PROJECT: Construction of Road, Brgy. San Miguel-Brgy.

lgplit Road, Digos City,


Davao del Sur.
LOCATION: Dlgos City, Davao del Sur
ON
Sectlon A
Statlon Limit
Length
Beg
Sta. 0 + 000.000
1,096.916
243 3/4
End
Sta. 1 +096.916
Sectlon B1
Beg.
Sta. 0 +000.000
789.985
End
Sta. 0+789.985
Sectlon B2
Sta. 0 + 000.000
Beg.
85.379
Sta. 0 + 085.379
End
Sectlon C
Sta. 0+ 000.000
Beg.
180.000
Sta. 0+ 180.000
End
Section D
Sta. 0 + 000.000
Beg.
98.809
Sta. 0 + 098.809
End
Section E
Sta. 0 + 000.000
Beg.
248.911
Sta. 0+ 248.911
End
2,500.000
Sta. 0 + 248.911
Gravel Transition at (Section E)
31.089 m
Sta. 0 + 280.000
2,500.000 m.
PCCP Length =
Gravel Transition =
31.09 m
Part C. EARTHWORKS
100(1) Clearing and Grubbing
Qty: 0.16 has
from gty sht.
1644.42 sq.m.
1644.42 sq.m.
bal=
Say = 0.16 has.
100(3) a1 Individual Removal of Trees, 150-300mm dia, small
from Trave
Qty: 22.00 each
19.00 ea.
Calumpang
Section A
3.00 ea.
Coco
Section B1
22.00 ea.
100(3)a2 Individual Removal of Trees, 301-500mm dia, small
from Tra
Qty: 150.00 each
66.00 ea.
Coco
2.00 ea.
Gemilina
Section A
5.00 ea.
Calumpang
2.00 ea.
Calumpang
29.00 ea.
Coco
Section B1
1.00 ea.
Mahogany
1.00 ea.
Coco
Section B2
2.00 ea.
Coco
Section C
1.00 ea.
Bahi
1.00 ea.
Section D
Coco
38.00 ea.
Calumpang
1.00 ea.
Coco
Section E
1.00 ea.
Alo