COMPANY PROFILE DECEMBER

2016

COMPANY PROFILE

Of
Tigray Road Construction Enterprise

December, 2016
Ethiopia, Tigray

TIGRAY ROAD CONSTRACTION ENTERPRISE


1
COMPANY PROFILE DECEMBER
2016

Table of Contents
List of Figures...............................................................................................................................................................4
COMPANY PROFILE......................................................................................................................................................5
1. BACK GROUND.........................................................................................................................................................6
1.1. General Description of the Enterprise...............................................................................................................6
1.2. Brief of TRA (Background of TRCE)....................................................................................................................7
1.3. Establishment of TRCE......................................................................................................................................7
1.4. MISSION AND VISION STATEMENT...................................................................................................................8
1.5. Duties and Responsibilities of TRCE..................................................................................................................8
1.6. Organization Structure......................................................................................................................................9
2. LISENSCES & REGISTERATION................................................................................................................................10
2.1 REGISTRATION.................................................................................................................................................10
2.2 INVESTMENT LICENSE......................................................................................................................................13
2.3 VAT CERTIFICATE..............................................................................................................................................14
2.4 TAX PAYER REGISTRATION CERTIFICATE..........................................................................................................15
3. Work Experience....................................................................................................................................................16
3.1. Construction Work Experience........................................................................................................................16
3.1.1. Completed Projects..................................................................................................................................16
3.1.2 Ongoing projects (Project at Hand)...........................................................................................................32
3.2. Other works Experience..................................................................................................................................33
3.2.1. Geo-Technique Services...........................................................................................................................33
3.2.2 Equipment Rental Service.........................................................................................................................34
3.2.3 Equipment Maintenance & Specification Preparation and inspection Service..........................................34
3.2.4 Supply of Aggregates.................................................................................................................................35
3.3. ADDRESSES OF CONSULTANTS........................................................................................................................36
4. Personnel...............................................................................................................................................................37
5. Equipment Owned by TRCE....................................................................................................................................40
6. FINANCIAL STANDING............................................................................................................................................41
6.1 Annual Revenue & Cost of Production.................................................................................................................41
6.2. STATEMENT OF ACCOUNT..............................................................................................................................42
7.LITIGATION HISTORY...............................................................................................................................................44

TIGRAY ROAD CONSTRACTION ENTERPRISE


2
COMPANY PROFILE DECEMBER
2016

List of Tables
Table 1: Table showing List of Number of Completed Road Projects................................................16
Table 2: Table showing List of Completed Road Projects Owned by Tigray Region
Construction ,Road & Transport Bureau................................................................................................17
Table 3: Table showing List of Completed Road Projects Owned by Federal Sugar Corporation.24
Table 4 Table showing List of Completed Road Projects Owned by Mekelle Municipality..........25
Table 5: Table showing List of Completed Road Projects Owned by Bureau Trade &Industry.. .25
Table 6 :Table showing List of Completed Road Projects Owned by Meles Zenawi Leadership
Academy......................................................................................................................................................25
Table 7 :Table showing List of Completed Road Projects Owned by Bureau Water Works..........25
Table 8 :Table showing List of Completed Road Projects Owned by Baeker Industry Park
Corporation.................................................................................................................................................26
Table 9 :Table showing List of Completed Road Projects Owned by Federal Sugar Corporation26
Table 10 :Table showing List of Completed Road Projects Owned by Mekelle City of
Infrastructure..............................................................................................................................................27
Table 11: Table showing Number of Completed Road Design Projects.............................................27
Table 12: Table showing List of Completed Road Design Projects Owned by Tigray Region
Construction, Road & Transport Bureau................................................................................................27
Table 13: Table showing List of Completed Road Design Projects Owned by Messebo Cement
Factory.........................................................................................................................................................28
Table 14: Table showing List of Total Completed Road Maintenance Work.....................................28
Table 15: Table showing List of Completed Road Maintenance Work Owned by Tigray Region
Construction, Road & Transport Bureau................................................................................................28
Table 16: Table showing List of Completed Road Maintenance Work Owned by Tigray Road
Authority.....................................................................................................................................................29
Table 17: Table showing List of Completed Compound Wall Construction Project........................31
Table 18: Table showing List of Total Ongoing road Project...............................................................32
Table 19: Table showing List of Ongoing road Project Owned by Tigray Region Construction,
Road & Transport Bureau.........................................................................................................................32
Table 20: Table showing List of Ongoing road Project Owned by Messebo Cement Factory........32
Table 21: Table showing List of Addresses of Consultants..................................................................36
Table 22: Table showing List of Professional Staff.................................................................................37
Table 23: Table showing List of Professional, technical & Supporting Staff for TRCE....................39
Table 24: Table showing List of major machineries and equipment’s owned by TRCE..................40
Table 25 :Table showing List of Revenue 2003-2011..............................................................................41
Table 26 :Table showing List of Cost of Production 2003-2011............................................................41

TIGRAY ROAD CONSTRACTION ENTERPRISE


3
COMPANY PROFILE DECEMBER
2016

List of Figures
Figure 1- Earth Work -1.............................................................................................................................19
Figure 2- Earth Work -2.............................................................................................................................19
Figure 3- Surfacing -1................................................................................................................................20
Figure 4- Surfacing -1................................................................................................................................20
Figure 5- Select Material Loading............................................................................................................21
Figure 6- Single Pipe Installation.............................................................................................................21
Figure 7- Triple Pipe Installation..................................................................................................................22
Figure 8- @ Grade Culvert Construction......................................................................................................22
Figure 9- Bridge Construction-1...............................................................................................................23
Figure 10- Pier Bridge Construction........................................................................................................23
Figure 11- Retaining Wall Construction.................................................................................................24
Figure 12-Axum Adet Maintenance Work.............................................................................................30
Figure 13-Axum DaeroHafash Maintenance Work.........................................................................30
Figure 14-Eintcho Nebelet Maintenance Work.................................................................................31
Figure 15-Laboratory-1..............................................................................................................................33
Figure 16-Laboratory-1..............................................................................................................................33
Figure 17-Equipment Maintenance.........................................................................................................34
Figure 18- Equipment Maintenance........................................................................................................34
Figure 19-Crusher Plant-1.........................................................................................................................35
Figure 20- Crusher Plant-2.....................................................................................................................35

TIGRAY ROAD CONSTRACTION ENTERPRISE


4
COMPANY PROFILE DECEMBER
2016

COMPANY PROFILE

TIGRAY ROAD CONSTRACTION ENTERPRISE


5
COMPANY PROFILE DECEMBER
2016

1. BACK GROUND
1.1. General Description of the Enterprise
Name:- Tigray Road Construction Enterprise (TRCE)
Type of ownership:- Government Owned
Nature of Business:- Road Construction
Grade:- Contractor Grade One
Year of Establishment:- August 2002 E.C.
Business Address:-
Tel:- 0344409518
Phone:- (+251) 0914721511, (+251) 0344409518
Fax:- 0344404477/0344417548
P.O.Box: 14
E-Mail:- trce03@gmail.com
Website:- www.trce.com.et
Mekelle, Tigray, Ethiopia
Contact Person:- Ato Muez Atsbeha
General Manager of TRCE
Business Registration Date:- 19/7/2004 E.C.
Registration Certificate:- 1396/2003
Trade License No:- TG/MK/SEM/01/46/1095306/2009
VAT Registration No:- 3319000052
TIN No:- 0020312468

TIGRAY ROAD CONSTRACTION ENTERPRISE


6
COMPANY PROFILE DECEMBER
2016

1.2. Brief of TRA (Background of TRCE)


Tigray Roads Authority (TRA) was established on 1984 E.C. by the regional government
of Tigray with an objective to construct and maintain rural roads in the region and
hence the authority performs as required in the development of rural roads (Constructs
more than 3000km on all zones of the region and nearby regions of Afar and Amhara)
and maintain routine and periodically all completed rural roads which provides
transportation service in the region.

Our regional government introduces the business process engineering as one of the
reform programs, thus Tigray Roads Authority (TRA) studies the business process with
the objective of introducing check and balance systems and the BPR study resulted in
a fundamental changes which creates the separate entities; i.e. Regulatory body and
Road Construction Enterprise; then based on the study TRA were transformed and
initially establish TRCE using all the skilled personnel, construction machinery &
equipment’s and different facilities from Tigray Roads Authority (TRA).

1.3. Establishment of TRCE


TRCE is a grade one contractor. It is established and owned by the Regional Council
Government of Tigray on August 2002 and registered in the trade and industry with an
initial capital of ETB 131,726,094.00. In the past years the enterprise has perform
different construction projects. Since its establishment the enterprise has shown
growth and currently undertaking a multimillion road construction projects.

Generally the enterprise has executed various construction and maintenance activities
through which it has achieved very rich and extensive experiences. It is fully dedicated
to serve the nation and to work to the complete satisfaction of its customers or clients
and stakeholders.

TIGRAY ROAD CONSTRACTION ENTERPRISE


7
COMPANY PROFILE DECEMBER
2016

1.4. MISSION AND VISION STATEMENT

Mission: - Road work, other construction works, consulting and supply services, by working
with quality and efficiency, ensuring customer satisfaction, and increasing the company's
income by being profitable.
Vision: - By 2022 EC, to become a Competitive and excellent national company with in construction
industry and trusted by customers.
Values: -
 we prioritize customer satisfaction
 Quality and efficiency is the hallmark of our work
 We believe in competition
 We work hard for change

1.5. Duties and Responsibilities of TRCE


Based on its establishment proclamation TRCE has the following duties and responsibilities:
 Based on customer request and invitation perform road construction and maintenance
activities, design roads, construct building and other related works, provide geo-
technical service, equipment rental and maintenance service, supply different grades of
aggregate and other works;
 Giving priority to government policies perform works order by the regional government;
 Produce or import any construction related inputs and then can rent or sell to
customers;
 Build its capacity;
 Prepare and after approved by the board introduces short, medium and long term plans;
 Following legal procedures participate on other development activities and investments;

TIGRAY ROAD CONSTRACTION ENTERPRISE


8
COMPANY PROFILE DECEMBER
2016

1.6. Organization Structure


In order to cope with the current competitive environment and based on TRCE’s duties and
responsibilities we have the following organization structure.

Regulatory Authority of Public


Enterprise

Board

General Manager

Legal Service Sub Process Internal Audit Sub Process

Deputy General Manager Deputy General


Manager

Construction & Maintenance Equipment Administration


Core Process Supporting Process

Planning, PR and Market Study


Study, Design & Contract Supporting Process
Administration Core Process

Procurement & Supply


Equipment Maintenance Core Supporting Process
Process

Projects Human Resource Management


Supporting Process

Financial Management
Supporting Process

TIGRAY ROAD CONSTRACTION ENTERPRISE


9
COMPANY PROFILE DECEMBER
2016

2. LISENSCES & REGISTERATION


2.1 REGISTRATION

TIGRAY ROAD CONSTRACTION ENTERPRISE 10


COMPANY PROFILE DECEMBER
2016

TIGRAY ROAD CONSTRACTION ENTERPRISE 11


COMPANY PROFILE DECEMBER
2016

TIGRAY ROAD CONSTRACTION ENTERPRISE 12


COMPANY PROFILE DECEMBER
2016

TIGRAY ROAD CONSTRACTION ENTERPRISE 13


COMPANY PROFILE DECEMBER
2016

2.2 INVESTMENT LICENSE

TIGRAY ROAD CONSTRACTION ENTERPRISE 14


COMPANY PROFILE DECEMBER
2016

2.3 VAT CERTIFICATE

TIGRAY ROAD CONSTRACTION ENTERPRISE 15


COMPANY PROFILE DECEMBER
2016

TIGRAY ROAD CONSTRACTION ENTERPRISE 16


COMPANY PROFILE DECEMBER
2016

2.4 TAX PAYER REGISTRATION CERTIFICATE

TIGRAY ROAD CONSTRACTION ENTERPRISE 17


COMPANY PROFILE DECEMBER
2016

3. Work Experience
3.1. Construction Work Experience

3.1.1. Completed Projects


The projects listed below are executed and completed successfully by our enterprise in the past
years.
A) Road Construction Projects (Gravel Roads)

Table 1: Table showing List of Number of Completed Road Projects


S/No No of Type of Project Total Contract Amount Owner
Projects Length (Br)
(Km)
1 40 Road Construction 718.2 1,516,070,869.83 Tigray Region
Construction, Road
& Transport Bureau
2 3 Road Construction 230.1 84,896,886.15 Federal Sugar
Corporation
3 1 Road Construction 5.09 14,785,144.45 Maykadira
Municipality
4 1 Road Construction 7.3 6,954,208.13 Mekelle
Municipality
5 2 Road Construction 13.7 29,068,123.05 Bureau trade
&industry
6 1 Road Construction 1.09 33,759,922.24 Meles Zenawi
Leader ship
Acadamy
7 1 Road Construction 2 19,918,103.53 Bureau water
Works
8 5 Road Construction 132.8 209,393,118.38 Federal Sugar
Corporation
9 2 Road Construction 7.3 28,091,072.98 Mekelle city office of
infrastructure
Total 54 11107. 58 1,942,937,448.74

TIGRAY ROAD CONSTRACTION ENTERPRISE 18


COMPANY PROFILE DECEMBER
2016

2 Bridge, Retaining 24m, 70,816,187.73 Tigray Region


wall Construction 20m Construction, Road
Bridge & Transport Bureau

Complete Project
Client:-Tigray Region Construction, Road & Transport Bureau
Table 2: Table showing List of Completed Road Projects Owned by Tigray Region
Construction ,Road & Transport Bureau

Total Length Contract Amount


S/No Project Zone Wereda
(Km) (Birr)
Dansha - Gube - Gichew -
1
35.943
Wetsern Tsegede 35.943 28,555,859.03
Intichoo – Edaga Arbi-
2
Nebelet -40.0km
Central Ahferom 40 54,466,714.29

3 Mugulat – Azeba 20.58km Eastern Ganta Afeshum 20.58 47,643,181.04


Alamata – Merewa -
4
43.4km
Southern Raya Alamata 43.4 28,242,303.11
Endabaguna – Edaga Hibret –
5 Hitsats-38.311km
North Wetsern Asgede Tsimbila 38.311 42,135,033.27
Dego - Chamo -Tsaedat- 2,646,
6 North Wetsern Asgede Tsimbila 27
27km 002.35
7 Maykadra – Shiglil -44km Wetsern Kafta Humera 41.33 95,989,620.53
8 Atsrega – Maykuhli -24km North Wetsern Tahtay Adyabo 25.32 53,655,063.16
9 Tekeze – Yechila -36km Central Tanqua Abergele 40.76 104,300,467.46
Axum - Welel – Chila -
10
32km
Central Lailay Maychew 34.51 125,434,900.02
Adidaero – Zelazile -
11
34.95km
North Wetsern Lailay Adiyabo 38.5 76,696,275.04
Mayhanse -
12
Adimehameday -16km
North Wetsern Asgede Tsimbila 14.9 36,459,256.95
Adihageray – Adiawlala -
13
16.5km
North Wetsern Tahtay Adyabo 9.8 35,303,344.39
Mugulat – Azeba Foga 18,150,
14 Eastern Ganta Afeshum 2.62
Qiate - 2.62km 788.37
Mugulat – Hagurega-
15
8.72km
Eastern Ganta Afeshum 8.72 12,913,566.67
Edagahamus – Feresmay -
16
12km
Central Ahferom 12 16,695,545.11
Edagahibret – Meli -
17
21.5km
North Wetsern Asgede Tsimbila 21.5 24,657,543.13
Dewhan - Yahodega -
18
19.36km
Eastern Eurob 19.3 39,548,655.83

TIGRAY ROAD CONSTRACTION ENTERPRISE 19


COMPANY PROFILE DECEMBER
2016

Dr. Atakaliti – Gurero -


19
28km
Central Kola Temben 25 7,823,886.18
Tabia Selam – Awra -
20
36.39km
Wetsern Welkait 24.47 68,380,652.71
21 Akeb Tarma -0.898km Central Tanqua Abergele 0.9 10,350,415.66
Sefo - Emba Ahferom -
22
7.61
Central Ahferom 7.61 26,687,208.83
Hidegwired -
23
Serhikabilaee-12km
Central Naider Adet 12 45,525,340.26
Simret - Jema -Wuhdet - 105,182,
24 Southern Endamoheni 22
22km 706.85
25 Mayabia – Siheta - 12km Eastern Ganta Afeshum 15 32,570,628.41
26 Dara – Dinka -15km Southern Ofla 13.9 24,258,151.67
Adikahsu – Godefay -
27
6.7km
North Wetsern Lailay Adiyabo 6.7 3,841,055.84
Adigedena – Hadegti -
28
9.9km
North Wetsern Lailay Adiyabo 9.9 4,092,074.94
Egrihamido – Ahsea -
29
21.8km
Central Mereb Leke 21.8 31,607,934.27
Debre kerbe – Kibrto -
30
11km
North Wetsern Medebay Zana 9.7 27,629,632.74
Zerbabit – Adihirdi -
31
4.36km
Wetsern Kafta Humera 4.26 49,559,414.00
Endamizan - Abraha 7,653,
32 Eastern Kilte Awlaelo 2.5
Atsbeha -2.5km 590.45
27,637,
33 Shibta – Gelewsa - 6.6km Southern Endamoheni 5.42
862.02
34 Zukuya – Becehka - 5.6km Southern Ofla 5.6 2,783,389.27
Main Road – Shihagne - 56,762,
35 Western Welkait 11.96
11.96km 981.92
Atsrega - Grat Reda - 11,133,
36 North Western Tahtay Adyabo 4.9
4.9km 316.91
Main Road - Mayberbere -
37
5.9km
North Western Asgede Tsimbila 5.48 46,246,546.06
Main Road – Kudo -
38
5.76km
Central Ahferom 5.76 21,215,871.30
Hareze - Endamosa - 45,839,
39 Eastern Eurob 19.22
Araero - 26km 833.80
40 Dewhan – Ayga - 9.67km Eastern Eurob 9.67 15,794,255.99
Sub Total (km) 718.2 1,516,070,869.83
Bridge & Retaining Wall
1 Alamata Bridge (20m) Southern Raya Alamata 57,008,214.50
4,
2 Tukul Emni Bridge (24m) Southern Seharti Samre
544,247.24
4,
3 Alamata - Merewa Suplimentary Southern Raya Alamata
993,892.18

TIGRAY ROAD CONSTRACTION ENTERPRISE 20


COMPANY PROFILE DECEMBER
2016

4 Enticho - E/hibret Suplimentary Central Ahferom


669,833.81
3,
5 Wukro - Atsbi Retaining Wall Eastern Kilte Awlaelo
600,000.00
Sub Total (km) 70,816,187.73

Figure 1- Earth Work -1

TIGRAY ROAD CONSTRACTION ENTERPRISE 21


COMPANY PROFILE DECEMBER
2016

Figure 2- Earth Work -2

TIGRAY ROAD CONSTRACTION ENTERPRISE 22


COMPANY PROFILE DECEMBER
2016

Figure 3- Surfacing -1

Figure 4- Surfacing -1

TIGRAY ROAD CONSTRACTION ENTERPRISE 23


COMPANY PROFILE DECEMBER
2016

Figure 5- Select Material Loading

Figure 6- Single Pipe Installation

TIGRAY ROAD CONSTRACTION ENTERPRISE 24


COMPANY PROFILE DECEMBER
2016

Figure 7- Triple Pipe Installation

Figure 8- @ Grade Culvert Construction

TIGRAY ROAD CONSTRACTION ENTERPRISE 25


COMPANY PROFILE DECEMBER
2016

Figure 9- Bridge Construction-1

TIGRAY ROAD CONSTRACTION ENTERPRISE 26


COMPANY PROFILE DECEMBER
2016

Figure 10- Pier Bridge Construction

Figure 11- Retaining Wall Construction

Client ፦Federal Sugar Corporation


Table 3: Table showing List of Completed Road Projects Owned by Federal Sugar Corporation

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)
53,677,220.09
1 Korarit Sefera Western Welkait 175

Mayzihilto Sefera-DC4-5+DC2-
30,482,930.06
2 Western Welkait 40.765
15+DC1-45=65km
736,736.00
3 Mayzihilto Sefera Access Road Western Welkait 14.3

Sub Total (km) 230.1 84,896,886.15

TIGRAY ROAD CONSTRACTION ENTERPRISE 27


COMPANY PROFILE DECEMBER
2016

Client ፦Mekelle Minicipality

Table 4: Table showing List of Completed Road Projects Owned by Mekelle Minicipality

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)
IDP Center Mekelle access
1 Mekelle Enderta 7.3
Road 6,954,208.13
Sub Total (km) 7.3 6,954,208.13

Table 4 Table showing List of Completed Road Projects Owned by Mekelle Municipality
Table 5: Table showing List of Completed Road Projects Owned by Bureau Trade &Industry

Client ፦Bureau Trade & Industry

Table 5: Table showing List of Completed Road Projects Owned by Bureau Trade &Industry

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)

Main Road - Adiabraha


1
Guben
Southern Raya Azebo 5.6 8,826,800.84

2 Arse geda - Gypsum Quarry Southern Hitalo Wejerat 8.1 20,241,322.21


Sub Total (km) 13.7 29,068,123.05

Client ፦Meles Zenawi LeadershipAcademy


Table 6 :Table showing List of Completed Road Projects Owned by Meles Zenawi Leadership Academy

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)
33,759,9
1 Meles Academy -1.09km Mekelle Enderta 1.09 22.24

Sub Total (km) 1.09 33,759,922.24

Client ፦Bureau Water Works

TIGRAY ROAD CONSTRACTION ENTERPRISE 28


COMPANY PROFILE DECEMBER
2016

Table 7 :Table showing List of Completed Road Projects Owned by Bureau Water Works

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)

Tanqua
1 Siye – Tekeze Central 2
Abergele 19,918,103.53

Sub Total (km) 2 19,918,103.53

Client ፦Baeker Industry Park Corporation

Table 8 :Table showing List of Completed Road Projects Owned by Baeker Industry Park Corporation

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)
Baeker Industry Park
Baeker IAIP Compound wall
1 Western Welakit 7.61km
Fence 40,624,431.17

Sub Total (km) 7.61 40,624,431.17

Client ፦Federal Sugar Corporation

Table 9 :Table showing List of Completed Road Projects Owned by Federal Sugar Corporation

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)

Maygaba Sugar
Maygaba - Mayday Dam -
1 26.06km & Afrata Sugar Factory- Western Welakit 38.06 34,642,507.02
12km
Maygaba - 2004 Lot-2 Access
2 Western Welakit 31.57
Road (10 roads=31.57km) 10,099,291.32
Kalema 800 Hectar Road-
3 50.406+14.443=64.85km; (27.2km Western Welakit 27.2 96,605,213.19
done)

TIGRAY ROAD CONSTRACTION ENTERPRISE 29


COMPANY PROFILE DECEMBER
2016

Kalema 2200 Hectar Road (main


4 Line-12.75+field road- Western Welakit 35.93 68,046,106.85
24.271=37.02km)

Total (km) 132.8 209,393,118.38


Client: - Mekelle City Office of Infrastructure
Table 10 :Table showing List of Completed Road Projects Owned by Mekelle City of
Infrastructure
Total
Contract Amount
S/No Project Zone Sub City Length
(Km) (Birr)

Dagya -Sub City Hadnet & Sirawat Hadnet &


1
inside Debre Genet
Mekelle
Hawelit
7.3 28,091,072.98

Total (km) 7.3 28,091,072.98

B) Road Design Works


Table 11: Table showing Number of Completed Road Design Projects
Total Owner
Contract
S/No Project Length
(Km)
Amount (Birr)
Road Design & preparation Tigray Region Construction,
1
of document (7 - Projects)
61.67 1,362,712.14 Road & Transport Bureau
Road Design & preparation Messebo Cement Factory
2 of document 1 - Projects)
24.08
Sub Total 1,362,712.14
Client:- Tigray Region Construction, Road & Transport Bureau

Table 12: Table showing List of Completed Road Design Projects Owned by Tigray Region Construction, Road &
Transport Bureau

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)

1 Main Road -Kudo Central Ahferom 5.76 215,066.24

2 Debreharmaz-Adifitaw Central Merebleke 10.22 222,326.41

3 Main Road -Mayberbere Northwest AsgedeTsimbla 5.9 215,066.24

4 Atsirega –Gra treda Northwest Tahtay Adyabo 4.9 228,150.23

TIGRAY ROAD CONSTRACTION ENTERPRISE 30


COMPANY PROFILE DECEMBER
2016

5 Maytsebre -Adiwesen North Western Tselemti 10 244,918.4

6 Main Road-Welel -1 Western Welkayt 5.6 237,184.64

7 Main Road-Welel -2 Western Welkayt 19.292

Total Sum (km)

Client:- Messebo Cement Factory

Table 13: Table showing List of Completed Road Design Projects Owned by Messebo Cement Factory

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)

Akeza –Gypsem Quarry


1 South Eastern Enderta 24.08
Site

Total Sum (km) 24.08

C) Periodic & Routine Gravel Road Maintenance Works


Table 14: Table showing List of Total Completed Road Maintenance Work
S/No Total Length Contract Amount (Br) Owner
(Km)
1 882.72 138,681,545.57 Tigray Region Construction, Road &
Transport Bureau
2 102 107,000,143.51 Tigray Road Authority

Total 984.72 245,681,689.08

Client:- Tigray Region Construction, Road & Transport Bureau

Table 15: Table showing List of Completed Road Maintenance Work Owned by Tigray Region
Construction, Road & Transport Bureau

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)

Main Road Dedebit -


1
Hawelti Maintenance
North Wetsern Tahtay Adyabo 18 4,243,929.37
Abrha Atsbha Road
2
Maintenance-13km
Eastern Kilte Awlaelo 13 201,735.30

TIGRAY ROAD CONSTRACTION ENTERPRISE 31


COMPANY PROFILE DECEMBER
2016

16 sections Perodic
3
Maintenance - 2008E.c
Diff Weredas 156.12 26,215,927.41
14 sections Perodic
4
Maintenance - 2008E.c
Diff Weredas 182.28 24,518,437.23
Mekelle - Samre
5 Southern East Mekelle - saharti 57 11,280,258.72
P/Maintenance /57 ኪ.ሜ/
Aksum - Adet Maintenance
6
-15km
Central Adet 15 2,755,231.76
Baeker - Adi Remets PM -
7
73km
Wetsern Kafta Humera 73 12,155,936.28
10 sections Perodic
8
Maintenance - 2007
Diff Weredas 129.27 17,388,075.38
Mekelle Hawelti (Sanitary
9
& Kitchen Const)
Mekele Hawelti 987,287.08

10 12 Sections PM -2006E.C Diff Weredas 152.55 20,519,462.36


Shewate Hugum PM -
11 Southern East Tanqua Abergele 36 5,255,316.00
36 ኪ.ሜ/
Samre - Dengolat &
Dengolat - Gijet Perodic
12
Maintenance -2006 /2
Southern East Sahart - Samre 40.5 5,447,644.87
sections/
Sobiya - Alatina Perodic
13 Eastern Erop 9.8 269,020.00
Maintenance - /2 ኪ.ሜ/
14 Abrha - Atsbeha Bridge Eastern Kilte Awlaelo 227,131.81
Hawzen - Nebelet
15 Maintenance (around Eastern Hawzen 0.2 3,616,152.00
13+000 - 13+200)
16 Wukro - Atsbi Retaining Wall Eastern Kilte Awlaelo 3,600,000.00
Total Sum (km) 882.72 138,681,545.57

Client:- Tigray Road Authority

Table 16: Table showing List of Completed Road Maintenance Work Owned by Tigray Road Authority

Total
Contract Amount
S/No Project Zone Wereda Length
(Km) (Birr)
1 Axum -Daerohafash Central Laelay Machew 26 25,922,347.87
2 Axum -Adet Central Laelay Machew 37 37,189,382.34
3 Inticho-Nebelet Central Ahiferow 39 43,888,413.30
Total Sum (km) 102 107,000,143.51

TIGRAY ROAD CONSTRACTION ENTERPRISE 32


COMPANY PROFILE DECEMBER
2016

Figure 12-Axum Adet Maintenance Work

Figure 13-Axum DaeroHafash Maintenance Work

TIGRAY ROAD CONSTRACTION ENTERPRISE 33


COMPANY PROFILE DECEMBER
2016

Figure 14-Eintcho Nebelet Maintenance Work

D) Baeker IAIP Compound Wall Construction Project

Table 17: Table showing List of Completed Compound Wall Construction Project

S/No Total Length Contract Amount (Br) Owner


(Km)

1 7.61 40,621,431.17 Tigray Region Industrial Park


Development Corporation (Baeker)
Total 7.61 40,621,431.17

TIGRAY ROAD CONSTRACTION ENTERPRISE 34


COMPANY PROFILE DECEMBER
2016

3.1.2 Ongoing projects (Project at Hand)


The projects listed below are ongoing gravel road construction projects.

Table 18: Table showing List of Total Ongoing road Project


S/No No of Total To-date Remain Contract Amount Owner
Projects Length Completed (Km) (Br)
(Km) (Km)

1 14 225.87 100.61 125.26 1,275,121,218.24 Tigray Region Construction,


Road & Transport Bureau
2 1 24.08 10.6 13.48 139,043,433.87 Messebo cement Factory
Total 15 249.95 111.21 138.74 1,414,164,652.11
Client:- Tigray Region Construction, Road & Transport Bureau

Table 19: Table showing List of Ongoing road Project Owned by Tigray Region Construction, Road &
Transport Bureau

S/ Total Length Contract Amount


No Project Zone Wereda (Km) (Birr)
1 Dejena - Awra Wetsern Welkait
26.04 114,299,927.89
Main Road - Awerqi Wetsern Welkait
2 9.05 86,958,899.18
Main Road - Shirela Wetsern Welkait
3 11.20 108,093,342.97
Main Road - Welel Wetsern Welkait
4 24.85 64,882,279.25
Main Road - Shihagane Wetsern Tsegede
5 11.96 61,071,167.77
Maytseberi - Adiwesen North Tselemti
6 Wetsern 10.00 44,771,447.97
Jira - Shenako Central Naider Adet
7 10.75 119,618,504.70
Dego - Dagna Central Naider Adet
8 32.00 210,028,611.00
Debre Harmaz - Adifitaw Central Mereb Leke
9 14.28 76,611,626.86
Yahodega - Arae Eastern Eurob 61,614,172.79
10 16.80
Main Road - Mergahaya Eastern Ganta Afeshum
11 7.72 63,682,786.26
Adikelebes - Marwa Eastern Saseetsadaemba
12 11.80 104,798,759.41
Simret - Jema - Wihdet Southern Endamoheni
13 22.00 105,182,706.85
Tashi - Adishishay Southern Seharti Samre
14 17.43 53,506,985.34
Sub Total (km) 249.95 1,275,121,218.24
Client:- Messebo cement Factory

Table 20: Table showing List of Ongoing road Project Owned by Messebo Cement Factory

S/ Total Length Contract Amount


No Project Zone Wereda (Km) (Birr)
Messebo South Enderta
1 Eastern 24.08 139,043,433.87

TIGRAY ROAD CONSTRACTION ENTERPRISE 35


COMPANY PROFILE DECEMBER
2016

S/ Total Length Contract Amount


No Project Zone Wereda (Km) (Birr)
Sub Total (km) 24.08 139,043,433.87

3.2. Other works Experience


3.2.1. Geo-Technique Services (We provide particularly soil and aggregate related geo-
technical laboratory tests – our laboratory has different testing equipment’s delivered
by European Union; we have customers from all over weredas and cities of our region
and nearby amhara region cities such as weldeya and sokota).

Figure 15-Laboratory-1

TIGRAY ROAD CONSTRACTION ENTERPRISE 36


COMPANY PROFILE DECEMBER
2016

Figure 16-Laboratory-1
3.2.2 Equipment Rental Service (we give equipment rental service particularly to
government offices and to inventors as well as local NGO who work on public projects).

3.2.3 Equipment Maintenance & Specification Preparation and inspection


Service
we provide services such as preparation and submission of equipment related
specifications , inspection of vehicles purchased by customers and equipment
maintenance service with well-constructed workshop and equip with skilled technician
and maintenance equipment’s.

TIGRAY ROAD CONSTRACTION ENTERPRISE 37


COMPANY PROFILE DECEMBER
2016

Figure 17-Equipment Maintenance

Figure 18- Equipment Maintenance


3.2.4 Supply of Aggregates (We have a huge crusher plant with 2000m3 production
capacity at Quiha nearby DBL Textile factory and we produce 00, 01, 02, 03
aggregates; from this production most of it we use it in our construction projects but
we also sell deferent types aggregates to different customers such as DBL Textile
Factoty, Velocity Textile Factory, Mekelle & Wukro City Cobble Stone pavement work)

TIGRAY ROAD CONSTRACTION ENTERPRISE 38


COMPANY PROFILE DECEMBER
2016

Figure 19-Crusher Plant-1

Figure 20- Crusher Plant-2

3.3. ADDRESSES OF CONSULTANTS


Table 21: Table showing List of Addresses of Consultants
NO. Name Adress
1 Net Consult Consulting P.O.B 3097 Code1250,AA,Ethiopia

TIGRAY ROAD CONSTRACTION ENTERPRISE 39


COMPANY PROFILE DECEMBER
2016

Engineers & Architects P.L.C Email netconsult @ethionet.et


Email:netcon@ethionet.et
Website:www.netconsult.com
2 Nomy Engineering P.L.C Tel 251116460408
FAX 251116460376
P.O.B 239 Code 1022
e-mail: nomy consult@ethionet.et
Addis Abeba,Ethiopia(Head office)
Tel 251344410134
FAX 251344413783
Mekelle,Ethiopia(Branch office)
3 ZEBL Consulting PLC Tel 251914314354
251914313622
251914314355
Mekelle,Ethiopia
4 H.B.S Engineering P.L.C Tel 0914702364
5 Tigray Water Works Study Tel 0344-41-85-83/41-86-21
Design & Supervision P.O.X 957
Enterprise FAX 0344400139
Mekelle,TIGRAY
6 Mekelle University Tel 251-344-410970
Ethiopian Institute of P.O.Box 231
Technology-Mekelle School of Fax 251-344-410984/417691
Civil Engineering Supervision Mekelle ,Ethiopia
and Contract Administration
of Rural Road Maintenance
Projecs

4. Personnel
The following table shows list of Professional currently working permanently at TRCE.

Table 22: Table showing List of Professional Staff

TIGRAY ROAD CONSTRACTION ENTERPRISE 40


COMPANY PROFILE DECEMBER
2016

Experience year
No Name Qualification Position With firm Total
1 Mueze Atsbeha MSC in Urban & General
amp;Regial Planning Manager 12 31
2 Harnet Kiros MBA,Project Design &
Planning Contract 15 25
BSc Degree in Civil Administration
Engineering Core Process
Owner
3 Adisu Tesfay BSc Degree in Civil Construction &
Engineering Maintenance 12 16
Core Process
Owner
4 Daniel Biyadglige BSc Degree in Civil Design Study
Engineering Sub Process 24 29
Coordinator
5 Shishay Mehari BSc Degree in Contract
Construction Administration 12 12
Technology Sub Process
Management Coordinator

6 Efrem Mezgebe MSC in Road


&Transport Office Engineer 7 7
Engineering
7 Nigsit Moges MSC in Road
&Transport Construction 10 10
Engineering Engineer
8 Solomon Yibrah B.Sc Degree in Civil Laboratory Case
Engineering Team Leader 11 11

9 Hailu Kahsay BSc Degree in Contract


Construction Engineer
Technology 12 12
Management
10 Tirhas Araya B.Sc Degree in Civil Design

TIGRAY ROAD CONSTRACTION ENTERPRISE 41


COMPANY PROFILE DECEMBER
2016

Engineering Engineer 10 10

11 Tsega G/Libanos B.Sc Degree in Civil Quantity


Engineering Surveyor 8 8

12 Afera Abrha Diploma Surveying Senior Surveyor


Technology 11 14

The following table shows list of Professional, technical & supporting staff currently working
permanently at TRCE.

Table 23: Table showing List of Professional, technical & Supporting Staff for TRCE

TIGRAY ROAD CONSTRACTION ENTERPRISE 42


COMPANY PROFILE DECEMBER
2016

S/No Profession Number


A Head Office
1 Engineers 12
2 Surveyors 1
3 Laboratory Technicians 4
4 Equipment Maintenance Technicians 63
5 Equipment Operators 25
6 Supporting Staff 177
Total 282
B Projects
1 Engineers 37
2 Surveyors 17
3 Earthwork/Structural work Foreman 48
4 Data Collectors 11
5 Skilled Masons 42
6 Skilled Carpenters 28
7 Skilled Bar Benders 7
8 Equipment Maintenance Technicians 15
9 Equipment Operators 67
10 Assistant Equipment operators 33
11 Supporting Staff (Adm., Finance, Supply) 64
Total 369
Total Number Permanent Employees 651

5. Equipment Owned by TRCE


The following table shows list & status of major machineries and equipment’s owned by TRCE.

Table 24: Table showing List of major machineries and equipment’s owned by TRCE

TIGRAY ROAD CONSTRACTION ENTERPRISE 43


COMPANY PROFILE DECEMBER
2016

S/No Type of Equipment Qty Acquisition Value (Birr)


A Construction Machinery
1 Bull Dozers 3 90,256,522.68
2 Motor Grader 1 20,219,148.83
3 Wheel Loader 1 20,858,748.49
4 Crusher 1 588,000.00
Total Construction Machinery 6 131922420
B Construction Equipment’s
1 Truck Concrete Mixer 1 1,781,313.30
2 Water Pump 20 935,359.40
3 Stationer Concrete Mixer 8 1,240,612.75
4 Air Compressor 10 3,621,235.36
5 Vibrator 19 385,544.94
6 Hand Compacter 9 243,795.83
7 Total Station with accessory 9 2,989,479.96
Total Construction Equipments 76 11197341.54
C Trucks & Vehicles
1 Dump Trucks 24 24,674,467.50
2 Water Trucks 3 19,621,001.94
3 Courier Trucks 3 3,656,112.45
4 Fuel Trucks 1 2,800,169.00
5 Low bed with Trailer 1 10,907,915.39
6 Tractor with Trailer 4 1,113,714.54
7 Shop Trucks 1 2,574,065.55
8 Small Vehicles 12 27,032,505.97
9 Bus 2 1,304,347.83
Total Trucks & Vehicles 51 93684300.17

6. FINANCIAL STANDING
6.1 Annual Revenue & Cost of Production
Revenue (2003 – 2011 EBY)

TIGRAY ROAD CONSTRACTION ENTERPRISE 44


COMPANY PROFILE DECEMBER
2016

Table 25 :Table showing List of Revenue 2003-2011


Budget Construction Road Maint & Eq Rent & Goods Other Income Total Revenue
Year Works Design Maint. Disposal
2003 92,280,027.40 30,403,570.42 100,866.49 0 338,565.40 123,123,029.71
2004 149,703,617.96 22,422,859.31 6,884,516.98 2,775,494.31 6,546,911.25 188,333,399.81
2005 148,066,126.88 22,804,792.78 19,388,778.70 233,071.04 3,020,166.34 193,512,935.74
2006 188,435,852.15 31,029,066.10 3,489,845.43 19,796,957.35 2,375,167.28 245,126,888.31
2007 173,224,907.78 32,139,273.20 1,151,301.48 4,444,251.00 3,018,754.54 213,978,488.00
2008 65,839,91 11,864,36 4,928, 3,6 265,020,999.35
178,714,580.01 1.43 1.30 227.47 73,919.14
2009 268,892,313.17
249,867,893.88 10,849,701.97 1,360,862.13 2,003,067.08 4,810,788.11
2010 196, 234,748,370.84
228,452,342.26 905.30 1,176,590.77 2,330,562.17 2,591,970.34
2011 617, 268,696,878.54
257,511,933.04 861.65 2,284,271.12 7,080,377.19 1,202,435.54
2012 153,094,142.17 - 4,835,844.64 1,472,243.89 3,226,604.23 162,628,834.93
2013 28,226,975.25 - 916,086.94 966,842.63 1,927,148.95 32,037,053.77
2014 - - 195,974.11 362,962.99 7,480,284.44 8,039,221.54
2015 16,887,244.9 47,958,024.12
27,899,886.72 - 1,043,143.20 2,127,749.25 5
Total 1,875,478,285.50 216,303,942.16 54,692,443.29 48,521,806.37 57,099,960.5 2,252,096,437.83
1
Cost of Production (2003 – 2011 EBY)
Table 26 :Table showing List of Cost of Production 2003-2011
Budget Labor Cost Equipment Cost Material Cost Depreciation Overhead Cost Total Cost
Year
2003 23,428,711.82 36,240,700.50 11,430,936.33 18,231,051.46 13,327,722.48 102,659,122.59
2004 30,350,905.41 42,047,324.51 18,640,297.63 20,849,749.33 11,109,936.46 122,998,213.34
2005 35,205,858.67 52,040,893.76 8,097,112.62 59,429,785.18 16,337,783.94 171,111,434.17
2006 64,739,812.81 81,395,166.65 22,782,327.12 51,404,198.50 3,660,361.86 223,981,866.94
2007 57,398,392.30 62,017,528.32 20,361,098.26 38,546,679.42 23,145,446.36 201,469,144.66
2008 79,94 27,817,83 37,395,7 41,35 249,139,184.27
62,622,622.49 7,505.35 7.74 92.26 5,426.43
2009 69,969,65 67,45 37,166,54 44,742,9 38,29 257,630,796.52
4.87 6,889.85 1.23 90.12 4,720.45
2010 79,694,48 43,38 39,130,19 9,941,0 39,46 211,612,520.54
4.50 5,093.62 3.29 23.45 1,725.68
2011 63,613,996. 27,218,700. 7,626,526. 41,486 222,361,657.72
82,415,904.60 24 47 22 ,530.19
2012 58,786,968.86 411,964.30.09 11,518,143.82 13,490,417.24 20,152,121.99 145,144,082.00
2013 48,738,691.85 1,903,241.58 6,618,221.20 - 22,638,383.57 79,898,538.20
2014 - - 111,556.80 18,455,145.58 10,192,027.63 28,758,730.01
2015 1,563,797.82 11,993,777.69 8,385.27 6,636,786.68 32,643,614.24 52,846,361.70
Total 614,915,806.00 583,238,548.16 230,901,351.78 326,750,145.44 313,805,801.28 2,069,611,652.66

TIGRAY ROAD CONSTRACTION ENTERPRISE 45


COMPANY PROFILE DECEMBER
2016

6.2. STATEMENT OF ACCOUNT

TIGRAY ROAD CONSTRACTION ENTERPRISE 46


COMPANY PROFILE DECEMBER
2016

TIGRAY ROAD CONSTRACTION ENTERPRISE 47


COMPANY PROFILE DECEMBER
2016

7.LITIGATION HISTORY

NO Litigation History

TIGRAY ROAD CONSTRACTION ENTERPRISE 48