Professional Documents
Culture Documents
DTS 94 REV.02 Unlocked
DTS 94 REV.02 Unlocked
DTS 94 REV.02 Unlocked
Dated : ##PRMDATEG##
12 / 03 / 2024 G
##PRMDATEH##
02 / 09 / 1445 H
Contract # : 4400018759
Dated : 28 / 02 / 2024 G
Regards,
NAIF AL RETHEA
Substation & Transmission Line Section Head
ASJ Engineering & Design Division - WOA
Cc: ENGR. TASAWAR HUSSAIN
NESMA
The given approval does not relieve the Contractor from his contractual responsibility & obligation to meet the requirements of
the project contract scope of work and technical specifications (SOW/PTS).
Attachment to EDD/SED Letter No.: 30501201 / ##PRMREFERENCE##
25326 - J / 24
Dated: ##PRMDATEG##
12 / 03 / 2024 G Submittal Status: B
ASJ 1 OF 1