INCLUDED
S.NO DESCRIPTION REMARKS
YES N/A NO
Submittal will contain following main drawing sheets
SLD Drawing sheet - Signed, dated, and stamped by Contractor &
1
Designer, which contain detail information as below:
2 CT/VT data
Equipment Details with Complete Information of Manufacturer &
3
Country
4 Specific Information of GIS & MV Switchgear
5 Concise HV & MV Busbar Details
6 Power Transformer Concise Technical Data
7 Capacitor Banks Concise technical Data
8 Auxiliary Transformer Concise Data
9 NER Concise Technical Data
Documents which are required to be considered
10 PTS of project
11 Pre-bid clarifications of project
12 Post-bid clarifications of project
13 Tender drawings requirements of project
14 Manufacturer’s rating plates
Standards which are required to be considered but not limited to
mentioned below
15 TES-P-119.33
BY SIGNING BELOW:
1-Contractor guarantees that all submitted documents are as per this check list, otherwise, Contractor is responsible to do all required
modifications without changing submittal’s revision number.
2-Contractor confirms that complete package of document submittal is stamped and signed by Contractor/Manufacturer.
3-Contractor should clarify and explain in the Remarks column if a particular document submittal is not applicable.
Rev No. Submission Date Releasing Date Days taken to Reply by Contractor
0 31.07.2023
1