Calendar Year: 2024

Site Name: POMF-BUMI SAWIT KENCANA


Region: POM-F
Country Code: ID
Site Code: BSK
Month MARET

Item: Subject:

01 Maintenance Working Hours:

01-01 Reactive Maintenance (RM)


01-02 Preventive Maintenance (PM)
01-03 Others
01-05 Personnel count

02 Control objects count

02-01 Motors
02-02 Instrumentation
02-03 Control Valves
02-04 On/Off Valves

02-10 Total
Units Hours

Comments:

Hrs 58
PM ran as per E&I good practices book, section 10.1 Hrs 311
Hrs 81
To include the site head Qty 3

Comments:

Control object count, categorized into 4 control object Qty 180


groups Qty 69
Qty 7
Qty 70

Qty 326
VS 15 BOILER 2 2
THRESHER 1 KLARIFIKASI 1 2
PRESS & DI 6 RPOME 1 1
KLARIFIKASI 12 WTP 3 1
KERNEL 2 FE 1 1
BOILER 7 LA 1
WTP PETRO 1
FE
WATER INTAKE
RPOME 2 BOILER 2
LA KLARIFIKASI 1
PETRO RPOME 1
WTP 3
FE 1
BPV LA 1
PETRO 1

45
18
D

NO. STASIONS PANEL/MACHINARY/INSTALLATION


Job Started
Reactive Maintenance (RM)
1 Kernel & Depricarper Starter motor Fiber Cyclone 8:00
2 Kernel & Depricarper Motor Fiber Cyclone 14:00
3 18:00

Preventive Maintenance (PM)


1 Kernel & Depricarper Starter motor Fiber Cyclone 8:00
2 8:00

Others
1 Kantor 16:00
2 ALL PROJECT PIMS 8:00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 17
01-01-01 Motor/MCC 11
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 6
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 16
01-03 Others 8
01-05 Personnel count
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : JULI 2023

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

12:00 2 4 8 Motor/MCC
17:00 1 3 3 Motor/MCC
0:00 1 6 6 Control System (PLC/ DCS)

12:00 2 4 8 Motor/MCC
12:00 2 4 8 Genset/generators
0
0
0
0

17:00 1 1 1
17:00 1 7 7
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

Mengganti kontaktor yang lengket -6 XXX


Ganti Bearing -4 XXX
HMI error -1

Preventive motor starter dan motor


Cek tahanan dioda

Buat laporan harian XX


Mengawasi pekerjaan kontraktor XX
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 THREHSER THRESHER NO 1 07.00

Preventive Maintenance (PM)


1 OFFICE LAMPU 09.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 4
01-01-01 Motor/MCC 4
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 6
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

09.00 2 2 4 Motor/MCC
0

12.00 2 3 6 Motor/MCC

0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN KONTROL PANEL ELMO KOBUS/EKY

PM LAMPU (CLEANING RUMAH LAMPU DAN GANTI LAMPU YG RUSAK) KOBUS/EKY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 PRESS PRESS NO 1 07.00
2 VS INSTRUMENT 14.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 21
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

12.00 3 5 15 Motor/MCC
16.00 3 2 6 Instrumentation
0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI BEARING ELMO KOBUS/EKY


PM INSTRUMENT KOBUS/EKY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 METHANE CAPTURE PANEL CONTROL GE 07.00

Preventive Maintenance (PM)


1 KERNEL ELMO 07.00
2 LAB AC 14.00

Others
1

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 10
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 10
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

12.00 2 5 10 Genset/generators

12.00 2 5 10 Motor/MCC
16.00 2 2 4 Others
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PENGECEKAN PANEL CONTROL EKY/KOBUS

PM ELMO KOBUS/EKY
SERVICE AC KOBUS/EKY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 ENGINE ROOM COOLING TURBINE 14.00

Preventive Maintenance (PM)


1 BOILER ELMO 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 4
01-01-01 Motor/MCC 4
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 10
01-05 Personnel count 2 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

16.00 2 2 4 Motor/MCC
0
0
0
0
0

12.00 2 5 10 Others
0
0
0
0
0

2
2
2
2
2
DESCRIPTION OF WORKS OVERTIME PIC

GANTI ELMO KOBUS/UMAY

PM ELMO KOBUS/UMAY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 THRESHER ELMO 07.00
2 KERNEL ELMO 09.00

Others
1 WORKSHOP UPS 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 4
01-05 Personnel count 2 UMAY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

09.00 2 2 4 Motor/MCC
12.00 2 3 6 Motor/MCC
0
0
0
0

16.00 2 2 4 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO EKI/KOBUS
PM ELMO EKI/KOBUS

SERVICE UPS EKI/KOBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 ALL STATION ELMO 07.00
2 KERNEL LAMPU SOROT 14.00

Others
1 ENGINE ROOM PANEL KONTROL 10.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 4
01-05 Personnel count 2 KOBUS OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

10.00 2 3 6 Motor/MCC
16.00 2 2 4 Lighting
0
0
0
0

12.00 2 2 4 Motor/MCC
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO UMAY/EKY
INSTALL LAMPU SOROT UMAY/EKY

INSTALL DIGITAL AMMETER UMAY/EKY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 KERNEL FIBER SHELL 07.00
2 KERNEL FD FAN 15.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

15.00 2 6 12 Motor/MCC
16.00 2 1 2 Motor/MCC
0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO (GANTI BEARING) EKI/KOBUS


PM ELMO (GANTI BEARING) EKI/KOBUS
D

NO. STASIONS PANEL/MACHINARY/INSTALLATION


Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 KERNEL INLINED HC 07.00
2 KERNEL CRACK MIX HC 07.00
3 MOVING FLOOR BOTTOM CONV FUEL 14.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 24
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

12.00 2 5 10 Motor/MCC
12.00 2 5 10 Motor/MCC
16.00 2 2 4 Motor/MCC
0
0
0

0
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI OIL SEAL EKY/OBUS


GANTI OIL SEAL UMAY/HENGKY
GANTI OIL SEAL EKY/OBUS
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 FFB RECIEPTION FFB 1 07.00

Others
1 ENGINE ROOM PANEL KONTROL 07.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 7
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

16.00 2 7 14 Motor/MCC
0
0
0
0
0

16.00 1 7 7 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI OIL SEAL DAN BEARNG KOBUS/EKY

INSTALL DIGITAL AMMETER UMAY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 DIGESTER DIGESTER NO. 5 07.00
2 VS PANEL KONTROL VS 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 28
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

12.00 3 7 21 Motor/MCC
16.00 1 7 7 Instrumentation
0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI BEARING EKY/KOBUS/UMAY


PM SISTEM KONTROL VS EKY/KOBUS/UMAY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 0
01-03 Others 0
01-05 Personnel count 0
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 KERNEL ELMO 07.00
2 ENGINE ROOM KAPASITOR BANK 14.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 2 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

12.00 2 5 10 Motor/MCC
16.00 2 2 4 Capacitor Banks
0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI OIL SEAL DAN BEARING ELMO ELEVATOR 4 KW KOBUS/UMAY


PM KAPASITOR BANK (CEK ARUS DAN SUHU) KOBUS/UMAY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 BOILER SOOT BLOWING 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 2 UMAY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

16.00 2 7 14 On/ Off Valves


0
0
0
0
0

0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM SOOT BLOWING EKY/OBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
#REF! ENGINE ROOM STATIC CRANE 07.00

Preventive Maintenance (PM)


1 KLARIFKASI DECANTER 14.00

Others
1 STORAGE TANK DESPACT CPO 09.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 4
01-01-01 Motor/MCC 4
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 4
01-03 Others 6
01-05 Personnel count 2 KOBUS OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

09.00 2 2 4 Motor/MCC
0
0
`
0
0
31
16.00 2 2 4 Motor/MCC
0
0
0
0
0

12.00 2 3 6 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI MCCB EKY/UMAY

PM ELMO EKY/UMAY

INSTALL POWER CCTV EKY/UMAY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 WATER INTAKE RESERVOIR PUMP 14.00

Preventive Maintenance (PM)


1 KLARIFIKASI DECANTER 600 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 4
01-01-01 Motor/MCC 4
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 15
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

16.00 2 2 4 Motor/MCC
0
0
0
0
0

12.00 3 5 15 Motor/MCC
0
0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

CEK RANGKAIAN KONTROL KOBUS/EKY

INSTALL ELMO DAN TEST RUNNING UMAY/EKY/KOBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 KERNEL HIDROCYCLONE 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 0
01-05 Personnel count 2 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

12.00 2 5 10 Motor/MCC

0
0

0
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO KOBUS/EKY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 BOILER SONIC BLOWING NO 2 07.00

Others
1 ENGINE ROOM PANEL POWER PERUMAHAN 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 4
01-05 Personnel count 2 KOBUS CUTI
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

12.00 2 5 10 On/ Off Valves

0
0
0
0

16.00 2 2 4 Power Distributions/MSB


0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

SERVICE SONIC BLOWING EKY/UMAY

GANTI CT EKY/UMAY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 ALL STATION ELMO 07.00

Others
1 KLARIFIKASI ELMO VIBRATING SCREEN COT NO 2 14.00
2 KLERNEL HDROCYCLONE STAGE 3 15.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 4
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0

12.00 2 5 10 Motor/MCC
0
0
0
0
0

15.00 2 1 2 Motor/MCC
16.00 0:00 0:00 2 Motor/MCC
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO EKY/KOBUS

TEST RUNNING EKY/KOBUS


GANTI COVER FAN ELMO EKY/KOBUS
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 KLARFIKASI SAND CYCLONE NO 2 14.00

Preventive Maintenance (PM)


1 ALL STATION TRAFO LAS 09.00

Others
1 ENGINE ROOM TURBINE RB4 07.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 4
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 4
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 6
01-03 Others 4
01-05 Personnel count 2 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

16.00 2 2 4 On/ Off Valves


0
0
0
0
0

12.00 2 3 6 Grounding/Ligtning Protection System


0
0
0
0
0

09.00 2 2 4 Genset/generators
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN AKTUATOR PNEUMATIC UMAY/KOBUS

PM TRAFO LAS UMAY/KOBUS

INSTALLL EXITER STATOR UMAY/KOBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 PRESS PRESS NO 1 07.00

Preventive Maintenance (PM)


1 WORKSHOP VIBRATING SCREEN COT 14.00
2
3
4
5
6
Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 10
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 10
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 4
01-03 Others 0
01-05 Personnel count 2 UMAY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

12.00 2 5 10 Control Valves

0
0
0
0

16.00 2 2 4 Motor/MCC

0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN KONTROL PRESS NO 1 EKY/KOBUS

SERVICE ELMO (GANTI BEARING) KOBUS/EKY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 FE SIRKULASI KOLAM 4 DAN 5 07.00
2 ALL STATION LAMPU 09.00
3 ENGINE ROOM AUTO BLOW OFF BPV 14.00

Preventive Maintenance (PM)

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 14
01-01-01 Motor/MCC 4
01-01-02 Instrumentation 0
01-01-03 Control Valves 4
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 6
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 0
01-03 Others 0
01-05 Personnel count 2 KOBUS OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

09.00 2 2 4 Motor/MCC
12.00 2 3 6 Lighting
16.00 2 2 4 Control Valves
0
0
0

0
0
0

0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN PANEL KONTROL ELMO EKY/UMAY


GANTI LAMPU EKY/UMAY
CEK AUTO BLOW OFF EKY/UMAY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 FE PANEL POMPA SRKULASI NO 5 07.00

Preventive Maintenance (PM)


WTP LAMPU TL 14.00

Others
1 OFFICE AC DC 09.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 4
01-01-01 Motor/MCC 4
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 4
01-03 Others 6
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

09.00 2 2 4 Motor/MCC
0
0
0
0
0

16.00 2 2 4 Lighting

0
0

12.00 2 3 6 Others

0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN PANEL POMPA SIRKULASI EKY/KOBUS

INSTALL LAMPU EKY/KOBUS

SERVICE AC EKY/KOBUS
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 ALL STATION Elmo
2 UWB UWB 1 DAN 2

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection System 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Started Job Ended Personel Duration Total Hours

0
0
0
0
0

07.00 12.00 2 5 10
14.00 16.00 2 2 4

0
0
0
0
0
MENTATION

DESCRIPTION OF WORKS OVERTIME


Categories

Motor/MCC Preventive maintenance Panel & Elmo All Station


Instrumentation PM UWB
PIC

KOBUS/EKY
KOBUS/EKY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 KERNEL HC STAGE 1 07.00
2 KERNEL LTDS FAN CYCLONE NO 1 14.00
3 VS INSTRUMENT 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 21
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

12.00 2 5 10 Motor/MCC
16.00 2 2 4 Motor/MCC
16.00 1 7 7 Instrumentation
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI BEARING KOBUS/EKY


GANTI BEARING KOBUS/EKY
PM INSTRUMENT VS UMAY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 ALL STATION ELMO 07.00
2

Others
1 ALL STATION TRAFO LAS 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 4
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

12.00 2 5 10 Motor/MCC
0
0
0
0
0

16.00 2 2 4 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO KOBUS/EKY

INSTALL SOCKET IPOS KOBUS/EKY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)

Others
1 BOILER TRAFO LAS 07.00
2 ALL STATION SOCKET IPOS 08.00
3 WORKSHOP GEARMOTOR 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 0
01-03 Others 14
01-05 Personnel count 2 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

0
0
0

08.00 2 1 2 Others
12.00 2 4 8 Others
16.00 2 2 4 Others
0 Others
0
0
DESCRIPTION OF WORKS OVERTIME PIC

UNISNTALL TRAFO LAS KOBUS/UMAY


INSTALL SOCKET IPOS KOBUS/UMAY
RAKIT GEARMOTOR KOBUS/UMAY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 THRESHER MPD 07.00

Others
1 OFFICE TIANG LAMPU 09.00
2 HOUSING STAFF AC 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 4
01-03 Others 10
01-05 Personnel count 2 UMAY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

09.00 2 2 4 Motor/MCC
0
0
0
0
0

12.00 2 3 6 Others
16.00 2 2 4 Others
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

LANGSIR ELMO KE MPD EKY/OBUS

EVAKUASI TIANG LISTRK EKY/KOBUS


SERVICE AC
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 THRESHER MPD 07.00
2 KERNEL DRY NUT ELEVATOR 14.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 2 KOBUS OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

12.00 2 5 10 Motor/MCC
16.00 2 2 4 Motor/MCC

0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI ELMO MPD UMAY/EKY


SERVICE ELMO UMAY/EKY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 0
01-03 Others 0
01-05 Personnel count 0
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

0
0
0

0
0
0
DESCRIPTION OF WORKS OVERTIME PIC
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 WATER INTAKE ELMO 07.00
2 OFFICE LAMPU 09.00

Others
1 ALL STATION FINDING EHS 10.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 6
01-03 Others 4
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

09.00 2 2 4 Motor/MCC
10.00 2 1 2 Lighting
0
0
0
0

12.00 2 2 4 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO KOBUS/EKY
SERVICE LAMPU KOBUS/EKY

CLOSING TEMUAN EHS KOBUS/EKY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 0
01-03 Others 0
01-05 Personnel count 0
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : MARET 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

0
0
0
0
0

0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC