Based on Prepared 2017-02-14 Jill Eriksson Title Connection diagram Doc.des. Ref.des.
Approved 2023-06-20 Patrik Nyback REL670 A42X00 Ver. 2.2 Doc.kind
F F
Project Single breaker, 1/3 phase tripping Resp.dept. Rev.ind. A Lang. en
Sheet 1
Rev Rev. Note Date Name
Hitachi Energy Switzerland AG Doc.No. 1MRK002807-LF Cont. 2
1 2 3 4 5 6 7 8
© 2017 Hitachi Energy. All rights reserved. 1 2 3 4 5 6 7 8
A A
p30:1
X302
p30:2
X303
p30:3
X311
p30:4
A
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
X304
B
C 6U (266,7 mm) C C
p31:1
X32 X42 X52 D
X305 X312
p30:5
p31:2
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.
X306 X313
X3061
p30:6
p31:3
X3062
D D
E E
Based on Prepared 2017-02-14 Jill Eriksson Title Connection diagram Doc.des. Ref.des.
Approved 2023-06-20 Patrik Nyback REL670 A42X00 Ver. 2.2 Doc.kind
F F
Project Single breaker, 1/3 phase tripping Resp.dept. Rev.ind. A Lang. en
Sheet 2
Rev Rev. Note Date Name
Hitachi Energy Switzerland AG Doc.No. 1MRK002807-LF Cont. 3
1 2 3 4 5 6 7 8
© 2017 Hitachi Energy. All rights reserved. 1 2 3 4 5 6 7 8
A A
B B
LOCATION=p1
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
X11
X11
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.
4
5
+ + - Protective earth must be connected
D EL D
E E
Based on Prepared 2017-02-14 Jill Eriksson Title Connection diagram Doc.des. Ref.des.
Approved 2023-06-20 Patrik Nyback REL670 A42X00 Ver. 2.2 Doc.kind
F F
Project Single breaker, 1/3 phase tripping Resp.dept. Rev.ind. A Lang. en
Sheet 3
Rev Rev. Note Date Name
Hitachi Energy Switzerland AG Doc.No. 1MRK002807-LF Cont. 4
1 2 3 4 5 6 7 8
© 2017 Hitachi Energy. All rights reserved. 1 2 3 4 5 6 7 8
A A
B 2 CH1 (I) B
LINE_CT_IL1
3
4 CH2 (I)
LINE_CT_IL2
5
6 CH3 (I)
LINE_CT_IL3
7
8 CH4 (I)
9
10 CH5 (I)
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
11
C 12 CH6 (I) C
13
14 CH7 (U)
LINE_VT_UL1
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.
15
16 CH8 (U)
LINE_VT_UL2
17
18 CH9 (U)
LINE_VT_UL3
19
20 CH10 (U)
WA1_VT_UL2 D
D 21
22 CH11 (U)
23
24 CH12 (U)
WA2_VT_UL2
E E
Based on Prepared 2017-02-14 Jill Eriksson Title Connection diagram Doc.des. Ref.des.
Approved 2023-06-20 Patrik Nyback REL670 A42X00 Ver. 2.2 Doc.kind
F F
Project Single breaker, 1/3 phase tripping Resp.dept. Rev.ind. A Lang. en
Sheet 4
Rev Rev. Note Date Name
Hitachi Energy Switzerland AG Doc.No. 1MRK002807-LF Cont. 5
1 2 3 4 5 6 7 8
© 2017 Hitachi Energy. All rights reserved. 1 2 3 4 5 6 7 8
A A
CONFIGURATION 24/30V
X31 48/60V
1
+ 110/125V
- 2 BI1 QA1_POS_CLS 220/250V
3 B
B +
- 4 BI2 QA1_SPRCHR
5
+
- 6 BI3 QA1_PD_IND
7
+
- 8 BI4 WA1_VT_OK
9
+
- 10 BI5 BBP_TR
11
+
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
- 12 BI6 QB1_POS_CLS
13 C
C +
- 14 BI7 QA1_POS_OPN
15
+
- 16 BI8
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.
RL X32
1
+
- 2 BI9 QB2_POS_CLS
3
+
- 4 BI10 WA2_VT_OK
5
+
- 6 BI11 QB9_POS_OPN D
D
7
+
- 8 BI12 LINE_VT_OK
9
+
- 10 BI13 LINE_DTTR
11
+
- 12 BI14 ZCPSCH_CR
13
+
- 14 BI15 ECPSCH_CR
15
+
E 16 BI16 ACTV_TESTMODE E
-
Based on Prepared 2017-02-14 Jill Eriksson Title Connection diagram Doc.des. Ref.des.
Approved 2023-06-20 Patrik Nyback REL670 A42X00 Ver. 2.2 Doc.kind
F F
Project Single breaker, 1/3 phase tripping Resp.dept. Rev.ind. A Lang. en
Sheet 5
Rev Rev. Note Date Name
Hitachi Energy Switzerland AG Doc.No. 1MRK002807-LF Cont. 6
1 2 3 4 5 6 7 8
© 2017 Hitachi Energy. All rights reserved. 1 2 3 4 5 6 7 8
A A
CONFIGURATION
X41 BO1
1 QA1_OP_L1
BO2
3 QA1_OP_L2
BO3
4 QA1_OP_L3 B
B BO4
6 QA1_OP
BO5
7 QA1_CMD_CLS
BO6
9
BO7
10 WA1_TRBU
BO8
12
BO9
13
BO10
15
BO11
16
BO12
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
18
C C
X42 BO13
1
BO14
3
BO15
4 WA2_TRBU
BO16
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.
6
BO17
7 ZCPSCH_CS
BO18
9 ECPSCH_CS
BO19
10 LINE_DTTS
BO20
12
BO21
13
BO22 D
D 15
BO23
16
BO24
18
X42
X41
17
14
11
17
14
11
8
5
2
8
5
2
E E
Based on Prepared 2017-02-14 Jill Eriksson Title Connection diagram Doc.des. Ref.des.
Approved 2023-06-20 Patrik Nyback REL670 A42X00 Ver. 2.2 Doc.kind
F F
Project Single breaker, 1/3 phase tripping Resp.dept. Rev.ind. A Lang. en
Sheet 6
Rev Rev. Note Date Name
Hitachi Energy Switzerland AG Doc.No. 1MRK002807-LF Cont. -