Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

1 2 3 4 5 6 7 8 9 10 11 12

D01 MD-513-1A10-EG-PR-PID-2001
REV DRAWING NUMBER
31A10-VSL-001 31A10-VSL-002 GENERAL NOTES:
CATCH POT LIQUID COLLECTOR FOR THE PLANT BREAKDOWN IDENTIFIER PREFIX OF ALL INSTRUMENT,
SIZE : 2200 MM ID X 4250 MM TT 31A10-VSL-001 VALVE AND PIPING SPECIALTY TAGGING TO BE OMITTED.
A DGN PRESS : 4805.0 KPAG THE PLANT BREAKDOWN IDENTIFIER PREFIX IS "31A10" ON THIS P&ID. A
SIZE : 850 MM ID X 2000 MM TT
DGN TEMP : 150 C DGN PRESS : 588.0 KPAG * : THE * BREAKDOWN IDENTIFIER IS "319FF".
MAT'L : SA516 GR.70N DGN TEMP : 150 C
MAT'L : SA516 GR.70

SYNGAS/AMMONIA FLARE
50-31A10-NAG-CA06-0203-NI NOTES:
3996
MD-513-1A00-EG-PR-PID-2021
5. EMERGENCY PUSH BUTTON IN CENTRAL CONTROL ROOM.
2 OF 3 6. VENT TO BE RUN TO SAFE LOCATION.
AMMONIA STORAGE FLARE ESD
50-31A00-NAG-CA06-0204-NI 685. EVAPORATION POND BY FOLK LIFT.
MD-513-1A00-EG-PR-PID-2021 1014 1.09
771. MANUAL INPUT FOR NG GAS BY OPERATOR MOLECULAR WEIGHT.

HH HH HH
B PI H PI H PI H B
FQ 0005 L 0005 0005
0005 A B C
M
SP SP NOTE 771 PT PT PT

CL150
CL150
C101 C102 N2 0005 0005 0005
N2 FI AY * A B C
0005 0924

RGAZXB

RGAZXB

RGAZXB
M REOPEN
CL600

CL600
PIC PI 20 20 20
25-31A10-NAG-CA06-0105-NI

25-31A10-NAG-CA06-0106-NI
XVHS HS 0001 0001
NATURAL GAS
0001 0001 B 400-31A10-NAG-CA06-0102-IA
FY
PV
2173 MD-513-1A10-EG-PR-PID-2002
0005 NOTE 5 31A10-FLT-002
0001
B
ESD HS 150 150
1.09 0001

RGAZXB
C
TI PI H FI CGAREC25 FC 25 CGAREC C
0014 0014 L 0005 XVY
150
RGAZXB
RGAZXB RGAZXB

RGAZXB RGAZXB

0001 N2
S PIC

CGARFD

CGARFD
25 25 TT PT 0001 PT
0014 0014 A 0001
FT 50 50 XVZ H
25 25 XV PV

RGAZXB
RGAZXB
0005 0001 L
20 0001 0001 20
50

MIN.

MIN.
NATURAL GAS A
400-319FF-NAG-CA06-0001-NI MIN. MIN.
3997 MD-513-19FF-EG-PR-PID-2003 N1

RGAZXB

RGAZXB

RGAZXB
CGAREC CGAREC 40 FC CGAREC
RGAZXB

RGAZXB

CGAREC 40 40 40 CGAREC FC 40
400

Blind-2 NI IA 15
250
CGARFD 400-31A10-NAG-CA06-0103-IA

Blind-1
50 31A10-VSL-001
D N4A D
CGARFD TRIM: CA06
MD-513-1A10-EG-PR-PID-2022 6077 15
50
31A10-FI-1168 N5A
HH CGARFD
LI H LT
LG 0001 L 0001
MD-513-1A10-EG-PR-PID-2006 6075 0501 LL MH
50 600
31A10-FI-1152 N5B
CGARFD
15
50
N4B
MD-513-1A10-EG-PR-PID-2006 6076 CGARFD
15
31A10-FI-1154A/B/C N3
E E

CGARFD
I
MD-513-1A10-EG-PR-PID-2004 6078 1.06
31A10-FI-1001
20
UVZ H
0001 L RGAZXB
UVY

CGLRXC
0001 50x25
MD-513-1A10-EG-PR-PID-2004 6079 50
31A10-FI-1003 FC

S
UV 50x25
0001

CGARFD
F F
NOTE 6

50-31A10-ODN-CA08-0101-NI
SP
F001 DOCUMENT APPRAISAL STAMP
20
DRAIN
50-31A10-ODN-CA08-0208-NI
MD-513-1A10-EG-PR-PID-2002 3445
250x150 20 31A10-FLT-002
REVIEWER'S NAME SIGN DATE
150-31A10-NAG-AA21-0104-NI
15

CGARFD

CGARFD

CGARFD
50 50 50 REVIEW GRADE
LT LI H
N6 N4 N1 N2 N5A 0004 0004 Result Code Description
G G
CL150 CL600 A Accepted
LG
MH C Proceed with exceptions to next submission and Revision
500 50
N5B R Do Not Proceed - Revise as noted and Resubmit
N3
CENTER OF VALVE 50 CGARFD Acceptance in any of these categories in no way relieves the Contractor/Supplier of its
15
31A10-VSL-002 responsibility for the due & proper performance of the Works in accordance with the
1500 MM CGARFD TRIM: AA21 Contract/Purchase Order
NOTE 685
PROJECT MANAGER SIGN-OFF:
GROUND NAME DATE:
DRAWN ISH 31/08/16
PROPRIETARY & CONFIDENTIAL
CHECKED SHY 31/08/16 UMM WU'AL PHOSPHATE PROJECT
H
This document and the information contained PIPING & INSTRUMENTATION DIAGRAM H
herein is Ma'aden proprietary know-how. ENGINEER KHC 31/08/16
This document or any part thereof should not NATURAL GAS INTAKE
be reproduced, stored in a retrieval system APPROVED JJY 31/08/16
or transmitted by any means, electronic or (01-01)
otherwise, or divulged without prior written EMPLOYER
D01 31/08/16 AS BUILT ISH SHY KHC JJY permission of Ma'aden. DRAWING NUMBER REV
SCALE
DOCUMENT NUMBER REFERENCE DOCUMENTS REV DATE REVISION DESCRIPTION DRN CHK ENG APP EMP NTS A1 MD-513-1A10-EG-PR-PID-2001 D01
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
D01 MD-513-1A10-EG-PR-PID-2002
REV DRAWING NUMBER
31A10-FLT-002/003 GENERAL NOTES:
NATURAL GAS FILTER THE PLANT BREAKDOWN IDENTIFIER PREFIX OF ALL INSTRUMENT,
SIZE : 900 MM ID X 3450 MM TT VALVE AND PIPING SPECIALTY TAGGING TO BE OMITTED.
A DGN PRESS : 4.805 MPAG THE PLANT BREAKDOWN IDENTIFIER PREFIX IS "31A10" ON THIS P&ID. A
DGN TEMP : 150 C
MAT'L : SA516 GR.70
NOTE 6, 14 NOTE 6, 14
NOTE 6
NOTES:
350-31A10-VPG-AA21-0109-NI
350-31A10-VPG-AA21-0105-NI 6. VENT TO BE RUN TO SAFE LOCATION.
14. PROVIDE 10MM DRAIN AT PSV DISCHARGE PIPE LOW POINT.
PDI H 50x25
SET @ 4805.0 kPa-g SET @ 4805.0 kPa-g 767. MANUAL SAMPLE TYPE 8.
0072
AA21 REFER TO P&ID NO. MD-513-1A00-EG-PR-PID-2081~4 FOR THE DETAILS.

RGAZXB
CA06 25
PSV PSV
001 350x150 002 350x150 PDT
B B
0072
UP TO THE IN FRONT
OF UTILITY PIPE RACK
400x100 400x100 50

RGAZXB
CGAREC
MH N7 20 IA NI

CGAREC
INTERLOCKING NATURAL GAS
400 350 350-31A10-NAG-CA06-0201-IA

RGAZXB
SP 400 N2 1020 MD-513-1A00-EG-PR-PID-2021
20 50

RGAZXB
N5 40 CGAREC 20
B706 31A10-VSL-003

CGARXA
NATURAL GAS 25
400-31A10-NAG-CA06-0102-IA 400
2173 MD-513-1A10-EG-PR-PID-2001 N1 SP 25
50x25

RGAZXB
CGAREC PI A001
40
Blind-3
31A10-VSL-001 N6 0581
50 RGAZXB
N4A SAMPLE NOTE 767
HH CGARFD
C
LI H LT
N3 C
0037 L 0037 N4B 31A10-FLT-002
LL 50 50x25 TRIM: CA06
CDR 01-10
400-31A10-NAG-CA06-0107-IA

350-31A10-NAG-CA06-0109-IA
CGARFD

RGAZXB
25
20
UVZ H
0042 L RGAZXB
50-31A10-NAG-AA21-0108-IA

CGLRXB
I
FC 25

S
1.08

UVY UV

RGAZXB
0042 0042
DRAIN 25
D 50-31A10-ODN-CA08-0208-NI D
MD-513-1A10-EG-PR-PID-2001 3445
31A10-VSL-002

50x25
50x25 AA21

RGAZXB
50x25 CA06 25
PDI H
0073

PDT
0073

E E
50

RGAZXB
MH N7 20

350
RGAZXB

N2
20 50 N5

RGAZXB
40 CGAREC
400
N1 50x25
Blind-4
PI
CGAREC N6
50 0582
N4A RGAZXB
HH CGARFD
LI H LT
N3
31A10-FLT-003
0038 L 0038 N4B
TRIM: CA06
LL 50 50x25
F F
CGARFD
RGAZXB

25
DOCUMENT APPRAISAL STAMP
UVZ H 20
0043 L RGAZXB
CGLRXB

I REVIEWER'S NAME SIGN DATE


FC 25
S

1.11
UV
UVY
RGAZXB

0043
0043 25
REVIEW GRADE
Result Code Description
G G
25-31A10-ODN-CA08-0208-NI A Accepted
C Proceed with exceptions to next submission and Revision
R Do Not Proceed - Revise as noted and Resubmit

Acceptance in any of these categories in no way relieves the Contractor/Supplier of its


responsibility for the due & proper performance of the Works in accordance with the
Contract/Purchase Order

PROJECT MANAGER SIGN-OFF:


NAME DATE:
DRAWN ISH 31/08/16
PROPRIETARY & CONFIDENTIAL
CHECKED SHY 31/08/16 UMM WU'AL PHOSPHATE PROJECT
H
This document and the information contained PIPING & INSTRUMENTATION DIAGRAM H
herein is Ma'aden proprietary know-how. ENGINEER KHC 31/08/16
This document or any part thereof should not NATURAL GAS FILTRATION (01-02)
be reproduced, stored in a retrieval system APPROVED JJY 31/08/16
or transmitted by any means, electronic or
otherwise, or divulged without prior written EMPLOYER
D01 31/08/16 AS BUILT ISH SHY KHC JJY permission of Ma'aden. DRAWING NUMBER REV
SCALE
DOCUMENT NUMBER REFERENCE DOCUMENTS REV DATE REVISION DESCRIPTION DRN CHK ENG APP EMP NTS A1 MD-513-1A10-EG-PR-PID-2002 D01
1 2 3 4 5 6 7 8 9 10 11 12

You might also like