Trap and the Trap itself, and lots within the tributary are

No.
TRASH RACK/ RISER MAINTENANCE: property, sanborn maps, environmental questionnaires, transaction screens, analytical testing, environmental assessments and audits.

1
0
constructed, it can be converted. Convert Sediment Trap as follows during the growing season:
Clogged or damaged spillways shall be repaired immediately. Trash and other debris shall be removed from the basin and riser. 13. All pumping of water from any work area shall be done according to the procedure described in this plan, over undisturbed vegetated areas.
· Pump sediment laden water from Trap through a sediment filter bag. Pump capacity cannot exceed 750gpm or 50% of manufacturer's
recommendation pump rate. Or a barrel and #57 gravel and pump per detail. 14. Vehicles and equipment may neither enter directly nor exit directly from site onto Braddock Avenue.
· Remove sediment and stockpile in an area surrounded with filter sock to dry and then mix with topsoil. DEWATERING FACILITY MAINTENANCE:
Dewatering Facility shall be continuously monitored during operation. If for any reason the dewatering facility ceases to function properly, it shall be 15. Until the site is stabilized, all erosion and sediment BMPs shall be maintained properly. Maintenance shall include inspections of all erosion and
· Remove the clean out stake. Dispose of properly, at an approved landfill.

AS NOTED
sediment BMPs after each runoff event and on a weekly basis. All preventative and remedial maintenance work, including clean out, repair,

10/22/2018
immediately shut down and not restarted until the problem has been corrected.
· Any damage to design dimensions during removal of temporary facilities and sediment shall be corrected by regarding, restabilization, replacement, regrading, reseeding, remulching and renetting must be performed immediately. If the E&S BMPs fail to perform as expected,

180539
etc. immediately. replacement BMPs, or modifications of those installed will be required.
§ Convert Trap to Detention Pond 1 as per plan and details. Seed disturbed area per permanent seeding schedule. ROCK APRON MAINTENANCE:
All aprons shall be inspected at least weekly and after each runoff event, displaced riprap within the apron shall be replaced immediately. 16. A log, DEP form 3150-FM-BWEW0083 dated 02/2012, showing dates that E&S BMPs were inspected as well as any deficiencies found and the
§ Convert Sediment Trap outlet basin as per plans and details to a level spreader. date they were corrected shall be maintained on the site and be made available to regulatory agency officials at the time of inspection.
3) Existing E&S controls can be removed once a uniform 70% perennial vegetative cover is obtained. Silt will be disposed of by being mixed with other
soils on the site or spread to dry in an area protected with filter sock and then seeded per permanent seeding specifications when dry. Compost from SPILLWAY MAINTENANCE: 17. Sediment tracked onto any public roadway or sidewalk shall be returned to the construction site by the end of each work day and disposed in the

project no.
the filter sock can be used as a soil supplement. Displaced riprap within the spillway or outlet channel shall be replaced immediately. manner described in this plan. In no case shall the sediment be washed, shoveled, or swept into any roadside ditch, storm sewer, or surface water.

scale

date
· Silt sock and erosion control matting is to be removed and disposed of properly, at an approved landfill. 18. All sediment removed from BMPs shall be disposed of in the manner described on the plan drawings.
COMPOST FILTER SOCK MAINTENANCE: 19. Areas which are to be topsoiled shall be scarified to a minimum depth of 3 to 5 inches - 6 to 12 inches on compacted soils - prior to placement of
TEMPORARY CONTROL MEASURES AND FACILITIES USED DURING EARTH MOVING. Compost filter sock shall be inspected weekly and after each runoff event. Damaged sock shall be repaired according to manufacturer's specifications or topsoil. Areas to be vegetated shall have a minimum 4 inches of topsoil in place prior to seeding and mulching. Fill outslopes shall have a minimum of
Program of operations: The life of this project is such that soil erosion and sedimentation measures must be continually applied and maintained during replaced within 24 hours of inspection. 2 inches of topsoil.
construction activities. This will be preceded by proper interim measures on a scheduled basis as outlined in this application.
20. All fills shall be compacted as required to reduce erosion, slippage, settlement, subsidence or other related problems. Fill intended to support

MDR
KGJ
Accumulated sediment shall be removed when it reaches ½ the above ground height of the barrier and disposed in the manner described in the plan.

QZ
buildings, structures and conduits, etc. shall be compacted in accordance with local requirements or codes.
PURPOSE - The purpose of the use of temporary or interim control measures is to prevent needless accumulation of sediment in the major drainage
channels and to minimize the creation of difficult and undesired conditions in and around the site during construction. Biodegradable compost filter socks shall be replaced after 6 months. Photodegradable socks after 1 year. Polypropylene socks shall be replaced 21. All earthen fills shall be placed in compacted layers not to exceed 9 inches in thickness.
according to manufacturer's recommendations. 22. Fill materials shall be free of frozen particles, brush, roots, sod, or other foreign or objectionable materials that would interfere with or prevent
BMP INSTALLATION construction of satisfactory fills.

graphic scale
Upon stabilization of the area tributary to the sock, stakes shall be removed, the sock may be left in place and vegetated or removed by cutting open the 23. Frozen materials or soft, mucky, or highly compressible materials shall not be incorporated into fills.

designed

checked
All Best Management Practices (BMP's) required by the Soil Erosion and Sedimentation Control Plans shall meet or exceed the standards of the mesh and spreading the mulch as a soil supplement.

drawn
24. Fill shall not be placed on saturated or frozen surfaces.
Commonwealth of Pennsylvania Department of Environmental Protection Office of Water Management's “Erosion and Sediment Pollution Control
Program Manual” dated March 2000 or newer. B.) Inspection schedule for proposed BMPs provided. 25. Seeps or springs encountered during construction shall be handled in accordance with the standard and specification for subsurface drain or other
approved method.
ALTERATIONS PROPOSED TO THE AREA. See Plan Sheets. Response: See information listed below for seeding scheduling. Inspection schedule for proposed BMPs are 26. All graded areas shall be permanently stabilized immediately upon reaching finished grade. Cut slopes in competent bedrock and rock fills need

EROSION AND SEDIMENT CONTROL PLAN

ALLEGHENY COUNTY, PENNSYLVANIA


also located on plan sheet C710. not be vegetated. Seeded areas within 50 feet of a surface water, or as otherwise shown on the plan drawings, shall be blanketed according to the

NORTH VERSAILLES TOWNSHIP,


standards of this plan.

NORTH BRADDOCK BOROUGH,


METHOD OF CALCULATION

EAST PITTSBURGH BOROUGH,


The methods of calculation for the storm water runoff and detention requirements for this project were established by D.E.P. -erosion and sediment TYPES OF MEASURES AND FACILITIES - 27. Immediately after earth disturbance activities cease in any area or subarea of the project, the operator shall stabilize all disturbed areas. During
pollution control program manual. This method was chosen because it is acceptable to all governmental bodies involved. The types of measures and facilities will include the use of positive grading techniques and practices which will be implemented during non-germinating months, mulch or protective blanketing shall be applied as described in the plan. Areas not at finished grade, which will be reactivated
construction to insure positive drainage in the work area. This is to prevent the creation of difficult and undesired working conditions. The drainage in within 1 year, may be stabilized in accordance with the temporary stabilization specifications. Those areas which will not be reactivated within 1 year

E&S CONSTRUCTION DETAILS


COMPOST FILTER SOCK INSTALLATION: these areas will be minimized to prevent excess erosion. If construction should cease during non-growing season disturbed areas shall be covered with shall be stabilized in accordance with the permanent stabilization specifications.
Sock fabric shall meet standards of table 4.1 of the PA DEP Erosion Control Manual. Compost shall meet the standards of table 4.2 of the PA DEP straw or excelsior mats.
28. Permanent stabilization is defined as a minimum uniform, perennial 70% vegetative cover or other permanent non-vegetative cover with a
Erosion Control Manual. Those areas where cover is removed will be exposed for a minimum period of time to final grading and reseeding. The seeding of disturbed density sufficient to resist accelerated erosion. Cut and fill slopes shall be capable of resisting failure due to slumping, sliding, or other movements.
areas will be in one of three schedules.
29. E&S BMPs shall remain functional as such until all areas tributary to them are permanently stabilized or until they are replaced by another BMP
Compost filter sock shall be placed at existing level grade. Both ends of the barrier shall be extended at least 8 feet up slope at 45 degrees to the main approved by the local conservation district or the Department. A log, DEP form 3150-FM-BWEW0083 dated 02/2012. showing dates that E&S
barrier alignment. Maximum slope length shall not exceed that specified for the size of the sock and the slope of the tributary area. SEEDING AND MULCHING MAINTEANENCE/SPECIFICATIONS
BMPs were inspected as well as any deficiencies found and the date they were
30. Upon completion of all earth disturbance activities and permanent stabilization of all disturbed areas, the owner and/or operator shall contact the
corrected shall be maintained on the site and be made available to regulatory
SEEDING local conservation district for an inspection prior to removal/conversion of the E&S BMPs. agency officials at the time of inspection.
Traffic shall not be permitted to cross compost filter sock.
If grass does not grow within 20 days of application [during growing season] the area shall be seeded again. 31. After final site stabilization has been achieved, temporary erosion and sediment BMPs must be removed or converted to permanent post
EROSION CONTROL BLANKET INSTALLATION: construction stormwater management BMPs. Areas disturbed during removal or conversion of the BMPs shall be stabilized immediately. In order to
APPLICABILITY. ensure rapid revegetation of disturbed areas, such removal/conversions are to be done only during the germinating season.
Seed and soil amendments shall be applied according to the rates in the plan drawings before installing the blanket.
Upon completion of the development and construction of buildings all disturbed areas will be seeded per permanent seeding schedule. 32. Upon completion of all earth disturbance activities and permanent stabilization of all disturbed areas, the owner and/or operator shall contact the
Provide anchor trench at toe of slope in similar fashion as at top of slope. local conservation district to schedule a final inspection. WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C708.dwg Plotted: October 19, 2018
H
TEMPORARY SEEDING SCHEDULE AND FERTILIZER RATES: M
33. Failure to correctly install E&S BMPs, failure to prevent sediment-laden runoff from leaving the construction site, or failure to take immediate REGISTERED

O
CO
Early spring (April 15 up to June 15) corrective action to resolve failure of E&S BMPs may result in administrative, civil, and/or criminal penalties being instituted by the Department as

F
Slope surface shall be free of rocks, clods, sticks, and grass. PROFESSIONAL

ET - BRADDOCK WELL PAD


- Annual grass (rye) at a rate of 40 pounds per acre. defined in Section 602 of the Pennsylvania Clean Streams Law. The Clean Streams Law provides for up to $10,000 per day in civil penalties, up to
TESSA MICHELE ANTOLICK
Late spring and early summer (June 16 to August 15) $10,000 in summary criminal penalties, and up to $25,000 in misdemeanor criminal penalties for each violation.

MERRION OIL & GAS


Blanket shall have good continuous contact with underlying soil throughout entire length, lay blanket loosely and stake or staple to maintain direct
contact with soil do not stretch blanket. - Japanese or foxtail millet at a rate of 35 pounds per acre. 34. Concrete wash water shall be handled in the manner described on the plan drawings. In no case shall it be allowed to enter any surface waters or ENGINEER

A
No. PE077667
groundwater systems.

E
Late summer and fall (August 16 and later) N

I
N N
S Y L V A
The blanket shall be stapled in accordance with the manufacturer's recommendations. - Annual Rye at a rate of 40 pounds per acre or Winter wheat at a rate of 180 pounds (3 bu) per acre. 35. Erosion control blanketing shall be installed on all slopes 3H: 1V or steeper within 50 feet of a surface water and on all other disturbed areas
specified on the plan maps and/or detail sheets.
SEDIMENT TRAP INSTALLATION: Prepare the ground surface apply ground lime stone and fertilizer per Table 5.10 of DER's "Erosion and Sediment Control Program Manual"
(page 5.40), Lime at a rate of 6 ton of agriculture limestone per acre and apply 20 lbs. of N (nitrogen), 40 lbs. of N/2 O/2 (Phosphate) of & 40 lbs. of This Drawing shall not be used for tender or construction unless sealed.
Fill material for the embankments shall be free of roots, or other woody vegetation, organic material, large stones and other objectionable materials. The
embankment shall be compacted in layer lifts of not more than 9 inches. The maximum rock size shall be no greater than 6 inches. Upon completion, K2O (Potash) per acre or as indicated by soil testing. I do hereby certify to the best of my knowledge, information and
the embankment shall be seeded and mulched or otherwise stabilized according to the specifications of the E&S plan drawings. If grading is completed developed during non-growing season, October 15 and April 15, disturbed areas shall be covered with straw mulch belief, that the Erosion and Sediment Control and Site Restoration
Plan and Post Construction BMPs are true and correct, represent
applied at 3 tons of mulch per acre to produce a loose layer of .75 to 1.0 inch deep per Penn DOT Standards 408. actual field conditions and are in accordance with the 25 Pa. Code
SEDIMENT TRAP TRASH RACK/RISER INSTALLATION: Chapters 78 and 102 of the Department's rules and regulations. I
am aware that there are significant penalties for submitting false
Box shall be bolted, strapped or otherwise secured to the temporary riser. PERMANENT SEEDING SCHEDULE AND FERTILIZER RATES information, including the possibility of fine and imprisonment.
Seed will be applied by approved hydro seeding methods to areas that are graded to final section, for slopes less than 10 feet in height and will not be
Top of temporary riser extension shall be at least as high as sediment basin temporary riser and shall be 6 inches minimum below crest of emergency disturbed, Using Kentucky 31 tall fescue, at a rate of 40 pounds per square acre, or, with fine fescue 10 pounds per square acre. Liming of soil shall be

drawing title

project title
spillway. per soil testing or 6 ton of agricultural grade limestone per acre and fertilizer added per soil testing or at a rate of 100 lb. of Nitrogen (N) 200 lb. of
TESSA MICHELE ANTOLICK, PE - 077667
Phosphate (P/2 O/5) and 200 lb. of Potash (K/2 O) per acre or as indicated by soil testing. Apply 3 tons of straw mulch per acre to produce a loose layer
of .75 to 1.0 inch deep or paper mulch per manufacturer's specifications.

C708
Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
ARM Group Inc.
EROSION CONTROL OPERATION & MAINTENANCE SCHEDULE

Engineers and Scientists


www.armgroup.net
EROSION & SEDIMENT E&S CONTROLS MINIMUM MAINTENANCE REQUIREMENTS
APPLICABLE
NOTE: All erosion controls are to be inspected weekly and after each runoff event unless otherwise noted below.
CONTROLS TO THIS PLAN
Any deficiencies found during inspection should be repaired or replaced immediately after inspection unless otherwise noted below.

BMP's INSPECT CLEAN REPAIR REPLACE DESCRIPTION

6 MONTHS IF SOCK BIODEGRADABLE 1 YEAR IF 1. Compost filter sock shall be inspected weekly and after each runoff event. Damaged sock shall be repaired according to manufacturer's specifications or replaced within 24 hours of inspection.
WEEKLY AND SOCK PHOTODEGRADABLE POLYPROPYLENE 2. Biodegradable compost filter socks shall be replaced after 6 months. Photodegradable socks after 1 year. Polypropylene socks shall be replaced according to manufacturer's recommendations.
SEDIMENT 1/2 WITHIN 24
SILT SOCKS X EVERY RUNOFF SOCKS ACCORDING TO MANUFACTURERS 3. Accumulated sediment shall be removed when it reaches ½ the above ground height of the barrier and disposed in the manner described in the plan.
BARRIER HEIGHT HOURS
EVENT RECOMMENDATIONS 4. Upon stabilization of the area tributary to the sock, stakes shall be removed, the sock may be left in place and vegetated or removed by cutting open the mesh and spreading the mulch
as a soil supplement.

WEEKLY AND 1. Filter fence shall be inspected weekly and after each runoff event. Any fence section which has been undermined or topped shall be immediately replaced with a rock filter outlet.
SEDIMENT 1/2 WHEN TOPPED OR UNDERMINED IMMEDIATELY 2. Accumulated sediment shall be removed when it reaches ½ the above ground height of the barrier and disposed in the manner described in the plan.
EVERY RUNOFF
SILT FENCE BARRIER HEIGHT IMMEDIATELY WITH ROCK FILTER OUTLET 3. Upon stabilization of the area tributary to the fence, fence shall be removed, and properly disposed of in a DEP approved facility.
EVENT

1. The structure's thickness will be constantly maintained to the specified dimension by adding rock. A stockpile of rock material shall be maintained on site for this purpose.
AS NECESSARY 2. All sediment deposits on paved roadways, will be removed and returned to the construction site immediately. If excessive amounts of sediment
ROCK CONSTRUCTION ENTRANCE X DAILY DAILY AS NECESSARY
are being deposited on roadway extend length of rock construction entrance by 50 foot increments until condition is alleviated or install wash rack.
3. Washing of the roadway or sweeping the deposits into roadway ditches, sewers, culverts, or other drainage courses is not acceptable.

DAMAGED OR LEAKING WASHOUT IMMEDIATELY 1. All concrete washout facilities should be inspected daily. Damaged or leaking washouts should be deactivated and repaired or replaced immediately.
CONCRETE WASHOUT X DAILY 75% OF CAPACITY IMMEDIATELY LINER WITH EACH CLEANING 2. Accumulated materials should be removed when they reach 75% capacity. Plastic liners should be replaced with each cleaning of the washout facility.

1. Channel dimensions shall be constantly maintained. Channels shall be cleaned whenever total channel depth is reduced by 1/4 at any location. Sediment deposits shall be removed within 24 hours of discovery or as soon
WEEKLY AND DEPOSITS WITHIN 24
LINING WITHIN 48 as soil conditions permit access to channel without further damage. Damaged lining shall be repaired or replaced within 48 hours of discovery. No more than 1/3 of the shoot (grass leaf) shall be removed in any mowing.
EVERY RUNOFF HOURS 1/4 FULL OF LINING WITHIN 48 HOURS
CHANNELS X HOURS Grass height shall be maintained between 2 and 3 inches unless otherwise specified. Excess vegetation shall be removed from permanent channels to ensure sufficient channel capacity.
EVENT SEDIMENT

05/31/2018 TRANT
ARM
WEEKLY AND 1. All sediment traps shall be inspected on a weekly basis and after each runoff event. Accumulated sediment shall be removed when it has reached the clean out elevation on the stake and the basin restored to its original

By
CLEAN OUT dimensions. Trap embankments,spillways and outlets shall be checked for erosion, piping and settlement. Clogged or damaged spillways shall be repaired immediately.
SEDIMENT TRAP X EVERY RUNOFF IMMEDIATELY RIPRAP REPLACE IMMEDIATELY
ELEVATION=______ Accumulated sediment shall be removed and disturbed areas inside the trap stabilized before conversion to a stormwater management facility. Trash and debris shall be removed from the trap and riser.
EVENT
Displaced riprap within the spillway and/or outlet channel shall be replaced immediately.

10/22/2018
1. All sediment basins shall be inspected on a weekly basis and after each runoff event. Accumulated sediment shall be removed when it has reached the clean out elevation on the stake and the basin restored to its original

Date
WEEKLY AND
CLEAN OUT dimensions. Basin embankments,spillways and outlets shall be checked for erosion, piping and settlement. Clogged or damaged spillways shall be repaired immediately.
SEDIMENT BASIN EVERY RUNOFF IMMEDIATELY RIPRAP REPLACE IMMEDIATELY
ELEVATION=______ Accumulated sediment shall be removed and disturbed areas inside the basin stabilized before conversion to a stormwater management facility. Trash and debris shall be removed from the basin and riser.
EVENT
Displaced riprap within the spillway and/or outlet channel shall be replaced immediately.

WEEKLY AND 1. Blanketed areas shall be inspected weekly and after each runoff event until perennial vegetation is established to a minimum uniform 70% coverage throughout the blanketed area.
EVERY RUNOFF WITHIN 4 DAYS 2. Damaged sediment filter logs shall be replaced within 4 calendar days of inspection.

REVISED PER PADEP COMMENTS


EROSION CONTROL MAT/BLANKET X N/A WITHIN 4 DAYS
EVENT

1. Filter bags shall be replaced when bag is 1/2 full of sediment. Spare bags shall be kept available for replacement of those that have failed or are filled.
Bags shall be placed on straps to facilitate removal unless bags come with lifting straps already attached.

Revision
PUMPED WATER FILTER BAG DAILY N/A IMMEDIATELY 1/2 FULL OF SEDIMENT 2. The pump discharge hose shall be inserted into the bags in a manner specified by the manufacturer and securely clamped. A piece of PVC pipe is recommended for this purpose.

PADEP SUBMISSION
The pumping rate shall be no greater than 750 gpm or 1/2 the maximum specified by the manufacturer which ever is less. Pump intakes shall be floating and screened.
3. Filter bags should be inspected daily. If any problem is detected, pumping shall cease immediately and not resume until the problem is corrected.

1. The structure's thickness will be constantly maintained to the specified dimension by adding rock. A stockpile of rock material will be maintained on the site for this purpose.
CONSTRUCTION VEHICLE CROSSING DAILY DAILY IMMEDIATELY IMMEDIATELY 2. After each runoff event, the inlet & outlet condition of the temporary pipe should be evaluated and any "wash-out" areas immediately repaired with compacted backfill materials.

1/2 FULL OF SEDIMENT OR IF 1. Inspect filter bags weekly and after every runoff event. Filter bags shall be emptied, rinsed and/or replaced when bag is 1/2 full or when flow capacity has been reduced so as to
WEEKLY AND FLOODING OCCURS OR IF cause flooding or bypassing the inlet. Damaged or clogged bags shall be replaced. A supply shall be maintained onsite for replacement of bags. All needed repairs shall be initiated
EVERY RUNOFF immediately after the inspection. Dispose of accumulated sediment as well as all used bags according to the plan notes.
INLET PROTECTION WATER BYPASSES THE INLET IMMEDIATELY IMMEDIATELY
EVENT

No.
1
0
WEEKLY AND 1. Sediment filter logs shall be inspected weekly and after each runoff event.
SEDIMENT 1/2 WITHIN 24 2. Accumulated sediment shall be removed when it reaches ½ the above ground height of the barrier and disposed in the manner described in the plan.
SEDIMENT FILTER LOG EVERY RUNOFF WITHIN 24 HOURS
BARRIER HEIGHT HOURS 3. Damaged sediment filter logs shall be replaced within 24 hours of inspection.
EVENT

AS NOTED
TRASH AND DEBRIS 1. Sediment shall be removed when accumulations reach 1/2 the height of the outlet.

10/22/2018
WEEKLY AND RECYCLED OR DISPOSED OF 2. Materials must be washed completely free of all foreign materials or new rock used to rebuild the filter.

180539
ROCK APRONS EVERY RUNOFF IN DEP APPROVED FACILITY IMMEDIATELY RIPRAP REPLACE IMMEDIATELY
EVENT

TRASH AND DEBRIS 1. Sediment shall be removed when accumulations reach 1/2 the height of the outlet.
WEEKLY AND RECYCLED OR DISPOSED OF 2. Materials must be washed completely free of all foreign materials or new rock used to rebuild the filter.
SPILLWAY X EVERY RUNOFF IN DEP APPROVED FACILITY IMMEDIATELY RIPRAP REPLACE IMMEDIATELY

project no.
EVENT

scale

date
1. In pools with depths exceeding 7', the top of the plywood baffle does not need to extend to the temporary riser crest. Super silt fence baffles need not extend to TRCE elevation.
WEEKLY AND 2. Baffles shall be tied into one side of the basin unless otherwise shown on the plan drawings.
EVERY RUNOFF N/A N/A 3. Substitution of materials not specified in this detail shall be approved by the department or the local conservation district before installation.
BAFFLES EVENT
WITHIN 7 DAYS
4. Damaged or warped baffles shall be replaced within 7 days of inspection.
5. Baffles requiring support posts shall not be installed in basins requiring impervious liners.
1. Clean and rake areas where excavated materials have been stockpiled to original vegetation.

MDR
WEEKLY AND

KGJ
SEDIMENT 1/2

QZ
AS NECESSARY 2. Backfill, seed and mulch any washout areas as necessary to assure reestablishment of a perenial vegetative cover over disturbed areas.
EVERY RUNOFF AS NECESSARY
UTILITY TRENCH CONTROLS BARRIER HEIGHT 3. Maintain silt barrier fence/hay bale barriers as specified above.
EVENT

EROSION CONTROL SITE MAINTENANCE REPORT GENERAL INFORMATION


Contractor is required to establish a maintenance schedule log, documenting, 1. Construction and materials shall be in accordance with PennDOT Publication 408, current edition.
2. Grading of site shall be done in increments so that entire site will not be open at one time.

graphic scale
but not limited to, the following information:
3. As disturbed areas are completed, seed/mulched within 24 hours to establish permanent vegetation.

designed

checked
1. Individual or individuals responsible for preparation of report and maintenance of Erosion Controls.

drawn
2. Date of Erosion Control review, findings and recomendations. 4. All disturbed areas and stockpiled earth exposed for 7 days or more, with no activity shall be seeded and mulched
3. Basic statement as to the effectiveness of the controls with specific attention given to problem areas. with a temporary vegetative cover. See DEP Standard Worksheet #21

EROSION AND SEDIMENT CONTROL PLAN

ALLEGHENY COUNTY, PENNSYLVANIA


FINAL SITE STABILIZATION REPAIR PARAMATERS

NORTH VERSAILLES TOWNSHIP,


NORTH BRADDOCK BOROUGH,
EAST PITTSBURGH BOROUGH,
AREAS DISTURBED DURING REMOVAL OR CONVERSION SHALL BE
STABILIZED IMMEDIATELY. REMOVAL OR CONVERSION ARE TO BE DONE
ONLY DURING THE GERMINATING SEASON.

TEMPORARY E&S BMPs TO BE REMOVED NO CONVERSION OF TEMPORARY

CONSTRUCTION DETAILS
AS PER PLAN E&S BMP's

ROCK CONSTRUCTION ENTRANCE,


SED. TRAP TO REMAIN AFTER SITE
EROSION CONTROL BLANKET, SILT
STABILIZATION. TRAP WILL
SOCK, PUMPED FILTER BAG, SEDIMENT A log, DEP form 3150-FM-BWEW0083 dated 02/2012. showing dates that E&S BMPs were inspected as
OPERATE AS OVERSIZED PIPE. well as any deficiencies found and the date they were corrected shall be maintained on the site and be made
BASIN, UNDERGROUND SEDIMENT TRAP
available to regulatory agency officials at the time of inspection.
ANY REPAIR OR REMOVAL OF BMPs DURING REQUIRED MAINTENANCE
WHICH CAUSES DAMAGE TO DESIGN DIMENSIONS WILL BE CORRECTED BY
REPLACEMENT, REGRADING, RESTABILIZATION, ETC. IMMEDIATELY.

WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C709.dwg Plotted: October 19, 2018
H
M
REGISTERED

O
CO

F
PROFESSIONAL

ET - BRADDOCK WELL PAD


TESSA MICHELE ANTOLICK

MERRION OIL & GAS


ENGINEER

A
No. PE077667

E
N

I
N N
S Y L V A

This Drawing shall not be used for tender or construction unless sealed.

I do hereby certify to the best of my knowledge, information and


belief, that the Erosion and Sediment Control and Site Restoration
Plan and Post Construction BMPs are true and correct, represent
actual field conditions and are in accordance with the 25 Pa. Code
Chapters 78 and 102 of the Department's rules and regulations. I
am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment.

drawing title

project title
TESSA MICHELE ANTOLICK, PE - 077667

C709
Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.
ARM Group Inc.
TABLE 11.3 TABLE 11.4 TABLE 11.5
TABLE 11.1

CUBIC YARDS OF TOPSOIL REQUIRED FOR

Engineers and Scientists


APPLICATION TO VARIOUS DEPTHS

www.armgroup.net
Depth (in) Per 1000 Square Feet Per Acre
1 3.1 134
2 6.2 268
3 9.3 403
4 12.4 537
5 15.5 672
6 18.6 806
7 21.7 940
8 24.8 1074

TABLE 11.2

05/31/2018 TRANT
ARM

By
10/22/2018

Date
REVISED PER PADEP COMMENTS
ADAPTED FROM PENN STATE, "EROSION CONTROL AND CONSERVATION PLANTINGS ON NON-CROPLAND."

Revision
PADEP SUBMISSION
NOTE: A COMPOST BLANKET WHICH MEETS THE STANDARDS OF THIS CHAPTER MAY BE SUBSTITUTED
FOR THE SOIL AMENDMENTS SHOWN IN TABLE 11.2 REVISION OF FERTILIZER TYPE TO 10-20-20.
MISPRINT WAS BROUGHT TO ATTENTION ON THE COMMENT SHEET FROM JANUARY 14, 2015
FROM THE ALLEGHENY COUNTY CONSERVATION DISTRICT.

No.
1
0
(1) GROWTH HABIT REFERS TO THE ABILITY OF THE SPECIES TO EITHER FORM A DENSE SOD BY VEGETATIVE

AS NOTED
10/22/2018
MEANS (STOLONS, RHIZOMES, OR ROOTS) OR REMAIN IN A BUNCH OR SINGLE PLANT FORM. IF SEEDED

180539
HEAVILY ENOUGH, EVEN BUNCH FORMERS CAN PRODUCE A VERY DENSE SOD. THIS IS SOMETIMES
(1) FOR SEED MIXTURES 11 AND 12, ONLY USE SPRING OATS OR WEEPING LOVEGRASS
CALLED A SOD, BUT NOT IN THE SENSE OF A SOD FORMED BY VEGETATIVE MEANS.
(INCLUDED IN MIX) AS NURSE CROP.
(1) PLS IS THE PRODUCT OF THE PERCENTAGE OF PURE SEED TIMES PERCENTAGE
(2) ONCE ESTABLISHED, PLANTS MAY GROW AT A SOMEWHAT LOWER pH, BUT COVER GENERALLY IS ONLY
GERMINATION DIVIDED BY 100. FOR EXAMPLE, TO SECURE THE ACTUAL PLANTING RATE (2) CONTACT THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT ROADSIDE
ADEQUATE AT pH 6.0 OR ABOVE.
FOR SWITCHGRASS, DIVIDE 12 POUNDS PLS SHOWN ON THE SEED TAG. THUS, IF THE SPECIALIST FOR SPECIFIC SUGGESTIONS ON TREATMENT TECHNIQUES AND MANAGEMENT

project no.
PLS CONTENT OF A GIVEN SEED LOT IS 35%, DIVIDE 12 pls BY 0.35 TO OBTAIN 34.3 PRACTICES.
(3) MINIMUM SEED LOTS ARE TRULY MINIMUM, AND SEED LOTS TO BE USED FOR REVEGETATION PURPOSES

scale
POUNDS OF SEED REQUIRED TO PLANT ONE ACRE. ALL MIXTURES IN THIS TABLE ARE

date
SHOULD EQUAD OR EXCEED THESE STANDARDS. THUS, DEERTONGUE GRASS SHOULD GERMINATE 75%
SHOWN IN TERMS OF PLS. (3) SEED MIXTURES CONTAINING CROWNVETCH SHOULD NOT BE USED IN AREAS ADJACENT TO
OR BETTER. CROWNVETCH WHOULD HAVE AT LEAST 40% READILY GERMINABLE SEED AND 30% HARD
WETLANDS OR STREAM CHANNELS DUE TO THE INVASIVE NATURE OF THIS SPECIES.
SEED. COMMONLY, SEED LOTS ARE AVAILABLE THAT EQUAL OR EXCEED MINIMUM SPECIFICATIONS.
(2) IF HIGH-QUALITY SEED IS USED, FOR MOST SITES SEED SPRING OATS AT A RATE OF 2
REMEMBER THAAT DISTURBED SITES ARE ADVERSE FOR PLANT ESTABLISHMENT. READY GERMINATION
BUSHELS PER ACRE, WINTER WHEAT AT 11.5 BUSHELS PER ACRE, AND WINTER RYE AT 1 ADAPTED FROM PENN STATE, "EROSION CONTROL AND CONSERVATION PLANTINGS ON
REFERS TO SEED THAT GERMINATES DURING THE PERIOD OF THE GERMINATION TEST AND THAT WOULD
BUSHEL PER ACRE. IF GERMINATION IS BELOW 90%, INCREASE THESE SUGGESTED NON-CROPLAND."
BE EXPECTED, IF CONDITIONS ARE FAVORABLE, TO GERMINATE RAPIDLY WHEN PLANTED. THE OPPOSITE

MDR
KGJ
SEEDING RATES BY 0.5 BUSHEL PER ACRE.

QZ
OF READY GERMINATION IS DORMANT SEED, OF WHICH HARD SEED IS ONE TYPE.
(3) THIS MUXTURE IS SUITABLE FOR FREQUENT MOWING. DO NOT CUT SHORTER THAN 4
(4) SWITCHGRASS SEED IS SOLD ONLY ON THE BASES OF PLS.
INCHES.
(5) NEED SPECIFIC LEGUME INNOCULANT. INNOCULANT SUITABLE FOR GARDEN PEAS AND SWEETPEASE
(4) KEEP SEEDING RATE TO THAT RECOMMENDED IN TABLE. THESE SPECIES HAVE MANY
USUALLY IS SATISFACTORY FOR FLATPEA.

graphic scale
SEEDS PER POUND AND ARE VERY COMPETITIVE. TO SEED SMALL QUANTITIES OF

designed

checked

drawn
SMALL SEEDS SUCH AS WEEPING LOVEGRASS AND REDTOP, DILUTE WITH DRY
(6) BIRDSFOOT TREFOIL IS ADAPTED OVER THE ENTIRE STATE, EXCEPT IN THE EXTREME SOUTHEAST WHERE
SAWDUST, SAND, RICE HULLS, BUCKWHEAT HULLS, ETC.
CROWN AND ROOT ROTS MAY INJURE STANDS.
(5) USE FOR HIGHWAY SLOPES AND SIMILAR SITES WHERE THE DESIRED SPECIES AFTER
ADAPTED FROM PENN STATE, "EROSION CONTROL AND CONSERVATION PLANTINGS ON NON-CROPLAND."
ESTABLISHMENT IS CROWNVETCH.

EROSION AND SEDIMENT CONTROL PLAN

ALLEGHENY COUNTY, PENNSYLVANIA


(6) USE ONLY IN EXTREME SOUTHEASTERN OR EXTREME SOUTHWESTERN PENNSYLVANIA.

NORTH VERSAILLES TOWNSHIP,


NORTH BRADDOCK BOROUGH,
EAST PITTSBURGH BOROUGH,
SERECIA LESPEDEZA IS NOT WELL-ADAPTED TO MOST OF PENNSYLVANIA.

(7) DO NOT MOW SHORTER THAN 9 TO 10 INCHES.

(8) SEED MIXTURES CONTAINING CROWN VETCH SHOULD NOT BE USED IN AREAS A log, DEP form 3150-FM-BWEW0083 dated
ADJACENT TO WETLANDS OR STREAM CHANNELS DUE TO THE INVASIVE NATURE OF 02/2012. showing dates that E&S BMPs were

CONSTRUCTION DETAILS
THIS SPECIEA
inspected as well as any deficiencies found and the
ADAPTED FROM PENN STATE, "EROSION CONTROL AND CONSERVATION PLANTINGS ON date they were corrected shall be maintained on the
NON-CROPLAND."
site and be made available to regulatory agency
officials at the time of inspection.

WE A L T
ON

P:\Merrion Oil & Gas\180539-1-1-ET Braddock 1H\Drwg\Production\E&S (24x36)\180539-ES-C710.dwg Plotted: October 19, 2018
H
M
REGISTERED

O
CO

F
PROFESSIONAL

ET - BRADDOCK WELL PAD


TESSA MICHELE ANTOLICK

MERRION OIL & GAS


ENGINEER

A
No. PE077667

E
N

I
N N
S Y L V A

This Drawing shall not be used for tender or construction unless sealed.

I do hereby certify to the best of my knowledge, information and


belief, that the Erosion and Sediment Control and Site Restoration
Plan and Post Construction BMPs are true and correct, represent
actual field conditions and are in accordance with the 25 Pa. Code
Chapters 78 and 102 of the Department's rules and regulations. I
am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment.

drawing title

project title
TESSA MICHELE ANTOLICK, PE - 077667

C710
Sheet
This drawing, its contents, and each component of this drawing are the
property of and proprietary to ARM Group Inc. and shall not be reproduced
or used in any manner except for the purpose identified on the Title Block,
and only by or on behalf of this client for the identified project unless
otherwise authorized by the express, written consent of ARM Group Inc.