SITE ACCEPTANCE TEST (SAT) AFTER INSTALLATION

Current Transformer

STANDARD TECHNICAL SPECIFICATIONS FOR ELECTRIC WORKS

SITE ACCEPTANCE TESTS (SAT) AFTER INSTALLATION

CURRENT TRANSFORMERS

ADWEA/ADDC/AADC STANDARD : SAT-AAA-SWG-CT-


(REV.0-2015)

PPage 1 of 5 (REV. 0-2015)


SAT-AAA-SWG-CT Page: 1 of 5
TEST REPORT

CURRENT TRANSFORMER

Customer : Order No. :


Station : Feeder/Location :
Manufacturer : Supplier :
Type : Year of manufacture :

Serial No.: L1: L2: L3: L4: L5:


L6:

1. Data

Core T1-1 T1-2 T2-1 T2-2 T3-1 T3-2


Ratio : A
Power : VA
Class

2. Visual Inspection

2.1. Supporting structure O.K.

2.2. Secondary wiring O.K.

2.3. Earthing O.K.

Date:_______________
Tested by: Witnessed by: Witnessed by:

______________________ ______________________ _____________________


Contractors Name Consultant Client
TEST REPORT

CURRENT TRANSFORMER

3. Measurements

3.1 Secondary Injection


3.1.1 Excitation Curve of CT
T1-1 core T1-2 core T2-1 core
sec. mA Sec. mA sec. mA sec. Volt
R Y B R Y R R Y B R Y B
1
2
3
4
5
T2-2 core T3-1 core T3-2 core
sec. mA Sec. mA sec. mA sec. Volt
R Y B Y B R R Y B R Y B
1
2
3
4
5

3.1.2 Winding resistance


Core T1-1 Core T1-2 Core T2-1
L1 L2 L3 L1 L2 L3 L1 L2 L3

Core T2-2 Core T3-1 Core T3-2


L1 L2 L3 L1 L2 L3 L1 L2 L3

Date:_______________
Tested by: Witnessed by: Witnessed by:

______________________ ______________________ _____________________


Contractors Name Consultant Client
TEST REPORT

CURRENT TRANSFORMER

3.1.3 Isolation (Megger Test)

Applied Test voltage: 1.000 V DC Sec  Earth


Resistance / Megaohm
Core T1-1 Core T1-2 Core T2-1
L1 L2 L3 L1 L2 L3 L1 L2 L3
Sec. -
Earth
Resistance / Megaohm
Core T2-2 Core T3-1 Core T3-2
L1 L2 L3 L1 L2 L3 L1 L2 L3
Sec. -
Earth

3.1.4. Polarity Check (Flick Test)


Core T1-1 Core T1-2 Core T2-1
L1 L2 L3 L1 L2 L3 L1 L2 L3

Core T2-2 Core T3-1 Core T3-2


L1 L2 L3 L1 L2 L3 L1 L2 L3

Date:_______________
Tested by: Witnessed by: Witnessed by:

______________________ ______________________ _____________________


Contractors Name Consultant Client
TEST REPORT

CURRENT TRANSFORMER

3.2 Primary Test

3.2.1 Ratio Check with Primary Injection

Primary Amps:

Core T1-1 Core T1-2 Core T2-1


L1 L2 L3 L1 L2 L3 L1 L2 L3
Sec.-
Amps
Core T2-2 Core T3-1 Core T3-2
L1 L2 L3 L1 L2 L3 L1 L2 L3
Sec.-
Amps

3.2.2 CT Loop resistance

Core T1-1 Core T1-2 Core T2-1


L1 L2 L3 L1 L2 L3 L1 L2 L3

Core T2-2 Core T3-1 Core T3-2


L1 L2 L3 L1 L2 L3 L1 L2 L3

Remarks

Date:_______________
Tested by: Witnessed by: Witnessed by:

______________________ ______________________ _____________________


Contractors Name Consultant Client