ROO Master System & Sub-System Listings
ROO Master System & Sub-System Listings
ROO Master System & Sub-System Listings
New Sub system added fro MOD Canal Crossing project by AR Dated 17/01/2022
New Sub system added fro MOD Canal Crossing project by AR Dated 17/01/2022
New Sub system added fro MOD Canal Crossing project by AR Dated 17/01/2022
New Sub system added fro MOD Canal Crossing project by AR Dated 17/01/2022
New Sub-System added as required by AR DATED 07/01/2022
Sub-System Description updated due to revised LOSH RN 23/10/21. New Full Field Fibre Sub-System added by RN 29/09/2
Sub-System Description updated due to revised LOSH RN 23/10/21. New Full Field Fibre Sub-System added by RN 29/09/2
Sub-System Description updated due to revised LOSH RN 23/10/21. New Full Field Fibre Sub-System added by RN 29/09/2
Sub-System Description updated due to revised LOSH RN 23/10/21. New Full Field Fibre Sub-System added by RN 29/09/2
Sub-System Description updated due to revised LOSH RN 23/10/21. New Full Field Fibre Sub-System added by RN 29/09/2
Sub-System Description updated due to revised LOSH RN 23/10/21. New Full Field Fibre Sub-System added by RN 29/09/2
Sub-System Deleted as no longer required due to revised LOSH RN 23/10/21. New Full Field Fibre Sub-System added by RN
Sub-System Deleted as no longer required due to revised LOSH RN 23/10/21. New Full Field Fibre Sub-System added by RN
Sub-System Deleted as no longer required due to revised LOSH RN 23/10/21. New Full Field Fibre Sub-System added by RN
Sub-System Deleted as no longer required due to revised LOSH RN 23/10/21. New Full Field Fibre Sub-System added by RN
-FW-22-01)
NOTE-Within SYSTEMS MNEMONICS, Rev 15, 19/10/2018, there is no System 200, therefore 200-XV-0101 shall be encomp
Scope relates to 202-XV-0101.
Workpack 017-Level Guage & valve scope.
Workpack 017-Level
Workpack 023-all control
guage&&level instruments
valve scope. loop calibration.
Workpack 024-all control & level instruments loop calibration.
Workpack 017-Level Guage & valve scope.
Workpack
Workpack 023-all control
017-Level guage&&level instruments
valve scope. loop calibration.
Workpack 024-all control & level instruments
Workpack 017-Level guage & valve scope. loop calibration.
Workpack
Workpack 023-all
024-all control
control &
& valve
valve instruments
instruments loop
loop calibration.
calibration.
Workpack 028-repair valve, LCV-0103.
Workpack
Workpack 031-all instrumentation
021-solution scope within.
current blockages & repair in-line valves.
Workpack 031-one instrument, NIDS-231-PDCV-0202.
MOC 0088).
Workpack
MOC 0133.015 -piping scope detail.
Workpack 015 -piping scope detail.
MOC
MOC 0075.
089.
Workpack
MOC 089. 002 - piping scope incl. valves.
Workpack 002 - piping scope incl. valves.
Workpack 024.
Workpack
Workpack 030-PSV removal/re-cal
020-Receiver 800-V-03 ...for receivers,
inst. 800-V-01 & 02.
valve replacement.
Workpack 030-PSV removal/re-cal for receivers, 800-V-03 & 04.
New Sub-System added as requested by STX AR DATED 12/11/21
New Sub-System added as requested by STX AR DATED 12/11/21
New Sub-System added as requested by STX AR DATED 12/11/21
New Sub-System added as requested by STX. RN 02/11/21
New Sub-System added as requested by STX. RN 02/11/21
New Sub-System added as requested by STX. RN 02/11/21
New Sub-System added as requested by STX. RN 02/11/21
New Sub-System added as requested by STX. RN 02/11/21
New Sub System added by AR Dated 04 March 2022
On Hold
Partial handover of pump
Partial handover of pump
1 & relevan DMCC.