EuroShip Services Ltd

Eefting Network
Equipment
Installation
(ECR / Bridge)

Ref: PM/ESL230620148/001

Prepared by: Paul Merrell – IT Manager


EuroShip Services Ltd
Long Reach House,
London Road
Purfleet
Essex, RM19 1PD
Telephone: +44 (0) 1708 891166
Facsimile: +44 (0) 1708 891177
Document Management

Document Owner Paul Merrell

Document Receiver
Eefting Network Equipment Installation
Document Name
(ECR / Bridge)
Document Reference PM/ESL23062014/001
rd
Document Version and Date V1 – 23 June 2014

Related Documents

Authorised By

Date Authorised

Date and Media Sent

Other ESL Related Documents

Page 2 of 6
You will shortly be receiving 2 network switches within your ships mail.
Please could you arrange for the Equipment to be installed in the
following locations, I will then come on board and re configure the
network and test connectivity

In the ECR there will be a panel where the existing Network connections
terminate, Please could you install Network switch Called VxxEFTSW1 in this
location, the switch will need to be installed a maximum of 1.5m away from the
existing network connections and will require 1 x power socket.

This
example
shows the
installation
in the
second
cabinet
from the
left hand
side.

Page 3 of 6
At the top
of the
cabinet
there is
plenty of
room for
the switch
and the
power
supply.

Example of
Installed
Equipment

Page 4 of 6
The second unit is to be installed on the Bridge, close to (within 1.5m) of the
existing network equipment (3G Router)

In this
example
the new
switch is
installed
next to the
3G router

This switch
is labelled
VxxEFTSW2

This switch
will require
a power
socket if
there is not
one close
by.

Page 5 of 6
Once both switches are installed could you please advise accordingly and I will
arrange for a visit to complete the networking.