Pre-Qualification Questionnaire
Pre-Qualification Questionnaire
The bidder is required to answer such questions as are pertinent to the work being bid. The purpose
of the questionnaire is to enable the awarding body to determine the qualifications of the bidder to
carry out successfully the contract if the same is awarded to the bidder.
NOTE: FAILURE TO FILL OUT THE QUESTIONNAIRE COMPLETELY MAY BE GROUNDS FOR DECLARING
THE ENTIRE BID NON-RESPONSIVE.
I. CONTRACTOR INFORMATION
General
Company Name:
SEC Registration No.
Address
Phone
Website
Contact person
Date of Incorporation
Years of operation
Total employees
BIR TIN No.
SSSNo.
Category Please check
☐Manufacturing
☐Construction
☐Engineering
☐Consulting
☐Project Management
Financial Information
Annual Revenue for the most recent 3 years 2022 : _____________
2021 : _____________
2020: _____________
What is your average monthly Cash Balance during Average Cash Balance during the last 24
the last 24 months? months: __________________
Page 1 of 6
SILANGAN MINDANAO MINING CO, INC.
TIMAMANA, TUBOD, SURIGAO DEL NORTE 8406
How much is your outstanding loan, other forms of Total Outstanding loan :__________________
indebtedness if any? Amount due within the next 12 months from
today: ______________________
Amount due during the 13th month to 24th
month: __________________________
Amount due after the 24th month:
___________________________________
Page 2 of 6
SILANGAN MINDANAO MINING CO, INC.
TIMAMANA, TUBOD, SURIGAO DEL NORTE 8406
______ YES
requirement of DOLE?
Page 3 of 6
SILANGAN MINDANAO MINING CO, INC.
TIMAMANA, TUBOD, SURIGAO DEL NORTE 8406
Do you have a person in your organization specifically accountable for enterprise wide
risk management?
V. CONSTRUCTION
What are your peak project workforces at
sites over the last 3 years?
Page 4 of 6
SILANGAN MINDANAO MINING CO, INC.
TIMAMANA, TUBOD, SURIGAO DEL NORTE 8406
Equipment list
1. List contracts completed with SMMCI in the last five years, if any.
3. Provide a list of previous projects relevant to SMMCI’s project being bidded out:
Name of Main Scope Contract Contract Contact Email
Project Owner of Work Amount Duration Person Address
2. Can you prepare detailed drawings from specifications and working drawings for Civil
Works? YES ________ NO __________
3. If NO, will you engage a third party to do the detailed drawings: YES _______ NO_______
☐Cost control
☐Planning and Scheduling
☐Reporting
Page 5 of 6
SILANGAN MINDANAO MINING CO, INC.
TIMAMANA, TUBOD, SURIGAO DEL NORTE 8406
☐Document Control
☐Contracts Management
☐Change Management
_________________________________ ___________________________________
Name/ Position/ Signature Name/ Position/ Signature