RIGGING AND SLINGING Supervisor and Appointed Person Exam
RIGGING AND SLINGING Supervisor and Appointed Person Exam
NAME: DATE:
Please Choose the correct answer and Place a Ö on the correct answer on multiple
choice questions. Show the solution for questions that required calculation.
Total Exam Points = Note: Passing Score 80% out of 100 points
2) Upper works
3) Cab
4) Car body
2. When determining the gross load the best method is: (1-point)
4) Decrease height
4. Two Wire Rope Slings @ 90o Angle between the sling with SWL of 11 tonne each, what
weight can safely lift? (5-points)
1) 15.4 tonne
2) 22 tonne
3) 12.32 tonne
4) 14 tonne
5. What is the reduction in SWL if a sling is in choked configuration? (1-point)
1) 10%
2) 20%
3) 30%
4) 40%
4) On tire capacities.
4) What is required for all personnel to fulfil the safe lift operation
8. Before using or applying any Rigging Equipment to the Crane Hook or the Load to be
lifted, what is required to be carried out by Rigging Personnel: (2-points)
10. During Lifting Operation what would be the safest means of communication between
Rigging Supervisor, Crane Operator and Rigging Personnel’s when the Crane Operator is
out of view. (2-points)
1) Mobile Phone
2) Radio Communication
3) Hand Signals
4) Verbal Communications
11. When lifting personnel in a man basket using 6 x 19 wire rope sling, the considered safety
factor is? (2-points)
1) 3:1
2) 5:1
3) 7:1
4) 10:1
12. The Project Superintendent determines if the Crane is properly setup and if the load
should be lifted? (2-points)
1) True
2) False
13. Who has the responsibility for determining the correct weight of a load? (2-points)
1) Owner
2) Store Keeper
3) Rigging Supervisor
4) Signalman
14. When an operator leaves the crane, he must first: (2-points)
1) Put all dogs or pawls in, but you may leave load in air.
2) Put the load on the ground and put all dogs or pawls in.
15. When replacing the hoist line wire rope on a crane, how do you determine the size or type
of wire rope to use? (1-point)
1) Drum lagging
2) Sheave size
16. After the crane pre-check has been carried out and before the crane lifting operations
begin the crew should: (2-points)
1) Have Rigging Training
17. Before any lifting operations begin who is the responsible person to determine the weather
conditions for a safe lift. (1-point)
1) Installation Manager
2) Projects Manager
3) Crane Operator
4) Rigging Supervisor
1) Hard fill
3) Concrete
4) Compacted fill
19. Whenever the boom is assembled, dismantled, length increased Personnel must be kept
away from beneath the Structures. (1-point)
1) False
2) True
21. Load radius is the distance from the centre of gravity of the suspended load to the:
(2-points)
3) Tipping axis
4) Hook rollers
4) A document issued stating that the lifting equipment has passed the examination
and is safe to use
23. If the SWL of a cranes wire rope is 1,000 kgs using one part, what is the SWL when using
4 parts? (2-points)
1) 1,000 kgs
2) 2,000 kgs
3) 3,000 kgs
4) 4,000 kgs
24. If the rated capacity of the crane is below the Bold line this means the capacity is based
on: (1-point)
2) Structural competence
3) 85% of tipping
25. All hazards and potential problems should be discovered during the: (1-point)
4) Coffee break
26. When making a multiple crane lift it is important for the Rigging Supervisor to understand
that: (1-point)
1) The weight is equally distributed at all times
3) The weight may increase if the other crane lands the load
4) The weight may decrease if the other crane lands the load
27. The correct way to keep personnel from being injured by the counterweight or caught
in between any structure and the load being lifted by the crane is to:
(1-point)
1) False
2) True
29.
30. What is the sling capacity required to Lift a Load of 10 tonne at 90º Angle. (5-points)
90O
10 tonne
Answer:
1. Load Weight ?
90̊
tonne ?
Answer: ................................
33. How should equipment be identified as fit for use and certified? (1-point)
1. With Serial or ID Number?
2. Colour Code?
3. Good Condition of Equipment
4. All of the Above?
34. What are a Lifting Equipment’s / Appliances? (1-point)
This will be implemented during classroom theory along with Case Study of Selecting
sling capacity and attachment on given load to be lift. (10 points)
Given:
900 900
17 tonne
P = 17 tonne
CG
R=5m
P = 50 tonne
A = 12 meters B = 18 meters
Crane B
Crane A
1. Load from CG =
1. Load from CG =
2. Minimum Capacity of Sling=
2. Minimum Capacity of Each Sling =
36. Enumerate at least three items that would be part of the load during any lift. (2-points)
1.
2.
3.
37. Enumerate at least 3-factors when preparing tandem lift location or critical area of
lift. (2-points)
1.
2.
3.
38.
39. Case study No.3 Fill-up the Lifting plan using a mobile crane specification with the load to be
transfer from (R1) 8 meters radius to (R2) 12 meters radius and with hook block of 80t at 4-falls.
Select appropriate boom length and the allowable is 75% of the load chart. (10 points)
10 tonne
10 tonne
R1= 8 meters
R2 = 12 meters
Page 1 of 15
Safe Rigging and Slinging Supervisor Assessment Questioner