DTS 94 REV.02 Unlocked

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Internal Correspondence | ΔϴϠΧ΍Ϊϟ΍Εϼγ΍ήϤϟ΍

ENGINEERING & DESIGN DEPARTMENT


ENGINEERING & DESIGN DIVISION - WOA
Jeddah, SEC-HQ

Our Reference #: 30501201 / 25326


##PRMREFERENCE##
- J / 24

Dated : ##PRMDATEG##
12 / 03 / 2024 G
##PRMDATEH##
02 / 09 / 1445 H

To : HV Projects Department - West

Attention : ENGR. NABIL KHUSHAIM


DIV MANAGER

Contract # : 4400018759

Project Title : (BIG CITY) CONSTRUCTION OF 110/13.8


KV HARAM-3 SS PROJECT

Subject : DC CB SIZING CALCULATIONS

Contractor's Ref.#: DTS-94 R02

Dated : 28 / 02 / 2024 G

Date Received @ EDD: 28 / 02 / 2024 G

STATUS OF THIS SUBMITTAL:

A Acceptable X B Acceptable with Comments

C Acceptable, Except as noted (Resubmit) D Rejected (Resubmit)

E Clarification / For Information X See Attached Comments ( 01 Page )

Regards,

NAIF AL RETHEA
Substation & Transmission Line Section Head
ASJ Engineering & Design Division - WOA
Cc: ENGR. TASAWAR HUSSAIN
NESMA

The given approval does not relieve the Contractor from his contractual responsibility & obligation to meet the requirements of
the project contract scope of work and technical specifications (SOW/PTS).
Attachment to EDD/SED Letter No.: 30501201 / ##PRMREFERENCE##
25326 - J / 24
Dated: ##PRMDATEG##
12 / 03 / 2024 G Submittal Status: B

# NG SA COMMENTS REV.0 CONTRACTOR’S NG SA COMMENTS CONTRACTOR’S NG SA COMMENTS REV.2


RESPONSE REV.1 RESPONSE
DTS-094-R02
CONSTRUCTION OF A NEW 110-13.8KV HARAM-3 S/S (BIG CITY)
LV DC CB SIZING CALCULATION
1 The total load of the Main Noted, kindly note that
The approved letter of Noted and complied
DCDBs shall be confirmed Battery Sizing
battery and charger kindly find attached
after the final approval of Calculation is still under
sizing calculations shall The approval of battery
battery and charger sizing review and once
be attached at least in and charger sizing
calculations. approved it will be
“B” status. calculations
attached for your check
2 The number of circuits and Noted, kindly note that Noted however DC SLD
designations shall be DC SLD is still under The approved letter of is still under review
confirmed after the final review and once DC SLD shall be attached and once approved it
approval of DC SLD. approved it will be at least in “B” status. will be attached for Final approval will be given after the
attached for your check your check finalization of DC SLD at least in “B”
3 Please confirm that the status. Any modification in the DC
rated breakers in this DTS SLD shall be reflected here in the DC
Noted and confirmed Noted. Closed cable sizing.
shall be incorporated in
the DC SLD.
4 The total load for the DC- Noted, kindly note that
Noted and complied
DC converter shall be Battery Sizing
kindly find attached
confirmed after the Calculation is still under
Refer to comment No.1. The approval of battery
finalization of battery and review and once
and charger sizing
charger sizing calculations. approved it will be
calculations
attached for your check
5 Contractor is requested to
provide and attach the
compliance statement Noted and complied Noted. Closed
sheet in Microsoft word
format.

ASJ 1 OF 1