प्रधान कार्यालय/ Headquarters

ನೈಋತ್ಯ ರೈಲ್ವೆ Office


दक्षिण पश्चिम रेलवे इंजीनियरिंग विभाग/Engineering
South Western Railway Department
गदग रोड/Gadag Road हुब्बल्लि /
Hubballi -580020

No. SWR/W.352/ROBs/HPT – BAY/UBL/NH-63 Date: 29.05.2024.

Commisioner,
Ballari City Corporation,
Ballari

Sub: HPT –BAY Section: Structural drawings for Moti circle ROB at km.207/360 for Br.No.262A.
Ref: Commissioner Ballari, letter dated 17.05.2024.

********
In connection with the above subject and letter under reference, Commissioner Ballari has requested
to provide structural drawings of ROB at Moti circle. It was searched in this office and no details are
available.

For kind information, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.71/Suitability Check 25T-2008/Exg Bridges Date: 29.05.2024.

Sr.DEN/Co-ord/SBC

Sub: Upgradation of PKD - DMM section for 25t axle loading-SWR.


Ref: 1.Sr.DEN/N/SBC,letter no. B/W/522/DRG/BR/31/Drawing/2024 dated 21.05.2024.
2. CTPM letter no. T.143/Planning/S&T/policy dated 17.11.2023.

********
In connection with the above subject and letter under reference, CTPM has requested to issue track and
bridge certificate for running 25t axle load in PKD-DMM section of South Western Railway.

After scrutinizing of all the completion drawings of the bridges in the above section, all the bridges in
the section certified fit to run 25t axle load at 75 kmph or sectional speed whichever is lower.
Speed restriction of 45 kmph has been imposed at bridge numbers (PD14, PD21, PD44, PD84, PD86,
PD127 & PD129) as structural drawings of superstructure, substructure & bearings are not available with this
office. In this regard, following are instructed to division.

1. Design of bearing of all seven bridges to be prepared and to be checked for suitability for running
25t loading.
2. Structure health monitoring of all the seven bridges to be undertaken and report to be submitted to
this office for further scrutiny and approval.

This is for kind information, further necessary action.

This has the approval of CBE.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
Sr.DEN/Co-ord/MYS, UBL, SBC

Sub: Submission of structural drawings pertains to MYS, UBL & SBC Div.
Ref: 1. Railway Board letter No.2019/CE-II/TS/25T dated 28.12.2023.
2.This office letter dated 17.05.2024,18.07.2023, 16.02.2024 &18.03.2024.

********
In connection with the above subject, it is requested to submit all approved structural drawings
(original tracing sheet) and design calculation booklet to Hq for record which pertains to Mysore Division.
The scanned copy of following documents also to be uploaded in BMS including soil report and waterway
calculations.
i. Structural drawings.
ii. Design calculation booklet.

For kind information and necessary action, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.71/Suitability Check 25T-2008/Exg Bridges

Sr.DEN/Co-ord/SBC

Sub: Upgradation of PKD - DMM section for 25t axle loading-SWR.


Ref: 1.Sr.DEN/N/SBC,letter no. B/W/522/DRG/BR/31/Drawing/2024 dated 21.05.2024.
2. CTPM letter no. T.143/Planning/S&T/policy dated 17.11.2023.

********
In connection with the above subject and letter under reference, CTPM has requested to issue
track and bridge certificate for running 25t axle load in PKD-DMM section of South Western
Railway.
After scrutinizing of all the completion drawings of the bridges in the above section, all the
bridges in the section certified fit to run 25t axle load at 75 kmph or sectional speed whichever is
lower.

Speed restriction of 45 kmph has been imposed at bridge numbers (PD14, PD21, PD44,
PD84, PD86, PD127 & PD129) as structural drawings of superstructure, substructure & bearings are
not available with this office. In this regard, following are instructed to division.

1. Design of bearing of all seven bridges to be prepared and to be checked for suitability for
running 25t loading.
2. Structure health monitoring of all the seven bridges to be undertaken and report to be
submitted to this office for further scrutiny and approval.

This is for kind information, further necessary action.

This has the approval of CBE.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: Sr.DEN/N/SBC– for kind information and necessary action, please.
No. SWR/W.352/ROBs/HPT – BAY/UBL/NH-63 Date: 29.05.2024.

Commisioner,
Ballari City Corporation,
Ballari

Sub: HPT –BAY Section: Structural drawings for Moti circle ROB at km.207/36o Br.No.262A.
Ref: Commissioner Ballari, letter dated 17.05.2024.
********
In connection with the above subject, and letter under reference, Commissioner Ballari
has requested to provide structural drawings of ROB at Moti circle. Records regarding above
ROB at Moti Circle is not available in this office.

For kind information, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.71/Suitability Check 25T-2008/Exg Bridges Date: 29.05.2024.

Sr.DEN/Co-ord/MYS

Sub: Submission of structural drawings pertains to MYS Div.


Ref: 1. Railway Board letter No.2019/CE-II/TS/25T dated 28.12.2023.
2.This office letter dated 17.05.2024,18.07.2023, 16.02.2024 &18.03.2024.

********
In connection with the above subject, it is requested to submit all approved structural
drawings (original tracing sheet) and design calculation booklet to Hq for record which pertains
to Mysore Division. The scanned copy of following documents also to be uploaded in BMS:
iii. Structural drawings
iv.Design calculation booklet
v. Soil Report
vi.Waterway calculation.

For kind information and necessary action, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
Sr.DEN/Co-ord/UBL

Sub: Submission of structural drawings pertains to UBL Div.


Ref: 1. Railway Board letter No.2019/CE-II/TS/25T dated 28.12.2023.
2.This office letter dated 17.05.2024,18.07.2023, 16.02.2024 &18.03.2024.

********
In connection with the above subject, it is requested to submit all approved structural
drawings (original tracing sheet) and design calculation booklet to Hq for record which pertains
to Hubballi Division. The scanned copy of following documents also to be uploaded in BMS:
vii. Structural drawings
viii. Design calculation booklet
ix. Soil Report
x. Waterway calculation.

For kind information and necessary action, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
Sr.DEN/Co-ord/SBC

Sub: Upgradation of PKD - DMM section for 25t axle loading-SWR.


Ref: 1.Sr.DEN/N/SBC,letter no. B/W/522/DRG/BR/31/Drawing/2024 dated 21.05.2024.
2. CTPM letter no. T.143/Planning/S&T/policy dated 17.11.2023.

********
In connection with the above subject and letter under Ref-2, CTPM has requested to
issue Track and Bridge Certificate for running 25T axle load in PKD– DMM sections of South
Western Railway.
In order to certify the existing bridges of the above mentioned sections for running 25t
axle load wagons, for identified sections PKD – DMM section of SBC Division. Following
details of bridges to be submitted:

1. To carry out the health monitoring for all major


bridges(PD14,PD21,PD44,PD84,PD86,PD127 & PD129) and report to be submitted to this
office.
2. The structural drawings and design booklet (substructure and superstructure) of all bridges in
PKD –DMM section) to be uploaded in BMS.

For kind information and necessary action, please.

This has approval of CBE

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/N/SBC– for kind information.
No. SWR/W.71/Suitability Check 25T-2008/Exg Bridges Date: 16.05.2024.

Sub: Upgradation of AVC-KTY section for 25t axle loading-SWR.


Ref: 1. Railway Board letter No.2019/CE-II/TS/25T dated 28.12.2023.
2. Sr.DEN/East/UBL, letter No.H/W.352/East/Bridge/CD, dated 15.05.2024.

********
In connection with the above subject and letter under Ref-1, Railway Board has
requested to issue Track and Bridge Certificate for running 25T axle load in Vyasa Colony –
Sasalu & Mormugao – Hosapete sections of South Western Railway.

In order to certify the existing bridges of the above mentioned sections for running
25t axle load wagons, for identified sections i.e Amarravathi colony – Kottur BG section of
Hubballi Division.

Vide letter under ref-2, the details of the bridges in Amaravathi colony – Kottur BG
section is submitted to this office. In this connection, it is requested to submitted the
soundness of the bridges at the earliest.

For kind information and necessary action, please.


This has approval of CBE

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.352/Hebbala ROB/BDA

Chief Engineer & Engineer Member


Date:10.05.2024.
BDA/Bangalore

Sub: YPR- OML Section: Proposed widening of existing ROB No.567A between piers AB14-AB15
(span 19.728m) and AB15-AB16 (span 35.040) at Rly.km.216/700-800 between Hebbala and
Banaswadi stations.

Ref: Letter No.W.BDA/EM/T-18/2024-25, dated 24.04.2024 of Chief Engineer/BDA/Bangalore.

*****
In connection with the above subject and letter under reference, the draft structural
drawings and design calculation of superstructure has been scrutinized and following
observations are to be clarified/corrected.
Design:
1.Design Excel sheet in editable format to be submitted to this office for checking design
calculations.
2.
2. The Staad model does not contain Seismic loads and special vehicle loads.
3. The staad model does not contain transverse loading along the carriage way width.
4. Design calculations of Steel girder, Deck slab, crash barrier and composite sections,
connection
design, splice, diaphragm, lateral bracings, bolt design etc., as per latest IRC codes shall
be submitted to this office..

The original copy of structural drawings (in tracing sheet) and design calculations
are to be proof checked by IIT/IISc along with letter from institute to be submitted to this
office for approval.

Design and structural drawings are returned for incorporating and to be resubmitted
for further processing please.

For kind information and necessary action, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
Superstructure:
For span 33.760m
1. In drawings DD-27/B/1(sheet 1 of 5 )
i) Detail at C the spacing of bolts, weld thickness (hatching) and radius of fillet to be shown.
ii) Elevation of girder, size of inter stiff plate near sec A-A shown as 190x20x1500 and near sec
B-B size of inter stiff plate shown as 160x12x1500, shall be checked and clarified.

2. In drawings DD-27/B/3 (sheet 3 of 5 )


i) In End diaphragm minimum Clearance from jacking point from top of pier is shown as
40mm to be
checked and corrected and also naming of BS1 and BS2 to be rechecked.
ii) In Int. Diaphragm, inner and outer dimensional details are not mentioned and also naming of
IS1 and IS2 to be rechecked.
iii) In Note no.9, referred RDSO drawing number should be removed.
iv) G1 & G7 connection details of BS1-BS2 & IS1-IS2 to be incorporated in drawings.

3. In drawings DD-27/B/4 (sheet 4 of 5 )


i) In End diaphragm minimum clearance from jacking point from top of pier is shown as
40mm to be
Checked and corrected and also naming of BS1 and BS2 to be rechecked.
ii) In Int. Diaphragm, inner and outer dimensional details are not mentioned and also naming of
IS1 and IS2 to be rechecked.
iii) In note no.9, referred RDSO drawing number should be removed.

4. In drawings DD-27/B/5 (sheet 5 of 5 )


i) For crash barrier and hand rail details, drawing shall be submitted.

For Span 18.648m


1. In drawings DD-27/A/1(sheet 1 of 5 )
i) In drawing, the number of splice joints shown as 2nos, where as the overall length of girder
is only 19.378m. Hence number of splice shall be reduced to one.
ii) In longitudinal elevation of girder, web plate dimension shall be checked and corrected.
iii) In sec A-A and Sec B-B, flange plate and web plate dimensions are not shown.
iv) In detail-E, weld (hatching) and radius of fillet to be shown. And also gusset plate dimension
to be checked.

2. In drawings DD-27/A/2(sheet 2 of 5 )
i) The distance between centre line of bearing to centre line of splice shall be checked and
corrected.
ii) In drawing no.DD27/A/2, note no.3 the pre camber value shown as 150mm, where as in
camber drawing it is shown as 65mm, same shall be checked and corrected.

3. In drawings DD-27/A/3(sheet 3 of 5 )
i) In Int. Diaphragm, inner and outer dimensional details are not mentioned.
iii) G1 & G7 connection details of BS1-BS2 & IS1-IS2 to be incorporated in drawings.

4. In drawings DD-27/A/4(sheet 4 of 5 )
i) Distance from later bracing to splice joint plate to be shown.

5. In drawings DD-27/A/5(sheet 5 of 5 )
i) In title box the span shown as 33.760m where as in drawing it is shown as 18.648m same
shall be checked and corrected.
ii) For crash barrier and hand rail details, drawing shall be submitted.

General Notes:
a. During tendering process for fabrication of steel girder, guidelines/procedure issued by
RDSO letter No.CBS/G/Reg, dated 24.05.2019 shall be strictly followed.
b. For sequence of Anti-corrosive/Painting scheme to the steel girders of Railway Bridges,
ROB/RUBs & FOBs, the instructions conveyed vide CBE/SWR Letter
no.SWR/W.70/Bridge/Policy, dated 23.08.2019 shall be strictly followed
(i.e..metalizing with aluminium average thickness 200 microns followed by Epoxy
painting).
c. All HSFG bolts shall confirm to drawing no. RDSO/B-11760/R.
d. Procurement/fabrication of steel girders shall be done through RDSO approved
vendors/fabricators.
e. Erection / launching work over running line shall be carried out under traffic block,
under supervision of concerned DY.CE.
f. Signature table for Railway officials to be incorporated.
g. In drawing the loading standard shown as SV loading, same shall be checked.
h. Theoretical deflection table for DL, SIDL, and LL, Pre camber, due to deck slab and
diaphragm, total deflection shall be incorporated in drawing.
i. Layout of bearing arrangement to be shown in drawing.
j. Load of bearings for SLS and ULS condition to be incorporated.
k. Details of welding sequence, shear studs & notes regarding launching of girder to be
incorporated in drawing.

Design:
1.Design Excel sheet in editable format to be submitted to this office for checking design
calculations.
2.The submitted design report contains only Staad output.
2. The Staad model does not contain Seismic loads and special vehicle loads.
3. The staad model does not contain transverse loading along the carriage way width.
4. Design calculations of Steel girder, Deck slab, crash barrier and composite sections,
connection
design, splice, diaphragm, lateral bracings, bolt design etc., as per latest IRC codes shall
be submitted to this office.

It is requested that design consultant may attend this office for discussion regarding
design and drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations
are to be proof checked by IIT/IISc along with letter from institute to be submitted to this
office for approval.

Design and structural drawings are returned for incorporating and to be resubmitted
for further processing please.

For kind information and necessary action, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.352/Gen/Bridge Design & Drawing/Vol-III Date:
03.05.2024.

Dy.CE/Bridge/SR

Sub: Sparing of Temporary Girder structural drawings.

In connection with above subject, the temporary girder bearing drawing nos.BE-
960, BE-1033 & BE-1228 are being used in SWR for bridge works. However the structural
drawings for the is same is not available in this office. Hence, it is kindly requested to spare
the above mentioned to this office. The copy of the drawing may be forwarded to this mail
id ( bridgeswrhq@gmail.com).

For information and necessary action, please.

(कृ त्यानंदझा/KrityaNandJha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridge
s/SWR
For CBE/SWR
No.SWR/W.182/Gati Shakti Unit/SBC

CPM/GSU/SBC
Date:02.05.2024.

Sub: YNK-BWT Section : Yelahanka-Bangarpet construction of ROB at km : 147/785 in


lieu of LC.No no 166 with 1 x 60m bowstring girder + 4 x 20m solid slab + 5 x 20m
PSC girder between Bangarpet - Kolar stations.

Ref: Letter No.W.352/GS/ROB@LC.No.166, dated 24.04.2024 of Dy.CE/GS/SBC.

*****
In connection with the above subject and letter under reference, the structural
drawings and design calculation has been scrutinized and following observations are to be
clarified/corrected;
Substructure:
1. Revised GAD to be submitted to this office duly incorporating the changes/alterations.
2. Size of pedestals for obligatory span to be incorporated drawing.
3. Capacity of pile shown as 475t to be verified by engineer in charge before start of work, note
to be incorporated.
Superstructure:
iv) It is observed that in structural drawings of PSC girder (drawing No.CITC/LC-166/STR/05)
note no.2a all prestessing strands shall have 7ply uncoated stress relived high tensile
strands of 12.7mm dia low relaxation strands conforming to IS:14628, is to revised as
per latest revised code 14268-2022.
v) As per letter No.CBS/DPC, dated 06.04.2023 of Executive director/B&S/RDSO and
revision of IS code 14268 “Uncoated Stress Relieved Low Relaxation Seven-Wire (Ply)
Strand for Prestressed Concrete-Specification” IS code and As per the latest
specification of IS: 14268: 2022, it is suggested that the 12.9-1860-P strand, whose
dimensions and physical properties are better, can be used in place of 12.7mm Cl-II
strand.
vi) The design and structural drawings of PSC girder are to be revised as per revised IS code
14268-2022 and submitted to this office.
vii) Deflection due to Dl,SIDL,LL etc., to be incorporated.

The original copy of structural drawings (in tracing sheet) and design calculations
are to be proof checked by IIT/IIsc along with letter from institute to be submitted to this
office for approval.

Design and structural drawings are returned for incorporating and to be resubmitted
for further processing please.

For kind information and necessary action, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.352/Gen/Bridge Design & Drawing/Vol-III Date:
01.05.2024.

Dy.CE/Design/BNC

Sub: Sparing of drawings to HQ.

For checking the camber of the bridges, the following drawings are required. It is requested
to spare drawings to HQ ( email:bridgeswrhq@gmail.com).
Sl. Division Br.No Span Section Type of Dwg.No
No. Girder
1 UBL 91DN 3x12.2 DWD-LD PSC-I CAO/C/RC
2 UBL 125DN 45x12.2 LD-MRJ PSC-I CAO/C/RC
3 MYS 765A 1x30.41 MYS-CMNR PSC ‘U’ SWR/CN/BNC/BR/216-2006
RUB
4 MYS 773 RUB 1x30.41 MYS-CMNR PSC ‘U’ SWR/CN/BNC/BR/CAD/223-2016
5 UBL 63D 2x45.7 LMT-WDL OWG BA11076
6 Temporary Girder 13.0 Ty Girder BE-1033
7 Temporary Girder 13.50 Ty Girder BE/960/BG

For information and necessary action please.

(कृ त्यानंदझा/KrityaNandJha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SW
R
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
26.04.2024.

GM/Civil/Projects/KRIDE

Sub: Major Bridge no. 513 at ch: 197119 Pro. construction of 2 x 12.20 m PSC slab on both up &
down stream side of the exg. bridge of 2 x 12.20 m steel girder in Belandur road station
yard.pro. Bridge is on both UP & down line.
Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/516 of GM/Civil/Projects/KRIDE, dated 18.03.2024.
2. This office letter dated 31.07.2023 , 01.12.2023 & 14.02.2024.
*****
In connection with the above subject and letter under reference, the structural drawing and
design calculation of Bridge no.513 with compliance has been scrutinized and following observations are
to be clarified/corrected;

1. Reference codal provision and clause for Socketing of pile to be incorporated in drawing.
2. Waterway calculations has been checked as per RBF-16 and sub structure code and it is
observed that, letter from Karnataka state government regarding discharge particulars to be
submitted :
i) Belandur Tank
ii) Doddanekundi Tank
iii) Soulkere Tank

Design and structural drawings are returned for incorporating the corrections

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्यानंदझा/KrityaNandJha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SW
R
For CBE/SWR
FileNo.SWR/W.71/Regirdering/SBC Date:
23.04.2024.

Dy.CE/GS/SBC
Sub: SBC- JTJ Sectio: Replacement of exg girder with New girder suit to fit for 25t loading-
2008 of exg Bridge No.840A( Down line) as 1x17.16m Plate Girder at km.349/500-600
between BNC-BNCE stations.
Ref: Dy.CE/Gati Shakti/SBC, letter No.W.148/GS/SBC/RUB/BR/12-2023, dated 22.04.2024.

*****

In connection with above subject and letter under reference, Gati Shakti Unit/SBC
have requested for alteration in the structural drawings, with regard to the measurement of gap
between bottom of top flange and end diaphragm top plate.
However, it is seen that the structural drawings submitted by Gati Shakti Unit/SBC is
not as per the structural drawing approved by this office. There is discrepancy in the structural
drawing submitted to us.
In this connection, the CBE approved structural drawings is sent through email for
kind information and necessary action please..

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
22.04.2024.

GM/Civil/Projects/KRIDE

Sub: Major Bridge no. 513 at ch: 197119 Pro. construction of 2 x 12.20 m PSC slab on both up & down
stream side of the exg. bridge of 2 x 12.20 m steel girder in Belandur road station yard.pro.
Bridge is on both UP & down line.
Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/516 of GM/Civil/Projects/KRIDE, dated 18.03.2024.
2. This office letter dated 31.07.2023 , 01.12.2023 & 14.02.2024.
*****
In connection with the above subject and letter under reference, the structural drawing and
design calculation of Bridge no.513 with compliance has been scrutinized and following observations are
to be clarified/corrected;
Abutment:
1. The design submitted for D/S side of abutment dated 14.07.2023, foundation is of C type with
pile foundation, whereas now structural drawings submitted is of abutment is of L type
arrangement. Detailed reasons to be brought.
2. Reasons for shifting the pile at haunch location shall be clearly justified. Design calculation for
the same to be submitted.
3. Design calculation and drawings of pile shoring to be submitted.
4. In section A-A, it is seen that the projection of 2400mm from pile cap has been shown,
same shall be clarified/corrected.
Pier :
3. Reference code provision and clause for Socketing to be incorporated in draweing.
4. The U/S side of pile cap has been shown above bed level. The reduction in water way area to
be checked and water way calculation to be furnished for approval.

i) Note regarding pile integrity shall be conducted as per “Guidelines for integrity testing of
piles (BS-41) - Rev-1 issued by RDSO dated, 29.11.2023 to be incorporated.
ii) Depth of pile is shown as minimum 24m, the note to be incorporated in drawing that pile to
be terminated in hard/soft rock.

It is requested that design consultant may attend this office for discussion regarding design and
drawing with prior intimation. Additionally, U/S and D/S design to be marked properly.

Design and structural drawings are returned for incorporating the corrections

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्यानंदझा/KrityaNandJha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SW
R
For CBE/SWR
FileNo.SWR/W.182/Gati Shakti Unit/SBC Date:
12.04.2024.

Sub: Proposed extension of existing Rail Over Rail Bridge No.834A at Km: 343/500-600 with 1
x 5.50 x7.65m RCC Box between Krishnarajapuram and Baiyappanahalli Stations – For
launching of RCC Boxes.
Ref: 1. Dy.CE/Gati Shakti/SBC, letter No.W.496/GSU/SBC/BNC-WFD Qudrapuling/ROR
834A, dated 04.04.2024
2. CRS, Southern Circle lr no.Q.22011/02/2024-25/SWR/18 dt: 02.04.2024.

In connection with above subject and letter under reference-2, CRS has raised
observation that“The effect on existing abutment foundation and overall stability analysis of
Abutment 1 due to construction of RCC Box. The drawing has been checked in this office and
observed that the existing abutment foundation and proposed RCC Box base slab are at same
founding level, hence there will be no additional load on foundation of existing abutment.

The following points are to be ensured during execution:


1. The suitable shoring arrangements to be done to avoid soil falling during
excavation along with caution order on the track.
2. Suitable precautions to be taken during launching of RCC Box to avoid hitting with
existing abutment.

This has approval of CBE


(Kritya Nand Jha)
उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR

No.SWR/W.182/Gati Shakti Unit/SBC

CPM/GSU/SBC
Date:11.04.2024.

Sub: YNK-BWT Section : Yelahanka-Bangarpet construction of ROB at km : 147/785 in


lieu of LC.No no 166 with 1x60m bowstring girder+4x20m solid slab+5x20m PSC
girder between Bangarpet - Kolar stations.

Ref: Letter No.W.352/GS/ROB@LC.No.166, dated 21.03.2024 of Dy.CE/GS/SBC.

*****
In connection with the above subject and letter under reference, the structural
drawings and design calculation has been scrutinized and following observations are to be
clarified/corrected;
viii) As per the approved GAD the type of foundation is open foundation, whereas per
the structural drawings and design calculations, pile foundation has been
proposed. The reasons for adopting pile foundation shall be justified.
ix) As per Railway Board letter No.2014/CE-III/Bridge policy dated 15.11.2016,
justification for adopting pile foundation shall be furnished from CPM/GS/SBC.
x) As per approved GAD, the span arrangement is of 4x20m solid slab and 5x20m PSC
girder. Whereas per structural drawings only PSC Girder has been proposed. The
reasons for changing the type of super structure shall be justified.
xi) The size of pedestal shall be decided keeping in mind the jacking point at 600mm
distance from the centre line of bearing duly considering the minimum base
diameter of jack of 300mm and same thing to be incorporated in structural
drawings. Size of pedestal to be incorporated.
xii)Pier cap top level of obligatory span and approach span to be shown in drawings.
xiii) Superstructure design submitted is of two different spans i.e., 18.6m and 20.1m
PSC girder. Reasons for adopting two different span superstructures shall be
justified.
xiv) Structural drawings for 20.1m PSC girder to be submitted.
xv) As the pier cap is of trapezoidal shape. The centre line of bearing to edge of pier cap
is around 2.5m. Pier cap shall be checked as corbel.
xvi) As per soil report the computed deflection is shown as 9.9mm which is
marginally safe. Hence number of piles to increased and pile design to
rechecked.
xvii) As per the soil report, the safe load carrying of pile in Hard Rock is shown as
475t. Whereas per the structural drawings it is shown as pile to be terminated in
Hard/Soft Rock. The safe load carrying of capacity of pile in Soft Rock to be
furnished.
xviii) As per practice the cantilever length for pier cap is 2.5m. However in present
case for obligatory span, the cantilever length of pier cap is provided as 3.8m on
both sides of pier cap. By increasing the length of pier, cantilever length of pier
cap shall be reduced.
xix) Note regarding pile integrity shall be conducted as per “Guidelines for integrity testing
of piles (BS-41) - Rev-1 issued by RDSO dated, 29.11.2023 to be incorporated in
drawing.
xx) Proposed bridge is on curve, the curvature effect shall be considered in design.
xxi) Pile load test to be conducted before the start of work.
xxii) The super structure design and structural drawings are under scrutiny, any
observation will be intimated in due course of time.

It is requested that design consultant may attend this office for discussion regarding
design and drawing with prior intimation.
The original copy of structural drawings (in tracing sheet) and design calculations
are to be proof checked by IIT/IIsc along with letter from institute to be submitted to this
office for approval.

Design and structural drawings are returned for incorporating and to be


resubmitted for further processing please.

For kind information and necessary action, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.352/LC.64(RUB)/MalugurYard/YNK-PKD/CN/DL Date:
02.04.2024.

Dy.CE/Design/CN/BNC

Sub:YNK-PKD Section: Construction of RUB in lieu of LC No.61(T) with RCC Box of size
1x9.0x5.65m at km.88/900-89/000 in Devarpalli yard – Design and structural drawing of RCC
Box.

Ref: 1.Dy.CE/Design/CN/BNC, Letter No.W.75/BNC/YNK-PKD/RUB/LC-51, dated 02.04.2024


2. This Office letter, dated 13.03.2024.

In connection with the above subject and letter under reference, the structural
drawing and design calculation of LC.No.61 has been scrutinized and following
observations are to be clarified/corrected;

1. In design calculation the max pressure on soil is shown as 7 t/sqm( mentioned at page
after 30), whereas in pg no.3, the max pressure on soil it is shown as 17t/sqm. The same
shall be checked and clarified.
2. In design calculation of base pressure, at bottom of RCC Box, at the same page only
dead load of box has been considered. However the Live load has not been considered.
The same shall be checked and clarified.
3. In page No.3 of design calculation, the maximum pressure on soil is shown as 17t/sqm
and safe bearing pressure on soil is shown as 17 t/sqm, where as in Drawing
No.SWR/CN/BNC/ST/273-2017 the safe bearing capacity of soil is shown as
17.83t/sqm. The same shall be checked and clarified.

The design and structural drawing to be attended accordingly.


For information and necessary action please.

(कृ त्या नंद झा/ Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: CE/CN/III/BNC– for kind information.

No. SWR/W.71/Sutability Check 25T-2008/Exg Bridges Date:


18.03.2024

Sr.DEN/Co-ord/MYS
Sr.DEN/Co-ord/UBL
Sr.DEN/Co-ord/SBC

Sub: Universalization of charging of excepted CC+6t and Universalized CC+6 routes


traffic at CC+8 routes.

Ref: 1) CTPM/SWR's letter No.T.143/Planning/S&T Policy dated 12.02.202


2) RDSO letter No.CBS/Golden/Q/Strength dated 21/27.07.2009.
3) RDSO letter No.CBS/Golden/Q/Streng dated 08.03.2016.
4)This office even letter dated 16.02.2024.

*****
In connection with the above subject and in continuation to letter under ref-4, it was
advised to divisions for assessment of the bridges for permitting higher axle load i.e
CC+8t+2t and 25T axle load.

However, in order to stream line the process and to maintain the uniformity of
assessment by all divisions, items to be considered during the assessment of the bridges for
permitting higher axle load (i.e CC+8t+2t / 25T axle load) are brought out below:
1. The Sub-structure of all the bridges have to be checked for permitting higher axle
load.
2. The Superstructure of non-standard span bridges shall be assessed.
3. In cases, where the details of Soil and SBC are not available, Soil investigation
shall be carried out.
4. For bridges, where Completion drawings are not available, the NDT test to be
done to ascertain the grade of concrete of substructure.
5. For bridges where Completion drawings are not available, the same has to be got
prepared.

Hence, it is kindly requested to take necessary action from your end for assessment
of bridges to permit CC+8t+2t wagons and 25T axle load wagons.

"MATTER MAY BE TREATED MOST URGENT"

(Kritya Nand Jha)


Dy. Chief
Engineer/Bridges
For CBE/SWR
Copy to:
CTPM/SWR - for kind information please

No.SWR/W.352/General/2019-20/2020-21/2022-23
Date:23.02.2024

DEAN
IRICEN/PUNE
Sub: Nomination of supervisors for MIDAS Course No.24451 in IRICEN Pune from 26.02.2024 to
02.03.2024(6days).

Ref: IRICEN Letter No.151/2441 of Professor Bridge-I, dated 12.01.2021.

****
With reference to the above subject and letter under reference the following supervisor is
nominated for campus training conducted by IRICEN/Pune . The course details are as follows

SN Course No. Course Name Mode of From To Nominated


Training supervisor
1 24451 MIDAS Campus 26.0.2024 02.02.2024 Vijaykumar I
Basanagoudar

The above employee is hereby relived from this office on 23.02.2024(AN) for attending campus
training at IRICEN Pune.
कृ त्या नंद झा/ Kritya Nand Jha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.71/Rebuilding/East/UBL Date:
21.02.2024.

Sr.DEN/Co-ord/UBL

Sub: GDG – HPT- BAY Section: Proposed rebuilding of existing Coupled WDG-2 loading standard
for Bridge No.107DN, 119DN and 136DN on GDG – HPT- BAY section, as RCC Box Bridge.

Ref: 1.Sr.DEN/East/Hubli, Letter No.H.W.352/East Bridge replacement/107/119/136, dated


08.02.2024
2. This Office letter, dated 01.12.2023.

In connection with the above subject and letter under reference, the revised structural
drawing and design calculation of bridges has been scrutinized and following are observations are to
be clarified/corrected;

4. In Plan, pre cast base slab unit to be shown for 6m box segment also.
5. Weight of 6m box segment to be shown in drawing.
6. Fatigue check design, live load shall be considered with impact factor and for the same design
shall be revised.
7. Bar no. a2 and C shown in drawing shall be checked with design and to be corrected
accordingly.
8. The gap between box segments are to be sealed by pressure cement grouting followed by epoxy
pointing (from inside) and concrete canvas sheets to be laid over the joints of RCC boxes ( from
outside) Note to be in corporate in drawing.
9. Structural drawings (in tracing sheet) and design calculations are to be submitted duly signed
signed by divisional officials.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

For information and necessary action please.

(कृ त्या नंद झा/ Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/East/UBL – for information and necessary action, please.
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
15.02.2024.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major bridge no. 412 at ch: 159721 Pro. Construction of 2 x 9.15 m PSC
slab on down stream side of the Exg. bridge of 2 x 9.14 m steel girder between Hosur and
Maranayakanahalli stations Pro Bridge is on up line.

Ref: 1. Letter No.BYPL - HSRA/DL/Bridge GAD/491 of GM/Civil/Projects/KRIDE, dated


01.02.2024.
2. This office letter dated 24.07.2023 & 01.12.2023.

*****

In connection with the above subject and letter under reference, the revised structural
drawing and design calculation of bridge no.412 has been scrutinized and following are observations
are to be clarified/corrected;

10.Maximum pressure at foundation level is shown as 434.60 kN/m 2, as per geo tech report the
SBC of soil is shown as 400 kN/m2 same shall be checked and design calculation to be revised.
11.In drawing, the conjunction wall is shown in middle of foundation same shall be checked and
corrected.
12.Stresses at bed level also to be shown in design calculation.
13.Lap and development length shall be incorporated.
14.Exposure condition and SBC of soil at foundation shall be incorporated.
15.Design and drawing of pier also to be submitted.
16.Compliance shall be submitted in detail with reference page numbers and description.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

Design consultant to attend this office with compliance without fail.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

GM/Civil/Projects/KRIDE

Sub: Major Bridge no. 513 at ch: 197119 Pro. construction of 2 x 12.20 m PSC slab on both up & down
stream side of the exg. bridge of 2 x 12.20 m steel girder in Belandur road station yard.pro. Bridge is
on both UP & down line.
Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/489 of AGM/Civil/Projects/KRIDE, dated 01.02.2024.
2. This office letter dated 31.07.2023 & 01.12.2023.
*****
In connection with the above subject and letter under reference, the structural drawing and
design calculation of Bridge no.513 has been scrutinized and following observations are to be
clarified/corrected;
Abutment:
5. The design submitted for D/S side of abutment dated 14.07.2023, foundation is of C type with
pile foundation, whereas now structural drawings submitted is of abutment is of L type
arrangement. Detailed reasons to be brought.
6. Reasons for shifting the pile at haunch location shall be clearly justified. Design calculation for
the same to be submitted.
7. Design calculation and drawings of pile shoring to be submitted.
8. In section A-A, it is seen that the projection of 2400mm from pile cap has been shown,
same shall be clarified/corrected.
Pier :
5. In drawing, it is observed that the dimensions & reinforcement details of pier is different for
both U/S and D/N side of bridge, for the same span and number of tracks. It shall be clarified.
6. The U/S side of pile cap has been shown above bed level. The reduction in water way area to
be checked and water way calculation to be furnished for approval.

iii) Note regarding pile integrity shall be conducted as per “Guidelines for integrity testing of
piles (BS-41) - Rev-1 issued by RDSO dated, 29.11.2023 to be incorporated.
iv) Depth of pile is shown as minimum 24m, the note to be incorporated in drawing that pile to
be terminated in hard/soft rock.

It is requested that design consultant may attend this office for discussion regarding design and
drawing with prior intimation. Additionally, U/S and D/S design to be marked properly.

Design and structural drawings are returned for incorporating the corrections

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.


(कृ त्यानंदझा/KrityaNandJha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SW
R
For CBE/SWR

SWR/W.352/Canal-Xing/MYS-ASK&TK-ASK/VJNL/Vol-I Date:
09.02.2024.

Sr.DEN/Co-ord/MYS

Sub: MYS – ASK Section: Proposed Construction of RCC Box of size2x5.7mx5.65m at km 155/300-
400 (canal ch:78+024)between HHT -ASK stations for Yettinahole gravity canal crossing from
ch:77+997 to78+051km (by cast-in-situ method).

Ref: 1. Sr.DEN/Co-ord/MYS, letter No.Y.73/I/130/YHP/Km.155-10/TK-ASK, dated 29.12.2023.


2. This office letter, dated, 26.07.2022, 25.11.2022 & 30.09.2023.

In connection with the above subject and letter under reference, the structural drawing and
design calculation of Precast abutment has been scrutinized and following observations are to be
clarified/corrected;

1. Depth of abutment shown in design and drawings are not tallying same shall be checked and
corrected.
2. Details of bearing plate and bed plate shown in drawing in not tallying with details shown in
approved type plan drawing of RH girder for 5deg curvature.
3. Weight of abutment shall be incorporated in drawing.
4. Sketch of abutment shown in design is for mass concrete abutment same shall be checked
and corrected.
5. Length of foundation shown in design is 7.85m, where as in drawing it is shown as 6.85m
same shall be checked and corrected.
6. SIDL & LL surcharge, load calculation shown in design shall be checked and corrected.

Design and structural drawings are returned for incorporating the corrections.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Dated
03.02.2024

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major Bridge No. 474 at CH: 182153.700 Pro. Construction of 2 x 12.20 m PSC
Slab on Down Stream side of the Exg. Bridge of 2 x 12.20 m steel girder between Baiyappanahalli 'A'
Panel and Hosur Stations. Proposed bridge is on up line.

Ref: 1.Letter No.BYPL-HSRA/DL/Bridge GAD/468 of Add GM/Civil/Projects/KRIDE, dated


07.12.2023 & 31.01.2024.
2. This office letter dated 03.08.2023, 07.09.2023 & 21.11.2023.

*****
In connection with the above subject and letter under reference, the draft revised structural
drawing and design calculation of bridge no.474 has been scrutinized and following observations are
to be clarified/corrected;

Abutment:
7. Structural details of protection also to be shown in drawing.
Pier:
8. Depth of pile shown in drawing and design and drawings shall be checked.

v) As per approved GAD, PSC slab is with foot path, whereas per structural drawing submitted
foot path and trolley refuge arrangement both are shown, as per IRBM Chapter XI ,1105
Cl.8, trolley refuge is not required for this bridge, necessity of providing trolley refuge shall
be furnished. As per your office letter dated 12.10.2023 structural drawings submitted to this
office is without trolley refuge.
vi) Revised GAD to be submitted to this office duly incorporating the changes/alterations.
vii) Note regarding pile integrity shall be conducted as per “Guidelines for integrity
testing of piles (BS-41) - Rev-1 issued by RDSO dated, 29.11.2023 to be incorporated.

Design and structural drawings are returned for incorporating the corrections.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.
For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

No.SWR/W.71/Sutiability check 25t-2008/Exg Bridges Dated:


02.02.2024

CTPM/SWR

Sub: Upgradation of routes for 25T loading- SWR.

Ref: Railway Board letter no. 2019/CE-II/TS/25t dated 28.12.2023.

*****
In connection with the above subject and letter under Reference, Railway Board
have requested to issue Bridge Certificate for operation of 25T axle load over the following
routes:

Sl. Routes
Total km
No From To
1 Vyasa Colony Sasalu 164.34
2 Mormugao Harbour Hosapete 377.46

In view of the above, the section from Ch:82.750 to 92.500 is falls under jurisdiction
of KRCL. In this regard the track and bridges details of the siding line between Mormugao
Harbor and Vasco station not available in this office. The same are to be collected from
siding authorities and furnish to this office for checking the fitness to 25t axle load. It is
requested to submit the details of track and bridge details of siding line which falls under
KRCL jurisdiction.

For kind information and necessary action, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे .
Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.71/Strengthening of Bridges/25t Dated:
01.02.2024

Sr.DEN/Co-ord/UBL
Sr.DEN/Co-ord/MYS

Sub: Upgradation of routes for 25T loading- SWR.

Ref: Railway Board letter no. 2019/CE-II/TS/25t dated 28.12.2023.

1) * * * * *
In connection with the above subject and letter under Reference, Railway Board
have requested to issue Bridge Certificate for operation of 25T axle load over the following
routes:

Sl. Routes
Total km
No From To
1 Vyasa Colony Sasalu 164.34
2 Mormugao Harbour Hosapete 377.46

In view of the above, it is to mention that as on date these sections are not fit to run
25T axle load. A detailed analysis is to be done to check the suitability of bridges and
works have to be proposed for re-building/re-girdering/strengthening of bridges. In this
regard tender may be floated for getting the bridges checked for 25T axle load.

For kind information and necessary action, please.

(Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे .
Dy.CE/Bridges/SWR
For CBE/SWR

No.SWR/W.71/Strengethingof Bridges/25t
Dated:01.02.2024

Sr.DEN/Co-ord/UBL
Sub: Upgradation of routes for 25T loading- SWR.

Ref: Railway Board letter no. 2019/CE-II/TS/25t dated 28.12.2023.

*****
Traffic department of SWR has sent proposal to RB to issue notification for
following routes for operation of 25T axle load
Routes
Sl. No. Total km
From To
1 Vyasa Colony Sasalu 164.34
2 Mormugao Harbour Hosapete 377.46

In view of the above, it is to state that as on date these sections are not fit to run 25T
axle load. A detailed analysis is to be taken up to check the suitability of bridges and works
have to be proposed for re-building/re-girdering/strengthening of bridges.

For kind information and necessary action, please.


(Kritya Nand Jha)
उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Dy.CE/GSU /SBC:- For information and necessary action, please .
No.SWR/W.182/Gati Shakti Unit/SBC

CPM/GSU/SBC
Date:29.01.2024.

Sub: BNC-WFD Section Proposed Extension of Existing Bridge No.841 at ch: 349737.5m of span
1x9.15m stone arch & 1x9.15m RCC T-Beam with 1x9.15m PSC slab duly dismantling RCC
“T” Beam for accommodating proposed new lines in quadrupling in between BNCE and BNC
Stations.

Ref: 1.Letter No.W.352/GSU/SBC/QUAD/Br.841, dated 12.01.2024 of Dy.CE/GS/SBC.


2. This Office letter dated, 15.12.2023 & 22.12.2023.

*****
In connection with the above subject and letter under reference, the structural
drawings and design calculation of bridge no.841 has received in this office, after scrutiny
it is observed that, following points are to be complied;
xxiii) As per the compliance it is seen that one major BWSSB Water pipe line and
drainage pipe with man hole is running through water way of the bridge. The
detailed sketch showing the location of the BWSSP pipe showing distance and
dia of the pipes to be submitted.
xxiv) Joint inspection with BWSSB and Railways to be done and report to be
submitted to this office.

Design and structural drawings are returned for incorporating and to be


resubmitted for further processing please.

For kind information and necessary action, please.


(Kritya Nand Jha)
उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Dy.CE/GSU /SBC:- For information and necessary action, please .

No. SWR/W.71/Rebuilding/East/UBL Date:


29.01.2024.
Sr.DEN/Co-ord/UBL

Sub: GDG – HPT- BAY Section: Proposed rebuilding of existing Coupled WDG-2 loading standard
for Bridge No.107DN, 119DN and 136DN on GDG – HPT- BAY section, as RCC Box Bridge.

Ref: This Office letter, dated 03.11.2023.

In connection with above subject and letter under reference, Sr.DEN/East/UBL has
requested to adopt Western Railway HQ structural drawings for RCC Box segmental box for
various sizes for proposed rebuilding of bridge No.107, 119 & 136 of GDG-HPT-BAY section.
It is observed that, detailed design calculations of RCC Box submitted to this Office, with 0m,
0.676m & 1.626m.
The detailed design and structural drawings to be prepared as Type plan hence the
details of the same to be submitted to this office for further processing please.
This has approval of Competent Authority

For information and necessary action please.

(कृ त्या नंद झा/ Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/East/UBL – for information and necessary action, please.
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Dated
19.01.2024.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major Bridge No. 474 at CH: 182153.700 Pro. Construction of 2 x 12.20 m PSC
Slab on Down Stream side of the Exg. Bridge of 2 x 12.20 m steel girder between Baiyappanahalli 'A'
Panel and Hosur Stations. Proposed bridge is on up line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/468 of Add GM/Civil/Projects/KRIDE, dated


07.12.2023.
2. This office letter dated 03.08.2023, 07.09.2023 & 21.11.2023.

*****
In connection with the above subject and letter under reference, the draft revised structural
drawing and design calculation of bridge no.474 has been scrutinized and following observations are
to be clarified/corrected;

Abutment:
9. Structural details of protection also to be shown in drawing..
Pier:
10. Depth of pile shown in drawing and design and drawings shall be checked.

viii) As per approved GAD, PSC slab is with foot path, whereas per structural drawing
submitted foot path and trolley refuge arrangement both are shown, as per IRBM Chapter XI
,1105 Cl.8, trolley refuge is not required for this bridge, necessity of providing trolley
refuge shall be furnished. As per your office letter dated 12.10.2023 structural drawings
submitted to this office is without trolley refuge.
ix) Changes/alterations in the GAD to be incorporated completion plan.
x) Revised GAD to be submitted to this office duly incorporating the changes/alterations.
xi) Note regarding pile integrity shall be conducted as per “Guidelines for integrity testing of
piles (BS-41) - Rev-1 issued by RDSO dated, 29.11.2023 to be incorporated.

Design and structural drawings are returned for incorporating the corrections.

It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.352/LC.46(ROB)/BGK-MGL/GDG-HG/NHD Date:
11.01.2024.

Executive Engineer
Gopalpur Galli
Vijaypura-586108

Sub: GDG- BJP Section: Construction of 4lane ROB in lieu of LC.No.46 at Rly km.94/600-700
(NH+144+256.5) between Bagalkot and Mugalolli stations on Shirur - Gaddankeri section of
NH367 ROB span 32m+52m+20m.
Ref: 1.Letter.No.EE/NHDN/VJP/NH-367/Compli/2023-24, dated 08.12.2023 & 04.08.2023.
2. This office letter dated 11.08.2023.
*****
In connection with the above subject, and letter under reference, the revised structural
drawings and design calculation of ROB in lieu of LC.No.46 are received in this office, same has
been scrutinized and following observations are to be clarified/corrected;
1. Detailed Geotechnical investigation report, SBC calculation strata wise, etc., shall be
submitted duly signed by concerned NH officials to be submitted.
2. Design calculations booklet fount size not legible, clear copy shall be submitted.
3. Name work to be shown in structural drawings as per approved GAD.
4. In design calculation for shear stress due to torsion, tensile stress and permissible tensile
stress the iteration ratio is 0.99, same shall be checked and design to be revised accordingly.
5. DL,SIDL,LL reaction taken from MIDAS, this office not having MIDAS software, manual
calculation shall be furnished.
6. Typical type of foundation, Pier and Pier cap shall be made for obligatory spans.
7. Grade of concrete shown in design and drawings shall be checked and corrected.
8. Maximum calculated pressure at foundation level for pier shall be shown in drawing.
9. Design calculation submitted to this office booklet without page numbers.
10. Latest codal reference to be incorporated in design.
11. Design calculation booklet to be signed in all pages by design consultant and also concerned
officials CE/EE of NH Div.
12. Signature table for railway officials shall be incorporated in drawings.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

The original copy of structural drawings in (A0/A1 tracing sheet) and design calculations are to
be proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major Bridge No. 474 at CH: 182153.700 Pro. Construction of 2 x 12.20 m PSC
Slab on Down Stream side of the Exg. Bridge of 2 x 12.20 m steel girder between Baiyappanahalli 'A'
Panel and Hosur Stations. Proposed bridge is on up line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/430 of GM/Civil/Projects/KRIDE, dated 12.10.2023.


2. This office letter dated 03.08.2023, 07.09.2023 & 21.11.2023.
*****
In connection with the above subject and letter under reference, the revised structural
drawing and design calculation of bridge no.474 has been scrutinized and following observations are
to be clarified/corrected;

Abutment:
11. Load on pile shown in drawing shall be checked with design calculations.
12. Design calculations of pile to be done duly considering the pile spacing same in parallel and
perpendicular to track.
13. Detailed plan and section of protection wall and return wall to be shown in drawing (3d
view).
Pier:
14. In drawing pile cap has been shown above the bed level. The reduction in water way area to
be checked and water way calculation to be furnished.
15. Socketing length to be incorporated as per codal provision in design and drawing.

xii) As per approved GAD with foot path, whereas per structural drawing submitted
trolley refuge arrangement, as per IRBM Chapter XI ,1105 Cl.8, trolley refuge not required
for this bridge, necessity of providing trolley refuge shall be furnished. As per your office
letter dated 12.10.2023 structural drawings submitted to this office without trolley refuge.
xiii) Revised GAD to be submitted to this office duly incorporating the
changes/alterations.
xiv) Recommendation and Conclusion part regarding adoption of pile foundation shall
be incorporated in soil report.
xv)Design and structural drawings are returned for incorporating the corrections.

It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
05.01.2024.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Proposed Construction of over head pipeline no. 516A at ch:19877.50 of
size 1 x21.825m, steel truss between Hosur and Bayapanahalli stations. pro.bridge is on up line
exg.bridge atch:198770 is of size 1 x 19.25m + 1 x 7.00m steel truss and over head pipe line
no.518A at ch:199907.57 is of size 1 x 21.825m steel truss between Hosur and Bayapanahalli
stations. pro.bridge is on up line exg.bridge of size 1 x 19.25m + 1 x 7.00m steel truss.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/471 of GM/Civil/Projects/KRIDE, dated


21.12.2023.
2. This office letter dated, 06.12.23, 28.10.23, 19.09.23& 28.08.2023. 6

*****
In connection with the above subject and letter under reference, the structural drawing and
design calculation of bridge no.516A &518A has been received in this office, after scrutiny it is
observed that, following points are to be complied;

9. The design calculations and structural drawings of bridge no.516A & 518A is submitted
without compliance.
10.The changes in structural members of draft design calculation, drawings submitted to this
office vide letter under ref-2 and proof checked design structural & drawings vide letter
under ref-1 are as follows :
SN Description Draft design Proof checked design
1 Top chord ISA 130x130x10LD 2ISMC back to back
2 Bottom Chord ISA 130x130x10LD 2ISMC back to back
3 Diagonals ISA 70x70x8 LD 2ISA 75x75x8 LD
4 Splice connection Bolted connection Welded splice connection
Reasons for changing the structural members and splice connection of truss shall be
justified.
11.Design calculation for top and bottom chord are not available in design booklet.
12.Grade of steel for structural steel shall be incorporated in drawing.
13.As per soil report page no.6, the recommended SBC shown as 20t/m 2,whereas per design
calculation & note no.6 of structural drawing( sheet 2 of 3) the maximum pressure at
foundation level is shown as 34.30t/m 2, same shall be checked and clarified (for pipe line
no.516A).
14.In structural drawing No.KRIDE/DL/BYPL-HSRA/ST/027/Sheet 1 of 3 signature of IISc
professor is missing, it is requested to obtaining the signature of professor and submit to
this office for both cases (Pipe line No.516A & 518A).
Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please

For information and necessary action, please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
05.01.2024.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Proposed extension of RUB no. 531 as 1 x 7.50 x 5.65m (clear ht:5.50m) rcc
box(cast in situ and 12o skew) at ch: 205221.69 and 1 x 18.30m composite girder at ch:205242.28 &
1 x 7.5 x 5.65m (clear ht:5.50m) RCC Box (cast in situ) at ch: 205260.31 in Baiyyappanahalli 'A'
panel (BPHI) yard between Belanduru road (BLRR) and Banaswadi(BAND) stations. The existing
bridge is 1 x 7.50 x 5.65m (clear ht:5.50m) RCC Box at ch:205221.69 and 1 x12.20m steel girder at
ch: 205241 and 1 x 7.50 x 5.65m (clear ht:5.50m) RCC Box at ch: 205260.31 on existing up main
line.

Ref: 1.Letter No.BYPL-HSRA/DL/Bridge GAD/468 of GM/Civil/Projects/KRIDE, dated 14.12.2023.


2. This office letter dated, 03.05.2023, 27.06.2023 & 07.08.2023.

*****

In connection with the above subject and letter under reference, the structural drawing and
design calculation of RUB. No.531 has been received in this office, after scrutiny it is observed that,
following points are to be complied;

15.The design calculations and structural drawings are submitted without compliance.
16.In structural drawing No.KRIDE/DL/BYPL-HSRA/ST/025/Sheet 4 of 10/2023 &
No.KRIDE/DL/BYPL-HSRA/ST/025/Sheet 5 of 10/2023 signature of IISc professor is
missing, it is requested to obtaining the signature of professor and submit to this office.
17.In design calculation of Abutment A1( Type 2) page no.5, the sketch of abutment shown in
design to be corrected as per structural drawings.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/New BG Line/CN Date:
27.12.2023

Sub: Opening of new BG Up line doubling line between Guledgudda Road – Bagalkote
stations as part of Gadag –Hotgi doubling project for public carriage of passengers.

Ref: 1. CE/CN/UBLletter No.H/CE/CN/I/2023 dated 27.12.2023.


2. Dy.CE/Design/CN/BNC’s letter No.W.75/CN/BNC/GADAG/HOTGI/BR-23
dated
27.12.2023
3. CRS letter No.R12027/04/2023-24/SWR, dated 20.12.2023.
In connection with above subject and CRS letter under Ref-3, CRS has raised observation
that analysis of extent of interference of foundation of New Bridge No.23 (Major) on Existing
bridge foundation shall be verified by CBE office.

In this connection, for Major Bridge No.23 the calculation for the base pressure below
existing RCC box for dispersion of load from doubling track for 25t-2008 loading has been
checked and approved by Dy.CE/Design/BNC. The same has been further forwarded to this
Office for verification as per CRS instructions. The design calculations submitted by P&D
office has been scrutinized and found to be ok.

This has approval of CBE

पुष्पेंद्र कु मार/Pushpendra Kumar


उप.मु.इं/पुल लाईन/प्र.का.

Dy.CE/Br.Line/HQ

CPM/GSU/SBC
Sub: Existing RUB No.840A with 1x17.16m steel girder for Exg UP line and DN line, proposed to be
extended with 1x17.16m plate girders for proposed two lines "Ch:3495950 and construction of an
additional vent- way for exg.RUB with 1x7.0x4.50m RCC Box at CH;349567.50 as deposit work
of BMRCL between BNC- BNCE stations ( Abutment).
Ref:
1. Letter No.W.352/RUB/RUB No.840A/BNC – BYPL/GSU, dated 20.12.2023.
2. Railway Board letter No.2014/CE-III/BR/Bridge policy, dated 15.11.2016.
3. This office letter dated 15.12.2023.

*****

In connection with the above subject and letter under reference, the structural drawings and
design calculation of RUB No.840A(Abutment) has been received in this office, after scrutiny it is
observed that, following points are to be complied;

1. . The same was advised to GSU/SBC in observation letter dated 23.11.2023 of this Office.
However, the proper compliance has not been submitted. Hence, approval of SAG officer
along with justification shall be communicated to this Office.
2. Fatique check shall be as per Cl,13.4.1 of IRS concrete Bridge code for substructure also.
3. In soil report BH-2 the SBC of Soil shown as 19t/sqm, whereas in design calculation (pg
no.45) the maximum pressure at foundation level for abutment is 19.60t/sqm, same shall be
checked and foundation size to be revised.
4. The time lapse for the approval of GAD and structural drawing for the proposed bridge is as
follows:

S GAD Structural drawings Observation Design


N approved date received date sent on Approved date
1 15.09.2023 07.12.2023 15.12.2023 -----

2 22.12.2023 ------

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Dy.CE/GSU/SBC – for information and necessary action
5. As per Railway Board letter No.2022/7/CE-III/CBEs seminar, dated 30.05.2023, it is advised to
carryout “RSI analysis in the inital design of bridge as per BS-114 version-2”.

FileNo.SWR/W.352/BMRCL/VOL-III Date:
19.12.2023
Chief Enginner/Planning/HO
Bangalore Metro Rail Corporation Ltd,
B.M.T.C Complex, 3rd floor,K.H.Road shanti nagar,
Bangalore-560027.

Sub: SA-SBC Section, Proposed BMRCL overhead structure of metro viaduct composite girder of
span 1x65.0m at railway Km.200/700-800 between Bellandur road and Baiyappanahalli
stations (Substructure Pier).
Ref: CE/Planning/BMRCL Letter No.BMRCL/Phase 2A&2B/ORP 434 &435/2023, dated
04.12.2023.

*****
In connections with above subject and letter under reference, the Structural drawings and
design calculations for proposed construction of overhead metro viaduct composite girder line between
Bellandur road and Baiyappanahalli has been scrutinized and following observations are to be
clarified/corrected;

1. As per Addendum and corrigendum (A&C slip) No.50 of IRS Bridge rules dated 06.12.2022 “All
structures near railway structures shall be checked for accidental impact from derailed rails as per
clause 2.16.4” shall be checked and revised design calculation and drawings to be furnished.
2. As per Addendum and corrigendum slip no.50 of IRS Bridge rules dated 06.12.2022, the
substructure shall be preferably wall type and to avoid the cantilever effect. As per Railway board
letter no.2023/3/CE-III/BR/BSC/87th BSC, dated 22.11.2023, item no.110, design calculation to
be furnished.
3. Fatigue check shall be done as per IRS concrete bridge code Cl.13.4.1.
4. As per Railway Board letter No.CBS/DWF, dated 29.11.2023, regarding, Integrity testing of piles
(BS-41), note to be incorporated in drawing.
5. As per Railway Board letter No.2014/CE-III/BR/Bridge policy, dated 31.07.2017, for span above
61m spherical may be used.
6. The Bore logs and soil properties shown in structural drawings and soil report is not tallying , same
shall be checked and proper soil report with pile capacity to be submitted.
7. Combination of seismic design forces with other forces shall be as per Cl.7.2 of IRS seismic code.
8. Pier shall be design for maximum height and span and drawing shall be same for both the
Piers(obligatory span).
9. Deign calculations for fixity as per IS codes shall be furnished.
10. Detailed design calculations for capacity of pile as per soil report shall be furnished and also pile
load test to be conducted at site for capacity of pile.
11. Soil load and SIDL not considered in design, same shall be checked and corrected.
12. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly signed
by concerned officials.
13. Corbel check for pier cap as per Cl.17.2.3.1 of IRS CBC along with corbel reinforcement, design
calculation shall be furnished.
14. All safety precautions to be made for casting of reinforcement bars and got approved by BMRCL
officials.
15. The values of BM, SF arrived in design calculation shall be connected.
16. Design calculation for one span live load and one span loaded condition to be furnished.
17. Speed of train considered in design shall be shown in drawings.
18. Detailed calculation of SIDL shall be furnished.
19. Only minimum reinforcement has been provided for pier, design shall be rechecked.
20. Depth required for pier cap as per IRS concrete bridge code design calculation to be furnished.
21. Pile shall be checked for minimum load and moment for combinations of loads.
22. In drawing it is shown that, load on walk way is considered as 40t on each pile, which is not
available in design calculation.
23. Dia of spacer bar and main bar shown in drawing shall be same, to be checked and corrected.
24. In pile design, bundle bar has been considered, where as in drawing spacer bar has been
considered, same shall be checked and corrected.
25. Pier cap design to be carried out at each pedestal location.
26. In pier cap drawings some locations it is shown as ON HOLD, it is requested to finalise the
drawings and send to this office.
27. In pier cap drawing the clear spacing of bars is very less, same shall be checked and spacing of
bars to be increased.
28. Torsion is not considered in ULS BM design.
29. As per approved GAD, All the levels like Ground level, Rail level, Pile cap level, etc. shall be
checked and corrected.
30. Design and structural drawings are to be signed by Chief Engineer/BMRCL and all pages of design
booklet are to be signed by BMRCL officials and design consultant
31. RSI analysis to be carried out in the initial design of bridge as per BS-119 version -2” RDSO
guidelines for RSI on metro system for continuation of LWR over Bridges. Design calculation to
be submitted.
32. Super structure design of composite girder is under scrutiny, if any observations/clarifications will
be intimated in due course.
33. Structural drawings submitted are in A3, which is not legible, minimum A1 size drawings are to be
submitted.
34. The height of pier is about 16.0mthe safety precautions to be taking at the time of casting the
reinforcement.

It is requested that design consultant to attend this office for discussion regarding design
and drawing with prior intimation.
Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please
The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For kind information and necessary action, please.

(कृ त्या नंद झा /Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/Co-ord/SBC:- For information please.
FileNo.SWR/W.352/BMRCL/VOL-III Date:
19.12.2023

Chief Enginner/Planning/HO
Bangalore Metro Rail Corporation Ltd,
B.M.T.C Complex, 3rd floor,K.H.Road shanti nagar,
Bangalore-560027.

Sub: SA-SBC Section, Proposed BMRCL overhead structure of metro viaduct composite girder of
span 1x65.0m at railway Km.200/700-800 between Bellandur road and Baiyappanahalli
stations (Super structure Composite Girder).
Ref: CE/Planning/BMRCL Letter No.BMRCL/Phase 2A&2B/ORP 434 & 435/2023, dated
04.12.2023.

*****
In connections with above subject and letter under reference, the Structural drawings and
design calculations for proposed construction of overhead metro viaduct composite girder line between
Bellandur road and Baiyappanahalli has been scrutinized and following observations are to be
clarified/corrected;

1. The lifting of girders shall be checked and for the same design calculation shall be furnished.
2. The grade of steel used for structural steel for different members shall be shown in tabular column.
3. The bracket may be provided support arrangement for the cantilever slab as an additional
precaution.
4.
5. As per Addendum and corrigendum slip no.50 of IRS Bridge rules dated 06.12.2022, the
substructure shall be preferably wall type and to avoid the cantilever effect. As per Railway board
letter no.2023/3/CE-III/BR/BSC/87th BSC, dated 22.11.2023, item no.110, design calculation to
be furnished.
6. Fatigue check shall be done as per IRS concrete bridge code Cl.13.4.1.
7. As per Railway Board letter No.CBS/DWF, dated 29.11.2023, regarding, Integrity testing of piles
(BS-41), note to be incorporated in drawing.
8. As per Railway Board letter No.2014/CE-III/BR/Bridge policy, dated 31.07.2017, for span above
61m spherical may be used.
9. Combination of seismic design forces with other forces shall be as per Cl.7.2 of IRS seismic code.
10. Pier shall be design for maximum height and span and drawing shall be same for both the
Piers(obligatory span).
11. Deign calculations for fixity as per IS codes shall be furnished.
12. Detailed design calculations for capacity of pile as per soil report shall be furnished and also pile
load test to be conducted at site for capacity of pile.
13. Soil load and SIDL not considered in design, same shall be checked and corrected.
14. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly signed
by concerned officials.
15. Corbel check for pier cap as per Cl.17.2.3.1 of IRS CBC along with corbel reinforcement, design
calculation shall be furnished.
16. All safety precautions to be made for casting of reinforcement bars and got approved by BMRCL
officials.
17. The values of BM, SF arrived in design calculation shall be connected.
18. Design calculation for one span live load and one span loaded condition to be furnished.
19. Speed of train considered in design shall be shown in drawings.
20. Detailed calculation of SIDL shall be furnished.
21. Only minimum reinforcement has been provided for pier, design shall be rechecked.
22. Depth required for pier cap as per IRS concrete bridge code design calculation to be furnished.
23. Pile shall be checked for minimum load and moment for combinations of loads.
24. In drawing it is shown that, load on walk way is considered as 40t on each pile, which is not
available in design calculation.
25. Dia of spacer bar and main bar shown in drawing shall be same, to be checked and corrected.
26. In pile design, bundle bar has been considered, where as in drawing spacer bar has been
considered, same shall be checked and corrected.
27. Pier cap design to be carried out at each pedestal location.
28. In pier cap drawings some locations it is shown as ON HOLD, it is requested to finalise the
drawings and send to this office.
29. In pier cap drawing the clear spacing of bars is very less, same shall be checked and spacing of
bars to be increased.
30. Torsion is not considered in ULS BM design.
31. As per approved GAD, All the levels like Ground level, Rail level, Pile cap level, etc. shall be
checked and corrected.
32. Design and structural drawings are to be signed by Chief Engineer/BMRCL and all pages of design
booklet are to be signed by BMRCL officials and design consultant
33. RSI analysis to be carried out in the initial design of bridge as per BS-119 version -2” RDSO
guidelines for RSI on metro system for continuation of LWR over Bridges. Design calculation to
be submitted.
34. Super structure design of composite girder is under scrutiny, if any observations/clarifications will
be intimated in due course.
35. Structural drawings submitted are in A3, which is not legible, minimum A1 size drawings areto be
submitted.

It is requested that design consultant to attend this office for discussion regarding design
and drawing with prior intimation.
Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please
The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For kind information and necessary action, please.

((कृ त्या नंद झा /Kritya Nand Jha)


उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/Co-ord/SBC:- For information please.
1. The girder shall be checked for launching loads and for the same design
calculation shall be furnished.
CPM/GSU/SBC
Date:15.12.2023.

Sub: BNC-WFD Section Proposed Extension of Existing Bridge No.841 at ch: 349737.5m of span
1x9.15m stone arch & 1x9.15m RCC T-Beam with 1x9.15m PSC slab duly dismantling RCC
“T” Beam for accommodating proposed new lines in quadrupling in between BNCE and BNC
Stations.
Ref: Letter No.W.352/GSU/SBC/QUAD/Br.841, dated 07.12.2023 of Dy.CE/GS/SBC.

*****
In connection with the above subject and letter under reference, the structural
drawings and design calculation of bridge no.841 has been scrutinized and following
observations are to be clarified/corrected;

xxv) As per the approved GAD the type of foundation is open foundation, whereas per
the structural drawings and design calculations pile foundation has been
proposed reasons for adopting pile foundation shall be justified.
xxvi) As per railway board letter no.2014/CE-III/BR/Bridge policy dated 15.11.2016,
justification for adopting the pile foundation shall be furnished from
CPM/GS/SBC.
xxvii) Stability check of existing abutment for 25t loading, design calculation to be
furnished.
xxviii) Design and structural drawings for non standard PSC slab are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office
for approval.
xxix) As per GAD the splayed wing wall is shown and as per structural wing wall is
not shown same shall be clarified.
xxx) BOG shown in structural shall be checked and corrected.
xxxi) Geotechnical investigation report, SBC calculation strata wise, etc., shall be
submitted duly signed by concerned officials

Design and structural drawings are returned for incorporating and to be


resubmitted for further processing please.

The original copy of structural drawings (in tracing sheet) and design
calculations are to be proof checked by IIT/IIsc along with letter from institute to be
submitted to this office for approval.

For kind information and necessary action, please.


(Kritya Nand Jha)
उप.मु.पुल इंजी./द.प.रे. Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Dy.CE/GSU /SBC:- For information and necessary action, please .
FileNo.SWR/W.182/Gati Shakti Unit/SBC Date:
12.12.2023.

CPM/GSU/SBC

Sub: Existing RUB No.840A with 1x17.16m steel girder for Exg UP line and DN line, proposed to be
extended with 1x17.16m plate girders for proposed two lines "Ch:3495950 and construction of an
additional vent- way for exg.RUB with 1x7.0x4.50m RCC Box at CH;349567.50 as deposit work
of BMRCL between BNC- BNCE stations ( Abutment).
Ref: Letter No.W.352/RUB/RUB No.840A/BNC – BYPL/GSU, dated 23.11.2023.

*****
In connection with the above subject and letter under reference, the structural drawings and
design calculation of RUB No.840A(Abutment) has been scrutinized and following observations are to
be clarified/corrected;

6. Stability check of existing abutment for 25t loading, design calculation to be furnished.
7. As per approved GAD the abutment is of Mass concrete, where as in structural drawing and design
calculation it is shown as RCC abutment, reasons for adopting RCC abutment shall be justified.
8. As per the Geotechnical investigation report (SBC at 2.5m is 16t/sqm), whereas in design the
maximum pressure at foundation level is 19.38t/sqm, the SBC of soil is less than the maximum
pressure same shall be justified.
9. Fatique check shall be as per Cl,13.4.1 of IRS concrete Bridge code.
10. Degree of curvature considered in design is for 1deg, where as per GAD degree of curvature is
2.63deg, same shall checked and design to be revised.
11. Abutment and return wall to be shown in plan.
12. Following points are to be incorporated in structural drawings:
a. Approved GAD number shall be incorporated in structural drawings
b. Exposure condition (as per clause No.15.92 of IRS concrete bridge code).

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Dy.CE/GSU/SBC – for information and necessary action
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
06.12.2023.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Proposed Construction of over head pipeline no. 516A at ch:19877.50 of size 1
x21.825
m, steel truss between Hosur and Bayapanahalli stations. pro.bridge is on up line exg.bridge
atch:198770 is of size 1 x 19.25m + 1 x 7.00m steel truss and over head pipe line no.518A at
ch:199907.57 is of size 1 x 21.825m steel truss between Hosur and Bayapanahalli stations. pro.bridge
is on up line exg.bridge of size 1 x 19.25m + 1 x 7.00m steel truss.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/450 of GM/Civil/Projects/KRIDE, dated 14.07.2023.


2. This office letter dated 19.09.2023& 28.10.2023.

*****
In connection with the above subject and letter under reference, the structural drawing and
design calculation of bridge no.516A &518A has been scrutinized and following observations are to be
clarified/corrected;

18. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by concerned officials (for 518A).
19. Back fill shall and thickness of boulder shall be as per 7.6 of IRS substructure code.
20. Length of member for splice connection to be shown in drawing.
21. RL, FL, VC etc., shown in design and drawing to be checked and corrected.
22. Grade of steel for structural steel shall be incorporated in drawing.
23. Section capacity of the structural members design shall be furnished.
24. In splice connection details, the number of bolts shown in design and drawing are not tallying.
25. Specification for anchor bolt and type of bolts shall be incorporated in drawing.

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action, please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/455 of Add.GM(Civil)/Projects/KRIDE, dated
16.11.2023.
2. This office letter dated, 19.09.2023& 28.10.2023.

*****
In connection with the above subject, and letter under reference, the draft structural drawings and
design calculation of the above overhead pipe line crossing has been scrutinized and following
observations are to be clarified/corrected;

13. Design calculation of bed block and dirt wall shall be furnished.
14. Design calculations for punching shear shall be furnished.
15. Detailed load calculation of SIDL to be furnished.
16. During casting the bed block, the anchor rods to be inserted inside the bed block, where as
compliance it is mentioned truss design and drawings will be submitted later same shall be
justified.
17. Centre line of future track to face of abutment is shown as 5280mm, whereas per GAD it is
2780mm only same shall be considered in design of abutment foundation (516A).
18. Top width of abutment is shown as 600mm; same shall be checked with seating arrangement of
bed plate at top.
19. Structural drawings and design calculation of truss with connection details to be submitted.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
06.12.2023.

GM/Civil/Projects/KRIDE

Sub: Major Bridge no. 513 at ch: 197119 Pro. construction of 2 x 12.20 m PSC slab on both up & down
stream side of the exg. bridge of 2 x 12.20 m steel girder in Belandur road station yard.pro. bridge is
on both up & down line.
Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/450 of GM/Civil/Projects/KRIDE, dated 14.07.2023.
2. This office letter dated 19.09.2023& 28.10.2023.
*****
In connection with the above subject and letter under reference, the structural drawing and
design calculation of bridge no.516A &518A has been scrutinized and following observations are to be
clarified/corrected;

26. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by concerned officials to be submitted (for 518A).
27. Back fill shall be as per 7.6 of IRS substructure code and thickness of boulder shall be
incorporated.
28. Length of member for splice connection to be shown in drawing.
29. Size, thickness and type of weld in connection details to be shown.
30. RL, FL,VC etc., shown in design and drawing to be checked and corrected.
31. Grade of steel for structural steel shall be incorporated in drawing.
32. Section capacity of the structural members design shall be furnished.
33.

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्यानंदझा/KrityaNandJha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SW
R
For CBE/SWR
GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major bridge no. 412 at ch: 159721 Pro. Construction of 2 x 9.15 m PSC
slab on down stream side of the Exg. bridge of 2 x 9.14 m steel girder between Hosur and
Maranayakanahalli stations Pro Bridge is on up line.

Ref: 1. Letter No.BYPL - HSRA/DL/Bridge GAD/446 of GM/Civil/Projects/KRIDE, dated


04.11.2023.
2. This office letter dated 24.07.2023 &15.09.2023.

*****

In connection with the above subject and letter under reference, the structural drawing and
design calculation of bridge no.412 has been scrutinized and following are observations are to be
clarified/corrected;

17.Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by concerned officials to be submitted.
18.Design and drawings of bed block and dirt shall be furnished.
19.Design calculation and drawings of shoring arrangement shall be furnished.
20.Design calculation of return wall and conjunction wall shall be furnished.
21.Plan of abutment shown in the drawing is without return wall, same shall be checked and design
and drawing to be corrected as per GAD.
22. Live load shall be considered with CDA factor in design (for pier and abutment).
23.Exposure condition and SBC of soil at foundation shall be incorporated.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.
The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.71/Rebuilding/East/UBL Date:
01.12.2023.

Sr.DEN/Co-ord/UBL

Sub: GDG – HPT- BAY Section: Proposed rebuilding of existing Coupled WDG-2 loading standard
for Bridge No.107DN, 119DN and 136DN on GDG – HPT- BAY section, as RCC box bridge.

Ref: letter No.Y/W.352/East/Bridge replacement/107/119/136, dated 03.11.2023.

In connection with above subject and letter under reference, Sr.DEN/East/UBL has
requested to adopt Western Railway HQ structural drawings for RCC Box segmental box for
various sizes for proposed rebuilding of bridge No.107, 119 & 136 of GDG-HPT-BAY section.
It is observed that, detailed design calculations of RCC Box are not submitted, hence the details
of the same to be submitted to this office for further processing please.
This has approval of Competent Authority

For information and necessary action please.

(कृ त्या नंद झा/ Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/East/UBL – for information and necessary action, please.
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
01.12.2023.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major bridge no. 412 at ch: 159721 Pro. Construction of 2 x 9.15 m PSC
slab on down stream side of the Exg. bridge of 2 x 9.14 m steel girder between Hosur and
Maranayakanahalli stations Pro Bridge is on up line.

Ref: 1. Letter No.BYPL - HSRA/DL/Bridge GAD/446 of GM/Civil/Projects/KRIDE, dated


04.11.2023.
2. This office letter dated 24.07.2023 &15.09.2023.

*****

In connection with the above subject, and letter under reference, the draft structural
drawings and design calculation of bridge no.412 received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
Abutment:
24.Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by concerned officials to be submitted.
25.Design and drawings of bed block and dirt shall be furnished.
26.Design calculation and drawings of shoring arrangement shall be furnished.
27.Design calculation of return wall and conjunction wall shall be furnished.
28.Abutment shown in the drawing is without return wall, same shall be checked and design and
drawing to be corrected as per GAD.
29. Live load shall be considered with CDA factor in design (for pier and abutment).
30.Exposure condition and SBC of soil at foundation shall be incorporated.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.71/Br.No.111/MYS-ASK Date:
29.11.2023

Sr.DEN/Co-ord/MYS

Sub: MYS-ASK Section: Proposed extension of Bridge no. 60 (exg.1x3.66m RCC slab) at km
119/500-600 at Hassan yard by 1x 3.66m precast post tensioned PSC slab on both UP and DN
stream side.

Ref: Letter No.Y/W.352/Br.No.60(Ext)/HAS yard, dated 24.11.2023 of Sr.DEN/Co-ord/Mys.

In connection with above subject and letter under reference, MYS Division has submitted the
structural drawings and design calculations of MCC Abutment and same have been scrutinized and
following are observation which shall be clarified;

The design of Mass Concrete abutment has been done considering the grade of concrete as
M35. As per clause 5.4.4 table 4(b) of IRS substructure code, the minimum grade of concrete for
PCC Member is M-25, it is requested furnish to clarify regarding adoption of M35 grade of
concrete.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

For information and necessary action please.

(कृ त्या नंद झा/ Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
25.11.2023.

GM/Civil/Projects/KRIDE

Sub: Major Bridge no. 513 at ch: 197119 Pro. construction of 2 x 12.20 m PSC slab on both up & down
stream side of the exg. bridge of 2 x 12.20 m steel girder in Belandur road station yard.pro. bridge is on
both up & down line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/450 of GM/Civil/Projects/KRIDE, dated 14.07.2023.


2. This office letter dated 31.07.2023.
*****
In connection with the above subject, and letter under reference, the structural drawing and
design calculation of bridge no.513 has been scrutinized and following are observations are to be
clarified/corrected;
I) Abutment:
31. Approval letter of Director/PP for adoption of pile foundation has not been submitted to
this office
32. RL, Fl shown in structural drawings is tallying with approved GAD.
33. Height of abutment shown in design and drawings are not tallying,
34. Design calculation of return wall/wing wall and conjunction wall shall be furnished.
II) Pier:
1. Load on pile to be incorporated in drawing.
2. Live load shall be considered with CDA factor.
3. In drawing pile cap has been shown above the bed level. The reduction in water way area to
be checked and water way calculation to be furnished
4. Detailed plan and section of protection wall and return wall to be shown in drawing (3d
view).
xvi) Revised GAD to be submitted to this office duly incorporating the
changes/alterations.
xvii) Recommendation and Conclusion part regarding adoption of pile foundation shall
be incorporated in soil report.
xviii) Design and structural drawings are returned for incorporating the corrections.
xix) Pile to be terminated in weathered/hard rock and length of socketing shall be as per
codal provision & length of pile (pile termination level) shall be shown in drawing.
xx)Design calculation of typical shoring arrangement to be furnished.
xxi) As per soil investigation report the capacity of pile is 5500kN. The maximum load on
pile for abutment is 150t and for pier is 150t, hence feasibility reducing the number of piles shall
be checked

It is requested that design consultant may attend this office for discussion regarding
design and drawing with prior intimation..
The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्यानंदझा/KrityaNandJha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SW
R
For CBE/SWR
GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major Bridge No. 474 at CH: 182153.700 Pro. Construction of 2 x 12.20 m PSC
Slab on Down Stream side of the Exg. Bridge of 2 x 12.20 m steel girder between Baiyappanahalli 'A'
Panel and Hosur Stations. Proposed bridge is on up line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/430 of GM/Civil/Projects/KRIDE, dated 12.10.2023.


2. This office letter dated, 03.08.2023 & 07.09.2023.
*****
In connection with the above subject and letter under reference, the revised structural
drawing and design calculation of bridge no.474 has been scrutinized and following observations are
to be clarified/corrected;f

Abutment:
16. Load on pile shown in drawing shall be checked with design calculations.
17. Design calculations of pile to be done duly considering the pile spacing same in parallel and
perpendicular to track.
18. Detailed plan and section of protection wall and return wall to be shown in drawing (3d
view).
Pier:
19. In drawing pile cap has been shown above the bed level. The reduction in water way area to
be checked and water way calculation to be furnished.
20. Socketing length to be incorporated as per codal provision in design and drawing.

xxii) Revised GAD to be submitted to this office duly incorporating the


changes/alterations.
xxiii) Recommendation and Conclusion part regarding adoption of pile foundation shall
be incorporated in soil report.
xxiv) Design and structural drawings are returned for incorporating the corrections.

It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.
The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

No. SWR/W.71/Rebuilding/East/UBL Date:


21.11.2023.

Sr.DEN/Co-ord/UBL

Sub: GDG – HPT- BAY Section: Proposed rebuilding of existing Coupled WDG-2 loading standard
for Bridge No.107DN, 119DN and 136DN on GDG – HPT- BAY section, as RCC box bridge.

Ref: letter No.Y/W.352/East/Bridge replacement/107/119/136, dated 03.11.2023.

In connection with above subject and letter under reference, proposed rebuilding of
bridge No.107, 119 & 136 of GDG-HPT-BAY section as RCC Box, Western Railway structural
drawings has been referred. After scrutiny it is observed that, detailed design calculations of
RCC Box to be submitted to this office for further processing please

For information and necessary action please.

(कृ त्या नंद झा/ Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/East/UBL – for information and necessary action, please.
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
17.11.2023.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major Bridge No. 474 at CH: 182153.700 Pro. Construction of 2 x 12.20 m PSC
Slab on Down Stream side of the Exg. Bridge of 2 x 12.20 m steel girder between Baiyappanahalli 'A'
Panel and Hosur Stations. Proposed bridge is on up line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/430 of GM/Civil/Projects/KRIDE, dated 12.10.2023.


2. This office letter dated, 03.08.2023 & 07.09.2023.
*****
In connection with the above subject and letter under reference, the revised structural
drawing and design calculation of bridge no.474 has been scrutinized and following observations are
to be clarified/corrected;

Abutment:
21. Load on pile shown in drawing shall be checked with design calculations.
22. Design calculations of pile to be done duly considering the pile spacing same in parallel and
perpendicular to track.
23. Detailed plan and section of protection wall and return wall to be shown in drawing.
Pier:
24. In drawing pile cap has been shown above the bed level. The reduction in water way area to
be checked and water way calculation to be furnished.
25. Socketing length to be incorporated as per codal provision in design and drawing.

Revised GAD to be submitted to this office duly incorporating the alterations.

Design and structural drawings are returned for incorporating the corrections.

It is requested that design consultant may attend this office for discussion regarding design and
drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

FileNo.SWR/W.182/Gati Shakti Unit/SBC Date:


05.09.2023.

CPM/GSU/SBC

Sub: Existing RUB No.840A with 1x17.16m steel girder for Exg UP line and DN line, proposed to be
extended with 1x17.16m plate girders for proposed two lines "Ch:3495950 and construction of an
additional vent- way for exg.RUB with 1x7.0x4.50m RCC Box at CH;349567.50 as deposit work
of BMRCL between BNC- BNCE stations.
Ref: Letter No.W.352/RUB/RUB No.840A/BNC – BYPL/GSU, dated 02.11.2023.

*****
In connection with the above subject, and letter under reference, the draft structural drawings and
design calculation of the RUB No.840AC received in this office and the same have been scrutinized and
following are observations/correction which shall be clarified/corrected;
13. Width of dispersion shall be considered for minimum of c/c of tracks and dispersion width for the
same design calculation shall be checked and revised.
14. Geotechnical investigation report (SBC at bottom of box), SBC calculation strata wise, etc., shall be
submitted duly signed by concerned officials to be submitted.
15. Dispersion width shall be considered for minimum spacing of tracks, for the design calculations shall
be revised.
16. As per soil report SBC off soil below ground level shown as 2.5m, where as per GAD the ground
level to bottom of box is 1.12m, the SBC at bottom of box shall be furnished.
17. One side earth pressure also to be considered in design calculation.
18. Design shall be checked for multiple tracks
19.
20. Following points are to be incorporated in structural drawings:
a. Approved GAD number shall be incorporated in structural drawings
b. Exposure condition (as per clause No.15.92 of IRS concrete bridge code).

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Dy.CE/GSU/SBC – for information and necessary action

No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
17.11.2023.

GM/Civil/Prjectes/KRIDE

Sub: SA – YPR Section: Major Bridge No. 474 at CH: 182153.700 Pro. Construction of 2 x 12.20 m PSC
Slab on Down Stream side of the Exg. Bridge of 2 x 12.20 m steel girder between Baiyappanahalli 'A'
Panel and Hosur Stations. Proposed bridge is on up line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/430 of GM/Civil/Projects/KRIDE, dated 12.10.2023.


2. This office letter dated, 03.08.2023 & 07.09.2023.
*****
In connection with the above subject, and letter under reference, the revised structural
drawing and design calculation of bridge no.474 has been scrutinized and following observations are
to be clarified/corrected;

Abutment:
26. Load on pile shown in drawing shall be checked with design calculations.
27. Design calculations of pile to be done duly considering the pile spacing same in parallel and
perpendicular to track.
28. Details of protection wall to be shown in the drawing.
Pier:
29. In drawing pile cap has been shown above the bed level. The reduction in water way area to
be checked.
30. Socketing length to be incorporated as per codal provision in design and drawing.

Design and structural drawings are returned for incorporating the corrections.

It is requested that design consultant may attend this office for discussion regarding design and
drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

No. SWR/W.71/Sidepathway/2023-24 Date:


08.11.2023

ADEN/Bridges/MYS
Sub: Safety inspection ladder for steel girder bridges in SBC division.
Ref: 1. letter No.08/Br Correspondence, dated 30.10.2023
2.This office even letter , dated 18.10.2023.

In connection with above subject ADEN/Bridge/SBC has submitted the draft structural
drawings and design calculations of safety inspection ladder, same have been scrutinized and
following are observations/correction which shall be clarified/corrected;

1. Horizontal distance from centre line of track to face of column shall be as per SOD.
2. Maximum axial force and Section capacity of the member shall be incorporated in design.
3. Rail level top and top level of landing shall be kept same and height of railing shall be shown.
4. Design calculation for embedded length of bolt in concrete to be furnished.
5. Arrangement of fixing of base plate and anchor bolts to be shown in drawing.
6. Width of platform shown as 750mm and width of ladder shown as 600mm, there is no space for
person to go and inspect the girders, same shall be checked and corrected.
7. General noted regarding steel fabrication, welding and fixing of bolts shall be incorporated.
8. Design calculations shall be signed in all pages and drawings shall be submitted in tracing sheet
and routed through Dy.CE/Bridge line.
9. The inspection ladder arrangement will be used as type plan, all the members and connection
details shall be proposed subjected to availability of materials.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

For information and necessary action please.

(कृ त्या नंद झा/ Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: Dy.CE/Bridge Line/HQ - for kind information please.


No. SWR/W.352/Canal X-ing/MYS-ASK&TK-ASK/VJNL/VOL-I Date:
03.11.2023

Sr.DEN/Co-ord/MYS

Sub: MYS -ASK Section: Proposed construction of RCC Box 2X5.7Mx5.5M at Km. 155/300-400
Between
HHT-ASK Yattinahole gravity canal X-ing (Ch: 78+024)(Deposit work by VJNL) “Pre- cast
Abutment”.
Ref: letter No.Y/W.731/130 (i) km.155/MYS-ASK/YH Canal crossing, dated 12.09.2023.

In connection with above subject MYS Division has submitted the draft structural drawings
and design calculations of Pre cast Abutment and RCC Twin Box, same have been scrutinized and
following are observations/correction which shall be clarified/corrected;

I ) Pre caste Abutment:


10.Size and depth of pedestal shall be shown.
11.Weight of Pre caste abutment.
12.Arrangement of fixing of base plate and anchor bolts to be shown in drawing.
13.Sketch of abutment shown in to be as per scale( design).
14.Pg no.12 of design booklet (weight of steel shown as 340 t to be checked).
15.Pg no.22 of design booklet (dia of bar for abutment stem shown as 25@150 where as in drawing
it is shown as 20@150mm).
16.Approved GAD number shall be incorporated.
Haunch size.
RCC Twin Box:
17.Only reinforcement details of Box is submitted. Dimensional details of RCC Twin Box( showing
Levels earth cushion etc., shall be submitted).
18.Canal bed level to be shown in drawing.
19.Ballast cushion shall be considered as 350mm in design.
20.EUDL SF and BM shall be considered for overall span ( i.e.14.4Sk).
21. 20kmph speed considered in PQRS loading shall be clarified.
22. Iteration ratio for ( MR/Design bending moment) is less than 0.4, the RCC Box is of more
conservative side , hence design of RCC twin box shall be redesigned by reducing the box
thickness and reinforcement.
23.Crack width check for base slab, top slap, and side walls area of steel considering design is
doubly reinforced.
24.Curvature effect shall be considered in design of abutment and foundation.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for
approval.

For information and necessary action please.

(कृ त्या नंद झा/ Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
.

No.SWR/W.70/Pipeline xing/POW/GOW Date:


31.10.2023.

JGM/Civil/RVNL/UBL

Sub: Londa – Vasco Section: Proposed Construction of Br. No 290B- 1a,with span 1x35.0m steel truss
(water pipe lines crossing) at km 106/240 between Dabolim and Vasco da gama stations.

Ref: Letter No.PIU/UBL/Rly Corresp/SKVL-VSG/290B-1A/01, dated 07.10.2023

*****
In connection with the above subject and letter under reference, the draft structural drawings
and design calculation of Pipe line crossing are received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;

1. Approval letter of CPM for adoption of pile foundation to be submitted to this office.
2. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by concerned officials to be submitted.
3. Pile integrity test shall be conducted to piles as per letter No.SWR/W.352/Genel/2020-21, dated
10.08.2020.
4. Design calculation for crack width for pile shall be furnished.
5. Type and grade of bolt shall be incorporated.
6. Following points are to be incorporated in structural drawings :
a. Exposure condition (as per clause No.5.4.1 of IRS concrete bridge code).
b. Seismic zone to be incorporated
7. The clear cover for wall for severe condition shall be corrected.
8. Signature of CPM/RVNL shall be obtained in design and drawings.
9. Pile cap depth shall be 1.5 times dia of pile.
10. Pile is of end bearing or friction pile shall be shown in drawing.
11. Pile capacity shall be checked and corrected.
12. Signature table for Hq officials shall be incorporated.

Design and structural drawings are returned for incorporating and to be resubmitted
for further processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to
be proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
28.10.2023.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Proposed Construction of over head pipeline no. 518A at ch:199907.57 is of
size 1 x 21.825m steel truss between Hosur and Bayapanahalli stations. pro.bridge is on up line
exg.bridge of size 1 x 19.25m + 1 x 7.00m steel truss.

Ref: 1. Add.GM(Civil)/Projects/KRIDE, reply for 518A, dated 25.10.2023.


2. This office letter dated 19.09.2023.
*****
In connection with the above subject, and letter under reference, the draft structural drawings and
design calculation of overhead pipe line crossing no.518A are received in this office.
Smt.P.Tejasri designer from Chetan Infratech Consultants Pvt ltd., Bangalore attended this office
on date 26.10.2023 during discussion the following points are discussed;
20. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by concerned officials to be submitted.
21. Capacity of member and maximum member force shall be incorporated in design calculation.
22. The overall length of truss is 21.76m, splice design calculation shall be furnished.
23. Seismic load shall be considered in STAAD.
24. Water load shall be considered along with live load.
25. End portal member size provided shall rechecked and also terrain category, design wind speed,
considered in design shall be checked.
26. As per compliance report Sl.No.7, the structural drawings and design calculations are submitted
to this office, where as this office is not received the structural drawings of truss.
27. Weep hole specifications shall be incorporated in abutment drawing.
28. Structural drawings and design calculation of truss with connection details to be submitted for
516A also.
29. The dead load of saddle concrete cover around MS pipe is around 53.39KN which is more and
also increases the dead load on truss, feasibility of providing steel saddle for pipe will reduce the
dead load over the truss.
30. Notes regarding codal provisions, fabrication, grade of steel, welding specifications, general
notes etc., shall be incorporated in drawings.
31. As discussed in this office on 26.10.23 all the observation shall be attended and design report
and structural drawings shall be submitted to this office.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
21.10.2023.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major Bridge No. 474 at CH: 182153.700 Pro. Construction of 2 x 12.20 m PSC
Slab on Down Stream side of the Exg. Bridge of 2 x 12.20 m steel girder between Baiyappanahalli 'A'
Panel and Hosur Stations. Proposed bridge is on up line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/430 of GM/Civil/Projects/KRIDE, dated 12.10.2023.


2. This office letter dated, 03.08.2023 & 07.09.2023.
*****
In connection with the above subject, and letter under reference, the revised structural
drawings and design calculation of bridge no.474 along with compliance are received in this office
and the same have been scrutinized and following are the further observations/correction which shall
be clarified/corrected;
Abutment:
31. Approval letter of Director/PP for adoption of pile foundation has not been submitted to this
office.
32. Details of protection wall below the pile cap to retain the earth behind the abutment to be
submitted.
33. This office observation for Sn.3 of l is not satisfactory, design calculation of wing wall is not
submitted to this office.
34. This office observation for Sn.4 is not satisfactory, reason for reduction in number of pile
has not been justified.
35. In design calculation of pile cap the value of crack width shown as 0.274mm which is
greater than 0.25mm same shall be checked and corrected.
36. In pile design, free headed pile shall be clearly mentioned.
Pier:
37. Pile cap bottom level shown in longitudinal section of Pier and Reinforcement details of Pile
is not tallying same shall be checked.
38. Live load considered in design shall be checked and corrected and also CDA to be added to
Live load.
39. Latest codal reference to be incorporated in design.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.
The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
20.10.2023.

GM/Civil/Projects/KRIDE
Sub: SA – YPR Section: Proposed Construction of over head pipeline no. 518A at ch:199907.57 is of
size 1 x 21.825m steel truss between Hosur and Bayapanahalli stations. pro.bridge is on up line exg.bridge
of size 1 x 19.25m + 1 x 7.00m steel truss.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/401 of Add.GM(Civil)/Projects/KRIDE, dated


07.09.2023.
2. This office letter dated 28.08.2023.

*****
In connection with the above subject, and letter under reference, the draft structural drawings and
design calculation of the above overhead pipe line crossing are received in this office and the same have
been scrutinized and following are observations/correction which shall be clarified/corrected;

32. In design calculation, live load surcharge only has been considered, dead load surcharge also to
be considered and maximum pressure shown as 39.97 t/sqm shall be rechecked.
33. Design calculation of bed block and dirt wall shall be furnished.
34. Design calculations for punching shear shall be furnished.
35. Detailed load calculation of SIDL to be furnished.
36. During casting the bed block, the anchor rods to be inserted inside the bed block, where as
compliance it is mentioned truss design and drawings will be submitted later same shall be
justified.
37. Centre line of future track to face of abutment is shown as 5280mm, whereas per GAD it is
2780mm only same shall be considered in design of abutment foundation (516A).
38. Top width of abutment is shown as 600mm; same shall be checked with seating arrangement of
bed plate at top.
39. Structural drawings and design calculation of truss with connection details to be submitted.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
04.10.2023.

GM/Civil/Projects/KRIDE
Sub: SA – BYPL Section: Proposed Construction of Foot over bridge of Clear span 23.308m at
ch:182931
at Heelalige station between Anekal and Karmelaram stations

Ref: Letter No.BYPL-HSRA/DL/2021/5061-37 of Add.GM(Civil)/Projects/KRIDE, dated 19.09.2023.

*****
In connection with the above subject and letter under reference, the structural drawings and
design calculation of FOB at Heelalige station are received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;

40. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by concerned officials to be submitted, the same has mentioned in note no.22 of
GAD.
41. Overall length of ramp shown in GAD and structural drawings is not tallying same shall be
checked and clarified.
42. Ramp columns have been proposed with single column, for stability and safety double
column shall be proposed.
43. Seismic zone and exposure condition shall be incorporated in drawings.
44. Details of batten plate bracket for ISMC100 shall be incorporated in drawings.
45. In drawing sheet no.5 details of G & F shall be incorporated.
46. Design calculations of batten plates shall be furnished.
47. Design calculation for capacity of structural members shall be furnished.
48. Letter from IISc regarding proof checking shall be furnished.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.352/Low Cost ROB/LC45&55/HAS-MAJN
Date:03.10.2023.

Sr.DEN/Co-Ord/MYS

Sub: HAS-MAJN Section: Proposed rebuilding of exg. ROB No.520 with 1 x 24.00m composite
girder at km
142/300-400 between KBPR-NRF Stations.

Ref: 1. Sr.DEN/Co-ord/MYS letter No.Y/W.352/Widening of ROB at KBPR, dated 11.09.2023.


2. This office letter dated 21.06.2023 & 31.08.2023.

In connection with above subject and letter under reference, the structural drawings and
design calculations of substructure of ROB No.520 submitted to this office for approval and the
same have been scrutinized and following are observations/correction which shall be
clarified/corrected;

1. The structural drawings submitted are to be signed by design consultant.


2. Geotechnical investigation report, SBC calculation strata wise shall be submitted duly
signed by divisional officials.
3. As per clause 705.2.2, IRC:78 for open foundations resting on rock:
i) for rocks and moderately strong and above in table 2 of classification of rock( under
clause 8.2 of appendix 2) having UCS of more than 12.5MPA or where it is not possible to
take core to get the UCS but extrapolated SPT NValue is more than500( embedment depth
shall be 0.6m)
ii) for rocks and moderately weak and above in table 2 of classification of rocks having
UCS <12.5MPA but > 2.5MPA or where it is not possible to take core to get the UCS but
extrapolated SPT NValue is more than 100 but less than 500( embedment depth shall be
1.5m).
Where as in structural drawings the depth of shear key shown as 0.6m is not satisfying the
above clause (as per soil report).
4. The feasibility of providing the shear key in rock shall be furnished.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
03.09.2023.

GM/Civil/Projects/KRIDE

Sub: SA – BYPL Section: Proposed Construction of Foot over bridge of Clear span 23.308m at ch:182931
at Heelalige station between Anekal and Karmelaram stations

Ref: Letter No.BYPL-HSRA/DL/2021/5061-37 of Add.GM(Civil)/Projects/KRIDE, dated 19.09.2023.

*****
In connection with the above subject and letter under reference, the structural drawings and
design calculation of FOB at Heelalige station are received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;

49. In design calculation, live load surcharge only has been considered, dead load surcharge also to
be considered and maximum pressure shown as 39.97 t/sqm shall be rechecked.
50. Design calculation of bed block and dirt wall shall be furnished.
51. Design calculations for punching shear shall be furnished.
52. Detailed load calculation of SIDL to be furnished.
53. During casting the bed block, the anchor rods to be inserted inside the bed block, where as
compliance it is mentioned truss design and drawings will be submitted later same shall be
justified.
54. Centre line of future track to face of abutment is shown as 5280mm, whereas per GAD it is
2780mm only same shall be considered in design of abutment foundation (516A).
55. Top width of abutment is shown as 600mm; same shall be checked with seating arrangement of
bed plate at top.
56. Structural drawings and design calculation of truss with connection details to be submitted.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.352/Canal X-ing/MYS-ASK&TK-ASK/VJNL/VOL-I Date:
30.09.2023

Sr.DEN/Co-ord/MYS

Sub: MYS -ASK Section: Proposed construction of RCC Box 2X5.7Mx5.5M at Km. 155/300-400
Between
HHT-ASK Yattinahole gravity canal X-ing (Ch: 78+024)(Deposit work by VJNL) “Pre- cast
Abutment”.
Ref: letter No.Y/W.731/130 (i) km.155/MYS-ASK/YH Canal crossing, dated 12.09.2023.

In connection with above subject MYS Division has submitted the draft structural drawings
and design calculations of Pre cast Abutment, the same have been scrutinized and following are
observations/correction which shall be clarified/corrected;

25.Geotechnical investigation report, SBC calculation strata wise( at foundation level of abutment
and RCC BOX), etc., shall be submitted duly signed by divisional officials to be submitted.
26.Moment of resistance and capacity of section to be incorporated.
27.HTS strands shall be used for lifting of precast abutment and same shall be incorporated in
drawings.
28.Curvature effect shall be considered in design of abutment and foundation.
29.Arrangement for fixing of anchor bolt and base plate shall be done at the time of casting of
abutment.
30.Detailed modus operandi for launching of pre cast abutment shall be submitted along with GAD
and TAD.
31.Design and drawings of Pre cast abutment and RCC Box shall be submitted simultaneously.
32.This office letter dated 03.03.2023 observation shall be complied.
9. Development length as per codal provision to be incorporated in drawings.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for
approval.

For information and necessary action please.

(कृ त्या नंद झा/ Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
.

The stiffener bend in a steel girder bridge serves several important purposes:

1. Structural Integrity and Stability: Stiffener bends are used to enhance the stability and structural
integrity of the girder. They help distribute loads more evenly across the length of the girder and prevent
it from buckling or failing under heavy loads.

2. Reduces Distortion and Deflection: When a bridge is subjected to dynamic loads, such as those from
moving trains, it experiences bending and distortion. Stiffener bends help reduce these distortions and
limit the amount of deflection that occurs.
3. Prevents Lateral Torsional Buckling: Lateral torsional buckling is a failure mode in which a slender
beam (like a bridge girder) twists and bends under load. Stiffeners are strategically placed to prevent
this type of failure.

4. Aids in Load Distribution: Stiffener bends help in distributing the concentrated loads from the bridge
deck or other components to the main girders more effectively. This ensures that the load is spread out
over a larger area, reducing the risk of localized stress concentrations.

5. Improves Fatigue Resistance: Dynamic loads, such as those from trains, can induce fatigue in the
material over time. Stiffeners can be designed to absorb some of this fatigue, extending the lifespan of
the bridge.

6. **Enhances Buckling Resistance**: Stiffeners are designed to resist buckling, which is a critical
onsideration in the design of bridges subjected to heavy loads, like those in railway applications.

7. **Maintains Alignment and Shape**: Stiffeners help maintain the desired shape and alignment of the
girder, especially when it is subjected to lateral forces or uneven loading.

8. **Aesthetic Considerations**: While not a primary engineering reason, stiffener bends can also
contribute to the overall aesthetics of the bridge by giving it a distinctive appearance.

In summary, stiffener bends in steel girder bridges are a crucial design element that plays a vital role in
ensuring the structural integrity, stability, and longevity of the bridge, particularly when subjected to the
dynamic and heavy loads associated with railway traffic.
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
19.09.2023.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Proposed Construction of over head pipeline no. 516A at ch:198777.50 of
size 1 x
21.825m steel truss between Hosur and Bayapanahalli stations. pro.bridge is on up line exg.bridge
atch:198770 is of size 1 x 19.25m + 1 x 7.00m steel truss and over head pipe line no.518A at
ch:199907.57 is of size 1 x 21.825m steel truss between Hosur and Bayapanahalli stations. pro.bridge
is on up line exg.bridge of size 1 x 19.25m + 1 x 7.00m steel truss.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/401 of Add.GM(Civil)/Projects/KRIDE, dated


07.09.2023.
2. This office letter dated 28.08.2023.

*****
In connection with the above subject, and letter under reference, the draft structural drawings and
design calculation of the above overhead pipe line crossing are received in this office and the same have
been scrutinized and following are observations/correction which shall be clarified/corrected;

57. In design calculation, live load surcharge only has been considered, dead load surcharge also to
be considered and maximum pressure shown as 39.97 t/sqm shall be rechecked.
58. Design calculation of bed block and dirt wall shall be furnished.
59. Design calculations for punching shear shall be furnished.
60. Detailed load calculation of SIDL to be furnished.
61. During casting the bed block, the anchor rods to be inserted inside the bed block, where as
compliance it is mentioned truss design and drawings will be submitted later same shall be
justified.
62. Centre line of future track to face of abutment is shown as 5280mm, whereas per GAD it is
2780mm only same shall be considered in design of abutment foundation (516A).
63. Top width of abutment is shown as 600mm; same shall be checked with seating arrangement of
bed plate at top.
64. Structural drawings and design calculation of truss with connection details to be submitted.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
14.09.2023.
GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major bridge no. 412 at ch: 159721 Pro. Construction of 2 x 9.15 m PSC
slab on down stream side of the Exg. bridge of 2 x 9.14 m steel girder between Hosur and
Maranayakanahalli stations Pro Bridge is on up line.

Ref: 1.Letter No.BYPL - HSRA/DL/Bridge GAD/392 of GM/Civil/Projects/KRIDE, dated


26.06.2023.
2. This office letter dated 24.07.2023.

*****

In connection with the above subject, and letter under reference, the draft structural
drawings and design calculation of bridge no.412 received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
Abutment:
35. Geotechnical investigation report, SBC calculation strata wise, etc., shall be
submitted duly signed by concerned officials to be submitted.
36. Design and drawings of bed block and dirt shall be furnished.
37. Design calculation and drawings of shoring arrangement shall be furnished.
38. .
39. Design calculation of return wall and conjunction wall shall be furnished.
40. In design calculation of scour depth, the value of f shown as 2.49( for fine sand),
whereas in bore log details in approved GAD, the type of soil up to 3m is silty
sandy clay, for the same scour depth calculation shall be revised .
41. Latest codal reference to be incorporated in design.
42. Design and structural drawings of Pier to be submitted.
43. Exposure condition, cover, grade of steel and reinforcement details for
foundation, bed block and dirt wall to be incorporated.
44. Signature table for Railway officials shall be incorporated in drawing.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
14.09.2023.
GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Major bridge no. 412 at ch: 159721 Pro. Construction of 2 x 9.15 m PSC
slab on down stream side of the Exg. bridge of 2 x 9.14 m steel girder between Hosur and
Maranayakanahalli stations Pro Bridge is on up line.

Ref: 1.Letter No.BYPL-HSRA/DL/Bridge GAD/392 of GM/Civil/Projects/KRIDE, dated


26.06.2023.
2. This office letter dated 24.07.2023.

*****

In connection with the above subject, and letter under reference, the draft structural
drawings and design calculation of bridge no.412 received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
Abutment:
45. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by concerned officials to be submitted.
46. Design and drawings of bed block and dirt shall be furnished.
47. Design calculation and drawings of shoring arrangement shall be furnished.
48. .
49. Design calculation of return wall and conjunction wall shall be furnished.
50. In design calculation of scour depth, the value of f shown as 2.49( for fine sand), whereas in
bore log details in approved GAD, the type of soil up to 3m is silty sandy clay, for the same
scour depth calculation shall be revised .
51. Latest codal reference to be incorporated in design.
52. Design and structural drawings of Pier to be submitted.
53. Exposure condition, cover, grade of steel and reinforcement details for foundation, bed block
and dirt wall to be incorporated.
54. Signature table for Railway officials shall be incorporated in drawing.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.438/Incr Spd/CBP - KQZ Date:
14.09.2023.

Sr.DEN/Co-ord/SBC

Sub: Kolar – Chikkaballapur section: Bridge No.65 of span 2x11.50m +2x12.5m PSC Girder and slab
(RDSO/B- 10258) at ch 112868m.
Ref: 1. CRS/SBC letter No.Q19017/02/2020-21 SWR, dated 18.01.2020.
2. This office letter No.SWR/W.438/Incr Spd/CBP-KQZ, dated 20.07.2021.

*****
In connection with the above subject and letter under reference-1, CRS has imposed a SR of
30kmph over Bridge No.65 (2x11.57m+2x12.20m+2x12.20m PSC I Girder) at km.112/800-900 while
opening the section, as there is a 2.70 curve over the bridge. In this regard, this Office has checked the
bridge for 2.70 curves with SR 80kmph. The same was communicated to SBC division vide letter under
Ref-2.

Now, after increasing the speed of 80kmph, it is requested to check any discrepancy observed in
the girder and the same shall be communicated to this office

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: Sr.DEN/N/SBC - for kind information pl.


No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
07.08.2023.

Sub: SA – YPR Section: Major Bridge No. 474 at CH: 182153.700 Pro. Construction of 2 x 12.20 m PSC
Slab on Down Stream side of the Exg. Bridge of 2 x 12.20 m steel girder between Baiyappanahalli 'A'
Panel and Hosur Stations. Proposed bridge is on up line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/407 of Add.GM/Civil/Projects/KRIDE, dated


28.08.2023.
2. This office letter dated,03.08.2023
*****
In connection with the above subject, and letter under reference, the revised structural drawings
and design calculation of bridge no.474 along with compliance are received in this office and the same
have been scrutinized and following are the further observations/correction which shall be
clarified/corrected;
40. It is be seen from the video that there is square returns for existing abutments, feasibility of
providing pile cap at the bed level for abutment and pier shall be explored.
41. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by concerned officials to be submitted.
42. Wing wall is designed for live load surcharge and earth pressure; hence design feasibility shall
be checked for open foundation.
43. Load on pile for abutment and pier is very less compared to capacity of pile, feasibility for
reducing the number of piles and reinforcement shall be checked.
44. As the pile cap for abutment is up to bottom of PSC Slab, how the soil behind the abutment will
be retained shall be explored.
45. Crack width for pile shall be furnished.
46. Design calculation of return wall/wing wall and conjunction wall shall be furnished.
47. In pier design single span and double span load considered same shall be checked and corrected.
48. Latest codal reference to be incorporated in design.
49. One span dislodged condition shall be considered in design.
50. The proposed bridge is in curvature, curvature effect shall be considered in design.
51. Design calculations of scour depth as per A & C slip No.10, dated 30.08.2021 shall be followed
Vague compliance shall not be given.
52. Following points are to be incorporated in structural drawings :
a. Exposure condition (as per clause No.5.4.1 of IRS concrete bridge code).
b. Seismic zone to be incorporated.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

65. Reasons for lifting of Pile above HFL& pile cap & up to bottom, vague compliance shall not be
given.
FileNo.SWR/W.182/Gati Shakti Unit/SBC Date:
05.09.2023.

CPM/GSU/SBC

Sub: SBC- JTJ Section: RUB NO.841C (1X12.25X5.50M) RCC BOX at km. 349/800 between
BNC-BYPL
Stations by Box Pushing method ( Deposit work for BMRCL).
Ref: Letter No.W.337/GSU/SBC/ROB/841C, dated 08.08.2023.

*****
In connection with the above subject, and letter under reference, the draft structural drawings and
design calculation of the RUB No.841C received in this office and the same have been scrutinized and
following are observations/correction which shall be clarified/corrected;

55. As per GAD the depth of temporary girder (1308mm+300mm=1608mm), where as


RL to Top of Box is 1508mm, same shall be checked and clarified.
56. Geotechnical investigation report (SBC at bottom of box), SBC calculation strata
wise, etc., shall be submitted duly signed by concerned officials to be submitted.
57. Dispersion width shall be considered for minimum spacing of tracks, for the design
calculations shall be revised.
58. Notes regarding RDSO guidelines for box pushing shall be incorporated.
59. Design shall be checked for maximum permissible speed as given in Para 3.3.1 of
IRS Bridge Rules.
60. One side earth pressure also to be considered in design calculation.
61. Following points are to be incorporated in structural drawings :
a. Approved GAD number shall be
incorporated in structural drawings.
b. Exposure condition (as per clause No.15.92 of IRS concrete bridge code).
b. Development length as per codal
provision to be incorporated in drawings.
62. Deflection check as per codal provision shall be furnished.
63. Design shall be checked for multiple tracks.
64. SIDL and earth cushion shall be considered in design of thrust bed.
65. As per extent instructions applicable codal charges are to be paid by the party, fully
funded by sponsoring agencies. All the necessary charges are to be collected and
details shall be submitted to this office for reference.
Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Dy.CE/GSU/SBC – for information and necessary action, please.
No.SWR/W.182/Minor Bridges/LD-VSGRVNL Date:
01.09.2023.

JGM/Civil/RVNL/UBL

Sub: MJO – VSG Doubling Project: Protection works for vertical lateral cuttings by Construction of RCC
Retaining
wall in SKVL-VSG Section.

Ref: 1. Letter No.PIU/UBL/Rly Corresp/MJO-VSG/01, dated 18.08.2023


2. This Office even letter dated 07.08.2023 & 16.08.2023.

*****
In connection with the above subject and letter under reference, the draft structural drawings
and design calculation of the Retaining wall are received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;

13. The detailed soil investigation report of proposed retaining wall shall be submitted.
14. The vertical reinforcement for retaining wall shall be as per cl.16.3 of IRC 112 for the same
design and drawings shall be revised.
15. The clear cover for wall for severe condition shall be corrected.
16. Development length (LD) shall be as per table 15.4 of IRC: 112-2022.
17. Design of retaining wall shall be as per latest IRC and IRS codes.
18. Retaining wall design shall be up to max of 6m height.
19. Signature of CPM/RVNL shall be obtained in design and drawings.
20. Drawings shall be submitted in tracing sheet.
21. Signature table for Hq officials shall be incorporated.

Design and structural drawings are returned for incorporating and to be resubmitted
for further processing please.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
28.08.2023.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Proposed Construction of over head pipeline no. 516A at ch:198777.50 of size 1
x 21.825m steel truss between Hosur and Bayapanahalli stations. pro.bridge is on up line exg.bridge at
ch:198770 is of size 1 x 19.25m + 1 x 7.00m steel truss and over head pipe line no.518A at ch:199907.57
is of size 1 x 21.825m steel truss between Hosur and Bayapanahalli stations. pro.bridge is on up line
exg.bridge of size 1 x 19.25m + 1 x 7.00m steel truss.

Ref: Letter No.BYPL-HSRA/DL/Bridge GAD/401 of Add.GM(Civil)/Projects/KRIDE, dated


05.08.2023.

*****
In connection with the above subject, and letter under reference, the draft structural drawings and
design calculation of the above overhead pipe line crossing are received in this office and the same have
been scrutinized and following are observations/correction which shall be clarified/corrected;
66. Detailed Geotechnical investigation report (at Abutment location), SBC calculation strata
wise, etc., shall be submitted duly signed by concerned KRIDE officials to be submitted .
67. Vertical clearance shown in drawings is not tallying with GAD, same shall be checked and
corrected.
68. As per Addendum and corrigendum slip no.50 of IRS Bridge rules dated 06.12.2022 “All
structures near railway structures shall be checked for accidental impact from derailed rails as
per clause 2.16.4” shall be checked and design calculation and drawings to be furnished.
69. Foundation of proposed BSRP Corridor-4 and foundation of abutment shall not infringe, same
shall be clarified/checked.
70. Truss members shall be equally spaced.
71. For stability,abutment shall be provided with square return walls.
72. All levels shall be w.r.t to GAD same shall be incorporated in structural drawings.
73. Latest codal reference to be incorporated in design.
74. Structural drawings of truss (structural members , splice joint, connection details of typical
members) is not been submitted, after submitting the design and drawings the abutment and truss
design will be checked in detail.
75. Manual design calculations of critical members shall be furnished.
76. Following points are to be incorporated in structural drawings( general) :
a. Exposure condition (as per clause No.5.4.1 of IRS concrete bridge code).
66. Grade of structural steel.
67. Chequered plate shall be provided at bottom chord of truss.
68. Development length.
.
77. SBC of soil at foundation level is shown 10t/sqm, whereas the calculated maximum pressure
on soil at foundation level for abutment is 18.35t/sqm same shall be checked and design and
drawings shall be revised( for 516A).
78. Design calculation for track live load on abutment foundation shall be checked.
79. Launching loads shall be considered in design of steel truss.
80. Notes regarding fabrication of steel girders shall be incorporated.
81. Seating arrangement of truss, anchor bolts design, base plate design and drawing shall be
furnished.

82. Velocity of water and impact load shall be considered in design.


83. For stability of truss x bracings shall be provided at top and bottom chord.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/Minor Bridges/LD-VSGRVNL Date:
16.08.2023.

JGM/Civil/RVNL/UBL

Sub: MJO – VSG Doubling Project: Protection works for vertical lateral cuttings by Construction of RCC
Retaining wall in SKVL-VSG Section.

Ref: 1. Letter No.PIU/UBL/Rly Corresp/MJO-VSG/01, dated 14.08.2023


2. Letter No.W.338/RVNL/LD-VSG, dated 27.04.2023 of Sr.DEN/West/UBL.
3. This Office even letter dated 07.08.2023.

*****
In connection with the above subject and letter under reference, the draft structural drawings
and design calculation of the Retaining wall are received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;

22. The detailed soil investigation report of proposed retaining wall shall be submitted.
23. The longitudinal section, cross section including berm and Retaining wall along the track to
be furnished.
24. The sloped surcharged load to be considered in design.
25. Details of boulders at earth side of retaining wall shall be shown as per IRS substructure
code.
26. Notes regarding IRS codes shall be checked and corrected.
27. Exposure condition shall be incorporated.

Design and structural drawings are returned for incorporating and to be resubmitted
for further processing please.
.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/BSC Meeting/Vol-III Date:
18.08.2023.

Director/B&S
Research Designs & Standards Organisations (RDSO),
Manak Nagar,
Lucknow-226011
Sub: Agenda items for 87th Meeting of Bridge and Structures Standards Committee.
Ref: Letter No.CBS/C-87(2022), dated 17.04.2023 of Executive Director (B&S) RDSO.

*****

In connection to the above subject, please find the enclosed herewith agenda items for 87th
Meeting of Bridge and Structures Standards Committee from SWR.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Encl: As above

Copy to: DG, IRICEN Pune - for kind information please.


No.SWR/W.182/Minor Bridges/LD-VSGRVNL Date:
16.08.2023.

JGM/Civil/RVNL/UBL

Sub: MJO – VSG Doubling Project: Protection works for vertical lateral cuttings by Construction of RCC
Retaining wall in SKVL-VSG Section.

Ref: 1. Letter No.PIU/UBL/Rly Corresp/MJO-VSG/01, dated 14.08.2023


2. Letter No.W.338/RVNL/LD-VSG, dated 27.04.2023 of Sr.DEN/West/UBL.
3. This Office even letter dated 07.08.2023.

*****
In connection with the above subject and letter under reference, the draft structural drawings
and design calculation of the Retaining wall are received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;

28. The detailed soil investigation report of proposed retaining wall shall be submitted.
29. The longitudinal section, cross section including berm and Retaining wall along the track to
be furnished.
30. The sloped surcharged load to be considered in design.
31. Details of boulders at earth side of retaining wall shall be shown as per IRS substructure
code.
32. Notes regarding IRS codes shall be checked and corrected.
33. Exposure condition shall be incorporated.

Design and structural drawings are returned for incorporating and to be resubmitted
for further processing please.
.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: 1. CPM/RVNL/SBC - for kind information pl.
2. Sr.DEN/West/UBL – for information pl.
No.SWR/W.352/LC.46(ROB)/BGK-MGL/GDG-HG/NHD Date:
11.08.2023.
Executive Engineer
Gopalpur Galli
Vijaypura-586108

Sub: GDG- BJP Section: Construction of 4lane ROB in lieu of LC.No.46 at Rly km.94/600-700
(NH+144+256.5) between Bagalkot and Mugalolli stations on Shirur - Gaddankeri section of NH367
ROB span 32m+52m+20m.
Ref: Letter.No.EE/NHDN/VJP/NH-367/ROB/LC.46/2023-24, dated 04.08.2023.

*****
In connection with the above subject, and letter under reference, the structural drawings and
design calculation of the above ROB are received in this office for approval and the same have been
scrutinized( for obligatory span) and following are observations/correction which shall be
clarified/corrected;
84. Detailed Geotechnical investigation report, SBC calculation strata wise, etc., shall be
submitted duly signed by concerned NH officials to be submitted.
85. Soft copy of design calculations in excel sheet in editable format shall be submitted to this
office( email: bridgeswrhq@gmail.com) for checking of design
86. Pier shall be of Wall type as per approved GAD and A&C No.50 of IRS BR.
87. As per Addendum and corrigendum slip no.50 of IRS Bridge rules dated 06.12.2022 “All
structures near railway structures shall be checked for accidental impact from derailed rails
as per clause 2.16.4” shall be checked and design calculation and drawings to be furnished.
88. Pier cap top levels shown in drawings are nor tallying with GAD.
89. Seismic zone considered is not correct same shall be checked and corrected and design to be
revised accordingly.
90. Moment of resistance and capacity of the section shall be incorporated in design calculation.
91. Typical type of foundation, Pier and Pier cap shall be made for obligatory spans.
92. Design calculation submitted to this office booklet without page numbers.
93. Manual calculations for DL,SIDL etc,, of approach span shall be furnished.
94. Live load reaction considered in design for MIDAS software, this office is not having
MIDAS software; hence manual Live load calculation/analysis shall be submitted.
95. Design has been done for open foundation with depth of foundation of 7.5m for ground
level, it is better to go for pile foundation for safety of Railway track, which is carrying
passengers and Goods Traffic. This will endanger the safety of running trains( lives to
human beings being and also goods transportation) and your activity a site may lead to some
unsafe and /or untoward incident and also it is shown in structural drawings that if SBC of
soil not found soil improvement to be adopted.
96. Summary of forces and load combination shall shown in tabular form.
97. Pier design slenderness check along and across the traffic shall be furnished.
98. Check for confinement reinforcement shall be considered in design.
99. Punching shear check to be furnished.
100. Latest codal reference to be incorporated in design.
101. Manual design calculation for crack width.
102. Flexure design calculation for pier and pier cap.
103. Design and structural drawings and design calculations submitted is not as per
approved GAD.
104. Deflection check design calculation shall be furnished.

105. Following points are to be incorporated in structural drawings :


a. Exposure condition.
69. Seismic zone to be incorporated.
70. Development length as per IRC:112
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/Minor Bridges/LD-VSG/RVNL Date:
07.08.2023.

JGM/Civil/RVNL/UBL

Sub: Protection works for vertical lateral cuttings by Construction of RCC Retaining wall in SKVL-VSG
Section.
Ref: Letter No.W.338/RVNL/LD-VSG, dated 27.04.2023.

*****
In connection with the above subject and letter under reference, protection works for vertical
lateral cuttings by Construction of RCC Retaining wall in SKVL-VSG Section is to be scrutinized as per
CBE instructions.
In this regard, it is requested to submit the structural drawings and design calculation of RCC
Retaining wall and slope stability analysis with slope stability measures for further processing please.
For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: 1. CPM/RVNL/SBC - for kind information pl.


2. Sr.DEN/West/UBL – for information pl.
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
07.08.2023.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Proposed extension of RUB no. 531 as 1 x 7.50 x 5.65m (clear ht:5.50m) rcc
box(cast in situ and 12o skew) at ch: 205221.69 and 1 x 18.30m composite girder at ch:205242.28 & 1 x
7.5 x 5.65m (clear ht:5.50m) RCC Box (cast in situ) at ch: 205260.31 in Baiyyappanahalli 'A' panel
(BPHI) yard between Belanduru road (BLRR) and Banaswadi(BAND) stations. The existing bridge is 1 x
7.50 x 5.65m (clear ht:5.50m) RCC Box at ch:205221.69 and 1 x12.20m steel girder at ch: 205241 and 1 x
7.50 x 5.65m (clear ht:5.50m) RCC Box at ch: 205260.31 on existing up main line.

Ref: Letter No.BYPL-HSRA/DL/Bridge GAD/400 of GM/Civil/Projects/KRIDE, dated 27.07.2023.

*****
In connection with the above subject, and letter under reference, the draft structural drawings and
design calculation of the above bridge are received in this office and the same have been scrutinized and
following are observations/correction which shall be clarified/corrected;
Abutment:
106. Latest codal reference to be incorporated in design.
107. Exposure condition, seismic zone shall be incorporated.
108. Design calculation of return wall/wing wall and conjunction wall shall be furnished.
109. Following points are to be incorporated in structural drawings :
a. Exposure condition (as per clause No.5.4.1 of IRS concrete bridge code).
71. Seismic zone.
RCC BOX:
110. Earth at rest shall be considered in design.
111. RCC BOX shall be designed for multiple tracks & note shall be incorporated in
drawing.
112. Proposed Road level shall be as per approved GAD.
113. Bar bending schedule is not tallying with box dimensions; same shall be checked and
corrected.
114. In crack with calculation area of reinforcement shall considered for singly
reinforcement.
115. Fatigue check for top, bottom and side walls also to be done.
116. Correction marked in the drawings to be attended ( for Abutment and Box).

As per Railway Board letter No.2022/7/CE-III/BR/CBEs Seminar, dated 30.05.2023, it is


advised to carryout “RSI analysis in the initial design of bridge as per BS-114 version -2” for
continuation of LWR over Bridges along with the bridge work or in future.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/Minor Bridges/LD-VSGRVNL Date:
07.08.2023.

JGM/Civil/RVNL/UBL

Sub: Protection works for vertical lateral cuttings by Construction of RCC Retaining wall in SKVL-VSG
Section.
Ref: Letter No.W.338/RVNL/LD-VSG, dated 27.04.2023.

*****
In connection with the above subject and letter under reference, protection works for vertical
lateral cuttings by Construction of RCC Retaining wall in SKVL-VSG Section is to be scrutinized as per
CBE instructions.
In this regard, it is requested to submit the structural drawings and design calculation of RCC
Retaining wall and slope stability analysis with slope stability measures for further processing please.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: 1. CPM/RVNL/SBC - for kind information pl.


2. Sr.DEN/West/UBL – for information pl.
No.SWR/W.352/General/2019-20 Date:
07.08.2023

NOTE

Sub: Sparing of General Assistant to CE/RSW in Hq.

In connection with above subject, Mr.Srinvas L Meundi General Assistant working under CE/RSW is on
leave from 07.08.2023 to 11.05.2023 , it is requested to spare one General Assistant to CE/RSW.

Dy.CE/Bridge
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
07.08.2023.

GM/Civil/Projects/KRIDE

Sub: SA – YPR Section: Proposed extension of RUB no. 531 as 1 x 7.50 x 5.65m (clear ht:5.50m) rcc
box(cast in situ and 12o skew) at ch: 205221.69 and 1 x 18.30m composite girder at ch:205242.28 & 1 x
7.5 x 5.65m (clear ht:5.50m) RCC Box (cast in situ) at ch: 205260.31 in Baiyyappanahalli 'A' panel
(BPHI) yard between Belanduru road (BLRR) and Banaswadi(BAND) stations. The existing bridge is 1 x
7.50 x 5.65m (clear ht:5.50m) RCC Box at ch:205221.69 and 1 x12.20m steel girder at ch: 205241 and 1 x
7.50 x 5.65m (clear ht:5.50m) RCC Box at ch: 205260.31 on existing up main line.

Ref: Letter No.BYPL-HSRA/DL/Bridge GAD/400 of GM/Civil/Projects/KRIDE, dated 27.07.2023.

*****
In connection with the above subject, and letter under reference, the draft structural drawings and
design calculation of the above bridge are received in this office and the same have been scrutinized and
following are observations/correction which shall be clarified/corrected;
Abutment:
117. Latest codal reference to be incorporated in design.
118. Exposure condition, seismic zone shall be incorporated.
119. Design calculation of return wall/wing wall and conjunction wall shall be furnished.
120. Following points are to be incorporated in structural drawings :
a. Exposure condition (as per clause No.5.4.1 of IRS concrete bridge code).
72. Seismic zone.
RCC BOX:
121. Earth at rest shall be considered in design.
122. RCC BOX shall be designed for multiple tracks & note shall be incorporated in
drawing.
123. Proposed Road level shall be as per approved GAD.
124. Bar bending schedule is not tallying with box dimensions; same shall be checked and
corrected.
125. In crack with calculation area of reinforcement shall considered for singly
reinforcement.
126. Fatigue check for top, bottom and side walls also to be done.

Correction marked in the drawings to be attended.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(कृ त्या नंद झा/Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Sub: SA – YPR Section: Major Bridge No. 474 at CH: 182153.700 Pro. Construction of 2 x 12.20 m PSC
Slab on Down Stream side of the Exg. Bridge of 2 x 12.20 m steel girder between Baiyappanahalli 'A'
Panel and Hosur Stations. Proposed bridge is on up line.

Ref: Letter No.BYPL-HSRA/DL/Bridge GAD/396 of GM/Civil/Projects/KRIDE, dated 24.07.2023.

*****
In connection with the above subject, and letter under reference, the structural drawings and
design calculation of the above bridge are received in this office for approval and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
127. Geotechnical investigation report, SBC calculation strata wise, etc., shall be
submitted duly signed by concerned officials to be submitted.
128. Pile integrity test shall be conducted to piles as per letter No.SWR/W.352/Genel/2020-
21, dated 10.08.2020.
129. Maximum load on pile (pile termination level) shall be shown in drawing.
130. Depth of Dirt wall shall be Fl to top of pile cap.
131. Crack width for pile shall be furnished.
132. Reasons for lifting of Pile above HFL& pile cap & up to bottom of PSC slab shall
justified.
133. Design calculation of return wall/wing wall and conjunction wall shall be furnished.
134. Water current & Buoyancy forces for pile design shall be considered in design.
135. Pile cap design shall be checked for punching shear.
136. Latest codal reference to be incorporated in design.
137. Abutment design, checking the stability against sliding and overturning shall be
furnished.
138. Design and structural drawings submitted is not as per approved GAD.
139. The proposed bridge is curvature, curvature effect shall be considered in design.
140. Design calculations of scour depth as per A & C slip No.10, dated 30.08.2021 shall be
followed.
141. Fatigue check as per clause 13.4.1 of IRS concrete bridge code to be incorporated.
142. Following points are to be incorporated in structural drawings :
a. Exposure condition (as per clause No.5.4.1 of IRS concrete bridge code).
73. Seismic zone to be incorporated.

Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
GM/Civil/Projects/KRIDE

Sub: Major Bridge no. 513 at ch: 197119 Pro. construction of 2 x 12.20 m PSC slab on both up & down
stream side of the exg. bridge of 2 x 12.20 m steel girder in Belandur road station yard.pro. bridge is on
both up & down line.
Ref: Letter No.BYPL-HSRA/DL/Bridge GAD/396 of GM/Civil/Projects/KRIDE, dated 14.07.2023.

*****
In connection with the above subject, and letter under reference, the structural drawings and
design calculation of the above bridge are received in this office for approval is not clear and the same
have been scrutinized and following are observations/correction which shall be clarified/corrected;
III) Abutment and Pier By S.Balakumar design consultant:
74. The Geotechnical investigation report soil report submitted to this office is not
pertains to Bridge No.513, it is requested to submit the soil report for bridge.
No.513 so the design and drawings cannot be checked and finalized with proper soil
report.
75. Soft copy of design calculations in excel sheet in editable format shall be submitted
for checking of design.
76. Levels shown in design and structural drawings are not tallying with approved GAD
same shall be checked and corrected.
77. Pile integrity test shall be conducted to piles as per letter
No.SWR/W.352/Genel/2020-21, dated 10.08.2020.
78. Pile to be terminated in weathered/hard rock and length of socketing shall be as per
codal provision & length of pile (pile termination level) shall be shown in drawing.
79. Design calculation for capacity of pile shall be furnished.
80. Detailed calculations of LWR forces.
81. Tractive/Braking force shall be considered for two tracks for the same design shall
be updated.
82. Crack width for pile and pile cap shall be furnished.
83. Design calculation of return wall/wing wall and conjunction wall shall be furnished.
84. Latest codal reference to be incorporated in design.
85. Signature table for Railway officials shall be incorporated in drawing.
IV) Abutment and Pier( Chetan Infra Tech):
5. Design and structural drawings submitted is not as per approved GAD.
i) Height of Pier.
ii) Bed block.
6. Before submitting design and drawings to Hq for approval the levels, soil report etc., shall be
thoroughly checked and submitted for approval.
Design and structural drawings are returned for incorporating and to be resubmitted for further
processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be proof
checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.
For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
FileNo.SWR/W.182/Gati Shakti Unit/SBC Date:
31.07.2023.
CPM/GSU/SBC

Sub: Replacement of existing rub no 838b, semi through girder (1x11.697m) with 1 x 12.20 m
post
Tensioned PSC u-slab at ch: 347466.00 m between BNC-WFD stations. Along with
extension of
existing RUB. No 838B with 1 x12.20 m post tensioned PSC U-slab for proposed 3rd and 4th
lines

Ref: Letter No.W.352/GSU/SBC/ROB/838B, dated 17.07.2023.

*****
In connection with the above subject, and letter under reference, the draft structural
drawings and design calculation of the above RUB received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
RUB.No.838B:
86. Geotechnical investigation report, SBC calculation strata wise, etc., shall be
submitted duly signed by concerned officials to be submitted.
87. Main reinforcement for abutment shown in drawings is less than 0.4%, same shall
be checked and design and drawings shall be revised.
88. Moment of resistance and capacity of the section shall be incorporated in design
calculation.
89. Procedure and strengthening of substructure as per RDSO drawing No.EDO/B-
1997/Alt-4 to be followed and same shall be incorporated in drawing
90. Following points are to be incorporated in structural drawings :
c. Approved GAD number shall be
incorporated in structural drawings.
b. Exposure condition (as per clause No.15.92 of IRS concrete bridge code).
d. Development length as per codal
provision to be incorporated in
drawings.
d. Seismic zone to be incorporated.
91. Existing abutment shall be checked for 25t loading with and without jacketing for
the same design calculation shall be furnished.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: Dy.CE/GSU/SBC – for information and necessary action, please.


No.SWR/W.565/Y/RUB.No.293A/MYS-HAS/MUDA Date:
27.07.2023
Chief Engineer
National Highways,
K.R. Circle, Bangaluru-560001.
SUB: Proposed construction of additional vent ways to existing RUB.No.293A at km.4/400-500 between MYS-
HAS Section along Mysuru Ring Road (By Air Pushing Method) & cast in situ method.

Ref: 1. Letter No.CNH/TA-2/AE-1/Drawings/2023-24, dated 09.6.2023 of CE/NH/Bangalore.


2. Letter No.SCPL/MYS/NH/32/2022-123, dated 08.07.2023.
3. This Office even letter dated 26.08.2022.
*****
In connection with the above subject and letter under reference , the structural drawings and design
calculations of above work submitted by CE/NH Bengaluru has been approved by Competent Authority on
25.07.2023.
Following are the drawing Numbers:

SN Name of work HQ.Drawing No.


1 R C DETAILS OF RCC PRECAST BOX (1x12.00x6.00m) SWR/2023/STR-19/Br No.293A(RUB)/MYS-HAS/NHD SHEET
1 OF 5.
2 R C DETAILS OF RCC PRECAST BOX (1x6.00x6.00m) SWR/2023/STR-19/Br No.293A(RUB)/MYS-HAS/NHD SHEET
2 OF 5.
3 R C DETAILS OF THRUST BED (1x12.00x6.00m BOX) SWR/2023/STR-19/Br No.293A(RUB)/MYS-HAS/NHD SHEET
3 OF 5.
4 R C DETAILS OF THRUST BED SWR/2023/STR-19/Br No.293A(RUB)/MYS-HAS/NHD SHEET
4 OF 5.
5 R C DETAILS OF THRUST BED (1x12.00x6.00m SWR/2023/STR-19/Br No.293A(RUB)/MYS-HAS/NHD SHEET
BOX) 5 OF 5.
The following conditions and their compliance shall be submitted before start of the work for MYS-
SBC(Br.No.746B), MYS-ASK(Br.No.293A), MYS-CMNR(Br.No.765B) & MYS-RBI( Br.No.3) same has already
intimated vide letter under ref-3:
1. MOU shall be signed between Railways and NH Div. A copy of the same shall be submitted to this office
for record.
2. Division shall ensure that the necessary charges to be paid by NH Division will be collected and MR copy
of the same shall be submitted to this office for record.
3. Locations of OHE mast (Commissioned or non-commissioned) if involves shifting: the exg. Locations and
the shifted locations shall be brought out in the TAD duly getting the approval of TRD branch. ACTM
read along with the latest ACS may be followed.
4. It is request to submit the temporary arrangement drawings to this office at the earliest.

Execution of work can be started in consultation with Mysore Division of South Western Railway.
It is requested to make arrangements to collect the blue print copies of approved Structural drawings and submit
two blue print copies each to this office for record.
For information and necessary action please.
(Kritya Nand Jha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: 1) Sr.DEN/Co-ord/MYS – for information and necessary action, please.
2) Dy.CE/Bridgeline/HQ –for information and necessary action, please.
3) DEN/West/MYS- for information and necessary action, please.
FileNo.SWR/W.182/Gati Shakti Unit/SBC Date:
27.07.2023.

CPM/GSU/SBC

Sub: Replacement of existing rub no 838b, semi through girder (1x11.697m) with 1 x 12.20 m
post
Tensioned PSC u-slab at ch: 347466.00 m between BNC-WFD stations. Along with
extension of
existing RUB. No 838B with 1 x12.20 m post tensioned PSC U-slab for proposed 3rd and 4th
lines

Ref: Letter No.W.352/GSU/SBC/ROB/838B, dated 17.07.2023.

*****
In connection with the above subject, and letter under reference, the draft structural
drawings and design calculation of the above RUB received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
RUB.No.838B:
92. Geotechnical investigation report, SBC calculation strata wise, etc., shall be
submitted duly signed by concerned officials to be submitted.
93. As per Addendum and corrigendum slip no.50 of IRS Bridge rules dated
06.12.2022 “All structures near railway structures shall be checked for accidental
impact from derailed rails as per clause 2.16.4” shall be checked and design
calculation and drawings to be furnished.
94. Main reinforcement for abutment shown in drawings is less than 0.4%, same shall
be checked and design and drawings shall be revised.
95. Moment of resistance and capacity of the section shall be incorporated in design
calculation.
96. Specification of weep holes shall be incorporated in drawing.
97. Procedure and strengthening of substructure as per RDSO drawing No.EDO/B-
1997/Alt-4 to be followed and same shall be incorporated in drawing
98. Following points are to be incorporated in structural drawings :
e. Approved GAD number shall be
incorporated in structural drawings.
b. Exposure condition (as per clause No.15.92 of IRS concrete bridge code).
f. Development length as per codal
provision to be incorporated in
drawings.
d. Seismic zone to be incorporated.
99. Existing abutment shall be checked for 25t loading with and without jacketing for
the same design calculation shall be furnished.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.
For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: Dy.CE/GSU/SBC – for information and necessary action, please.


No.SWR/W.565/Y/RUB.No.293A/MYS-HAS/MUDA Date:
27.07.2023

Chief Engineer
National Highways
K.R. Circle, Bangaluru-560001.

SUB: Proposed construction of additional vent ways to existing RUB.No.293A at km.4/400-500 between MYS-
HAS Section along Mysuru Ring Road (By Air Pushing Method) & cast in situ method.

Ref: 1. Letter No.CNH/TA-2/AE-1/Drawings/2023-24, dated 09.6.2023 of CE/NH/Bangalore.


2. Letter No.SCPL/MYS/NH/32/2022-123, dated 08.07.2023.
3. This Office even letter dated 26.08.2022.
*****
In connection with the above subject and letter under reference , the structural drawings and design
calculations of above work submitted by CE/NH Bengaluru has been approved by Competent Authority on
25.07.2023.
Following are the drawing Numbers:
SN Name of work HQ.Drawing No.
1 R C DETAILS OF RCC PRECAST BOX (1x12.00x6.00m) SWR/2023/STR-19/Br No.293A(RUB)/MYS-HAS/NHD SHEET
1 OF 5.
2 R C DETAILS OF RCC PRECAST BOX (1x6.00x6.00m) SWR/2023/STR-19/Br No.293A(RUB)/MYS-HAS/NHD SHEET
2 OF 5.
3 R C DETAILS OF THRUST BED (1x12.00x6.00m BOX) SWR/2023/STR-19/Br No.293A(RUB)/MYS-HAS/NHD SHEET
3 OF 5.
4 R C DETAILS OF THRUST BED SWR/2023/STR-19/Br No.293A(RUB)/MYS-HAS/NHD SHEET
4 OF 5.
5 R C DETAILS OF THRUST BED (1x12.00x6.00m SWR/2023/STR-19/Br No.293A(RUB)/MYS-HAS/NHD SHEET
BOX) 5 OF 5.
.

The following conditions and their compliance before start of the work for MYS- SBC(Br.No.746B), MYS-
ASK(Br.No.293A), MYS-CMNR(Br.No.765B) & MYS-RBI( Br.No.3) same has already intimated vide letter
under ref-3:

5. MOU shall be signed between Railways and NH Div. A copy of the same shall be submitted to this office
for record.
6. Division shall ensure that the necessary charges to be paid by NH Division will be collected and MR copy
of the same shall be submitted to this office for record.
7. Locations of OHE mast (Commissioned or non-commissioned) if involves shifting: the exg. Locations and
the shifted locations shall be brought out in the TAD duly getting the approval of TRD branch. ACTM
read along with the latest ACS may be followed.
8. It is request to submit the temporary arrangement drawings to this office at the earliest.

Execution of work can be started in consultation with Mysore Division of South Western Railway

It is requested to make arrangements to collect the blue print copies of approved Structural drawings and submit
two blue print copies each to this office for record.

For information and necessary action please.


(Kritya Nand Jha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: 1) Sr.DEN/Co-ord/MYS – for information and necessary action, please.
2) Dy.CE/Bridgeline/HQ –for information and necessary action, please.
3) DEN/West/MYS- for information and necessary action, please.
FileNo.SWR/W.182/Gati Shakti Unit/SBC Date:
26.07.2023.

Sub: Replacement of existing rub no 838b, semi through girder (1x11.697m) with 1 x 12.20 m
post
Tensioned PSC u-slab at ch: 347466.00 m between BNC-WFD stations. Along with
extension of
existing RUB. No 838B with 1 x12.20 m post tensioned PSC U-slab for proposed 3rd and 4th
lines

Ref: Letter No.W.352/GSU/SBC/ROB/838B, dated 17.07.2023.

*****
In connection with the above subject, and letter under reference, the draft structural
drawings and design calculation of the above RUB received in this office and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
RUB.No.838B:
100. Geotechnical investigation report, SBC calculation strata wise, etc., shall be
submitted duly signed by concerned officials to be submitted.
101. As per Addendum and corrigendum slip no.50 of IRS Bridge rules dated
06.12.2022 “All structures near railway structures shall be checked for accidental
impact from derailed rails as per clause 2.16.4” shall be checked and design
calculation and drawings to be furnished.
102. Main reinforcement for abutment shown in drawings is less than 0.4%, same
shall be checked and design and drawings shall be revised.
103. Moment of resistance and capacity of the section shall be incorporated in
design calculation.
104. Specification of weep holes shall be incorporated in drawing.
105. Forces due to LWR over a bridge shall be checked as per cl.2.8.1.1 and for
the same design calculations shall be furnished.
106. Procedure and strengthening of substructure as per RDSO drawing
No.EDO/B-1997/Alt-4 to be followed and same shall be incorporated in
drawing
107. Following points are to be incorporated in structural drawings :
g. Approved GAD number shall be
incorporated in structural drawings.
b. Exposure condition (as per clause No.15.92 of IRS concrete bridge code).
h. Development length as per codal
provision to be incorporated in
drawings.
d. Seismic zone to be incorporated.
108. Existing abutment shall be checked for 25t loading with and without
jacketing for the same design calculation shall be furnished.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
FileNo.SWR/W.439/Suitability Check 25T-2008/Exg Bridge Date:
20.07.2023
Sr.DEN/Co-ord/UBL
Sr.DEN/Co-ord/ MYS

SUB: Mission 3000MT: Proliferation of 25T axle load routes.

Ref: 1. Railway Board letter No.2022/CE-II/TK/M3000MT dated 09.06.2022.


2. This
OfficeletterNo.SWR/W.71/25T/Bridgedated,19.08.2022,22.08.2022,14.09.2022,28.09.2022 &
29.11.2022.
*****
In connection with above subject and letter under reference-1, Railway Board has identified
HPT-BAY, JRU-RDG, HPT-SMLI sections & MMEC siding for running 25T axle load and has
advised to check the suitability of bridges and propose the works, if required for making the sections
fit for running 25T axle load.
Based on the analysis of the bridges, the rebuilding / strengthening of few bridges were
advised by this Office vide letter under Ref-2.

It is seen that completion drawings for the some of the bridges are not available in this Office
and same has been advised to division vide letter dated 14.09.2022 under Ref-2. Division were
advised to submit the completion drawings to this office to check the fitness of the bridges vide letters
dated 22.08.2022 & 19.08.2022 under Ref-2.

However, the completion drawings have been received with incomplete data like soil strata &
foundation details. Without these data, it is not possible to ascertain the fitness of the bridges for 25T
axle load.
In this connection, Hubballi and Mysuru divisions may propose to conduct the instrumentation
for checking the stability of Bridges (Priority- I) for which completion drawings are not available. The
list of bridges are enclosed as Annexure-I.

For information and necessary action please.

Encl: Annexure-I
(Kritya Nand Jha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/S
WR
For CBE/SWR
No.SWR/W.71/Suitability check 25T-2008/Exg bridges Date:
20.07.2023

Sr.DEN/Co-ord/UBL & MYS

Sub:.Mission 3000MT: Proliferation of 25T axle load routes.

Ref: 1) Railway Board letter No.2022/CE-II/TK/M3000MT dated 09.06.2022.


2)ThisOfficeletterNo.SWR/W.71/25T/Bridgedated,
16.08.2022,19.08.2022,22.08.2022,26.08.2022,29.08.2022,14.09.2022,23.09.2022 & 29.11.2022.

In connection with the above subject and letter under reference, the structural
drawings and design calculations of above work submitted by CE/NH Bengaluru has been
approved by Competent Authority on 17.07.2023.Following are the drawing Numbers
FileNo.SWR/W.565/7/RUB.No.765B/MYS-CMNR/MUDA Date:
17.07.2023
Chief Engineer
National Highways
K.R. Circle, Bangaluru-560001.
SUB: Proposed construction of additional vent ways to existing RUB.No.765B at km.7/500-600
between MYS-CMNR along Mysuru Ring Road (By Air Pushing Method) & Cast in situ method.

Ref: 1. Letter No.CNH/TA-2/AE-1/Drawings/2023-24, dated 09.6.2023 of CE/NH/Bangalore.


2. Letter No.SCPL/MYS/NH/32/2022-123, dated 08.07.2023.

*****
In connection with the above subject and letter under reference, the structural drawings and
design calculations of above work submitted by CE/NH Bengaluru has been approved by Competent
Authority on 17.07.2023.
Following are the drawing Numbers:

SN Name of work HQ.Drawing No.


1 R C DETAILS OF RCC PRECAST BOX SWR/2023/STR-18/Br No.765B(RUB)/MYS-CMNR/NHD
(1x12.00x6.00m) SHEET 1 OF 5.
2 R C DETAILS OF RCC PRECAST BOX SWR/2023/STR-18/Br No.765B(RUB)/ MYS-CMNR /NHD
(1x6.00x6.00m) SHEET 2 OF 5.
3 R C DETAILS OF THRUST BED (1x12.00x6.00m SWR/2023/STR-18/Br No.765B(RUB)/ MYS-CMNR /NHD
BOX) SHEET 3 OF 5.
4 R C DETAILS OF THRUST BED SWR/2023/STR-18/Br No.765B(RUB)/ MYS-CMNR /NHD
SHEET 4 OF 5.
5 R C DETAILS OF THRUST BED SWR/2023/STR-18/Br No.765B(RUB)/ MYS-CMNR /NHD
(1x12.00x6.00m BOX) SHEET 5 OF 5.
Execution of work can be started in consultation with Mysore Division of South Western Railway.

It is requested to make arrangements to collect the blue print copies of approved Structural drawings and
submit two blue print copies each to this office for record.

For information and necessary action please.


(Kritya Nand Jha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/S
WR
For CBE/SWR
Copy to: 1) Sr.DEN/Co-ord/MYS – for information and necessary action, please.
2) Dy.CE/Bridgeline/HQ –for information and necessary action, please.
3) DEN/West/MYS- for information and necessary action, please.
FileNo.SWR/W.565/7/RUB.No.3/MYS-RBI/MUDA Date:
14.07.2023.

Chief Engineer
National Highways
K R Circle, Bangalore-560001

Sub: Proposed construction of additional vent ways to existing RUB.No.3 at km.0/780 between
MYS-
RBI siding along Mysuru Ring Road (By Air Pushing Method).

Ref: Letter No.CNH/TA-2/AE-1/Drawings/2023-24, dated 09.6.2023 of CE/NH/Bangalore.

*****
In connection with the above subject, and letter under reference, the structural drawings and
design calculation of the above RUB received in this office for approval and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
RUB.No.3:
109. Earth cushion shown in structural drawings for RCC BOX is 478mm only, in
this connection the depth of temporary girder and gap between RCC box and
temporary girder to be furnished and feasibility of adopting 478mm earth cushion
for box pushing method with temporary girder shall be furnished.
110. Temporary arrangement drawings duly showing the scheme of box pushing
scheme shall be submitted to this office.
111. After submitting the TAD for above work the structural drawings and design
calculation will be processed for approval.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
12.07.2023.
GM/Civil/Projects/KRIDE

Sub: Proposed construction of RUB Bridge no. 531 at ch: 205241 1 x 18.30m composite girder &
2x7.5x5.5m RCC BOX (RUB) on up line of the exg. Bridge of 1 x 12.20 m steel girder +
2x7.5x5.5m RCC BOX(RUB) between Bellanduru and Banaswadi stations - Dn line pro. Bridge is
on up line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/373 of GM/Civil/Projects/KRIDE, dated


28.04.2023.
2. This Office letter dated 03.05.2023.
*****
In connection with the above subject, and letter under reference, draft structural drawings
and design calculation of the above bridge are received in this office for approval and the same have
been scrutinized and following are observations/correction which shall be clarified/corrected;
Abutment:
112. Earth cushion shown in structural drawings for RCC BOX is 478mm only,
in this connection the depth of temporary girder and gap between RCC box and
temporary girder to be furnished and feasibility of adopting 478mm earth
cushion for box pushing method with temporary girder shall be furnished.
113. Temporary arrangement drawings duly showing the scheme of box pushing
scheme shall be submitted to this office.
114. After submitting the TAD for above work the structural drawings and
design calculation will be processed for approval.
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
FileNo.SWR/W.565/7/RUB.No.3/MYS-RBI/MUDA Date:
07.07.2023.

Chief Engineer
National Highways
K R Circle, Bangalore-560001

Sub: Proposed construction of additional vent ways to existing RUB.No.3 at km.0/780 between
MYS-
RBI siding along Mysuru Ring Road (By Air Pushing Method).
Ref: Letter No.CNH/TA-2/AE-1/Drawings/2023-24, dated 09.6.2023 of CE/NH/Bangalore.

*****
In connection with the above subject, and letter under reference, the structural drawings and
design calculation of the above RUB received in this office for approval and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
RUB.No.3:
1. Depth of earth cushion shown in struwith approved GAD same shall be checked and design
shall be revised.
2. Segment length and barrel length of box is not tallying with approved GAD.
3. Index sheet and page numbers are to be incorporated in design booklet.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
12.07.2023.
GM/Civil/Projects/KRIDE
Sub: SA – YPR Section: Major bridge no. 412 at ch: 159721 Pro. Construction of 2 x 9.15 m PSC
slab on down stream side of the Exg. bridge of 2 x 9.14 m steel girder between Hosur and
Maranayakanahalli stations Pro Bridge is on up line.

Ref: Letter No.BYPL-HSRA/DL/Bridge GAD/392 of GM/Civil/Projects/KRIDE, dated


26.06.2023.

*****
In connection with the above subject, and letter under reference, the structural drawings and
design calculation of the above bridge are received in this office for approval and the same have
been scrutinized and following are observations/correction which shall be clarified/corrected;
Abutment:
115. Geotechnical investigation report, SBC calculation strata wise, etc., shall be
submitted duly signed by concerned officials to be submitted.
116. Forces due to LWR over a bridge shall be checked as per cl.2.8.1.1 and for
the same design calculations shall be furnished.
117. Soft copy of design calculations in excel sheet in editable format shall be
submitted for checking of design.
118. Forces due to eccentricity of track shall be considered in design.
119. Check for sliding and overturning of abutment design calculations shall be
furnished.
120. Design calculation of return wall and conjunction wall shall be furnished.
121. In design calculation of scour depth, the value of f shown as 2.49( for fine
sand), whereas in bore log details in approved GAD, the type of soil up to 3m is
silty sandy clay, for the same scour depth calculation shall be revised .
122. Latest codal reference to be incorporated in design.
123. Design and structural drawings of Pier to be submitted.
124. Exposure condition, cover, grade of steel and reinforcement details for
foundation, bed block and dirt wall to be incorporated.
125. Signature table for Railway officials shall be incorporated in drawing.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.
The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
FileNo.SWR/W.182/ Gati Shakthi/SBC Date:
11.07.2023.

CPM/GSU/SBC

Sub: Reconstruction of existing road under bridge no. 410, 1 x 12.20m steel girder as 2 x9.00m x
5.50m RCC Box at km.158/916 at hosur yard.
Ref: Gad of above Bridge has been approved in e-das on 27.05.2023.

*****

In connection with above subject the structural drawings and design calculations of bridge
no.410 have been scrutinized and following are observations/correction which shall be
clarified/corrected;

1. Speed shall be considered in design as per cl.2.4.1 of IRS Bridge Rules.


2. Earth at rest shall be considered in design.
3. RCC BOX is fit for single track or multiple tracks note shall be incorporated in drawing
3. In design calculation of crack width, for side wall value of crack width is 0.26mm which is
more than
Permissible, same shall be checked and design to be revised.
4. Fatigue check shall be done as per
4. Fatigue check shall be done as per Cl.13.4.1 of IRS concrete Bridge Code for the same design
calculations to be furnished.
5. Bar bending schedule shown in drawing shall be corrected as per RDSO RCC box structural
drawings.
6. In between two boxes lean concrete to be shown as per approved GAD.
7. Approved GAD number to be incorporated in drawings.
8. Index sheet and page numbers are to be incorporated in design booklet.

The original copy of structural drawings (in tracing sheet) and design calculations duly signed by
design consultant and GSU officials to be submitted.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
FileNo.SWR/W.565/Br No.745A(RUB)/MYS-SBC/MUDA Date:
04.07.2023
Chief Engineer
National Highways
K.R. Circle, Bangaluru-560001.

SUB: Proposed construction of additional vent ways to existing RUB No.746B at km.133/100-200
between MYS-SBC Section along Mysuru Ring Road (By Air Pushing Method).

Ref: Letter No.CNH/TA-2/AE-1/Drawings/2023-24, Dated.09.06.2023 of CE/NH/Bangalore.

*****
In connection with the above subject and letter under reference, the structural drawings and
design calculations of above work submitted by CE/NH Bengaluru has been approved by Competent
Authority on 04.07.2023.
Following are the drawing Numbers:

SN Name of work HQ.Drawing No.


1 R C DETAILS OF RCC PRECAST BOX SWR/2023/STR-17/Br No.746B(RUB)/MYS-SBC/NHD
(1x12.00x6.00m) SHEET 1 OF 5.
2 R C DETAILS OF RCC PRECAST BOX SWR/2023/STR-17/Br No.746B(RUB)/MYS-SBC/NHD
(1x6.00x6.00m) SHEET 2 OF 5.
3 R C DETAILS OF THRUST BED (1x12.00x6.00m SWR/2023/STR-17/Br No.746B(RUB)/MYS-SBC/NHD
BOX) SHEET 3 OF 5.
4 R C DETAILS OF THRUST BED SWR/2023/STR-17/Br No.746B(RUB)/MYS-SBC/NHD
SHEET 4 OF 5.
5 R C DETAILS OF THRUST BED SWR/2023/STR-17/Br No.746B(RUB)/MYS-SBC/NHD
(1x12.00x6.00m BOX) SHEET 5 OF 5.
Execution of work can be started in consultation with Mysore Division of South Western Railway.

It is requested to make arrangements to collect the blue print copies of approved Structural drawings and
submit two blue print copies each to this office for record.

For information and necessary action please.


(Kritya Nand Jha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/S
WR
For CBE/SWR
Copy to: 1) Sr.DEN/Co-ord/MYS – for information and necessary action, please.
2) Dy.CE/Bridgeline/HQ –for information and necessary action, please.
3) DEN/West/MYS- for information and necessary action, please.

FileNo.SWR/W.565/7/RUB.765A/MYS-CMNR/MUDA Date:
07.07.2023.
Chief Engineer
National Highways
K R Circle, Bangalore-560001

Sub:1.Proposed construction of additional vent ways to existing RUB.No.765B at


km.7/500-600 between MYS-CMNR section along Mysuru Ring Road (By Air Pushing
Method).
2.Proposed construction of additional vent ways to existing RUB.No.293A at
km.4/400-500 between MYS-HAS section along Mysuru Ring Road (By Air Pushing
Method).
Ref: Letter No.CNH/TA-2/AE-1/Drawings/2023-24, dated 09.6.2023 of CE/NH/Bangalore.

*****
In connection with the above subject, and letter under reference, the structural drawings and
design calculation of the above RUB received in this office for approval and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
RUB.765B:
4. RL of Rail level, FL,FRL etc shown in structural drawings are not tallying with approved
GAD same shall be checked and design shall be revised..
5. Segment length and barrel length of box is not tallying with approved GAD.
6. Index sheet and page numbers are to be incorporated in design booklet.
RUB 293A:
1. Size and dimension of box shown in design and drawings are not tallying same shall be
checked and design to be revised.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
FileNo.SWR/W.182/Speed Restriction/CN Date:
07.07.2023.

Chief Engineer/CN/I/Hubli

Sub: Miraj– Londa Section: Major Bridge No.208 at km.734606.79 exg bridge No.1x12.20m
steel girder. Proposed construction as 1x12.20m PSC slab on down stream side of
the existing bridge for down line between Shedbal and Vijaynagar stations.
Ref: 1. Letter No.H/CE/CN/1/2023, dated 04.07.2023 of CE/CN/I/UBL.
2. CRS/SC/SBC letter No.R12027/2023-24/SWR/481-485, dated 0906.2023.
3. RDSO letter No.CBS/DPS, dated 05.06.2012.

*****
In connection with above subject and vide letter under reference-2 CRS/SC/SBC has
imposed a speed restriction of 75kmph on Bridge No.208 and vide letter under ref-1
CE/CN/I/UBL has requested for evaluating the strength of the PSC slabs and further loss of pre-
stress in the long term and suggest necessary strengthening/retrofitting measures if necessary.
After scrutiny it is observed that following are the data required to be submitted for
further process:
1. Past testing records of the bridge.
a) Pre stressing force applied shall be submitted.
b) Elongation achieved.
c) Cable profile for PSC slab
d) Average slip value.
e) Loss of pre stress in PSC slab.
2. Concrete test results of the PSC slab.
3. Shuttering records and profile of PSC slab.
4. Camber in PSC as RDSO drawing
5. Camber after concerting of PSC slab.
6. Camber after post tensioning of PSC slab.
7. Camber after SIDL + LL of PSC slab.
8. Pictures of bridge shall be submitted.
9. Since the camber is more than 20mm, stresses to be checked at tension fiber and report to
submitted to
this office.
10. Load test on the PSC slab for 25t loading-2008 shall be conducted clause 18 of IRS
Concrete Bridge Code and report shall be submitted to this office.
11.Deign report shall be routed through Dy.CE/Design and signed by CE/CN.
FileNo.SWR/W.565/7/RUB.765A/MYS-CMNR/MUDA Date:
30.06.2023.

Chief Engineer/NH/Bangalore

Sub:1.Proposed construction of additional vent ways to existing RUB.No.765B at


km.7/500-600 between MYS-CMNR section along Mysuru Ring Road (By Air Pushing
Method).
2.Proposed construction of additional vent ways to existing RUB.No.293A at km.4/400-
500 between MYS-HAS section along Mysuru Ring Road (By Air Pushing Method).

Ref: 1.Letter No.CNH/TA-2/AE-1/Drawings/2023-24, dated 09.6.2023 of CE/NH/Bangalore.


2. CRS/SC/SBC letter No.R12027/2023-24/SWR/481-485, dated 0906.2023.

*****

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
In connection with above subject and letter under reference, CRS/SC/SBC vide letter
under reference has imposed a speed restriction of 75kmph on Bridge No.208, as per CRS/SC/SBC,
Now CE/CN/I/UBL has requested for evaluating the strength of the PSC slabs and further loss of pre-
stress in the long term and suggest necessary strengthening/retrofitting measures if necessary.

After scrutiny it is observed that following are the data required to be submitted for further process:
10. Past testing records
f) Pre stressing force
g) Elongation
h) Cable profile
i) Average slip value
j) Cable profile
k) Loss of pre stress
l) 2
m)
11. Concrete test results
12. Shuttering records and profile
13. Camber in PSC as RDSO drawing
14. Camber after concerting
15. Camber after post tensioning
16. Camber after SIDL + LL
17.
18. Pictures of bridge shall be submitted
19. Since the camber is more than 20mm, stresses to be checked at tension fiber and report to
submitted.
20. .
FileNo.SWR/W.565/Br No.745A(RUB)/MYS-SBC/MUDA Date:
04.07.2023

Chief Engineer
National Highways
K.R. Circle, Bangaluru-560001.

SUB: Proposed construction of additional vent ways to existing RUB No.746B at km.133/100-200
between MYS-SBC Section along Mysuru Ring Road (By Air Pushing Method).

Ref: Letter No.CNH/TA-2/AE-1/Drawings/2023-24, Dated.09.06.2023 of CE/NH/Bangalore.

*****
In connection with the above subject and letter under reference, the structural drawings and
design calculations of above work submitted by CE/NH Bengaluru has been approved by Competent
Authority on 04.07.2023.
Following are the drawing Numbers:

SN Name of work HQ.Drawing No.


1 R C DETAILS OF RCC PRECAST BOX SWR/2023/STR-17/Br No.746B(RUB)/MYS-SBC/NHD
(1x12.00x6.00m) SHEET 1 OF 5.
2 R C DETAILS OF RCC PRECAST BOX SWR/2023/STR-17/Br No.746B(RUB)/MYS-SBC/NHD
(1x6.00x6.00m) SHEET 2 OF 5.
3 R C DETAILS OF THRUST BED (1x12.00x6.00m SWR/2023/STR-17/Br No.746B(RUB)/MYS-SBC/NHD
BOX) SHEET 3 OF 5.
4 R C DETAILS OF THRUST BED SWR/2023/STR-17/Br No.746B(RUB)/MYS-SBC/NHD
SHEET 4 OF 5.
5 R C DETAILS OF THRUST BED SWR/2023/STR-17/Br No.746B(RUB)/MYS-SBC/NHD
(1x12.00x6.00m BOX) SHEET 5 OF 5.
Execution of work can be started in consultation with Mysore Division of South Western Railway.

It is requested to make arrangements to collect the blue print copies of approved Structural drawings and
submit two blue print copies each to this office for record.

For information and necessary action please.


(Kritya Nand Jha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/S
WR
For CBE/SWR
Copy to: 1) Sr.DEN/Co-ord/MYS – for information and necessary action, please.
2) Dy.CE/Bridgeline/HQ –for information and necessary action, please.
3) DEN/West/MYS- for information and necessary action, please.
FileNo.SWR/W.565/7/RUB.765A/MYS-CMNR/MUDA Date:
30.06.2023.

Chief Engineer/NH/Bangalore

Sub:1.Proposed construction of additional vent ways to existing RUB.No.765B at


km.7/500-600 between MYS-CMNR section along Mysuru Ring Road (By Air Pushing
Method).
2.Proposed construction of additional vent ways to existing RUB.No.293A at km.4/400-
500 between MYS-HAS section along Mysuru Ring Road (By Air Pushing Method).

Ref: Letter No.CNH/TA-2/AE-1/Drawings/2023-24, dated 09.6.2023 of CE/NH/Bangalore.

*****
In connection with the above subject, and letter under reference, the structural drawings and
design calculation of the above RUB received in this office for approval and the same have been
scrutinized and following are observations/correction which shall be clarified/corrected;
RUB.765B:
7. RL of Rail level, FL,FRL etc shown in structural drawings are not tallying with approved
GAD same shall be checked and design shall be revised..
8. Segment length and barrel length of box is not tallying with approved GAD.
9. Index sheet and page numbers are to be incorporated in design booklet.

Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.
It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.

The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.
For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
27.06.2023.
GM/Civil/Projects/KRIDE

Sub: Proposed construction of RUB Bridge no. 531 at ch: 205241 1 x 18.30m composite girder &
2x7.5x5.5m RCC BOX (RUB) on up line of the exg. Bridge of 1 x 12.20 m steel girder +
2x7.5x5.5m RCC BOX(RUB) between Bellanduru and Banaswadi stations - Dn line pro. Bridge is
on up line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/373 of GM/Civil/Projects/KRIDE, dated


28.04.2023.
2. This Office letter dated 03.05.2023.
*****
In connection with the above subject, and letter under reference, draft structural drawings
and design calculation of the above bridge are received in this office for approval and the same have
been scrutinized and following are observations/correction which shall be clarified/corrected;
Abutment:
126. Geotechnical investigation report, SBC calculation strata wise, etc., shall be
submitted duly signed by concerned officials to be submitted (for both abutment
and RCC Box).
127. Forces due to LWR over a bridge shall be checked as per cl.2.8.1.1 and for
the same design calculations shall be furnished.
128. Design and structural drawings are to be revised as per approved GAD.
129. In approved GAD of above work special note no. 7, 8 & 9 to be considered
in design along with compliance.
130. Check for sliding, overturning maximum pressure on soil at foundation
level design calculation shall be furnished.
131. Feasibility of providing square returns for abutments may be explored and
between RCC box and Abutment and earth fill to be shown in structural drawing
and same to be considered in design.
132. Design calculation and structural drawings of dirt wall shall be furnished.
133. Moment of resistance and capacity of the section shall be incorporated in
design calculation.
134. Latest codal reference to be incorporated in design.
RCC BOX:
1. Design and structural drawings are to be revised as per approved GAD.
2. Fatigue check shall be done as per Cl.13.4.1 of IRS concrete Bridge Code for the same
design calculations to be furnished.
3. Bar bending schedule and notations of bars shall be shown as per standard RDSO drawings.

It is requested that design consultant may attend this office for discussion regarding design
and drawing with prior intimation.
The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
FileNo.SWR/W.70/RDSO,Correspondence/Vol-IPolicy/2022 Date:
27.06.2023

Executive Director (B & S),


Research Design and Standard Organisation,
Manak Nagar, Lucknow - 226011

SUB: Issue of drawing for Inspection pathway in Standard RDSO drawings for Open Web Girder and
Bow string Girders.
*****
Open web through type girders are being adopted for minimum span of 30.50m as per RDSO
drawing. The locations of open web girder member such as top chord, the joint between top chord &
vertical and end rackers are very critical location for inspection and maintenance. However these
locations are inaccessible due to non- availability of ladder arrangement. The same situation is
existing in ROBs of Bow string girders.

Now a day & many numbers of ROB are being constructed with Bow string girders of
different spans. The height of Bow string girders varies from 7.5m to 12.0m. As per the RDSO
standard drawing, there is no provision of ladder or any other arrangement for person to go to the top
of the girder for the purpose of Inspection & maintenance. It causes lot of difficulty in maintaining
these girders. Provision is to be made in the GAD for climbing to the Bow string girders and open
web girder top.

In view of this, it is kindly requested to issue of ladder arrangements for inspection of top
members of OWG & BSG.
(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL Date:
27.06.2023.

GM/Civil/Projects/KRIDE

Sub: Proposed construction of RUB Bridge no. 531 at ch: 205241 1 x 18.30m composite girder &
2x7.5x5.5m RCC BOX (RUB) on up line of the exg. Bridge of 1 x 12.20 m steel girder +
2x7.5x5.5m RCC BOX(RUB) between Bellanduru and Banaswadi stations - Dn line pro. Bridge is
on up line.

Ref: 1. Letter No.BYPL-HSRA/DL/Bridge GAD/373 of GM/Civil/Projects/KRIDE, dated


28.04.2023.
2. This Office letter dated 03.05.2023.

*****

In connection with the above subject, and letter under reference, draft structural drawings
and design calculation of the above bridge are received in this office for approval and the same have
been scrutinized and following are primilary observations/correction which shall be
clarified/corrected;
.
For information and necessary action please.
(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
FileNo.SWR/W.70/RDSO,Correspondence/Vol-IPolicy/2022 Date:
27.06.2023

Executive Director (B & S),


Research Design and Standard Organisation,
Manak Nagar, Lucknow - 226011

SUB: Issue of drawing for Inspection pathway in Standard RDSO drawings for Open Web Girder and
Bow string Girders.

*****

Open web through type girders are being adopted for minimum span of 30.50m as per RDSO
drawing. The locations of open web girder member such as top chord, the joint between top chord &
vertical and end rackers are very critical location for inspection and maintenance. However these
locations are inaccessible due to non- availability of ladder arrangement. The same situation is
existing in ROBs of Bow string girders.

Now a days many numbers of ROB are being constructed with Bow string girders of
different spans. The height of Bow string girders varies from 7.5m to 12.0m. As per the RDSO
standard drawing, there is no provision of ladder or any other arrangement for person to go to the top
of the girder for the purpose of Inspection & maintenance. It causes lot of difficulty in maintaining
these girders. Provision is to be made in the GAD for climbing to the Bow string girders and open
web girder finds top.

In view of this, it is kindly requested to issue of ladder arrangements for inspection of top
members of OWG & BSG.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.352/Low Cost ROB/LC45&55/HAS-MAJN
Date:21.06.2023.

Sr.DEN/Co-Ord/MYS

Sub: HAS-MAJN Section: Proposed rebuilding of exg. Rob no.520 with1x24.00m composite girder
at km 142/300-400 between KBPR-NRF Stations

Ref: Sr.DEN/Co-ord/MYS letter No.Y/W.352/Widening of ROB at KBPR, dated 02.06.2023.

In connection with above subject and letter under reference, the structural drawings and
design calculations of above ROB substructure submitted to this office for approval and the same
have been scrutinized and following are observations/correction which shall be clarified/corrected;

5. The design calculations booklets are to be signed by divisional officials.


6. In design calculation booklet (pg no.33) Cl.10.2 check for sliding for seismic case condition
it is shown as 0.978 which is less than 1, same has to be checked and design calculation and
drawings are to be revised.
7. The sizes of pedestal for bearings are to be incorporated in drawings.
8. Depth of anchor bars at foundation levels are to be incorporated.
9. In inspection platform details, side railing arrangements are to be incorporated.
10. Cover considered in crack calculations are to checked and corrected.
Design and structural drawings are returned for incorporating and to be resubmitted for
further processing please.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
FileNo.SWR/W.352/ROB/RNN-DBU/BYPL-DMM/NHAI Date:
15.06.2023
DGM(T) & Project Director,
National Highway Authority of India,
Project Implementation Unit- Bengaluru
Bengaluru- Tumkuru Road, Beside Nagasandra Metro Station
Bangaluru-560073
SUB: Proposed New Road over Bridge No.478A at Railway km.35/900--36/000 between Rajankunte
(RNN) and Dodaballapur(DBU) stations of Baiyyappanahalli - Dharnavaram section Span 1 x
43.018m c/c of Pier composite girder + 1 x 39.845m Composite girder (SWRSBC0014).

Ref: 1. Letter No.NHAI/37011/PIU-BNG/2023, dated,30.05.2023.


2. This office letter dated 14.11.2022.

In connection with the above subject and letter under reference-1,NHAI has requested for
modification in approved structural drawing for above ROB and the same have been approved by
Competent Authority on 15.06.2023.
Following are the drawing Numbers:

SN Name of work HQ.Drawing No.

1 BCE/STR/ROB-478A-38.445M-02 SWR/2022/STR-19/ROB No.478A at km.35.96/RNN-


DBU/BYPL-DMM/NHAI/SHEET 14 OF 22/ALT-1.
2 BCE/STR/ROB-478A-38.445M-03 SWR/2022/STR-19/ROB No.478A at km.35.96/RNN-
DBU/BYPL-DMM/NHAI/SHEET 15 OF 22/ALT-1.
3 BCE/STR/ROB-478A-38.445M-04 SWR/2022/STR-19/ROB No.478A at km.35.96/RNN-
DBU/BYPL-DMM/NHAI/SHEET 16 OF 22/ALT-1.
4 BCE/STR /ROB-478A-41.62M-2 SWR/2022/STR-19/ROB No.478A at km.35.96/RNN-
DBU/BYPL-DMM/NHAI/SHEET 19 OF 22/ALT-1.
5 BCE/STR /ROB-478A-41.62M-03 SWR/2022/STR-19/ROB No.478A at km.35.96/RNN-
DBU/BYPL-DMM/NHAI/SHEET 20 OF 22/ALT-1.
6 BCE/STR /ROB-478A-41.62M-04 SWR/2022/STR-19/ROB No.478A at km.35.96/RNN-
DBU/BYPL-DMM/NHAI/SHEET 21 OF 22/ALT-1.

Execution of work can be started in consultation with DY.CE/Bridge line/HQ (M-9731665215),


ADEN/Bridges/SBC and Sr.DEN/Co-ord/SBC of South Western Railway.
It is requested to make arrangements to collect the blue print copies of approved Structural drawings and
submit two blue print copies each to this office for record.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: 1) Sr.DEN/Co-ord/SBC – for information and necessary action, please.
2) Dy.CE/Bridgeline/HQ –for information and necessary action, please.
3) ADEN/Bridges/SBC- for information and necessary action, please.
No.SWR/W.182/New BG Line/CN Date:
08.06.2023.

CE/CN/III/UBL

Sub: Opening of New BG Line between Sangnal (km.21.651) to Hanmapur (km.34.750) stations as
“One Train system " as a part of Gadag(talkal) - Wadi new line project in Hubballi division.

Ref: CE/CN/III/UBL letter No.H/CE/CN/UBL/III/2023, dated 01.06.2023.

In connection with above subject and letter under reference, the sketch showing details of
crash barrier has been submitted vide above reference. It is requested to submit the design
calculations and drawings for crash barrier for Br.No.70 and to be routed through
Dy.CE/Design/CN/BNC and approval of CE/CN to be taken.

For information and necessary action please.

(Kritya Nand Jha)

उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/POLICY/2022 Date:
08.06.2023

Executive Director (B&S)


Research Design & Standard Organisation
Manak Nagar, Lucknow.

Sub: Regarding suitability of RDSO drawings for gradient levels.

*****
This Office is receiving proposals from BMRCL, KRIDE and Other Organizations adopting
RDSO approved bridge drawings for track in gradients (Some time gradient up to 1 in100).

It is requested to clarify whether the standard approved RDSO bridge drawings for bridges can be
permitted to use in gradient also.

If it is permitted to adopt, whether the same type of bearings indicated in the drawings can be
adopted.

(पी.एस.ब्रह्मानंदम)
(P.S. Brahmanandam)
मुख्यपुलअभियंता/ द.प.रे.
Chief Bridge Engineer/SWR
No.SWR/W.182/New BG Line/CN Date:
08.06.2023.

CE/CN/III/UBL

Sub: Opening of New BG Line between Sangnal (km.21.651) to Hanmapur (km.34.750) stations as
“One Train system " as a part of Gadag(talkal) - Wadi new line project in Hubballi division.

Ref: CE/CN/III/UBL letter No.H/CE/CN/UBL/III/2023, dated 01.06.2023.

In connection with above subject and letter under reference, the structural drawing and
sketch of Br.No.70 ROB has been submitted vide above reference. The design calculations to be
routed through Dy.CE/Design/CN/BNC and approval of CE/CN to be taken.

This is issued with the approval of Competent Authority

For information and necessary action please. (Kritya Nand Jha)

प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR

For CBE/SWR

Copy to: DY.CE/Design/CN/BNC - for information and necessary action, please


No.SWR/POLICY/2022 Date:
08.06.2023

Executive Director (B&S)


Research Design & Standard Organisation
Manak Nagar, Lucknow.

Sub: Regarding suitability of RDSO drawings for gradient levels.

*****

With reference to above, it is noticed that in all RDSO drawings (viz. PSC Slab, OWG, BSG,
Composite Girder, Plate Girder etc.) there is not mentioning whether the drawings are suitable for
gradient or not.

Some drawings are being received in this Office with gradient of 1 in 100 in the bridge proper
locations. Additionally, it is also requested to clarify whether the drawings for bearings are also fit for
above mentioned gradient or not.

(पी.एस.
ब्रह्मानंदम/P.S.Brahmanandam)
मुख्यपुलअभियंता/Chief Bridge Engineer
No.SWR/POLICY /2022 Date:
06.06.2023

CAO/CN/BNC
Sr.DEN/Co-ord/MYS,SBC& UBL
CPM/RVNL
MD/KRIDE

Sub: RSI analysis with design of bridge before execution of the work.

Ref: Rly Bd’s Letter No.2022/7/CE-III/BR/ CBE’s Seminar, dated, 30.05.2023.

******
Railway Board vide letter under reference, instructions have been issued for
conducting RSI analysis for permitting LWR on ballasted deck bridges on case to case basis
in the initial design of bridge itself.

In this connection, it is kindly advised to carryout “RSI analysis in the initial design
of bridge as per BS-114 version -2” for continuation of LWR over Bridges along with the
bridge work or in future.

Also, Railway Board has advised that Zonal Railways should carry out RSI analysis
for existing bridges to continue LWR across the bridges in a planned manner and consider
taking up these works as per availability of fund. Hence divisions are advised to plan the
works according.

This is for information and necessary action, please.


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/S
WR
For CBE/SWR
No.W.182/JRU –UBL/Patch doubling/Vol. I Date: 22-
05-2023.

CE/CN/III/BNC

Subject: UBL-JRU Doubling (190KM): Checking adequacy of Important Bridge no.38


between Savanur and Karajgi stations-UBL Division-based on inspection notes and
deviations in dimensions and bed plate dislocations - reg
Reference: 1. CE/CN/III/BNC, letter No.W.CN/IV/Br.38/Inspection Notes,Dt.22.05.2023.
2. Dy.CE/CN/V/BNC, Letter No.CN.DCE/N/DL/UBL-JRU, Dt.22.05.2023.
3. Dy.CE/CN/V/BNC letter No.CN.DCE/V/DL/UBL-JRU, Dt.11.05.2023.

In connection with the above subject and letter under references, the adequacy check and
design calculations for important Bridge No.38, duly proof checked by IIT/Madras submitted vide
letter under ref(3) are checked and found in order.

Vide letter under ref (1) & (2), parawise compliance to CRS observations has been submitted
and also the defects observed during sample check carried out during inspection on 20.05.2023 are
attended by CN unit.

PSR of 60kmph speed on the bridge 38 to be relaxed in stages as per following-


Stage-I: From existing 60kmph to 90kmph.
Stage-II: From 90kmph to sectional speed of 110kmph after Satisfactory performance of bridge for a
minimum period of 2months from stage-I.
This has approval of CBE.
For information and necessary action, please.
(Kritya Nand Jha)
उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: 1) DRM/SBC- for kind information please.
2) Sr.DEN/Co-ord/SBC – for information and necessary action, please.
FileNo.SWR/W.352/ROB/KQZ – BWT/NHAI-VOL-I Date:
19.05.2023

DGM(T) & Project Director,


National Highway Authority of India,
#245,2nd floor, Kotack Mahindra bank building,
HMT Layout, Nelagadaranahalli, Nagasandra post,
Bangaluru-560073

SUB: KQZ – BWT Section: Proposed Construction of 4 lane ROB ( Bridge No.9B) at Rly
km.142/750 (NH km.41+920) between KQZ & BWT stations as a part of Bangalore – Chennai
Express Highway ( PID: SWRSBC0002).
Ref: 1. Letter No.NHAI/11030/BCE-PKG-II/2023-24/PIU – BNG(EXP)/95, dated 01.05.2023.
2. This office letter dated 14.06.2022.
*****
In connection with the above subject, the structural drawings of above work submitted by NHAI vide
letter under Ref (for Girder G1,G2 & G6 and revised structural drawing for Girder G3,G4 & G5) have
been approved by Competent Authority on 18.05.2023.

Following are the drawing Numbers:

SN Name of work HQ.Drawing No.

1 Details of Main Girder for ROB(42.0m SWR/2022/STR-10/ROB


bearing span) for structure No.42/3 at No.9B/KQZ-BWT/NHAI/SHEET 13 OF 23/ALT-1(Sh 1
proposed CH: 41+920 For Girder G1,G2 & of2).
G6
2 Details of Main Girder for ROB(42.0m SWR/2023/STR-12/ROB
bearing span) for structure No.42/3 at No.9B/KQZ-BWT/NHAI/SHEET 13 OF 23 (Sh 2 of2).
proposed CH: 41+920 For Girder G3,G4 &
G5

Execution of work can be started in consultation with DY.CE/Bridge line/HQ (M- 9731665215),
ADEN/Bridges/SBC and Sr.DEN/Co-ord/SBC of South Western Railway.

It is requested to make arrangements to collect the blue print copies of approved Structural drawings and
submit two blue print copies each to this office for record.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: 1) Sr.DEN/Co-ord/SBC – for information and necessary action, please.


2) Dy.CE/Bridgeline/HQ –for information and necessary action, please.
3) ADEN/Bridges/SBC- for information and necessary action, please.
No.SWR/W.71/Gantry Girder Workshop Date:
19.05.2023.

Dy.CWM/UBLS

Sub: Regarding General Arrangement Drawing and Structural drawings of EOT Crane at Hubli
Workshop.

Ref: 1.Letter No.UBLS/M/M&PRB/2022-23/ETO15TBSP of Dy.CWM/UBLS, dated 29.08.2022 &


21.04.2023 & 17.05.2023.
2.This office even letter dated, 08.11.22, 03.01.22,20.04.22 and Joint Inspection Note dated
01.05.2023.

*****

In connection with the above subject and letter under reference, hubli workshop is under
process for procurement of one number of EOT crane for 15t capacity through COFMOW, in this
regard DY.CWM/UBLS has requested to issue the stability certificate for crane gantry.

As per the Joint Inspection it was found that no drawings are available for the existing structure.
Furthermore the Columns of the Gantry have been jacketed with concrete for which no records are
available.

It is brought out that without the availability of all records the stability Certificate cannot be
given.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
FileNo.SWR/W.352/lC.75(ROB)/MVD – JML/GDG-HG/NH-VOL-I Date:
12.05.2023

SUB: GDG – BJP Section: Proposed Construction of subway (1x5.0x3.0m) RCC Box in lieu of
L.C.No.75 CH:15 +560, between Mulvad and Jumnal stations.

Ref: 1. Letter No.EEHD/VJP/PB/AE/NH-218/ROB/EPC/2022-23, dated 04.05.2023.


2. This office letter dated 02.05.2023.

*****

In connection with above subject and letter under reference, the structural drawings
and design calculation of above work has been approved by this office and communicated vide letter
under ref(2). Now EE NH Div, Vijaypur has requested for use of mechanical couplers, stating that lap
length of the bar is 50times diameter due to providing the 50d of 32mm, 25mm and 20mm there is no
space for free flow of concrete and compaction using with pin vibrator.
As per clause 15.9.6.6 of IRS concrete bridge code, lap splices shall not be used for
bars larger than 32mm. Hence Mechanical Couplers may not be permitted.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/RailwayBridges(DesignCorrespondance)/SA-SBC/KRIDE/DL
Date: 03.05.2023.

GM/Civil/Projects/KRIDE

Sub: Proposed construction of RUB Bridge no. 531 at ch: 205241 1 x 18.30m composite girder &
2x7.5x5.5m RCC BOX (RUB) on up line of the exg. Bridge of 1 x 12.20 m steel girder +
2x7.5x5.5m RCC BOX(RUB) between Bellanduru and Banaswadi stations - Dn line pro. Bridge is
on up line.

Ref: Letter No.BYPL-HSRA/DL/Bridge GAD/373 of GM/Civil/Projects/KRIDE, dated 28.04.2023.

*****

In connection with the above subject, and letter under reference, draft structural drawings
and design calculation of the above bridge are received in this office. However, GAD for the
proposed work yet to be approved. Hence the structural drawings and design calculation will be
processed after the approval of GAD.

For information and necessary action please.

0
(Kritya Nand Jha)
प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.70/Tunnel Portal Date:
02.05.2023.

Sr.DEN/Co-ord/UBL

Sub: Tornalgalu – Ranjitpura Section: Protection of track from boulder falling infront of tunnel faces
by tunnel portal extension (Tunnel No.1) Length of extension of portal by 20m on both side from
km16/469 to 16/489 at TNGL end 16/710 to 16/730 at RNJP end.

Ref: 1.Sr.DEN/East/UBL, letter No.H/w.352/East/Tunnel portal/Drg, dated 27.04.2023.


2.This office even letter dated 11.04.2023.

In connection with above subject and letter under reference, Hubli division has submitted the design
calculations of Tunnel portal of above work and the same have been scrutinized and following are
observations/correction which shall be clarified/corrected;

135. Geotechnical investigation report, SBC calculation strata-wise, etc., shall be submitted duly
signed by divisional officials to be submitted
136. Only design calculations booklet has been submitted, it is requested to submit the structural
drawings also.
137. Design calculation is done with IS:800 which may not be appropriate. In the present proposal
extension of tunnel portals is of composite section, hence design codes for composite section shall be
referred and design calculations shall be revised.
138. The seismic zone considered in design as Zone II, the section comes under seismic zone III,
for the same design shall be revised.
139. The connection details of different structural members in tunnels viz weld, bolt connection,
splice arrangement etc, is not shown, same shall be incorporated in drawings.
140. Manual calculation of design for tunnel portal including foundation shall be furnished
showing the actual stress and permissible stress as per codal provisions.
141. Tunnel portal shall be checked for lateral thrust, sliding, slope filling and filling
earth/boulders on one side of section.
142. Arrangement of vertical column, anchor bolts, MS sheet and arch beam shall be shown in
detail.
143. Design calculations for crack width & length required for anchor bars shall be furnished.
144. Boulders falling from a height of 8m with impact shall be considered in design.
145. Impact of live load & surcharge at foundation level and max pressure on foundation shall be
furnished
146. Following points are to be incorporated in structural drawings :
i. Approved GAD number shall be incorporated in structural drawings.
j. Exposure condition (as per clause No.15.92 of IRS concrete bridge code)
k. Development length as per codal provision to be incorporated in drawings.
l. Seismic zone to be incorporated.

It is requested that design consultant may attend this office for discussion regarding design and
drawing with prior intimation.

For information and necessary action please.

(Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: Sr.DEN/East/UBL - for information and necessary action, please.


No.SWR/W.71/Gantry Girder Workshop Date:
26.04.2023.

Dy.CE/Designs/C/SC/SCR

Sub: Regarding General Arrangement Drawing and Structural drawings of EOT Crane at Hubli
Workshop.

Ref: Letter No.UBLS/M/M&PRB/2022-23/ETO15TBSP of Dy.CWM/UBLS, dated 29.08.2022 &


21.04.2023.

*****

In connection with the above subject, it is planned for installation of 15T EOT crane in the
Hubli Workshop. However, the GAD and structural drawings of the structure (gantry girder) are not
available in SWR. As the gantry girder were constructed during the time when UBL Division was in
SCR. Hence, it is kindly requested to check whether any details of the structure are available in your
Office.

Regards,

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: DY.CWM/UBLS - for your kind information please.


Sr.DEN/Co-Ord/UBL

Sub: Regarding General Arrangement Drawing and Structural drawings of EOT Crane at Hubli
Workshop.

Ref: Letter No.UBLS/M/M&PRB/2022-23/ETO15TBSP of Dy.CWM/UBLS, dated 29.08.2022 &


21.04.2023.

*****

In connection with the above subject, it is planned for installation of 15T EOT crane in the
Hubli Workshop. However, the GAD and structural drawings of the structure (gantry girder) are not
available in SWR. As the gantry girder were constructed during the time when UBL Division was in
SCR. Hence, it is kindly requested to check whether any details of the structure are available in your
Office.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: DY.CWM/UBLS - for your kind information please.


Dy.CE/Designs/C/SC/SCR

Sub: Regarding General Arrangement Drawing and Structural drawings of EOT Crane at Hubli
Workshop.

Ref: Letter No.UBLS/M/M&PRB/2022-23/ETO15TBSP of Dy.CWM/UBLS, dated 29.08.2022 &


21.04.2023.
*****

In connection with the above subject, it is planned for installation of 15T EOT crane in the
Hubli Workshop. However, the GAD and structural drawings of the structure (gantry girder) are not
available in SWR. As the gantry girder were constructed during the time when UBL Division was in
SCR. Hence, it is kindly requested to check whether any details of the structure are available in your
Office.

Regards,

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Dy.CE/Bridge Designs/HQ/SCR

Sub: Regarding General Arrangement Drawing and Structural drawings of EOT Crane at Hubli
Workshop.

Ref: Letter No.UBLS/M/M&PRB/2022-23/ETO15TBSP of Dy.CWM/UBLS, dated 29.08.2022 &


21.04.2023.

*****

In connection with the above subject, it is planned for installation of 15T EOT crane in the
Hubli Workshop. However, the GAD and structural drawings of the structure (gantry girder) are not
available in SWR. As the gantry girder were constructed during the time when UBL Division was in
SCR. Hence, it is kindly requested to check whether any details of the structure are available in your
Office.

Regards,

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
In connection with above subject and letter reference, for checking the adequacy of existing
structure for installation of 15t capacity EOT crane, it is requested to submit the GAD and structural
drawings of existing gantry girder, structural members and foundation details of production shop A
& B of Hubli Work shop, as the is work is proposed for procurement of higher capacity EOT crane
by CWM office workshop Hubli.
The completion drawings of EOT crane in production A & B shop of Hubli workshop is not found in
this office, it might be available with S.C Railway as UBL was part of S.C.Railway during the year
1997.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/JRU – UBL/Patch Doubling Vol-I Date:
25.04.2023.

CE/CN/III/BNC

Sub: Chikkajajur – Hubli Doubling: Section: Bridge No.38 at km.403/500-800 as 15 x 18.30m span
Plate Girder welded type between Karajgi and Savanur stations New Bridge on Down Line.

Ref: CE/CN/III/BNC letter No.W.CN/IV/Br.38/Inspection, dated 20.04.2023.

In connection with above subject and letter under reference, the adequacy check, design calculation
and drawing for important bridge No.38 has been submitted vide above reference. The adequacy
check design calculations and drawings to be routed through Dy.CE/Design/CN/BNC and approval
of CE/CN to be taken.

This is issued with the approval of Competent Authority


For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: DY.CE/Design/CN/BNC - for information and necessary action, please


No.SWR/W.71/ASSEMENT OF CRANE GIRDER Date:
25.04.2023.

ADEN/Bridge/UBL

Sub: Procurement of one number of EOT crane 15 ton on replacement account in production A&B
shop of Hubli workshop- certificate of stability.

Ref: 1. This office even letter , dated 08.11.2022 & 03.01.2023 & 20.04.2023.
2. Letter No.UBLS/M/M&PRB/2022-23/ETO15TBSP of Dy.CWM/UBLS,dated 29.08.2022
&21.04.2023.

In connection with above subject and letter reference, for checking the adequacy of existing
structure for installation of 15t capacity EOT crane, it is requested to submit the 3 rd party inspection
report for scrutiny and to issue the stability certificate for crane gantry.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/JRU – UBL/Patch Doubling Vol-I Date:
24.04.2023.

CE/CN/III/BNC

Sub: Chikkajajur – Hubli Doubling: Section: Bridge No.38 at km.403/500-800 as 15 x 18.30m span
Plate Girder welded type between Karajgi and Savanur stations New Bridge on Down Line.

Ref: CE/CN/III/BNC letter No.W.CN/IV/Br.38/Inspection, dated 20.04.2023.

In connection with above subject and letter under reference, the adequacy check, design calculation
and drawing for important bridge No.38 has been submitted vide above reference. The adequacy
check design calculations and drawings to be routed through Dy.CE/Design/CN/BNC after
submitting the same, the same will be processed for approval of Competent Authority.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: DY.CE/Design/CN/BNC - for information and necessary action, please


No.SWR/W.71/ASSEMENT OF CRANE GIRDER Date:
25.04.2023.

ADEN/Bridge/UBL
Sub: Procurement of one number of EOT crane 15 ton on replacement account in production A&B
shop of Hubli workshop- certificate of stability.

Ref: 1. This office even letter , dated 08.11.2022 & 03.01.2023 & 20.04.2023.
2. Letter No.UBLS/M/M&PRB/2022-23/ETO15TBSP of Dy.CWM/UBLS,dated 29.08.2022
&21.04.2023.

In connection with above subject and letter reference, for checking the adequacy of existing
structure for installation of 15t capacity EOT crane, it is requested to submit the 3 rd party inspection
report for scrutiny and to issue the stability certificate for crane gantry.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No.SWR/W.182/JRU – UBL/Patch Doubling Vol-I Date:
24.04.2023.

CE/CN/III/BNC

Sub: Chikkajajur – Hubli Doubling: Section: Bridge No.38 at km.403/500-800 as 15 x 18.30m span
Plate Girder welded type between Karajgi and Savanur stations New Bridge on Down Line.

Ref: CE/CN/III/BNC letter No.W.CN/IV/Br.38/Inspection, dated 20.04.2023.

In connection with above subject and letter under reference, the adequacy check, design calculation
and drawing for important bridge No.38 has been submitted vide above reference. The adequacy
check design calculations and drawings to be routed through Dy.CE/Design/CN/BNC after
submitting the same, the same will be processed for approval of compentent Authority.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: DY.CE/Design/CN/BNC - for information and necessary action, please


Reminder-2

No.SWR/W.71/ASSEMENT OF CRANE GIRDER Date:


20.04.2023.

DY.CWM/UBLS

Sub: Procerement of one number of EOT crane 15 ton on replacement account in production A&B
shop of Hubli workshop- certificate of stability.

Ref: 1. This office even letter , dated 08.11.2022 & 03.01.2023.


2. Letter No.UBLS/M/M&PRB/2022-23/ETO15TBSP of Dy.CWM/UBLS dated 29.08.2022.
In connection with above subject and letter reference, for checking the adequacy of existing
structure for installation of 15t capacity EOT crane, it is requested to submit the detailed design
calculation and structural drawings to this office for approval and also the details regarding crane
etc., has also to be submitted to this office, the same has been communicated to your office letter
dated 08.11.2022 and 03.01.2023 as well.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: ADEN/Bridge/UBL - for information and necessary action, please


No.SWR/W.352/LC.NO.91,92&95/JTJ-PU/JTJ-SBC/CN Date:
04.04.2023.

DY.CE/East/CN/BNC

Sub: Bengaluru city- Jolarpetteai Section: Proposed construction of ROB No.635A in lieu
L.C.No.95 at km.228/500-800of span 1 x 36m Bow string girder and 11x20.0m PSC girder at PU
yard in SBC-JTJ Section.

Ref: ADEN/Bridges/SBC letter no.05/Inspection/ROB 635A, dated 31.03.2023.

In connection with above subject, Inspection was conducted by ADEN/Bridges/SBC. Several


deficiencies were noticed including deviance from the approved TAD. In this regard, it is advised to
give detailed reasons for the deviance and action taken report to be submitted to this office at the
earliest.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: DY.CE/Design/CN/BNC - for information and necessary action, please


No. SWR/W.352/Br.No.25/NMGA – HAS/BAW – HAS/KRDCL Date:
20.03.2023.

Chief Engineer
KRDCL/Bengaluru

Sub: BAW - HAS Section: Proposed construction of RUB as RCC BOX of size 2X6.0mx6.0m at
Railway Km. 14/300 to 14/400 (KRDCL CH 0+780) Between Nelamangala(NMGA) and Hassan
(HAS) Railway stations by Rolling- in/Launching method (Self Execution by KRDCL under the
supervision of Railways).

Ref: This office even letter dated 28.06.2022.

In connection with above subject KRDCL has submitted the structural drawings and design
calculations of RCC Box and Retaining wall of above work and the same have been scrutinized and
following are observations/correction which shall be clarified/corrected;

147. A MOU has to be entered by SBC Division & KRDCL and copy of the same shall be
submitted to HQ for perusal and record.
148. Tripartite agreement (As mentioned in CBE/SWR letter No. SWR/W.352/Br. No-25/NMGA-
HAS/BAW-HAS/KRDCL dated 15.10.2020) has to be entered by SBC Division, KRDCL and
Execution agency of KRDCL and copy of the same shall be submitted to HQ for perusal and record.
149. As per extent instructions applicable codal charges are to be paid by the party, fully funded
by sponsoring agencies. All the necessary charges are to be collected and details shall be submitted
to this office for reference.
150. All the necessary charges are to be collected from KRDCL by SBC Division and details of
the same shall be submitted to this office.
151. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by divisional officials to be submitted.
152. Dimensional details showing (earth fill above top slab of box, dimension of RCC BOX,
haunch size, reduced levels as per approved GAD) to be incorporated.
153. The dimensional shown in structural drawings and design calculations is more than required,
hence the size of RCC twin Box shall be reduced and design and drawings to be revised.
154. As per Cl.26.2 of IS 456 the actual lap length shall be calculated and same shall be shown in
drawing.
155. Reduced levels of RL, Fl, FSL, Canal BL, Foundation level etc.,shown in drawing is not
tallying with approved GAD, same shall be checked and corrected.
156. The track is in curve, the curvature effect to be considered in design calculation.
157. Moment of resistance and capacity of the section shall be incorporated in design calculation.
158. Fatigue check shall be done as per Cl.13.4.1 of IRS concrete Bridge Code for the same
design calculations to be furnished.
159. Bar bending schedule and notations of bars shall be shown as per standard RDSO drawings.
160. Following points are to be incorporated:
m. Approved GAD number shall be incorporated in structural drawings.
n. Exposure condition (as per clause No.15.92 of IRS concrete bridge code)
o. Development length as per codal provision to be incorporated in drawings.
161. The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.
162. This office even letter dated 26.07.2022 also to be complied.
163. As per extent instructions applicable codal charges are to be paid by the party, fully funded
by sponsoring agencies. All the necessary charges are to be collected and details shall be submitted
to this office for reference.
164. Signed copy of MOU between Railways and VJNL shall be submitted

It is requested that design consultant may attend this office for discussion regarding design and
drawing with prior intimation.

After getting compliance for the above observations, structural drawings and design calculations can
be processed for approval of the competent Authority.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.352/Canal X-ing/MYS-ASK&TK-ASK Date:
03.03.2023

Sr.DEN/Co-ord/MYS

Sub: MYS -ASK Section: Proposed construction of RCC Box 2X5.7Mx5.5M at Km. 155/300-400
Between HHT-ASK Yattinahole gravity canal X-ing from 77+799 to 78+249Km (Under self-
execution scheme) (Deposit work by VJNL).
Ref: This office even letter dated 26.07.2022.
In connection with above subject MYS Division has submitted the draft structural drawings and
design calculations of RCC Twin Box of above work and the same have been scrutinized and
following are observations/correction which shall be clarified/corrected;

165. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by divisional officials to be submitted.
166. Dimensional details showing (earth fill above top slab of box, dimension of RCC BOX,
haunch size, reduced levels as per approved GAD) to be incorporated.
167. The dimensional shown in structural drawings and design calculations is more than required,
hence the size of RCC twin Box shall be reduced and design and drawings to be revised.
168. As per Cl.26.2 of IS 456 the actual lap length shall be calculated and same shall be shown in
drawing.
169. Reduced levels of RL, Fl, FSL, Canal BL, Foundation level etc.,shown in drawing is not
tallying with approved GAD, same shall be checked and corrected.
170. The track is in curve, the curvature effect to be considered in design calculation.
171. Moment of resistance and capacity of the section shall be incorporated in design calculation.
172. Fatigue check shall be done as per Cl.13.4.1 of IRS concrete Bridge Code for the same
design calculations to be furnished.
173. Bar bending schedule and notations of bars shall be shown as per standard RDSO drawings.
174. Following points are to be incorporated:
p. Approved GAD number shall be incorporated in structural drawings.
q. Exposure condition (as per clause No.15.92 of IRS concrete bridge code)
r. Development length as per codal provision to be incorporated in drawings.
175. The original copy of structural drawings (in tracing sheet) and design calculations are to be
proof checked by IIT/IIsc along with letter from institute to be submitted to this office for approval.
176. This office even letter dated 26.07.2022 also to be complied.
177. As per extent instructions applicable codal charges are to be paid by the party, fully funded
by sponsoring agencies. All the necessary charges are to be collected and details shall be submitted
to this office for reference.
178. Signed copy of MOU between Railways and VJNL shall be submitted

It is requested that design consultant may attend this office for discussion regarding design and
drawing with prior intimation.

After getting compliance for the above observations, structural drawings and design calculations can
be processed for approval of the competent Authority.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
.
SUB: TK – ASK Section: Construction of prestressed concrete box girder (post tensioned) 1 x
24.40m (up line & dnline) bridge at railway km.155/100-200 between Honnavalli road - Adihalli
stations for Yettinahole gravity canal crossing ch: 97+927.

Ref: Sr.DEN/Co-ord/MYS letter No.Y/W.73/I/130/YHP/km.155.10/TK-ASK, dated 02.02.23

In connection with above subject MYS Division has submitted the draft structural drawings and
design calculations of substructure and foundation of above work the same have been scrutinized
and following are observations/correction which shall be clarified/corrected;

179. Geotechnical investigation report duly mention the SBC calculation strata wise type of
soil,N values etc., as per IS shall be submitted duly signed by concerned Divisional officials.
180. In design calculation of earth pressure, height of earth fill (H1) shall be considered taken
from top of formation level to foundation level.
181. Shear links to be provided to abutment, dirt wall and abutment stem.
182. Necessary of providing PCC behind abutment may be explained.
183. PCC towards canal side shall be provided with skin reinforcement, if required.
184. DL of PCC over footing shall be considered in design and also reason for filling PCC above
footing shall be justified.
185. Design calculation and structural drawings of return wall and dirt wall shall be furnished.
186. Maximum pressure on soil at foundation level is shown as 58.98t/sqm, same shall be
reduced by increasing the size of foundation.
187. Moment of resistance and capacity of the section shall be incorporated in design calculation.
188. Depth of cushion considered in CDA calculation shall be checked and corrected.
189. Forces due to eccentricity of track as per cl.2.5 of IRS Bridge rules shall be checked and
incorporated in design calculation.
190. Forces due to LWR over a bridge shall be checked as per cl.2.8.1.1 and for the same design
calculations shall be furnished.
191. Reinforcement in the pedestal and jacking mesh shall be incorporated.
192. Following points are to be incorporated:
s. Approved GAD number shall be incorporated in structural drawings.
t. SIDL considered in design shall be checked and corrected.
u. Seismic zone shall be incorporated.
v. Suitability check for rock anchor shall be furnished.
w. Exposure condition (as per clause No.15.92 of IRS concrete bridge code)
x. Position of jacking and mesh below jacking point shall be incorporated in drawings.
y. Development length as per codal provision to be incorporated in drawings.
z. As per drawing the abutment foundation is resting on rock. Hence suitable anchoring may also be
proposed.
193. The structural drawings and design calculations are to be proof checked by IIT/IIsc and the
same may be submitted to this office for approval.
194. The detailed procedure/sequence/possibility of construction of abutment, bed block and dirt
wall under running traffic condition shall be furnished.

195. The structural drawings and design calculations are to be submitted duly signed by design
consultant in all pages and by VJNL officials in main page.
196. As per extent instructions applicable codal charges are to be paid by the party, fully funded
by sponsoring agencies. All the necessary charges are to be collected and details shall be submitted
to this office for reference.
197. Signed copy of MOU between Railways and VJNL shall be submitted

After getting compliance for the above observations, structural drawings and design calculations can
be processed for approval of the competent Authority.

For information and necessary action please.

(P. I. KAMBLE)
AXEN/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/N/MYS- for information and necessary action, please.
Sub: MYS -ASK Section: Proposed construction of RCC Box 2X5.7Mx5.5M at Km. 155/300-400
Between HHT-ASK Yattinahole gravity canal X-ing from 77+799 to 78+249Km (Under self-
execution scheme) (Deposit work by VJNL).
Ref: 1.This office even letter dated 26.07.2022.
2.Sr.DEN/Co-ord/MYS letter No.Y/W.73/I/130/YHP/km.155.10/TK-ASK, dated 02.02.23

In connection with above subject Mys Division has submitted the draft structural drawings and
design calculations of substructure and foundation of above work the same have been scrutinized
and following are observations/correction which shall be clarified/corrected;

198. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by divisional officials to be submitted.
199. In design calculation of earth pressure, height of earth (H1) shall be taken from top of
formation level to foundation level.
200. Shear links to be provided to abutment, dirt wall and abutment stem.
201. DL of PCC over footing shall be considered in design and also reason for filling PCC above
footing shall be justified.
202. Design calculation and structural drawings of return wall and dirt wall shall be furnished.
203. Maximum pressure on soil at foundation level is shown as 58.98t/sqm, same shall be
reduced by increasing the size of foundation.
204. Moment of resistance and capacity of the section shall be incorporated in design calculation.
205. Depth of cushion considered in CDA calculation shall be checked and corrected.
206. Forces due to eccentricity of track as per cl.2.5 of IRS Bridge rules shall be checked and
incorporated in design calculation.
207. Forces due to LWR over a bridge shall be checked as per cl.2.8.1.1 and for the same design
calculations shall be furnished.
208. Pedestal reinforcement and jacking mesh shall be incorporated.
209. Following points are to be incorporated:
aa. Approved GAD number shall be incorporated in structural drawings.
bb. SIDL considered in design shall be checked and corrected.
cc. Seismic zone shall be incorporated.
dd. Suitability check for rock anchor shall be furnished.
ee. Exposure condition (as per clause No.15.92 of IRS concrete bridge code)
ff. Position of jacking and mesh below jacking point shall be incorporated in drawings.
gg. Development length as per codal provision to be incorporated in drawings.
hh. As per drawing the abutment foundation is resting on rock, reinforcement shall be anchored.
210. The structural drawings and design calculations are to be proof checked by IIT/IIsc and
submitted to this for approval.
211. The detailed procedure/sequence/possibility of construction of abutment, bed block and dirt
wall under running traffic condition shall be furnished in detail to deal this case further.
After getting compliance for the above observations, structural drawings and design calculations can
be processed for approval of the competent Authority.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/N/MYS- for information and necessary action, please.
No. SWR/W.352/Canal X-ing/Mys-ASK & TK-ASK/VJNL Date:
20.02.2023
SUB: TK – ASK Section: Construction of prestressed concrete box girder (post tensioned) 1 x
24.40m (up line & dnline) bridge at railway km.155/100-200 between Honnavalli road - Adihalli
stations for Yettinahole gravity canal crossing ch: 97+927.

Ref: Sr.DEN/Co-ord/MYS letter No.Y/W.73/I/130/YHP/km.155.10/TK-ASK, dated 02.02.23

In connection with above subject Mys Division has submitted the draft structural drawings and
design calculations of substructure and foundation of above work the same have been scrutinized
and following are observations/correction which shall be clarified/corrected;

212. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by divisional officials to be submitted.
213. In design calculation of earth pressure, height of earth (H1) shall be taken from top of
formation level to foundation level.
214. Shear links to be provided to abutment, dirt wall and abutment stem.
215. DL of PCC over footing shall be considered in design and also reason for filling PCC above
footing shall be justified.
216. Design calculation and structural drawings of return wall and dirt wall shall be furnished.
217. Maximum pressure on soil at foundation level is shown as 58.98t/sqm, same shall be
reduced by increasing the size of foundation.
218. Moment of resistance and capacity of the section shall be incorporated in design calculation.
219. Depth of cushion considered in CDA calculation shall be checked and corrected.
220. Forces due to eccentricity of track as per cl.2.5 of IRS Bridge rules shall be checked and
incorporated in design calculation.
221. Forces due to LWR over a bridge shall be checked as per cl.2.8.1.1 and for the same design
calculations shall be furnished.
222. Pedestal reinforcement and jacking mesh shall be incorporated.
223. Following points are to be incorporated:
ii. Approved GAD number shall be incorporated in structural drawings.
jj. SIDL considered in design shall be checked and corrected.
kk. Seismic zone shall be incorporated.
ll. Suitability check for rock anchor shall be furnished.
mm. Exposure condition (as per clause No.15.92 of IRS concrete bridge code)
nn. Position of jacking and mesh below jacking point shall be incorporated in drawings.
oo. Development length as per codal provision to be incorporated in drawings.
pp. As per drawing the abutment foundation is resting on rock, reinforcement shall be anchored.
224. The structural drawings and design calculations are to be proof checked by IIT/IIsc and
submitted to this for approval.
225. The detailed procedure/sequence/possibility of construction of abutment, bed block and dirt
wall under running traffic condition shall be furnished in detail to deal this case further.
After getting compliance for the above observations, structural drawings and design calculations can
be processed for approval of the competent Authority.

For information and necessary action please.


(Kritya Nand Jha)
प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/N/MYS- for information and necessary action, please.

SWR/W.352/GEN/Bridge-Design & Drawing


Date:-.14.02.2023.

Dy.CE/Design/CN/BNC

SUB: FOB structural drawings and design calculation for non standard span of 27.93m to 31.922m.

Ref: Dy.CE/Design/BNC, letter. No./W.573/BNC/Non- standard/FOB, dated 09.07.2021.

Vide above subject, the structural drawings and design calculations of non standard FOB with
span of 27.93m to 31.92m has been approved by construction unit vide drawing
No.(SWR/CN/BNC/ST-127-2021 sheet 1 to 4). It is kindly requested to send the soft copy of the
design and drawings along with STAAD analysis and excel sheets for reference.

For information and necessary action, please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
SWR/W.352/Canal-Xing/MYS-ASK & TK-ASK
Date:-.10.02.2023.

Sr.DEN/Co-ord/MYS

SUB: Mysore-Arsikere section: Proposed construction of Temporary Abutment for RCC Box of size
2x5.7mx5.65m at km 155/300 - 400 (Canal Ch: 78+024) between HHT-ASK stations for Yettinahole
gravity canal crossing from ch:77+997 to 78+051km (by cast-in-situ method)

Ref: 1. Letter. No. Y/W.73/I/130(i)/MYS-ASK/YH Canal X-ing, dated 02.02.2023 .


2. Letter. No. Y/W.73/I/130(i)/MYS-ASK/YH Canal X-ing, dated 17.10.2022 .
Vide above subject, the structural drawings and design calculations of Temporary RCC
Abutment submitted by Mysore division have been scrutinized and observed that the original Proof
checking copy of structural drawing and letter from institute (IISc) has not been submitted. Hence it is
requested to arrange to send the above details/documents at the earliest.

After getting compliance for the above observations, structural drawings and design calculations
can be processed for approval of the competent Authority.

For information and necessary action, please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to: ADEN/SW/MYS - for information and necessary action, please.


No. SWR/W.71/2-Wheeler Over Bridge Date:
18.01.2023

Sr.DEN/Co-ord/UBL

SUB: Proposed construction of Two-Wheeler Over Bridge over South Western Railway.

*****

In connection with above subject, it is proposed for construction of 2-wheeler over bridges at
locations of unauthorized trespassing by local people. These locations are primarily near yards where
due to non-connectivity between the two sides, people tend to cross the tracks. At several occasions,
this has led to major casualties. Construction of ROB/RUB at these locations is not feasible due to no
LC nearby, site constraint etc, huge expense for construction of ROB/RUB.

Hence, construction of 2-wheeler over bridge primarily for the pedestrians and 2-wheelers may solve
this issue and the same may required to be proposed wherever feasible on experimental basis.

In view of this, a type (drawing) has been developed for 2-Wheeler over Bridge (4.0m wide) for 4
track crossing and enclosed herewith for perusal..

It is requested to provide an Abstract Estimate and submit to office for further processing.

For information and necessary action, please.

Encl: Structural drawings & approximate quantity of concrete and steel.


(Kritya Nand Jha)
प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

SUB:
Ref: Plan head 30-Road Safety Works-Road Over /Under Bridges in IRPSM.

In connection with above subject, it is proposed for construction of 2-wheeler over bridges at
locations of unauthorized trespassing by local people. These locations are primarily near yards where
due to non-connectivity between the two sides, people tend to cross the tracks. At several occasions,
this has led to major casualties. Construction of ROB/RUB at these locations is not feasible due to no
LC nearby, site constraint etc, huge expense for construction of ROB/RUB.

Hence, construction of 2-wheeler over bridge primarily for the pedestrians and 2-wheelers can solve
this issue on experimental basis.

It is here by requested to submit the abstract estimate and vetting of the proposal from accounts.

For information and necessary action, please.

Encl: Structural drawings.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/HQ/UBL- for information and necessary action, please.
No. SWR/W.71/2-Wheeler Over Pass Date:
18.01.2023

Sr.DEN/Co-ord/UBL

SUB: Proposed construction of Two-Wheeler Over Bridge over South Western Railway.

Ref: Plan head 30-Road Safety Works-Road Over /Under Bridges in IRPSM.

In connection with above subject, it is proposed for construction of 2-wheeler over bridges at
locations of unauthorized trespassing by local people. These locations are primarily near yards where
due to non-connectivity between the two sides, people tend to cross the tracks. At several occasions,
this has led to major casualties. Construction of ROB/RUB at these locations is not feasible due to no
LC nearby, site constraint etc, huge expense for construction of ROB/RUB.

Hence, construction of 2-wheeler over bridge primarily for the pedestrians and 2-wheelers can solve
this issue on experimental basis.

It is here by requested to submit the abstract estimate and vetting of the proposal from accounts.

For information and necessary action, please.


Encl: Structural drawings.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/HQ/UBL- for information and necessary action, please.
No. SWR/W.70/Tunnel Portal Date: 06.01.2023

Sr.DEN/Co-ord/UBL

SUB: Proposed extension of tunnel portals by 20m for protection of track from rock & boulder fall
due to heavy rainfall near. Tunnel no.7 at km 34/602 between CRZ & DDS stations.Tunnel no.11 at
km 38/520 between DDS & LIM stations .Tunnel no.13 at km 39/367 between DDS & LIM
stations Tunnel no.16 at km 43/570 between LIM & QLM stations.

Ref: GAD has been received in e-das.

In connection with above subject Hubli Division has submitted the structural drawings and design
calculations of tunnel portals and the same have been scrutinized and following are the
observations/correction which shall be clarified/corrected;
226. The structural members shown in drawings and design calculation (staad analysis) are not
tallying. Same shall be checked and design and drawings shall be revised.
227. Design report shall consists of Introduction, salient features of project, Topographical
feature, geological setup, design approach, geo technical design parameters, geotechnical and
structural material properties.
228. Design calculation is done with IS:800 which may not be appropriate. In the present
proposal extension of tunnel portals is of composite section, hence design codes for composite
section shall be referred and design calculations shall be revised.
229. The connection details of different structural members in tunnels viz weld ,bolt, splice
arrangement etc, is not shown. Hence the same shall be shown.
230. Manual calculation for design of raft foundation shall be furnished.
231. The design shall be checked for lateral thrust, sliding, slope filling and filling on one side of
section.
232. Detailed Geotechnical investigation report, strata wise SBC calculation etc., shall be
submitted duly signed by divisional officials..
233. Side earth pressure has not been considered in design calculation.
234. The bending moment, shear force, axial force of tunnel portal shall be shown in tabular
format along with sketches.
235. Combination of load shall be considered in Staad analysis.
236. Arrangement of vertical column, anchor bolts, MS sheet and arch beam shall be shown in
detail.
237. Falling of boulders from a height of 8m shall incorporated in notes of drawing.
238. Design calculation and structural drawings shall be submitted in tracing paper duly signed
by Railway officials.
239. Maximum pressure on soil at foundation level shall be incorporated in drawing.
240. Following points are to be incorporated:
qq. SIDL considered in design shall be checked and corrected.
rr. Seismic zone shall be incorporated.
ss. Suitability check for rock anchor shall be furnished.
tt. Exposure condition (as per clause No.15.92 of IRS concrete bridge code)
uu. Reference codes and clause shall be furnished in design.
vv. Development length as per codal provision to be incorporated in drawings.
241. Signature table for Railway officials shall (both UBL div and Hq) be incorporated in
drawings.

After getting compliance for the above observations, structural drawings and design calculations can
be processed for approval of the competent Authority. It is requested that design consultant may
attend to this office for attending correction and discussion regarding design with prior intimation.
For information and necessary action, please.
(Kritya Nand Jha)
प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/W/UBL- for information and necessary action, please.
No. SWR/W.352/Canal X-ing/Mys-ASK & TK-ASK/VJNL Date:
09.12.2022

SUB:Construction of prestressed concrete box girder (post tensioned) 1 x 24.40m (up line & dnline)
bridge at railway km.155/100-200 between Honnavalli road - Adihalli stations for Yettinahole
gravity canal crossing ch: 97+927.

Ref: Sr.DEN/Co-ord/MYS letter No.Y/W.73/I/130/YHP/km.155.10/TK-ASK, dated 28.11.22

In connection with above subject Mys Division has submitted the draft structural drawings and
design calculations of substructure and foundation of above work the same have been scrutinized
and following are observations/correction which shall be clarified/corrected;

242. Geotechnical investigation report, SBC calculation strata wise, etc., shall be submitted duly
signed by divisional officials to be submitted.
243. In design calculation of earth pressure, height of earth (H1) shall be taken from top of
formation level to foundation level.
244. Shear links to be provided to abutment, dirt wall and abutment stem.
245. DL of PCC over footing shall be considered in design.
246. Design calculation and structural drawings of return wall and dirt wall shall be furnished.
247. Maximum pressure on soil at foundation level is shown as 58.98t/sqm, same shall be
reduced by increasing the size of foundation.
248. Moment of resistance and capacity of the section shall be incorporated in design calculation.
249. Depth of cushion considered in CDA calculation shall be checked and corrected.
250. Forces due to eccentricity of track as per cl.2.5 of IRS Bridge rules shall be checked and
incorporated in design calculation.
251. Forces due to LWR over a bridge shall be checked as per cl.2.8.1.1 and for the same design
calculations shall be furnished.
252. Pedestal reinforcement and jacking mesh shall be incorporated.
253. Following points are to be incorporated:
ww. Approved GAD number shall be incorporated in structural drawings.
xx. SIDL considered in design shall be checked and corrected.
yy. Seismic zone shall be incorporated.
zz. Suitability check for rock anchor shall be furnished.
aaa. Exposure condition (as per clause No.15.92 of IRS concrete bridge code)
bbb. Position of jacking and mesh below jacking point shall be incorporated in drawings.
ccc. Development length as per codal provision to be incorporated in drawings.
ddd. As per drawing the abutment foundation is resting on rock, reinforcement shall be anchored.
254. The structural drawings and design calculations are to be proof checked by IIT/IIsc and
submitted to this for approval.
After getting compliance for the above observations, structural drawings and design calculations can
be processed for approval of the competent Authority.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to: Sr.DEN/N/MYS- for information and necessary action, please.
No. SWR/W.352/e-das correspondence Date:
25.11.2022

SUB: Tumkur- Arsikere Section: Construction of prestressed concrete box girder (post tensioned) 1
x 24.40m (up line & dnline) bridge at railway km.155/100-200 between Honnavalli road - Adihalli
stations for Yettinahole gravity canal crossing ch: 97+927

Ref: GAD of above FOB has been approved in e-das.

In connection with above subject RVNL has submitted the structural drawings and design
calculations of FOB in e-das and the same have been scrutinized and following are
observations/correction which shall be clarified/corrected;

eee. Pile integrity test shall be conducted to piles as per letter No.SWR/W.352/Genel/2020-21,
dated 10.08.2020.
fff. Pile to be terminated in weathered/hard rock and length of socket ting shall be as per codal
provision.
ggg. Length of holding down bolts shall be shown in drawing.
hhh. As per approved the GAD the substructure and super structure of FOB is as per design of
non standard span, the design calculations and structural drawings of superstructure of FOB duly
proof checked and submitted to this office for reference.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.352/LC.18 (ROB)/KDO-NTW/MYS-CMNR/NHD Date:
23.11.2022

Sr.DEN/Co-ord/MYS

Sub: MYS-CMNR Section:Proposed construction of 4-lane ROB in lieu of LC-18 at Rly


Km.23/700-800 (NH Chainage 620+600) between Kadakola (KDO) & Nanjangud Town (NTW)
Station with span arrangement (1x36.0m+1x36.0m(Obligatory) + 1x24.0m PSC I Girder. (PID:
SWRMYS0009).
Ref: Letter No. Y/W.352/ROB/LC.18/MYS-CMNR of Sr.DEN/Co-ord/MYS, Dated: 04.11.2022.

In connection with above subject the structural drawings and design calculations of substructure Pier
and foundation (P1L,P1R,P2L&P2R) for Proposed construction of 4-lane ROB in lieu of LC-18 at
Rly Km.23/700-800 (NH Chainage 620+600) between Kadakola (KDO) & Nanjangud Town (NTW)
Stations stations have been approved by Competent Authority on 22.11.2022.

The following are the drawing numbers:


SN Name of work HQ.Drawing No.

1 Dimension details of Pier and Foundation for SWR/2022/STR-20/LC-18(ROB)/


P2R,P2l,P1L & P1R KDO-NTW/MYS-CMNR/Sheet 1 of 2
2 Reinforcement details of Pier and Foundation SWR/2022/STR-20/LC-18(ROB)/
for P2R,P2l,P1L & P1R KDO-NTW/MYS-CMNR/Sheet 2 of 2

Execution of work can be started in consultation with DY.CE/Bridge line/HQ (M-9731665215),


DEN/Bridges/MYS and Sr.DEN/Co-ord/MYS of South Western Railway.

It is requested to make arrangements to collect the blue print copies of approved Structural drawings
and design booklets and to submit two blue print copies each to this office for record.

It is requested to submit the Temporary Arrangement Drawing/launching scheme duly proof


checked by IIT/IISc for the proposed work to this office at the earliest for approval.

For information and necessary action please.

(P.I.Kamble)
AXEN/Bridges
For CBE/SWR

Copy to: 1) Assistant Executive Engineer, National Highway, Subdivision,Nazardad, Mysore–570010 -


for information and necessary action, please.
2) Dy.CE/Bridgeline/HQ –for information and necessary action, please.
3) DEN/Bridges/MYS- for information and necessary action, please.
No. SWR/W.352/Canal-Xing/MYS-Ask/TK-ASK/VJNL Date:
04.11.2022
SUB: Mysore-Arsikere section : Proposed construction of RCC Box of size2x5.7mx5.65m at km
155/300-400 (canal ch: 78+024) between HHT-ASK stations for Yettinahole gravity canal crossing
from ch:77+997 to 78+051km (by cast-in-situ method)

Ref: GAD of above work has been approved in e-das.

In connection with above subject Mysore division has submitted the structural drawings and design
calculations of RCC abutment and the same have been scrutinized and observations which shall be
clarified;

The construction of dirt wall of during under running line shall be explored .

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.352/e-das correspondence Date:
04.11.2022

SUB: Proposed Foot Over Bridge in Castle Rock Station at km.24.625 span of
1x14.20+1x13.05+1x24.75.

Ref: GAD of above FOB has been approved in e-das.

In connection with above subject RVNL has submitted the structural drawings and design
calculations of FOB in e-das and the same have been scrutinized and following are
observations/correction which shall be clarified/corrected;
iii. Pile integrity test shall be conducted to piles as per letter No.SWR/W.352/Genel/2020-21,
dated 10.08.2020.
jjj. Pile to be terminated in weathered/hard rock and length of socket ting shall be as per codal
provision.
kkk. Length of holding down bolts shall be shown in drawing.
lll. As per approved the GAD the substructure and super structure of FOB is as per design of
non standard span, the design calculations and structural drawings of superstructure of FOB duly
proof checked and submitted to this office for reference.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.352/ROB&RUBs/Vyasa Colony/SMIORE Date:
09.09.2022

Sr.DEN/Co-ord/UBL
Sub: VC - SMLI Section: Proposed Construction of Subway of Size2x6.0x 5.5m, Pre-Cast Rcc
Segmental Box t Km.16/150 In VC Yard Between Vyasanakere -Vyasa Colony Stations By Cut
Open method For Sandur Manganese And Iron Ore Limited, Sandur..
Ref: Sr.DEN/East/UBL, letter No.H/W.352/RUB/SMIORE/VC/East/DRG, dated, 22.08.022.

****
In connection with above subject, draft structural drawing and design calculations of RCC segmental
box for proposed construction of subway of size 2 x 6.0mx5.5m Precast segmental box at
km.16/100-200 VC - SMLI section has been scrutinized and following are observations/correction
which shall be clarified/corrected;

1. As per extent instructions applicable codal charges are to be paid by the party in case of
ROB/RUB not in lieu of LC, fully funded by sponsoring agencies. All the necessary charges are to
be collected and details shall be submitted to this office.
2. Soil investigation report containing the detailed SBC calculations duly signed by divisional
officials shall be submitted.
3. Scheme of sealing of joints for RCC Box segments as per Hq.letter
No.SWR/W.70/Policy/2020/dt.12.07.2021 shall be followed in field.
4. Longitudinal section of each pre caste box unit showing details of lifting hook shall be
incorporated in drawing.
5. Crack width calculations shall be checked at mid height for side walls of segmental box.
6. GAD number shall be checked and corrected.
7. Standard of loading shall be incorporated in title box.
8. The structural drawings and design calculations are to be proof checked by IIT/IIsc and
submitted to this for approval.

After getting compliance for the above observations, structural drawings and design
calculations can be processed for approval of the competent Authority.

For information and necessary action please.

(P I Kamble)
AXEN/Bridges/HQ
For CBE/SWR

Copy to:
Sr.DEN/E/UBL- For information and necessary action, please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.352/RUBs/Mysore Division(Railway Bridges) b Date:
18.08.2022
Sr.DEN/Co-ord/MYS
Sub: HAS-MAJN Section: Proposed construction of RUB as 2 x 9.15m PSC slab in lieu of manned
level crossing no.105 at km. 139/100-200 at KBPR station yard.
Ref: 1. Sr.DEN/Co-Ord/MYS letter No.Y/W.352/RUB/LC.105@ KBPR, dated 04.08.2022(Recived
Through mail).
2. This Office letter dated, 23.07.2022.
****
In connection with above subject, draft structural drawing and design calculations of substructure for
proposed construction of road under bridge as 2 x 9.15m PSC slab in lieu of manned level crossing
No.105 at km.139/100-200 at in HAS-MAJN section has been scrutinized and following are
observations/correction which shall be clarified/corrected;

9. The design of Abutment & wing wall is with provision of weep holes but, as per PCE
Circular No.SWR W.352/GEN/Bridge -Design & Drawing/Vol –ll, Dated: 17.02.2022 weep holes
shall not be provided in the Abutment/ wing wall and Abutment and wing wall shall design shall be
shall be designed without weep hole as per .
10. In design calculations of abutment earth pressure (page no.5) H1 is considered from
formation level to Pile cap bottom, where as the pile cap is buried and for calculation earth pressure
the height H1 shall taken from formation level to top of pile cap.
11. The depth of pile for abutment, pier and wing wall to be shown in the drawings.
12. Note regarding pile integrity test shall be incorporated.
13. Horizontal load on pile design calculation to be furnished, as per soil report the horzontial
load on pile is 35t and deflection is 0.97mm which is less than 10mm, therefore the revised
calculation of horizontal load shall be furnished.
14. Crack width calculation for pier cap and pile also to be furnished.
15. In design calculation of crack width:
i) the bending moment at service stage considered for per meter length and width.
ii) whereas the reinforcement considered is for overall length.
iii) for the same design calculation shall be revised.
16. Levelling course below pile cap shall be shown in drawing.
17. The structural drawings and design calculations are to be proof checked by IIT/IIsc and
submitted to this for approval.

After getting compliance for the above observations, structural drawings and design calculations
can be processed for approval of the competent Authority.

For information and necessary action please.

(Kritya Nand Jha)


प.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
No. SWR/W.352/Canal X-ing/MYS-ASK&TK-ASK Date:
26.07.2022

Sr.DEN/Co-ord/MYS

Sub: 1. MYS -ASK Section: Proposed construction of RCC Box 2X5.7Mx5.5M at Km.
155/300-400 Between HHT-ASK Yattinahole gravity canal X-ing from 77+799 to 78+249Km (Under
self-execution scheme) (Deposit work by VJNL).
2.TUMKUR - ARSIKERE Section: Construction Of Welded Through Type Steel
Girder Of Size 2 X 45.7m Bridge At Railway Km.155/100-200 Between Honnavalli Road - Adihalli
For Yettinahole Gravity Canal Crossing Ch: 97+927 (Under self-execution scheme) (Deposit work by
VJNL).
Ref: Letter No.Y/W.73/I/130(i) km155/MYS-ASK/YH Canal X-ing dated 22.06.2022 of
Sr.Den/Co-ord/Mys.
****

In connection with above subject, structural drawings and design calculation for proposed
construction construction of RCC Box 2X5.7Mx5.5M at Km. 155/300-400 Between HHT-ASK
Yattinahole gravity canal and Construction Of Welded Through Type Steel Girder Of Size 2 X 45.7m
Bridge At Railway Km.155/100-200 Between Honnavalli Road - Adihalli has been received and
scrutinised and following are the observations to be complied/clarified:
I. Related to the Drawing;
a) Approved GAD number shall be incorporated in structural drawings.
b) Original sheets of Structural drawings and design calculations to be submitted duly signed by
IISc professor.
c) Bar bending schedule, shape of bar, description and reference codes shall be incorporated in
tabular form.
d) Exposure condition, cover (as per clause No.15.92 of IRS concrete bridge code) & grade of
steel & concrete shall be incorporated in drawing.
e) Lap length shall be incorporated in drawing as per IRS Concrete Bride Code.
f) The casting methodology/construction of RCC BOX shall be incorporated.
g) All the levels viz. RL, FL, FRL, FSL, Top of box, Bottom of Box etc. shall be checked and
corrected as per approved GAD.
h) Maximum calculated pressure at the beneath the box & SBC of shall be incorporated.
II. Related to the Design;
i) All the levels viz. RL, FL, FRL, FSL, Top of box, Bottom of Box etc. is not tallying with design
calculation and structural drawings shall be checked and corrected as per approved GAD.
j) Bed slope is not matching with approved GAD.
k) Permissible Stress in Compression Bending σ cbc, Xumax/d value shown in design calculation shall
be checked and corrected.
l) In STAAD model the total barrel length considered is 40.0m whereas per approved GAD the
barrel length of box is 54m same shall be checked and corrected.
m) In STAAD model, the force analysis has been considered for full barrel length (i.e.40m) where as
in design calculation considered unit meter length.
n) Two dimensional Box analyses in STAAD model shall be done.
o) Manual design calculation for RCC Box:-
1. Load inputs (DL, LL, SIDL, Earth pressure) as per IRS codes.
2. Combination of loads as per IRS codes.
3. Sub grade modulus reaction calculation and spacing of each sub grade modulus.
4. Earth pressure at one side, both sides of box & earth at rest condition shall be considered.
5. Live load surcharge as per IRS code.
6. Derailment load & PQRS load shall be considered.
7. Thickness of top and bottom slab considered in design is 1550mm, where as in drawing it is
shown as 1100mm, where as in staad model it is taken as 1050mm same shall be checked/clarifed and
corrected.
8. Design calculation for distribution steel and shear links shall be furnished.
9. Ultimate moment of resistance and design bending moment for top slab, bottom slab, side walls
and intermediate wall shall be furnished.
10. Water load shall be considered in design.
11. Stress in concrete and steel for box shall be furnished.
12. Max crack width calculation shown as 0.1 is wrong, shall be cheeked as per IRS codes and
detailed crack width calculation shall be furnished.

III. Related to the Design& drg (2 X 45.7m Bridge At Railway Km.155/100-200);


p) Approved GAD number shall be incorporated in structural drawings.
q) Dead load surcharge is not considered in design, same shall be checked and design to be
revised.
r) Dead load of superstructure & SIDL considered in design shall be checked and corrected.
s) Seismic analysis shall be done as per IRS Seismic code-2020.
t) Minimum reinforcement of abutment shall be 0.4% as per IRS concrete bridge code.
u) Suitability check for rock anchor shall be furnished.
v) Exposure condition (as per clause No.15.92 of IRS concrete bridge code)
w) Position of jacking and mesh below jacking point shall be incorporated in drawings.
The structural drawings and design a calculation is returned for incorporating the corrections and to be
resubmitted for further processing please.
It is requested that design consultant may attend to this office for attending correction and discussion
regarding design with prior intimation.
For information and necessary action please.

(Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to:
1. Sr.DEN/W/MYS- For information and necessary action, please.
2. Executive Engineer Yettinahole project division No.3, Arasikere, Hassan-573103- For
information and necessary action, please
Sr.DEN/Co-ord/MYS

Sub: MYS -ASK Section: Proposed construction of RCC Box 2X5.7Mx5.5M at Km.
155/300-400 Between HHT-ASK Yattinahole gravity canal X-ing from 77+799 to 78+249Km (Under
self-execution scheme) (Deposit work by VJNL).
Ref: Letter No.Y/W.73/I/130(i) km155/MYS-ASK/YH Canal X-ing dated 22.06.2022 of
Sr.Den/Co-ord/Mys.
****

In connection with above subject, structural drawings and design calculation for proposed
construction construction of RCC Box 2X5.7Mx5.5M at Km. 155/300-400 Between HHT-ASK
Yattinahole gravity canal has been received and scrutinised and following are the observations to be
complied/clarified:
IV. Related to the Drawing;
x) Approved GAD number shall be incorporated in structural drawings.
y) Original sheets of Structural drawings and design calculations to be submitted duly signed by
IISc professor.
z) Bar bending schedule, shape of bar, description and reference codes shall be incorporated in
tabular form.
aa) Exposure condition, cover (as per clause No.15.92 of IRS concrete bridge code) & grade of
steel & concrete shall be incorporated in drawing.
bb) Lap length shall be incorporated in drawing as per IRS Concrete Bride Code.
cc) The casting methodology/construction of RCC BOX shall be incorporated.
dd) .
ee) All the levels viz. RL, FL, FRL, FSL, Top of box, Bottom of Box etc. shall be checked and
corrected as per approved GAD.
ff) Maximum calculated pressure at the beneath the box & SBC of shall be incorporated.
V. Related to the Design;
gg) All the levels viz. RL, FL, FRL, FSL, Top of box, Bottom of Box etc. is not tallying with design
calculation and structural drawings shall be checked and corrected as per approved GAD.
hh) Bed slope is not matching with approved GAD.
ii) Permissible Stress in Compression Bending σ cbc, Xumax/d value shown in design calculation shall
be checked and corrected.
jj) In STAAD model the total barrel length considered is 40.0m whereas per approved GAD the
barrel length of box is 54m same shall be checked and corrected.
kk) In STAAD model, the force analysis has been considered for full barrel length (i.e.40m) where as
in design calculation considered unit meter length.
ll) Two dimensional Box analyses in STAAD model shall be done.
mm)Manual design calculation for RCC Box:-
13. Load inputs (DL, LL, SIDL, Earth pressure) as per IRS codes.
14. Combination of loads as per IRS codes.
15. Sub grade modulus reaction calculation and spacing of each sub grade modulus.
16. Earth pressure at one side, both sides of box & earth at rest condition shall be considered.
17. Live load surcharge as per IRS code.
18. Derailment load & PQRS load shall be considered.
19. Thickness of top and bottom slab considered in design is 1550mm, where as in drawing it is
shown as 1100mm, where as in staad model it is taken as 1050mm same shall be checked/clarify and
corrected.
20. Design calculation for distribution steel and shear links shall be furnished.
21. Ultimate moment of resistance and design bending moment for top slab, bottom slab, side walls
and intermediate wall shall be furnished.
22. Water load shall be considered in design.
23. Stress in concrete and steel for box shall be furnished.
24. Max crack width calculation shown as 0.1 is wrong, shall be cheeked as per IRS codes and
detailed crack width calculation shall be furnished.

The structural drawings and design a calculation is returned for incorporating the corrections and to be
resubmitted for further processing please.
It is requested that design consultant may attend to this office for attending correction and discussion
regarding design with prior intimation.
For information and necessary action please.

(Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR
Copy to:
3. DEN/W/UBL- For information and necessary action, please.
4. Executive Engineer Yettinahole project division No.3, Arasikere, Hassan-573103- For
information and necessary action, please
Sr.DEN/Co-ord/UBL

Sub: GDG-HG section: Proposed construction/Rebuilding of bridge No. 99 at km: 270/500-


600 (exg. Size 1x2.44m RCC slab) between Tadwal-Hotgi station as 1x2.45x3.0 m RCC segmental
boxes with RH girder method.

Ref: 1) Proposal received through e-DAS on 23.06.2021.


2) Railway board letter No. 2017/10/CE-III/BR/PSC slab, dated: 20.06.2017.
****

In connection with above subject, GAD and TAD for proposed construction/rebuilding of minor
bridge No. 99 at km: 270/500-600 in GDG-HG section has been received and scrutinised and
following are the observations to be complied/clarified:
1. Related to the GAD;
II) Project ID shall be checked and corrected.
III) Completion Drawing of Existing Bridge shall be attached in e-Das.
IV) A detailed justification shall be furnished for the bridge construction/rebuilding by open line
(DN line) and CN organisation (UP line).
V) Distance between both centre line of track, directions of UP and DN line, Directions of flow
shall be incorporated in the key plan.
VI) Gradient post shall be indicated as per the L-section in key plan and copy of the same shall be
enclosed in e-DAS.
VII) Orientation of caution indicator and text for indicating the km/chainage of board shall be
checked and also corrected and traffic direction shall be incorporated in temporary speed restriction
diagram.
VIII) Hydraulic particular like VC, free board, scour depth etc. Shall be incorporated in the GAD in
tabular form and shall be indicated in the elevation and cross section.
IX) No scour certificated shall be signed by the concerned Authorities.
X) Haunch dimension shall be checked and corrected as per referred RDSO’s drawing.
XI) Bed slope shall be checked and corrected in cross section “ABCD.”
XII) In title box and elevation span of existing and proposed bridge is mentioned as2.44m & 2.45m
but in it is shown as 1.2m in plan, same to be checked and clarified.
XIII) Shoring arrangement dimensions mentioned in shoring certificate are not matching with the
dimension shown in shoring elevation plan. The same shall be checked and corrected. Also, Shoring
certificated shall be signed by the Concerned Authorities.
XIV) Position of shoring arrangement requires corrections. The same shall be checked and
corrected.
XV) Depth of construction shown as track details (old track and new track) shall be checked and
corrected.
XVI) Drop wall, curtain wall and flooring shall be indicated in plan and cross section.
XVII) Provision of drop wall/ curtain wall shall be made as per the direction of water flow. Hence,
the provision of drop wall and curtain wall shall be checked and corrected.
XVIII) Whether the proposal is constructing on downstream side or upstream side of the existing
bridge? That shall be mentioned.
XIX) Existing bridge (UP line) foundation details shall be incorporated in elevation.
XX) In title box it is mentioned as existing bridge is RCC slab but in elevation box is incorporated, so
same shall be checked and corrected.
XXI) Existing bridge levels mentioned at elevation are not matching as per the depth mentioned,
same to be checked and corrected.
XXII) Weep holes as per para 7.6 of substructure code shall be provided to wing wall/Return wall.
XXIII) Maximum foundation pressure of Box and wing wall shall be depicted in tabular form in
GAD.
XXIV) In reference, referred RDSO drawing number and size shall be mentioned.
XXV) The present proposal has been sent by the UBL Division through e-DAS without the
following necessary attachments, this practice is not acceptable and all the necessary documents have
to be attached in the e-DAS before forwarding the drawings to the HQ for approval of Competent
Authority:
(a) Revised Check list duly signed by concerned officials.
(b) Waterway particulars calculation sheet duly signed by concerned officials.
(c) Soil exploration report containing Classification of soil, N- values and SBC at each stratum
with calculation duly signed by concerned officials.
(d) A copy of the working section/L-section shall be enclosed.
XXVI) Following special notes shall be incorporated in GAD.
XXVII)
a) Gap between the box segments are to be sealed by pressurized cement grouting follow by epoxy
pointing.
2. Minor correction mentioned in the PDF has to be corrected.
The GAD is returned for incorporating the corrections and to be resubmitted for further processing
please.
For information and necessary action please.

(Kritya Nand Jha)


उप.मु.इंजी./पुल/दपरे/Dy.CE/Bridges/SWR
For CBE/SWR

Copy to:
Sr.DEN/C/UBL- For information and necessary action, please.

Sub: GDG-HG Section: Proposed construction of Subway as 1 x 7.5M x 5.5M RCC Segmental
Boxes in lieu of LC No.37 at km..72/000-100 between BDM-GED Stations by launching method
using RH Girder.

Proposed construction of subway of size 1 x 7.5mx5.5m Precast segmental box at


km.72/00-100 GDG - HG have been checked and following are observations/correction which shall
be clarified/corrected;

1. Soil investigation report containing the detailed SBC calculations duly signed by divisional
officials shall be submitted.
2. Scheme of sealing of joints for RCC Box segments as per Hq letter
No.SWR/W.70/Policy/2020/dt.12.07.2021 shall be followed in field.
3. Crack width calculations shall be checked at mid height for side walls of segmental box.
4. GAD number (SWR/2022/GAD-111/LC.NO.37/BDM-GED/GDG-HG) shall be checked
and corrected.
5. The design of RCC segmental box shall be checked for 0 to 1m fill height and up to 5deg
curvature of track.
6. The interaction ratio for ultimate moment of resistance to moment of the section is shown as
0.99 which is marginally safe, it is suggested that interaction ratio less than or equal to 0.85.
7. For bottom slab of box IRC live load shall be checked for two lane class A or one lane of
70R.
8. Structural details of footpath shall be incorporated.
9. The structural drawings and design calculations are to be proof checked by IIT/IIsc and
submitted to this for approval.

After getting compliance for the above observations, structural drawings and design
calculations can be processed for approval of the competent Authority.
FileNo.SWR/W.70/RDSO,Correspondence/Vol-IPolicy/2022 Date:
21.06.2023

Executive Director (B & S),


Research Design and Standard Organisation,
Manak Nagar, Lucknow - 226011

Sub: Issue of a modified drawing for provision of Inspection pathway of TOP Chord and access ladder
over end rackers in for Open Web Girders for the bridge No.725A & 726 of Mysore division.

*****
1. There is no RDSO drawing available for inspection pathway of top chord and access ladder over
end rackers for Open web girders.
2. ECR has developed a drawing for the above purpose, vide drawing No. ECR-22-23/Type plan/46
for open web girders of span 76.2m.
3. CBE /SWR has approved the above drawing of ECR for adoption in SWRly on trial basis.
4. There are 2 OWG bridges of spans 8x37.7m and another 2 OWG bridges of span 7x37.7m in this
Railway constructed based on drawing approved by construction organization.
5. The inner distance of OWG as per above construction drawing is only 4660mm against 4725mm
in RDSO drawing.
6. On account of the above, the angle of ISA90x90x10mm used for clamps for fixing the access
ladder infringes with the SOD while fixing on the OWG fabricated as per the construction
drawing.
7. In view of the above, RDSO is requested to kindly check and issue a suitable drawing to execute
the provision of inspection pathway of TOP Chord and access ladder over end rackers in for
Open Web Girders of bridge nos 725A and 726 available as per the construction drawing.