Calendar Year: 2024

Site Name: POMF-BUMI SAWIT KENCANA


Region: POM-F
Country Code: ID
Site Code: BSK
Month FEBRUARI

Item: Subject:

01 Maintenance Working Hours:

01-01 Reactive Maintenance (RM)


01-02 Preventive Maintenance (PM)
01-03 Others
01-05 Personnel count

02 Control objects count

02-01 Motors
02-02 Instrumentation
02-03 Control Valves
02-04 On/Off Valves

02-10 Total
Units Hours

Comments:

Hrs 109
PM ran as per E&I good practices book, section 10.1 Hrs 292
Hrs 73
To include the site head Qty 3

Comments:

Control object count, categorized into 4 control object Qty 180


groups Qty 69
Qty 7
Qty 70

Qty 326
VS 15 BOILER 2 2
THRESHER 1 KLARIFIKASI 1 2
PRESS & DI 6 RPOME 1 1
KLARIFIKASI 12 WTP 3 1
KERNEL 2 FE 1 1
BOILER 7 LA 1
WTP PETRO 1
FE
WATER INTAKE
RPOME 2 BOILER 2
LA KLARIFIKASI 1
PETRO RPOME 1
WTP 3
FE 1
BPV LA 1
PETRO 1

45
18
D

NO. STASIONS PANEL/MACHINARY/INSTALLATION


Job Started
Reactive Maintenance (RM)
1 Kernel & Depricarper Starter motor Fiber Cyclone 8:00
2 Kernel & Depricarper Motor Fiber Cyclone 14:00
3 18:00

Preventive Maintenance (PM)


1 Kernel & Depricarper Starter motor Fiber Cyclone 8:00
2 8:00

Others
1 Kantor 16:00
2 ALL PROJECT PIMS 8:00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 17
01-01-01 Motor/MCC 11
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 6
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 16
01-03 Others 8
01-05 Personnel count
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : JULI 2023

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

12:00 2 4 8 Motor/MCC
17:00 1 3 3 Motor/MCC
0:00 1 6 6 Control System (PLC/ DCS)

12:00 2 4 8 Motor/MCC
12:00 2 4 8 Genset/generators
0
0
0
0

17:00 1 1 1
17:00 1 7 7
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

Mengganti kontaktor yang lengket -6 XXX


Ganti Bearing -4 XXX
HMI error -1

Preventive motor starter dan motor


Cek tahanan dioda

Buat laporan harian XX


Mengawasi pekerjaan kontraktor XX
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 FE POMPA KUTIP 07.00
2 ENGINE ROOM AC 11.00

Others
3 ENGINE ROOM STABILIZER 15.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 12
01-03 Others 7
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

09.00 2 4 8 Motor/MCC
15.00 2 2 4 Others
0

16.00 1 7 7 Others
DESCRIPTION OF WORKS OVERTIME PIC

GANTI BEARING OBUS/EKY


SERVICE AC OBUS/EKY

INTSALL STABILIZER OBUS/EKY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 BOILER SOOT BLOWING 07.00

Others
1 E.ROOM KABEL POWER PERUMAHAN 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 4
01-05 Personnel count 2 EKI OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

12.00 2 5 10 Others
0
0
0
0
0

16.00 2 2 4 Power Distributions/MSB

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

Eky

SERVICE SOOT BLOWING OBUS/UMAY

PERBAIKAN KABEL POWER OBUS/UMAY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 ENGINE ROOM GENSET 400 KW 07.00

Preventive Maintenance (PM)

Others
1

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 14
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 14
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 0
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

16.00 2 7 14 Genset/generators

0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN GOVERNOUR DAN INDTRUMEN ENGINEE EKY/KOBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 UWB TCS TAMU 14.00

Preventive Maintenance (PM)


1 UWB UWB 07.00

Others
1 ENGINE ROOM MCC 09.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 4
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 4
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 4
01-03 Others 12
01-05 Personnel count 2 KOBUS OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

16.00 2 2 4 Instrumentation
0
0
0
0
0

09.00 2 2 4 Others
0
0
0
0
0

12.00 2 2 2 Motor/MCC
2
2
2
2
2
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN BARIER GATE EKI/UMAY

PREVENTIF ELECTRICAL EKI/UMAY

INSTALL DIGTAL AMMETER EKI/UMAY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 ENGINE ROOM GENSET 400 KW 07.00

Preventive Maintenance (PM)


1 ALL STATION ELMO 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 7
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 7
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

16.00 1 7 7 Genset/generators
0
0
0
0
0

16.00 2 7 14 Motor/MCC

0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN KONTROL GENSET UMAY

PM ELMO ALL STATON EKI/KOBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 ALL STATION ELMO 07.00
2 BOILER LAMPU SOROT 14.00

Others
1 ENGINE ROOM PANEL KONTROL 10.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 4
01-05 Personnel count 2 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

10.00 2 3 6 Motor/MCC
16.00 2 2 4 Lighting
0
0
0
0

12.00 2 2 4 Motor/MCC
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO KOBUS/UMAY
INSTALL LAMPU SOROT KOBUS/UMAY

INSTALL DIGITAL AMMETER KOBUS/UMAY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 KERNEL FIBER CYCLONE 07.00
2 KERNEL AIRLOLCK LTDS CYCLONE NO2 15.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 2 UMAY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

15.00 2 6 12 Motor/MCC
16.00 2 1 2 Motor/MCC
0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO (GANTI BEARING) EKI/KOBUS


PM ELMO (GANTI OIL SEAL) EKI/KOBUS
D

NO. STASIONS PANEL/MACHINARY/INSTALLATION


Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 KERNEL LAMPU 07.00
2 ALL STATION ELMO 14.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 2 KOBUS OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

12.00 2 5 10 Lighting
16.00 2 2 4 Motor/MCC

0
0
0

0
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI LAMPU TL EKY/UMAY


PM ELMO EKY/UMAY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 ALL STATION ELMO 07.00
1 E.ROOM LAMPU 10.00

Others
1 FINAL EFFLUENT POMPA SIRKULASI KOLAM 6 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 4
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

10.00 2 3 6 Motor/MCC
12.00 2 2 4 Lighting
0
0
0
0

16.00 2 2 4 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO KOBUS/EKY
INSTALL LAMPU SOROT KOBUS/EKY

INSTALL KABEL POWER ELMO POMPA KOBUS/EKY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 ALL STATION ELMO 07.00
2 VS PANEL KONTROL VS 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 19
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

12.00 3 5 15 Motor/MCC
16.00 2 2 4 Instrumentation
0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI OIL SEAL EKY/KOBUS


PM SISTEM KONTROL VS EKY/KOBUS
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 DIGESTER DIGESTER NO 5 07.00

Others
1 OFFICE PANEL LISTRIK 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 15
01-03 Others 6
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

12.00 3 5 15 Motor/MCC

0
0
0
0

16.00 3 2 6 Lighting
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI BEARING UMAY /EKY/OBUS

INSTALL KABEL POWER UMAY/EKY/KOBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 KERNEL ELMO 07.00

Others
1 OFFCE AC 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 15
01-03 Others 4
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

12.00 3 5 15 Motor/MCC

0
0
0
0

16.00 2 2 4 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO KOBUS/EKY

SERVICE AC DC KOBUS/EKY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 BOILER SOOT BLOWING 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 2 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

16.00 2 7 14 On/ Off Valves


0
0
0
0
0

0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM SOOT BLOWING KOBUS/EKY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 DEPERICARPER CBC 07.00

Others
1 E.ROOM COMPRESSOR AIR SYSTEM 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 10
01-03 Others 4
01-05 Personnel count 2 UMAY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
`
0
0

12.00 2 5 10 Motor/MCC
0
0
0
0
0

16.00 2 2 4 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PM ELMO EKY/KOBUS

INSTALL COMPRESSOR AIR SYSTEM EKY/KOBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 ALL STATION ELMO 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 21
01-03 Others 0
01-05 Personnel count 2 KOBUS OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

16.00 3 7 21 Motor/MCC
0
0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

TES RUNNING ELMO ALL STATION UMAY/EKY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 PRESS PRESS NO 5 11.00

Preventive Maintenance (PM)


1 KOLAM LIMBAH POMPA LA 07.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 6
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 6
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 8
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

16.00 2 3 6 On/ Off Valves


0
0
0
0
0

11.00 2 4 8 Motor/MCC

0
0

0
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI RELIEF VALVE EKY/KOBUS

PM ELMO EKY/KOBUS
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 PRESS VIBRATING SCREEN NO 3 07.00

Preventive Maintenance (PM)


1 DIGESTER LAMPU SOROT 14.00

Others
1 HOUSING STAFF AC 15.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 10
01-01-01 Motor/MCC 10
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 2
01-03 Others 2
01-05 Personnel count 2 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

12.00 2 5 10 Motor/MCC

0
0
0
0

15.00 2 1 2 Lighting
0
0
0
0
0

16.00 2 1 2 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN ELMO VIBRATING SCREEN EKY/KOBUS

INSTALL LAMPU EKY/KOBUS

SERVICE AC EKY/KOBUS
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 DIGESTER DIGESTER NO 3 07.00

Others
1 OFFICE PANEL LISTRIK 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 15
01-03 Others 6
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0

12.00 3 5 15 Motor/MCC
0
0
0
0
0

16.00 3 2 6 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI BEARING ELMO EKY/UMAY/KOBUS

FINISHING CONNECT UPS TO PC EKY/UMAY/KOBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 WATER INTAKE POMPA CELUP 07.00

Preventive Maintenance (PM)


1 ALL STATION ELMO 14.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 10
01-01-01 Motor/MCC 10
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 4
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

12.00 2 5 10 Motor/MCC
0
0
0
0
0

16.00 2 2 4 Motor/MCC
0
0
0
0
0

0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN PANEL STARTER ELMO EKY/UMAY

PM ELMO EKY/UMAY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 PRESS PRESS NO 1 07.00
2 KLARIFIKASI LAMPU 14.00

Preventive Maintenance (PM)


1 ALL STATION ELMO 15.00
2
3
4
5
6
Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 12
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 10
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 2
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 2
01-03 Others 0
01-05 Personnel count 2 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

12.00 2 5 10 Control Valves


16.00 2 1 2 Lighting
0
0
0
0

16.00 2 1 2 Motor/MCC

0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN KONTROL PRESS NO 1 UMAY/KOBUS


GANTI LAMPU UMAY/KOBUS

CEK SUHU DAN BERSIHKAN KISI2 ELMO UMAY/KOBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 VS VS NO 1 10.00

Preventive Maintenance (PM)


1 ALL STATION ELMO 07.00

Others
1 FIBER SHELL LAMPU TL 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 4
01-01-01 Motor/MCC 4
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 6
01-03 Others 4
01-05 Personnel count 2 UMAY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

12.00 2 2 4 Motor/MCC
0
0
0
0
0

10.00 2 3 6 Motor/MCC

0
0
0

16.00 2 2 4 Lighting
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN PANEL DAN ELMO EKY/KOBUS

PM ELMO EKY/KOBUS

INSTAL LAMPU EKY/KOBUS


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 KLARIFIKASI VIBRATING NO 2 07.00
2 THRESHER EXCESS CONVEYOR 07.00
3 KERNEL DESTONER AIRLOCK 10.00
4 KERNEL BOTTOM NUT CONVEYOR 14.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 24
01-03 Others 0
01-05 Personnel count 2 KOBUS OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

16.00 2 5 10 Motor/MCC
10.00 2 3 6 Motor/MCC
12.00 2 2 4 Motor/MCC
16.00 2 2 4 Motor/MCC
0
0

0
DESCRIPTION OF WORKS OVERTIME PIC

SERVICE ELMO EKY/OBUS


SERVICE ELMO UMAY/HENGKY
SERVICE ELMO UMAY/HENGKY
SERVICE ELMO UMAY/HENGKY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 ALL STATION Elmo
2 UWB UWB 1 DAN 2

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection System 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 14
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Started Job Ended Personel Duration Total Hours

0
0
0
0
0

07.00 12.00 2 5 10
14.00 16.00 2 2 4

0
0
0
0
0
MENTATION

DESCRIPTION OF WORKS OVERTIME


Categories

Motor/MCC Preventive maintenance Panel & Elmo All Station


Instrumentation PM UWB
PIC

EKY/KOBUS
EKY/KOBUS
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 UWB RFID 07.00
2 WATER INTAKE PANEL POMPA CELUP 14.00

Preventive Maintenance (PM)

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 14
01-01-01 Motor/MCC 4
01-01-02 Instrumentation 10
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 0
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

12.00 2 5 10 Instrumentation
16.00 2 2 4 Motor/MCC
0
0
0
0

0
0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

TROUBLE SHOOTNG EKY/KOBUS


CEK PANEL KONTROL DAN PERBAIKAN EKY/KOBUS
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 PRESS PRESS NO 1 07.00
2 BOILER INSTRUMENT BOILER 14.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 21
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0
0

12.00 3 5 15 Motor/MCC
16.00 3 2 6 Instrumentation
0
0
0
0

0
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

GANTI BEARING ELMO EKY/KOBUS/UMAY


PM INSTRUMENT EKY/KOBUS/UMAY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 BOILER KOMPRESSOR 07.00

Preventive Maintenance (PM)


1 UWB UWB 09.00
2 THRESHER MPD 14.00

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 4
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 4
01-02 Preventive Maintenance (PM) 10
01-03 Others 0
01-05 Personnel count 3
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

09.00 2 2 4 Others
0
0
0
0
0

12.00 2 3 6 Instrumentation
16.00 2 2 4 Motor/MCC
0
0
0
0

0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN KOMPRESSOR EKY/OBUS

PM UWB Eky/Obus
SERVICE ELMO EKY/KOBUS
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)


1 THRESHER MPD 07.00

Others
1 OFFICE TIANG LAMPU 09.00
2 HOUSING STAFF AC 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 4
01-03 Others 10
01-05 Personnel count 2 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

09.00 2 2 4 Motor/MCC
0
0
0
0
0

12.00 2 3 6 Others
16.00 2 2 4 Others
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

LANGSIR ELMO KE MPD EKY/OBUS

EVAKUASI TIANG LISTRK EKY/KOBUS


SERVICE AC
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 KLARIFIKASI SAND CYCLONE NO 2 07.00
2 UWB TCS TAMU 10.00

Preventive Maintenance (PM)

Others
1 OFFICE TRAINING EHS 14.00

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 10
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 6
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 4
01-02 Preventive Maintenance (PM) 0
01-03 Others 6
01-05 Personnel count 2 UMAY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

10.00 2 3 6 On/ Off Valves


12.00 2 2 4 Others
0
0
0
0

0
0
0
0
0
0

16.00 3 2 6 Others
0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN AKTUATOR VALVE EKY/KOBUS


PERBAIKAN BARIER GATE TCS TAMU EKY/KOBUS

TRAINING CONFNED SPACE EKY/KOBUS/UMAY


NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)
1 PRESS VBRATING SCREEN NO 3 07.00
2 MC FUSE 14.00

Preventive Maintenance (PM)

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 14
01-01-01 Motor/MCC 10
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 4
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 0
01-03 Others 0
01-05 Personnel count 2 KOBUS OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

12.00 2 5 10 Motor/MCC
16.00 2 2 4 Power Cable/Cable Support
0
0
0
0

0
0
0

0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC

PERBAIKAN ELMO VIBRATING SCREEN UMAY/EKY


GANTI FUSE TRAFO UMAY/EKY
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 0
01-03 Others 0
01-05 Personnel count 0 EKY OFF
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0
0

0
0
0
0

0
0
0
0
0
DESCRIPTION OF WORKS OVERTIME PIC
NO. STASIONS PANEL/MACHINARY/INSTALLATION
Job Started
Reactive Maintenance (RM)

Preventive Maintenance (PM)

Others

No. Main Object Total Hours


01-01 Reactive Maintenance (RM) 0
01-01-01 Motor/MCC 0
01-01-02 Instrumentation 0
01-01-03 Control Valves 0
01-01-04 On/ Off Valves 0
01-01-05 Control System (PLC/ DCS) 0
01-01-06 Power Distributions/MSB 0
01-01-06 Capacitor Banks 0
01-01-07 Genset/generators 0
01-01-08 Power Cable/Cable Support 0
01-01-09 Grounding/Ligtning Protection Sys 0
01-01-10 Lighting 0
01-01-11 ELCB 0
01-01-12 Others 0
01-02 Preventive Maintenance (PM) 0
01-03 Others 0
01-05 Personnel count 0
Motor/MCC
Instrumentation
Control Valves
On/ Off Valves
Control System (PLC/ DCS)
Power Distributions/MSB
Genset/generators
Capacitor Banks
Power Cable/Cable Support
Grounding/Ligtning Protection System
Lighting
ELCB
Others
PT BUMI SAWIT KENCANA
DAILY ACTIVITIES OF ELECTRICAL INSTRUMENTATION
PERIODE : FEBRUARI 2024

WORKING HOURS
Job Ended Personel Duration Total Hours Categories

0
0
0
0

0
0
0
0
0

0
0
0
0
0