Download as pdf
Download as pdf
You are on page 1of 216
3M, ‘Supply an italian of S314 AY Bik Bult Primary intec. ‘supeiaton wih ecessris including eating werks In A Ale “Sarsanayat Intec Paral CONTRAGTNO.A~14840 a ‘DRAWING / DOCUMENT COMMENT SHEET NO. OTS-082 Rev? Erg Snore Eesonecarical & Onna Cataaing LESSER aioe AAT Fovhor ober ent pons ve a6 a fiveimroae. Fats esees voce EMAILED | SA ata Ral GALLO OTRIOTES Siomaeoncate ‘Stauaor” | Sate ‘Oe avgnat 2019 eee sez | Peaatat CaeBeitooumouorsant Frias ARR tem Titles | Details il DOC. No. Rev | Status |Comments | | SHRRV AT Sanat PRY SSCTEVT | prassnesavooons | 2 ‘Stang alcition [ [A [see tow [SATUS a= fpaied ARN Apporetanegarse, NA=Naprel NE= Ampere | PROSE = Dring eae wih hs DISCOM ora (PevRo) commen: No 7_| Rely comments SL Now Nota, 22 | CTWT make, pe sal be based on eco ia est nd pe ea aie eceven 1 AUS 2018 7 5 ks ae Engineering Solurions Fletromechanical & General Contracting LLC P.O. BOX 52239 ABU DHABI, UAE. DOCUMENT TRANSMITTAL SHEET "TO; Ma GOPA INTERNATIONAL ENERGY CONSULTANTS Gmifif LLG 7.0. BOX 9380 ABU DHABI. UAE. Contract No.A14940 | DTSNos | oz | Rev. | 2 | Dute:31072019 | Supply and Installation of 33/1 1kV Brick Built Primary Substation with Accessories Including Cabling Works in Al Ain~ Al Sanays-L “The following ecunens ae eco Lr reoot Ep tarmtentin appetites] \e 0c ORWE'Te teemenine [ewe | Mace | 1, | SSIAV AlSaaayact PRY SS CFA VE a svomesrmasan | 2 AP = Approved AEN. = Approved Excep Nott A= Necappoved or narmtinaly/ Nt Sbjct Apo eal & General Contacting LLC ‘BAGU PAIR { 5 PROIECT MANAGER | oeco™! DOCUMENT DISTRIBUTION Ta | AADC Projects Delivery Division Manager (2 Copy +2 CD) Tx | GOPA Al Ain (I Top Sheet ~ 1 CD) 1x | GOPA Site Office (1 Original +1 CD) [1s | ENGSOL Site Office (1 Copy) A14940 Supply and Installation OF 3VIIKV ‘ck Bult Primary Substation with Accessories Inluding Cabling Works in AI Aln- Al Sanayi DRAWING / DOCUMENT COMMENF SHEET NO. DTS 082 "To © Engincoring Solutions Flecivomechanical & Fax Noro (9 General Contrating LLC P.O Box 52239 ‘Abu Dh, UAE, ‘Atta: Project Manager Copy: AADC, Projects Delivery Division Manager, AL Ain aca 87018136 ‘acoimen Transeo DISORD Rev? | Comment Sheet Ret Stomisin Date Son | Dae Rewsp Date Previous a. Previous Sa l [No WD wth ope nes te oc! DRWG Tie espe, | mev-| staus | net. | Comment [SMA Al Saya PRY SSC ‘VU Siang Catealaton ‘STATUS: AP= Approve, AEN RET Diag uated wit DTSCOM sheet (YesNo) COMMENTS: [i ty PAs For AADC {Ge AADC Projets Dalneg Dion Wangs ENGSOL | Pitatvsttstaton with acesoresinctine Supply and installation OF 33/32 Brick But (Gabling Works nA in Al Sonaya-t Contract Ho, £18940, —— DATE REPLY TO DOCUMENT COMMENT SHEET 31.07.2018 PROJECT At4s4o MATERIAL DOCUMENT 3/11KV Al Sanaya-t PRY SS CT & VT Caleulatien Ret. Comment Sheet +) UAEI2340680-01/RDJIDTS-274 Date 7.05 2079, DISIMAS Ref DTS.082 Rev DOC No. ‘AlAG40-ES-7700-052 Date SL. ‘AADC! GOPA.Intoc COMMENTS ENGSOL REPLY No. [22.05.2018 GENERAL COMMENTS: GENERAL COMMENTS: Reply to SL. No. 1f09,11, 1210 18,2021 t0 26 Noted Lion ‘Reply to SINe 70: Class, rao GfLVAG CT for LV tar meter shall be according to ASTS and. shall be accosted by AADC metering section As. | Noted & Complied. Celclaton has been Per AADC speo. secondary curent should be | revieed according), ‘A, class 7.0, Provided CT details are not matching. Reply to 5 No 18: AUX Wafo Teeder CT SOMA ‘considering 31.SkA as faut curent i leading to ‘abnormal voltage, contacto reply is acceptable However, Vis determined based on the ley high set point and net on system faut level Noted 8 Complies Rely to SL. No 26" i not acceptable: REF phase CT & neutral CT shall be considered in esleistion ‘Noted! & Compiled, REF CT Calculations tre aed 11KV phase CT & neutal CT for REF protection Taeare- The maximum short eeu curtent of | Noted & Compl. 31.54 shall be considered for calculating CT knee point wotage. SIGNATURE. FOR ENGINEERING SOLUTIONS tLe" 2OUVA Power Transformer CT for Difeental Protection (S3KV A T1kV) Ti-coret. The | Noted & Compl. ‘maximum short circu curent of 37 5kA shall be Considered for calculation CT | Page 1ofa suntan secansewanycobiewone eA AM) infec “al senaya 1 Intec * 4 (CONTRACT NO. A= 1040 ‘AWG rBOCUMENT Drs-oenewt > ea eee ‘Abu Dhabi, UAE. rw yas an: a a8 Cap: AADC, Froees Delivery Division Manngei3h Al gy No as Ti8i36 Se ar pena Geer note eee Boe |S | __ tose om EAR VES CTEM Ties rms Tap SL Re 99 Te TAR BTN apy SC Ne (9 Ch ano Ao CY fe (Va a TTS SERGE ATS ET sa by Aa mace ln eft Mme sy Greet Pe eS ce obras tea arte “a Sonar ntcaton ag [x ‘ (8 ToS tat atest Tare et [THROES GPE Orr accu aETIO TE COP Te a] Tap ee Ara CT SOTA cag STA we Taw one STG roa em mocap svn mre tras be oe 2 Ah Se a "HV Phese Bho CF fr REF pcakin TECwao The mina shat Pea SE oT ol cca catet (St ia ea be caries eneg CT ee po wots 79.07.2019 REVISED 16.05.2019 REVISED 0 | 09.04.2019 FOR APPROVAL Rev | Date Description Employer: Eoin sles eee AlAin Distribution Company Consultant: intec | SEE: Contractor: WB see Serepemee Project: z CONTRACTNO.A-14940 SUPPLY AND INSTALLATION OF 33/11KV BRICK BUILT PRIMARY SUBSTATION WITH ACCESSORIES INCLUDING ‘CABLING WORKS IN AL AIN-AL SANAYA 1 ‘Drawing Title: 33/11KV Al SANAVA-d PRIMARY SUBSTATION (CTA VT SIRING CALCULATION Prepared by i S6A Date: 29.07.2019 Checked Ww Date: 29.07.2019 Approved by: OD Date: 29.07.2019 cso Origin | Subject [Type] UniqNo. | Rev. No. ofol s foja]z POCNO-AL49406577004-082 1201207 AND VISZING CALCULATION neve [PRoNEr: SUPPLY AND ETALATION OF 37 BRICK GUI RIARY SUBSTATION UT [ACCESSORIES INCLUDING CAGLING WORKS IN ALBIN-ALSANAYA [cowraacr Wo: 34340 EMPLOYER : AL AlN ISTHIBUTION COMPANY ADE [conSULTANT: GOPA.NTERNATIONAL ENERGY CONSULTANTS GHBMTLLC [CONTRACTOR ENGINEERING SOLUTIONS ELECTRO NIECHANICRL B GENERAL CONTRACTING LLC 12 _ [pone or creaaancrns sev a) a ESR CUCATER TORSBIV NEOMER EDEN CT, CORE CRRA ORRENTAC WHT sue star PTET Sa [ETERS HTCUATN TORIES TRANSFOR FEDER CP, COREL ARTO perrariratracricion Ta Et Sat ALCUOTTEN FOR ZIV SSH THOS GRTER FEDER CT, COREE OER orecron scr 32 _ [ers ca.cuson Fon a 3/3 Sh TSTONMER FEDER CFT, COE - METER “a [era excaLaTon Fon a0) 90s STORET, CREA OCH UF MOTEHION ACP TSE RCT TON TORRY SRTNA GHD STATON REMOTE ONO THEDEN, REPO SR STANCE PROTECTION 7 [buna oF r pnancrns nv) + favunevreomesar 10 _ few oF cronnancrns (nwa) 112 _[ersianscaicvaTion Fon 16v NCOVER EEDIN TTA CORE O/C ZK PRCTECTONNCFUNAE 113 _ [rss ea.cvanien ron sev ncxven EDEN CT-2 CORE WETERNG 7a _ rswnceaicounowron ne eussecvoN cri, cOnEA- O/C Er ROTECTONACRD 1 [eras cascuarion ror sat GMAGTORFEDERCTT RES O/CK KF MOTECTON 7 _[ersianc crcaanonron suka, nase aun TaNGFonaER REDE CT, COREA ACP Page rots OC NO-ALsS40:57700::082 sRO!20-T AND VISE CALCULATION neve [PRonecTSuPPLY Ao RETALIATION OF 357 BAEK BUI PRIMARY SUBSTATION TH [ACCESSORIES IMCLIDING CABLING WORKS IV ALIN-AL SANA IMPLOYER: AL AW DISTRIBUTION COMPANY (ARES) [conSULTANT: GOPAAWNTERNATIONAL ENERGY CONSULTANTS GHOHTLLE [conTMCTOR ENGINEERING SOUUTIONS ELECTRO MECHANICAL GENERAL COW RACING LLC [eS ECUTON TOR SGA TEAS AULA TATSFOMER DER CUT COPE 1351 _[ersans cucuuon ronan OUTCOME CALE FEEDER, cone RERU 352 _[evsmns catcuaTon soe 330 ure CAML FERC, COREA-METEANG 363 _[ersana eccuunon on aana 297157 TRNSFORAER SY SDE-REFPROTECION| 163A |ersans ccuanon soRzaNWA 275k HANSFORNER NY SDE PUASEC -REFPROTECTON 1618 [Grane cacao fORZOWA a/R TANGFOR MER NEUTRALCT-REFPEOTECION aa [SRG CREATION TORTS STS TRANSFOR, WV SOE TR RENTAL CTS CORET 27 [sunny oF vr araveTENS VAS) 9 fimwousvi concia2 20 _[sunaaany or crananeTes KG) 211 _[ersane avcauon ron ats TRANSFER WEDUER EDGE CECT -WEIERMS 212 _|eraane caucuarion Fon ty ASTORWER NCOMER AEBERETCT2-O) A YF MOTECTION 122 |crsana cLcuronFonomiiv aussicnon cre O/C RUF AOTECTION Fa ES ELEUTON FOR SARA TI ASA ANAT TONSFORER CUT, OATEIV SOE TE 222 _ [eran atcwarion on snk, AAV AAR TARO, SN REF PROTECTION aan [er sams cALcuOn FoR sow sash, OAS SIDE HASECT REF PRCTECION| ‘aan _|crstanc canton For sow K/ASNYTRARSTORNERNEUTRAEcT-REPFEOTECTEN 24 [bones oF vronmoverens ach a fenmune 2 crsiconony CBU RESSTANGE VALE Page 20t 154 OCNO-ALASH0:5-7001-082 20420 AND VT SZING CALCULATION nove [racic surPLv AND ISTALATION OF 3/0” BICK BUT PRITARY SUBSTATION WITH CESSORIES INCLUDING CABLING WORKS IN ALAIN-ALSANAYA-1 [cowracr no: 14540 lewoveR A Aw OSTRBUTION COMPANY AADE) [coNSULTANT GOPRRTERNATIONAL ENERGY CONSULTANTS GMBHLLE [comnacron : ENGINEERING SOLUTIONS ELECTRO MECHANICAL & GENERAL CONTRASTING LLC “pan ERBURET PORTERS NANOS, SUSE WO REINS TER, HOLE NL NET Pace 3.0154 DOCNO-ALASHOES. 7700082 204207 AND VT SING CALCULATION reve [PRoneCT SUPPLY aD WSTALLATION OF 35/3RV BRICK BUILT PRIMARY SUBSTATION WITH laccesSonies nLUDING CABLING WORKS AL AINA SANAYA2 [conrmactno.:a-14840 [ewriovER: AL un DsTRiSUTION COMPANY AAD) [CONSULTANT : copa-NTERNATIONAL ENERGY CONSULTANTS GHUBHLLE [CONTRACTOR ENcINE=NG SOLUTIONS ELECTRO MECIANICALR GEnnAL CONTRACTING LLC 2 [stam rat curensosderes 53144 (1 Se obo 34a UR Vota ee fine aed coe pe 5-13 stm 3 |soucenit at acorn 25 for AVS for SV pr ADC ch apn 285. 7 [sb ower caine ofan cnr 806m ante he prose 45, Page et 54 A-14940 Supply & Installation of 33/L1KV Brick Built Primary Substation with ‘Accessories Including Cabling Works in Al Ain ~ Al Sanaya 1 33kV CT VT CALCULATION aes bases ree ree Do [BOCNO-AL484D-8-700-1082 120820. AND VTSZING CALCULATION neve [pone sopPiAnD misTALIATION OF 3/38 RICK BUILT PRIMARY SUBSTATION aT |ACCESSORIS CDA CABLING WORKS IN ALAIN-ALSANAYA [comrancr wo: 34980 [nmPLover= AL ain oesTRiBUTION COMPAR [ARDC] [consUtTANT: GOPA.NTERRATIONAL ENCRGY CONSULTANTS GH LLC i CT SIZING CALCULATION FOR 33kV INCOMER FEEDER CT- T1, CORE-1 - CURRENT DIFFERENTIAL WITH BACKUP DISTANCE PROTECTION DOCNO-ALESEOS.700:4082 ROKRO Max fel arent at 208 ie Tas ieee = st500 Ataee Proposed CT paemeters Ricca ‘cre. mo case | vetvt> —fronmin75} aoc | WS ma [oo Tel 7 0 2 | 0 crlead tere = 50m emote Conductor wes 58 em estance a0 fw = G.00K6L ohm —_ Rete Anny Thermal coefient a = comes esstance at 75°C fox = an sat75. 209) enastst+ 000999720) = 0.0055" onm/m Lend Rests (2 wa eth) 2is0"% 0085 an 058 ohm [ott onnscad burn in ens va = oye % 01 ohm Page of st DOCND-ALASHDES-7700:3022 204204 AND VTSZING CALCULATION reve [PROWEC: SUPP AND STATLATION OF 33/1KV BRICK BUILT PRIMARY SUBSTATION WITH ACEESSORES) Icio CABLING WORKS HAL AN-ALSANATAL PLOVER : AL osTRi6UTHON COMPAR RADE] [consULTaNT: coPA.nNTERNATIONAL ENERGY CONSULTANTS GHBHILLC (Ret Sth 4126 Rely he cutest wansormer requirements flo rotecion Manal-Page na. P3103) eter kanes) Ean 2 MOIRA RAR ie CTetation age corasaonding tothe EC esi permis rar 4 faut avert insecondary aps resting fom etna alate ramatetrinaleace serena he msl exera ou crent (cuentiternca canons) XIR = mary stem ectane ovr revitance ati at the remate termi a "wo way Lead RevstanceHetwoen Klay nd CT secondary Terminal Me Butdenofthe Relay f= iasderananing ator eteine by tory testing) ‘ 5 for atnceeemares (ro and quads elements] t 75 or caren fran lemons ORDISTANCE FUNCTION Inpedance sieation Source impedance: Xs = (Phyel/Phew)sntar een) (a3%a000%1 1eséaraNeoyiserts"31500, = 66s ‘Ones Rs = Phyel/Pheu|teostan RD (2310008 cos(aTaNtso/tst3)"31500) = oo ‘Obes m= Sanfasese2 som} = 06es ohms 20k, 1600 sqm Cable parameter (pate arraes} a Tat yOkmm =~ O07. OhmsAm pt 10177 \Otvm = 030877 Ohms 0 yond © wOwwm = 0.76006 Ohmi Ps fas skim = a6059 Ons Page bot 158 OCNO.As4840457700-4082 MO8e-CT AND VT SING CALCULATION mvs [pROVECT SUPPLY AND STAILATION OF 5/18 BRK BILTPRIWARY SUBSTATION WAT] ACETSSOMIES| nexuoive CABLING WORKS AL AIN:AL SANA [cowrRacr No. 0-140 [SUPLOYER ALAN DISTRIBUTION COMPAR TAADEL [GoNSUCTaNT GOPR INTERNATIONAL cWERGY CONSULTANTS GUN ELE [EOWTRACTOR: ENGINEFRMNG SOLUTIONS ELECTRO MECHANICAL & GENERAL CONTRACTING LE ‘Une impedance Unelength = 38 i Maes aexos0er = 0398 obm Ramet amxo07as = 0299 ohm ‘ne impedance at Zone ond 0%ofine Length) nu 0 ef the Lin lng Rzacance value km = osxaaxcon7 ie, of thtine gh xResbtarce aie / = osxssxoo7 02 Ohm kof he Une lang Reactance vale Kin ais ohm 5 ohof te Line ren Raetance value in = o8e384075005 Past Ohms 03, sth loop inpedanes(oret) z (ROY) 3-402 + XV (o2eoan2sii)/s 44 fomsios1910385)/3 oss 4 Oars Om auur cunnenreaccuarion: Phase Fal creat (End of one et) Totalimpedance for end of one alt = ast ssen(osop anon Sar 319)¢240013-024)2) Faulecuret torent of one lt = Phecl/oinp. = (3"1000/ (1.017 xs) Doss & lesa FOUR CeRUCT al) 1W7351/ 000 nth Fut current Endo rot fot) Totalimpadinceferendof sore ast =sqn(tconpaeama) Ssr(oses+0275)29(00x3083/2) = 1535 ohm Page sof 1st OCNO-ALGS4045.770044082 \RO:20-7 AND VISZINS CALCULATION eve [PROTECT SUPPLY AND INSTALTATION OF 3/6 BIC BUILT PRIMARY SUBSTATION WATH ACCESORIE) Inco CABLING WORKS ALANA SANAYAS (CONTRACT NO. a-t4900 [EMPLOYER ALAIN DSTRIDUTION COMPANY WADE) [cONSULTANT: GOPA:NTERNATIONAL ENERG® CONSULTANTS GMBRLLE [cOWTRACTOR ENGINEERING SOLUTIONS ELECTAO MECHANICAL B GENERA CORTAAGTING LLC Fu cuter frend of zane oat rol jPhi. (@3¢3e00/(1 3515 xt) sow A ec may (FOUR CUTERICT at) 3104/50 nemesis one? end {125% of Une net ‘Cnsdering 25% of theme eth or Zone. 2 sting a er Rly manuacirer’s {ne impedance: nz = saswofthetine rath Restance ve fim laseaaxoi077 ©0488 Ob mz = Uswofthe ne lenginsRestance ae / in = laseasxooss 0375 Ohm wn 125 of hee length Reactnce ven 023, Olen won 1258 of he Lie lerth Resistance value Km tasxasna7eoos sen Ohms Eacthloop impedance fone) z (Re Ra RO}/3-j01.0 +m = (earaarsisey/3 4 foaserasse0.9)/3 Saas 4 oa Ohm Phase Fut current End fre ft) Total lmpadance forenoon? fol = Boel a Sen(psen2sRsaa) > sqri(oses04382-(n013-037572) aut curt forenoon fat = Paoli. = son) (L227 xsaten) lesan Bent ati) = 824/000 rth Foul erent Ed of ze2 ful) Totalimpatance or ond ofan? elt eal = Sat 2A) Sarto e65049/240.013+ 45492) = isi ohm Page 204156 OCNO-AL4840457700::082 s20420-C AND VSZINS CALCULATION neve [PRONE SoPPLY AND NSTAUATION OF 3/6 SICK BURL PRIMARY SUBSTATION WATH ACOESORIE) {NeLUDNe CABLING WORKS IAL ABA SAMAYAS [comrACT Wo. a-14560 [eMPLOvER A AW OISTHIBUTION COMPANY WADE) [GORSULTANT:: GOPA:NTERNATIONAL ENERGY CONSULTANTS GMBHLLE [CONTRACTOR ENGINEERING SOLUTIONS ELECTAO MECHANICAL E GENERAL CORTAACTING LLC ror nd of ne alt ln. (93es000/ 852 esq) = 10106 A cman (PR ure ro) 0406 1/600 Une Impedance at Zone end 200% of Une ane) Conesering 200% othe in ath or Zone 3 ering pa Ray manutacrer’s {in impedance: mae + 200% ofthe ine anath Restaen vale / Km 2e3ax010077 077 Om na 200% fhe Line nth Resistance value km a 200% ofthe une engthaRenctance va km 243.9x0.06099 = 04st Om woz oof hee engine Relance value {ain nop inpedance fers) 2 = URE EREY/ a HD HON = (aseosems7™/3 4 larsr07e7-0464)/3 = aH 4 sas Om Phase Fault ure (ed fre fut) Totalimpesance for end of ones alt 25:0 =sqn(assonrannsatf Sey 0.665+0737-21(0012-289)2) 1s ohm Frultcurentforend of one lt = Payette. = (23°2000/(1585xsqnt30) lace everett) = amma (600 OCNO-A2484045-7700:032 M0420. AND VT SZING CALCULATION revs [PROTECT SUPPLY AND WSTAITATION OF 3/L1RV GREK BUILT PRIMARY SUBSTATION WT ACCESSORIES] exo CABLING WORKS ALAIN: SANAYE2 [cowrRacr No.-a-16940 [EMPLOYER AL AM oISTRIBUTON COMPAR TRADE] [SONSULTANe GOPANTERNATIONAL ENERGY CONSULTANTS GuBTLLE [CONTRACTOR ENGWETRING SOLITIONS ELECTRO MECHANICAL 6. GENERAL CONTRACTING LLC ‘arth Fut current (nd of 003 2) ‘Total mpedance for end of one al 2 = Senay 272) + San(oss50 st6p240013+2325)2) 2701 Ohm Faulecurenttor and of one felt = Phan /Pimp (3000/2200 esq) yok cman Fe curanerrt) = sts2/600 ns & OR DIFFENENTIAL FUNCTION: “Through Fal Caron caleltion Fale pedance| al = ser MowaeRsenb2) Sto 665+0996)251001310229)2) 1108 Ohm ‘Though Faur cure sot /Prine- [Ber2000/(1 08 sy) ims6 A eau crear) = rise 1/600 = me 8 DR DIFFERENTIAL FUNCTION: Throw alt Bar EMAAR RE 2 2662 (041) v0S6108)/75 fon ostance FUNCTION, {Zone End PPh fault RANA Ra 31225 *(50-1)*24056+031/6 708 UaMRoahRge DRE 295" (01) *vas640./5 > UMReniR DR Tk 2.2586" (509) (20581031/6 pv Page 120154 DDOCHO-AM4S4DES-700--039. R70. AND VTSZING CALCULATION neve [PRORECT SPAT ro WSTALIATION OF 3/3 BRICK BIT PRINARY SUBSTATION WITH ACCESSONE IMELUDING CARLING WORKSN AL AINAL SANAYE-L TRACT HO. 4980 [EMPLOYER sl Ak DISTRIBUTION COMPABT [RADE] [CONSULTANT GOPRANTERNATIONAL ENERGY CONSDUTANTS GBNLLE [cOnTRACTOR- NGINNG SOLUTIONS ELECTRO MECHAMHCAL GENERAL CONTRACTING LLC Yale AR Falh 12.3 00)“ [4056403 /6 Zone. PhP tet eR le 2.035 * 501) *(24055101)/6 ‘one Ende fault ar EA/ReA RHR Re 13.357* [sot * (006404 /€ Fromthe above alculton Neha hee pint otage has heen conse M4 mY conser 20% marin M eel ence, cast i= 047.2 < proposed Vk 80V) ‘Senin: {om the above lesion requ nee poh weap ies thon the reormende vale forthe mania felt exer, sete parameters re suet ferratio way ® lcrvnoe pol votage 2850 V a 22 0 lm 5 30 mew? DOCNO-AS4S40:5 700-082 ‘M6870. AND VTSZING CALCULATION revs (PRONE SUPPLY AND INTATIATION OF 3/138 BRICK BUILT PRIARY SUBSTATION aH [ACCESSORIES NCLUDIVG CABLING WORKS IN AL IN SANAYA [EMPLOYER ALAIN OSTRIBUTION COMBAN PRIDE. [gONSUITANT: GOPAANTERVATIONAL ENTRY CONSULTANTS GVBRLLC [conTmAcTon : ENG NEERING SOLUTIONS ELECTAO MECHANICAL E GENERA CONTRACTING LLE CT SIZING CALCULATION FOR 33kV INCOMER FEEDER CT- T1, CORE-2- BAY CONTROL & PROTECTION UNIT Page 14158 CC NO-ALESHOES-77004082 20420CT AND YF SPIUG CALCULATION neve [PRoncc SUPPLY AND NSTALIATON OF 3/10 BRICK BUI PRINARY SURSTATIONWTH [ACCESSORIES INCLUDING CABLING WORKS IN ALAIN-AL AMAA [conTRAcr Wo. 34580 [eMPiOVER sl Ak .STRIOUTION COMPANT [ARDG [consULTAWT: copa WTERNATIONAL ENenGY CONSULTANTS GHBHLLC [cONTRACIOR.ENGWETAING SOLUTIONS ELECTRG MECHANICAL & GENERAL CONTRACTING LLC ‘ame of the Sstton S9/K0 AL SANAVA FRMARY SUBSTATION. Name ofthe feeder Ssubvinconer feeder ‘Bay number ozs H0722 ‘rotacion ancton “ypeofprotzcten ‘ny Conta end Protection Unt ection srfzrs9/e4s0/5i78 Tyee orsisennxcaanessann. Nate 1 SCHWEITZER ENGMEERING LABORATORIES vaainden 01 YA Geterammeca) Power System Dat ated cage - a ow Sytem requeney rs Max fut curen at 3hV side ais tte = S00 Ale Proposed CT parameters Fa os] ol corer, to cts | vague [formats] JO | ea Tr [oT T+ 7 3a as, crlendiengh som estates) Conductor ae smn Fesistance 020°C Ray = 06 ohm (Refer amen) Thermal coeisert e one: fesktanco 75°C Ron as 7520) = go4sisa+ aoousa7s- 20) = 00088 hv Lead Resin (2 way length) = *s0%o0086 a = 086 atm [ott connects burden inchs = we = owe fe = 01 bm 1 Pate cunt an) = as00x1/600 age 15.0 154 DOCNO-AL494D-57700:-082 “MOEINT AND IZING CALCULATION revs [>RONEC: SUPPLY AND WSTATATION OF 3 /TIhV RICK BUILT PRINT SURSTATIONWITH |acceSSORIES INCLUDING CABLING WORKS HURL IN-AL SANAYA- fcowrmacr no. :s-12540 [ewrtoven at ain o1rRSbUTNON COMPAR TARDE) [consutran: cormamTeRNATIONSL ENETGY CONSULTANTS GRAIL [conTmAcTon ENGINEER SOLUTIONS ELECTRO MECHANICAL e GENERAL CONTRACTING TLE ‘aleltion of CF ke pot vata ecurement w We lRe2RR Ye = asirum vag corey cet cng felt condo ‘ ‘atu fat erent secondary Re = Tier Raitance 2h Twoway end Resistance between Relea CT secondary Temils Re = Barca ne 30PU 4 2 525405601) > asa5v Conciderng20xmamin MS asaasei2 ene elevated Vie =230 58 proposed vk (200% Sonduson: [From te above custo, required ene pint vl sss han ho recommend ue (ore utinatlrmmum] ack eure elected T parameter 2 SommaryofT conmended parameters (er tio Teo lass mx [crkneepointvotge > 300 V lee ss oa ln ss mew, Page 16.0154 DOCNO-ALE94065.7700032 20420CT AUD YF SAING CNCULATON seve fpaonecr: surPLy Avo wiSTALATION OF 37TH HICK BUILT PRIRIANY SUBSTATIONT |nccESSonIEs CLUDING CABLING WORKS IW AL AIN-AL SANAYAS feowrracr no.:a-ias40 JewrLoven Ac aw DIsTHiBUTION COMPANY AAD) [consULTAN: GoPk NTERNATIONAL ENERGY CONSULTANTS IBALL [conRAcToR: ENGINEERING SOLUTIONS ELECTRO PAECHANICAL CT SIZING CALCULATION FOR 33kV INCOMER FEEDER CT- T1, CORE-3 - METERING Page of 54 OCNO-ALEON-ES-7700:H032 |2OKROCT AND YT SZING CALCULATION neve [PRORCC: SUPPLY AND INSTATIATON OF 370 VEX BOT PRIMARY SUBSTATIONWTH |AccESSORIES INCLUDING CABLING WORKS I ALAIN-AL SANAYA1 EMPLOYER: LAIN D'sTRIBUTION COMPANY [AADG [consULTANT: GOPA WTERNATIONAL ENERGY CONSULTANTS GHBHLLC [conTRACToR: ENGINEERING SOLUTIONS FLECTRO MECHANICAL & GENERAL CONTRACTING LLC Name of th ubetation 'S3/1HL AL SANAYRCA PRIMARY SLESTATION ame ofthe feeder 23 neaer eset oy number oats 07. TWe 196 ate owe aBurden DSS VA —ReferAenen7) Mutuneion Meter = sus = = a tS 4 lores sitio ‘ ws one faa teh —— a ow ated Wk volge us ow Perertagsimpeciree - 2s ‘Mas. au erento 230 sso mS tate 1500 Atse Syste wegen - 0 Me roped parameter cvme| io | cme | io femme] = ltwize en Tt [wo] 7 Ta |e oo. 2 | 0 rieadieneh som esta Resbtance 20° fon ‘e046 obm/m {eter aun) Thema confer « = 00039 restance at 75° he Dhan *e(75209 cad Resistance 2 way tenth) am ‘otal connects burden in hs ‘onder +0.003937520) = 00056 orn vat oan Page 22154 DOCNO-ALASIG-5-77003082 s20120-T AND VTSZING CALCULATION revs [PROJECT SUPPLY AND NSTAIATION OF 357 BRICK BUILT PRIMARY SUBSTATION 77H |ncCESSORIES INCLUING CABLING WORKS AL ALA SANAYAGI [corrmacr no. :.12880 [EaPLOveR- AL ANN DISTRIBUTION COMPANY ADE] [CONSULTANT : GOPA:NTERNATIONAL ENERGY CONSULTANTS GMBH LLC [eowTRACTOR.: ENGNG SOLUTIONS ELECTRO MCGIANICAL& GENERAL CONTRACTING LUE {inee Poin Vatape Requirement w > abe aRLRe)—(Rfersenoet were “ rinirum nee pln chace b maxi through faut anerin CT seconsory 2% “Twoway Lead Restance between fla ni Tecan Terns % Burden ofthe Rly Considering KZ the transformer 4 toa yastissz) accooeatsr"33000"0 22 core (Comidering 18% tolerance or Kotz = moss mas = 102 4 20000000/tsa3)*33000"0.302) = 08 ar ako of troup foul cen om Cas 2 shal be cme or cali, Secondary fol erent = 330/400 = ess nee point vohagerequrament Vy =P ss7s"(205603) = se Vv Comidering20%marcn = assi9n2 = samy onion 2-As per st. ‘spe Shab 3 considering 6:imes fflloed eet on primary see (note annars) Full curene fc raf: ating et) 53) = ova/(a722 33h) lok a6 tines of hloedearent = ast380 = smo 8 Secondary au corent = seoor00| Paras DDOCNO-AL498645-7004-082 ‘0N420-T AND VI SING CALCULATION [PROHEC, SUPPLY AnD STATATION OF 3/00 RICK BUILT PRIMARY SUBSTATION WT |AcCESSORIES INCLUDING CABLING WORKS IN AL IN-AL SANAYA-1 [conracr no. 32540, JeMPiOVER :AL an os aiGUTION COMPAR TARDE] [cowsucran: cops arTennsmowat ENERGY CONSULTANTS Glan LLC [eoNTRACTOR: ENGINEFRING SOWUTIONS ELECTRO MECHANICAL & GENERAL CONTRACTING LLC epi wohae aque = Pse"fs05603) Cconsoreg20%maran yaaeta2 onition:3-As er AADC eaitement [As per AADC requeren casing mdm al curent t 34 sde Nami futeaen 2338 #0 = ss007o0 ee point woe requrement = re7st20 36101) = nes v Comideing200 meres = masz = mv her va of from andi 1.28 3 atl be ak te conlerton ene caleuated v= 0274 < proposes Vi [S00V) 1 From the ave clan requred keep vg as than ha recommenced vale ene lca CT parameter aes 2. Summary fC reconmendes peramotrs ferrane 7 mo7t® fuss Px lcrineepelntvotars > 600 v lon <2 mewe Page 23 154 DOC NO-AL494D:57700:-082 ,2OK004T AND VISZING CALCULATION ees [pRORTHE SUPPLY Ab WISTATLATION OF 3/136 BRICK BUILT PAIRIARY SUBSTATION TT IAcceSSORIES INCLUDING CABLING WORKS BU AL AIN-AL ARAYA [zwrvoven AL nw 1sTiBUTION COMPANY ARDC] [consucran copa NTERNATIONAL ENERO CONSULTANTS GNIBHLLE [conTRACTOR ENGINEERING SOLUTIONS ELECTRO MECHANICAL H GENERAL CONT CT SIZING CALCULATION FOR 20MVA, 33/11.5kV TRANSFORMER FEEDER CT-T1, CORE-2 - O/C & E/F PROTECTION + BCPU Page 24 of 54 DOCNO-ALSHOES-7700:-082 ‘2O420.T AND VE SPING CALCULATION neve [PRONE SUPPLY AND INSTALLATION OF 3/S38V BRICK HUET PRINIARYSURSTATIONWITH IACCESSORIESINCIUDING CABLING WORKS lL ANAL SAUAYAL [conracr no: -14580 [ewrtoveR :at av 1sTROUTION ConPAaNY AAD [cousutran : GoPRsNTERNATIONAL ENERGY CONSULTANTS GHBNLLC [contmACTon-ENGWCTING SOLUTIONS ELECTRO MECHANICAL & GENERAL CONTRACTING LC ame ofthe Substation "53/11 AL SANAYAA PRIMARY SUBSTATION Name ofthe feeder 20MVA, 2/2150 ancora ander ay mumbor o,.o6 a0 Protection action Te of peteton (OC 8 EF Protection Relay Funeon sisin ety Dats Te smb iAosI610 Make SWITZER ENGINEERING LABORATORIES vasurden Bor VA aterarnext) type osstsenncoxaysasn Make SEAMVET2ER ENGINEERING LABORATORIS vaBuden 01 VA MeferAtroe Power Transformer Data Faatava = 0 MMA Fat H sige vekoee ad Fated cde tage ous ow Percentage mpedance la # Sten Freaaaney 2 Mac auteur 2236” se SS ame = 3500 Ate Proposed Ct peramtert a | stra core. Fatio cess | viv [format 73] 77] Bs | ree [woo TT + 3 23] crleastenst 50 meetin Conduct te 58 sam Rostance a 20° ew ‘00461 obm/m —(eferAarex2) “ermal concent ® = ooos3 Restance st 75°C se = Fag xt7520) = ooee1ss+-0.003930520) (0056. onm/m eae Resttance(2 waren) 2*s0%00056 Page 250154 DOCNO-ALEOND-ES.7760032 2OKIOCTAND VT ZING CALCULATION reve [PRONE SUPPLY AND INSTALIATION OF 3/TIRV VEX BUILT PRIMARY SUBSTATIONWTH |AcceSSORIES INCLUDING CABLING WORKS IM AL AIN-AL SANAYA-1 EMPLOYER: AL ANN DSTRBUTION GOMPANT (AAD [consULTANT: GOPA WTERNATIONAL ENERGY coNSULTANTS GHBHLLC [conTRACTon ENGINEERING SOLUTIONS ELECTRO MECHANICAL & GENERAL CONTRARTNGLLE Teal burden comets to CT = owes Teal connected burden in Ons = wwe ayia m 021 Ohm I fst cura extn = a1soox1 /400 ‘aleuston of Cine sont ol eoienenk w > WOy2RRe) where “ ‘meerrum vkage across ay eu rng faut conion » system fut curetin ET scandy fa (Titer Resistance am ‘io way La Retsance tween Relay ad CT seconry Tenn ® burden of he Rely Hoge sont voltage reurement 797910303503) = me y mora = mos7y considering 20%mergin Ms once, ealmdate Vk = 280 67V «proposed Vk (2004 ‘oncison: 4 rrom the soveclestion,requred ines port ogi ls than the recommended vie forthe utimateranimm| alt cent, ct Tporareters ar suit. 2. sumory fC recommended parameters fernatio arte fies 1K lcrkncepermvotige > 800 V lon 5 mew (BOCNO.-AS4S40-65-700--082 0870 AND ZING CALCULATION neve [PROVE SUPPLY Avo STALIATION OF 3S BRICK BUILT PAIUARY SUBSTATION TT IACCESSORIES CLUDING CARLING WORKS IN ALAN-ALSANAYA IMPLOYER: AL Ain DISTRIBUTION COMPAR ADE] [conSULTANT: GOPALWTFRNATIONAL ENCRGe CONSULTANTS GwOHLLE [conTAACTOR ENGINEERING SOUUTIONS ELECTRO NECHAAICAL& GeRERAL CONTMACTINGLLE CT SIZING CALCULATION FOR 20MVA, 33/11.5kV ‘TRANSFORMER FEEDER CT-T1, CORE-3 - METERING Page ois DOCHO-ALsS40:5-7700,.092 2D120.CF AND YT SING CALCULATION neva [pnonecr SUPPLY AND STALLATION OF 3/1IKV BRICK BOLT PRIMARY SUBSTATION WHT IACCESSORIES CLUDING CARLING WORKS IN AL ALL SANAY AA [comreacr no 14960 [eMPLOvER :A Av DISTRIBUTION COMPAR IAADE [coNSUETANT: GOPRANTERNATIONAL ENERGY CONSULTANTS GMBHLLC [comTRACTOR: ENGINEERIVG SOLUTIONS ELECTRO MECHANICAL B GENERAL CONTRACTING LLC Name ofthe Substation 39/3100 AL SANAYRL PRIMARY SUBSTATION Name ofthe fender 20AVA, 3/2154 Tanto cs ay romber 01,4060 somrcter tw ass VaBurden 035 VA afer Arve) Multanetion Met mae cewe Va Burden 1 VA Ree tes Imutstraneduer Type uses Mane CAMILE BAUER Vaburaen Fact vA (ReterAmers) Power Transformer bata ates VA wa fated votage : ow ated Ys volage us Ww Perentags pede le ® scam trea) = 0 Ma faut caro at 38 e SMS tats soa Ase Proposed CT paramstrs we Fe | een ‘corer ‘allo es Te [tote 75| oon es [oT 7] 4 os = 2 Le crlexa eng = 0m estimate ‘conductor rea 2 gee Restance st 20° = ‘200%61 obm/m (eter Aare) ‘Theemal eoetlnt « = oomes Rosbtnce at 75°C Rn Rag xChsa5-204 = opodsa x(1+0.00398(7520) = 00086" obmvm woe Restance 2 way enh) + Psor00088 tm = 038 ohm Page 280154 OCNO-ALASEOS-77001.082 20420. ANDVTSZING CRLCULATION nov (PROJECT: SUPPLY AND INSTALLATION OF 3/SIRV BRICK BUILT PRIMARY SUBSTATION WITH [ACCESSORIES NCLUDING CABLING WORKS I ALAIN-ALSANAYAA [EMPLOVER: AL AW DISTRIBUTION COMPANY AADC) [conSULTANT: GOPA TERNATIONAL ENERGY CONSULTANTS GMBHLLE [conTRACTOR ENGINEERING SOLUTIONS ELECTRO MECHANICAL 8 GENERAL CONTRACTING LLC Total burden connected the = ossea2co) Tet connec burden in hs vw? asejin = 486 om Total burden incarg ea resiance asmas6 2 ohm Total eden in VA = oe > ame Saw Isnort ume tara! rating of meters IMulttuncion eter = Roimextersee (eer ever) beter Soimextorasec Refer Arne) wuts wonscucr taantorssee (eer deren) OperatngisrofsecT, Kame = Ma tS ke Fete nme Securty Factor 8 (cTitamalturden Ss Fotos tren fie CT Ss. ‘etal burden lata oad = seq tamaysaoyie* 1m2)+232) Kee = 7 [sortie Tecra rating of meters are wel above Operating Instrument Secu Fator af the CT. Sonsuson; 5rom the aboe caleation connected burden ser than he epee of ted bran, Nenes the selected CT parameters are suit 2. Summary of CT recommended parameters feraatio wort fase 2 os ct 23 a ate burden fw va DOCNO-AL4SE0ES:770054032 GOKRDT AND VT SING CALCULATION revs [PROIET: SUPPLY AND INSTALLATION OF 3/S38V BRICK BUT PINIARY SUBSTATION WT |ACCESSORIESINCIUDING CABLING WORKS IN AL AIL SANYAL (CONTRACT NO. 36540 [sepLovER Al An DSTISUTION COMPANY [AAD] [consUTaNT GOP TERNATIONAL ENEGY CONSULTANTS GMBH LLC [coNTRACTOR ENGWEEIING SOLUTIONS ELECTRO MECHAVCAL& GENERAL CONTRACTING LLC CT SIZING CALCULATION FOR 33k BUS SECTION CT-T3, CORE-1 - O/C & E/F PROTECTION + BCPU DOCNO-AL4SDES-700:082 0420-C AND VT SZING CALCULATION revs [Peon supe An WSTALIATION OF 37s IRV BRICK BUT PRIMARY SUBSTATIONWITH |acceSSORIES INCLUDING CABLING WORKS IN ALAIN-AL SANAYA-2 [comrmacr no. a-14540 [ewrtoven : a an OSTRBUTION CovPANT TARDE) [consuLraN: Gora.RTERNATIONAL NENG CONSULTANTS GMBHLLC [conTmACror ENGINEERING SOLUTIONS FLECTRO MECHANICAL & GENERAL CORMACTING LLC ame ofthe Seaton [S/H SANA PRMARY SUBSTATION ame ofthe feeder sakv bussecton ay number yo h08 Proteon tncton Toe of protection oc errotetontaler neon SuSIN flay Data we 2 ysnmoionas11610 ae 1 SCHWETEER ENGINEERING LASCRATORES waturden P00 VA (ete awent) Tw + orsaserstemaneiaao, Nake SCsWTR ENGIIESRIG LABORA TORRES Untrden POL VA feleramert} Power Syste Data fee vlogs - a ow Spe epency oo Me ut eran st 36768 ns tale asco kts Proosed Cr paremetrs ore na, ato. css | vier |fonmintas| 08) on se lueool 7 Ta 7 20 7s CTeadtenath 50m (ema) Consors 4 Samm pesiance 20° a= 0086 ohm fer Amora) Thera cof a oms3 Feainace t7 fs Ro slea05-20) dissent 000937520) 10056 ohms Lene Reson (2 ne) wsorn00s6 mF Ose ohm Total burden cnn amos = on Page 31.154 DOCNO-ALASHOES-7700,082 ‘2O420-F ANDI SPINS CALCULATION [nonce SUPPLY AnD WSTALATION OF 3/1 HICK BUILT PRIMARY SUBSTATIONWITH |AcCESSORIES INCLUDING CABLING WORKS IW AL AIN-AL SANAYAS lcowrract no.:a-ias40 [ewroveR Ac Aw ISTRBUTION COMPAR IAADCL [conSULTAVT: GOPRaNTERNATIONAL ENTRGY CONSULTANTS GNBHLLC [coNTRACTOR: ENGINEERING SOLUTIONS FLEcTHO MECIIANICAL & GENERAL CONTRACTING LLC Tota connected burden Os = ww = oui % on Om Faun ure ats) = soon /2600 = see 8 ‘aelation fcr kn pot vag eqrament w 2 tRer2R = maniumetage aos rely cut xing trough faut condtion Ie = themaximum faut caren nseoneary amos Me = CTiterna Resistance 2 “Twoway ad Resistance betwaen Rey and CT scandy Ter Fe = Burden ofthe Rly “ 2 sgseeyossio1) > aso v conideing 20% mornin We = stort ener eledated i= 28121 < proposed (300%, Sonduson: 1 Fram the bone eesti, quired nee pot vlae less than he rcommerced ae forte utinatefmexmum) eu eure Slt CT parmetr sre suiclert, 2 Sumer of CT recommended partes jcrnatio aao7t a lass 1 [crineepointvttge 2-300 et s7 a lm = mewn DOC NO-ALASE05-77004-032 AD420CT AND VT SZING CALCIRATION nove. [RECT SUPPLY AND INSTALATION OFS3/LnRVSRICKBUILT PRIMIARY SUBSTATION WT [ACCESSORIES INCLUDING CABLING WORKS I ALAIN-ALSANAYAC CT SIZING CALCULATION FOR 33k BUS SECTION, CT-T3, CORE-2 - METERING Page 3 of 154 DOCNO-AIsB40:5-77003.082 2042047 AND VTSZING CALCULATION ove [PROIECT: SUPPLY AD NSTALIATION OF 30 HICK BUILT PRIMARY SUBSTATION TH [ACCESSORIES NCLUOING CABLING WORKS I ALAIN-ALSANAYA EMPLOYER: Ain DISTRIBUTION COMPANY AAD [CONSULTANT : GPA INTERNATIONAL ENERGY CONSULTANTS GBC [EoNTRACTOR: ENGINEERING SOLUTIONS cL{CTRO RICCHANICALB GENERAL CONTAACHNG LLC tame ofthe Substation 12/1KV AL SHNAY PRIMARY UBSTATION srr oasioe tee vase nearer S85 vk GilerAnen svoitonon ter tive ues ve cove vnurden Pe eraen st trond Toe swsea Ne 2 Ce eauen vaturden Float ve Wrz) owe ptr Ont ford vane now Sete een 2h Ma acer 30 sie ls tase asm Arad roped parameters 7% Se ean ele eee | eg 3a [ee] 3] 05 = 7 La eka tenn a) Sone, 1 Plt fesstnce 2 C Rew flnset ch (ele Aen) Thera court 4 oss fesstee 75 Ren fea 520 amie 0002090520) conse ohm tea estan (2 yen) rivoone a ase ol “Total burden comested tothe assesaqvarecn) = 156 va DOC NO-ALAS4045-77004052 120120.T AND VT SING CRCULATION| neve [PROIECT SUPPLY AND INSTALATION OF 3/F1RV BRICK BUR PINIANY SUBSTATION WITH lacceSSORIES INCLUDING CABLING WORKS IN ALAIN-AL SANAYAt [conTRACT no: atesun EMPLOYER :AL AlN DISTRSUTION COMPANT [ADO [CONSULTANT GoPA WTERNATIONAL ENEKaY CONSULTANTS GUBHLLC [CONTRACTOR ENGINEERING SOLUTIONS ELECTRO MECHANICAL & GENERAL COWAGTING LL ‘otal connected burden in be = we aseniee = 156 ohm Talburdenincingleadresitance 1.564056 Total urd in VA ret Short time thermal rating of meters Mulancon meter = 2imaclor Sec [elerdmers) Demeter Soimoetor See [ReferamexT) ‘Mull vaneducer UaAforasec eter Arex) Operating SF oftheCT, Kar Kant where og ~— Raterment Sect Facer Se = Rates arden ote oT 5. = fatal burden clung lead aeons = S2(9 4482) 20y07712)¢222) Kop = 88 Ishorewme Thrmarating of eters are wllabove Operating Isrument SacutyFacor ofthe CT Sonsuson: 1 fron the above calebor,cenacte CT burden lesser tan the apecty of Creed buren, ones, the slecte CT parameters are suite. 2. Summary CT rearemended paaretrs fernatio aao7t Ise 5 let 27 0 lated wurden WA Pogo 5 of 154 DOCND-AIS940:5:7700:-032 20120. AND VT SING CALCULATION reve (PROTECT: SUPPLY AND WSTAILATION OF 3/53RV BR/OK BUILT PRIARY SUBSTATION WT RIES IUCLUDING CABLING WORKS IN AL AL ALSANAYA1 [SuPiOveR Al AW DISTBUTION COMPANY [RADE] [coNSUCTANT cook nVTERRATIONAL ENERGY CONSULTANTS GMBH LE CT SIZING CALCULATION FOR 33KV BUSBAR PROTECTION Page 350054 OCHO.AL4940.577004-082 \RO:20-C AND VTSZANG CALCULATION neve [PROXECTSOPPLY AND NSTALIAION OF 37S RIC BUILT PRAY SUBSTATION WT [ACCESSORIES INCLUDING CABLING WORKS IN AL AIN-ALSBNAYR. [conTAACT NO. t4580, [EMPLOYER AAW OS TRIBUTION CONANT IAAD] [CONSULTANT GOPAINTERNATIONAL ENERGY CONSULTANTS GRR LLC [CONTRACTOR ENGINECRING SOLUTIONS ELECTRO NEGHANICAL & GENERAL CONTAAGING LLC ame ofthe substaven SIAL AL SANAY PRIMARY SUSTETION ‘ypeet ertecuon utr Protection Main De & Check Zone reay Data Te ‘sacoxbupaboxas6i0 ate SCHWEITZER ENGINCERING LABORATONES, Va Burdon Dor VA feteramaxs Power Systm ats Sater x Ratio - 0 ated votage Bow Sater tresteney 20m ‘Max fu avert ot 2087 side Dofig late = amo Atze Proposed ct parameters 338 Cable feeder (02 405,07.) SS Saka Stet et fp stromans ta st cero] ao | caw | ann [PCR in epee tae fee er situation ee Ser Te Porte sia onl = = |e Sarl bese eft OCNO-A14840-8-700,.082,120820.CTANDVTSING CALCULATION [PROTECT SUPPLY AND INSTAMATION OF 3/LIRV BRICK OILY PRIMIARY SUBSTATION WT [ACCESSORIES INCLUDING CABLING WORKS IN ALAIN-AL SANAYAG1 kev [conTRACT no. 44580 |MPLOYER : A AtW DISTRIBUTION COMPAR KAD [SONSUCTANT OPA WTERNATIONAL ENERGY CONSULTANTS GMBH ELE [CONTRACTOR: ENGINEERING SOLUTIONS ELECTRO MECHANICAL & GENERAL CONTRACTING LLC (rica eng = 0m (eimatoa) Conductor ae 2 gam Fedstane at 208 ia 0026 ohmyn eter Anen2) Therma coe . ons Resstancet °C Re = Rae aha(75-20) = cooesn(2+0.0039395.20), = 00086 ohm ead Resistance (242) lonath) = rsorocoss 2 = 056 ohm faut cwren/cr ae) ascot 1600 Stabity Vokoge: Ta antve nity or entema ous, the aby vetsge forthe rotation must be eterna which wl be dependent upen maximum CT stony crrentfor an ‘eternal eurent nd ako on th hah loo eiance value Between CT ‘Sammon pont and any ofthe Cr % betReRy © rari vole aco reay ut ing trough fel canon 1 = rman sendy stat though faut cre seconory as) ey = Chine estan 2, = Twoway ee Restance betwoen lay and CT socondary Termin My = urcenf he Relay ety budeninones == VA = ooyiee % = Cot ohm % sss 74056) ee point voltage ‘The mnimum knee pin lage (ofthe CT must be wo mM consderng20Kmarcin = Mk = 28812 = 376 v DOC NO-A14S4065-77001-032 204207 AND VT SZING CALCINATION [PRORECT SUA AnD WsTALATION OF 39/15 BRICK BUILT PINARY SURSTATIONWITH SORIESINCIUDING CABLING WORKS IAL AICALSANAAL lEwPiOvER AL ln bisTiaUiiOn Compan AADQ NSULTANT: GOPAANTERNATIONAL ENERGY CONSULTANTS GUBH LC [CONTRACTOR ENGINEERING SOLUTIONS ELECTRO MECHANICAL & GENERAL CONTRACTING LLC Hoes calelted Vk = 357 6V «proposed Ve OO}. ety sting: Relay sting current on &feosidered) Stabling resistor R= OLE, ohm sahere % Stabiaing resto: 4 Flay seting cent % Sern ope me ay buses % (uss}am = 1480 Ohm ‘Temal rating tbieingrestor Therese ected ester tl hve minim floulne vethstand characteristics ea serng vores = 0134936 = uy eon ay oor"se89 99 ai ecand power ating ofresitor \Votag devsloped arena eta fr maim tel fu condton tyme ota aco resto = pees = manu ol crent i seconcaryampe x Ssablangresstor tre Y= crinae pone vlage = vohae eros resistor Y= (aorartaessots9exapalerns Ts a secondpowerratng Puy = WEIR = asazraynseo90 as Ww Page 39 of 154 DOC NO-A149H045-77054032 2OKROCT AND YF SING CALCULATION [PRIECT: SUPPLY AND WSTAILATION OF 3/13RV BRICK BUILT PRIMARY SUBSTATION WATE [ACCESSORIES INCLUDING CABLING WORKS VAL AIN-ALSANAYA [PLOvER A Ain DISTBUTION COMPANY AAD] [coNSUCTANT COPRANTERNATIONAL ENERGY CONSULTANTS GIBHLLE [CONTRACTOR ENGINEERING SOLUTIONS ELECTRO MECHANICAL E. GENERAL CONTRACTING LLC sendy “The sensitiv in tems of primar fault utenti obtained fom the salu ve (iy etn cure In this case sum of he magpetling caren sbi VERGE 319 le tad . NoofcTecomecedinperel = 38 L MageetsngeunenfthecT = 18 mAs he Mato curent = asa tsar ws ‘952 Gentz)» 48 /s0071/025) aos 1 turns rato = (usrassjo1vo.0026/40/1600) le = AB mernos Reguement of voltage ing device fr protection of oly cet ing intra ult ‘Tosstabon the ecureent of none eto NL) the peak woke nee to ‘he miriam vooge developed in absence of T saturation Ve BNE VCD) were Ya = prckvalucotvokage waveform Ve + tals oiage that would appear iC dt ot ntuate Me ater AR RR) = snseeteossvo.o1-s48099) = 2st vy a rani steady ste thuh faut uretecondsry ames) fa (Freer estance 2, “we way Leo Resistance betnoen Ray nd CT Secondary Teas % ety aurcen x stabiangrasstor Ya = zor S48 400NHOS > serv ‘nce vpeimore than 8, Metros requied ‘The ype of ato choan by thermal ring as atne bythe forma P= yr Ue OCNO-AL4S40£5-7700:4092 2OH20CT AKDT SZING CALCULATION [Ron SUPPLY AR TISTATATION OF 3/TIRT BRICK BOLT PRIMARY SUBSTATION WT |ACCESSORIES UCLUDIG CABLING WORKS IN AL ANAL SANAYA-t [cowreacr no. a-14980 [eMPLOvER AL AW DISTRIBUTION COMPA [AAD [coNSUETANT: GOPA:NTERNATONAL ENERGY CONSULTANTS MBTULE [conacron ENGINEEANG SOLUTIONS ELECTRO MEGIANICAL& GENERAL CONTRACTINGLLC 4 Nase shor eu er neral feu in le = Tay mina carat be (secondary nominal erent P= apstertinsrsyooyrnes 3.757 Koes por second ‘alu hasbeen considered onthebas of Votage sting Forthscaleton ye w8N Hence anon inet restr wth the value of C26, B= a5 regard ‘conusion: 1. From the above clean kre pole vag less than the recommended ie ones sled Cr parameter ae sient 2 Cakeste valves of varios CT parameters % - we % = ev ® 13490 Ohms t = season Summary Crecmended parameters fernstio 70077 fases % Ive 2 40 fre 27 a hn 5 1 mew htetrost ‘oonyss [nestor 3500 Ohms, 80 Page 4a 156 DOCNO-AN4SEDES-700:5082 04204 AND VI SING CALCULATION rev [PRORECT: SUPPLY AND INSTALATON OF 3/538 BRICK BUILT PRINIARY SUBSTATION WITH [ACCESSORIES NCIUDING CABLING WORKS IM L AIN-AL SANAYASL IConTRACT No.3 [euploveR Al An oSTRSUTION COMPANY RDG [consucranT: GPa: NTERNATIOWAL ENERGY CONSULTANTS GHBH LLG [CONTRACTOR : ENGINEERING SOLUTIONS ELECTRO MECHATICAL GENERAL CONTRACTING LLC CT SIZING CALCULATION FOR 33kV SANAYA GRID STATION (REMOTE END FEEDER), CORE-1 - FOC-LINE DIFFERENTIAL WITH BACKUP DISTANCE PROTECTION rape 2 of 58 DOCNO-AL4SH0S-7700:4082 2OK2DCT AND YT SUING CNCULATION ave, [PRONECT: SUPPLY AND WISTAIIATION OF 33K BRICK GUILT PRIA SUBSTATION TH RCESSORIB) fricivoinG CABLING WORKS ALAIN-ALSANAYA. [cowrpAct no: a-1300 [ewetover a Ain bisTHIBUTION COMPANY AAD] [coNsULTaNT,GOPA TERNATIONAL ENENGY CONSULTANTS GMBNLLC Protection wnetion Tee oFprasecton ety Dats VA Burden Power Systm Data Stem X78 Ratio fated votage System ecuency ax foul cute a 236 ste Proposed ct parameters [conrracron: ENGINEERING SOLUTIONS ELECTRO NECHAMEAL& cenEnAl CONTRAZTING LLC 13/ky ALSANAYR GD SUESTATIN Suh Sanyo: Pry St Remote End Fender) ome camer with backup Os te Relay wea erntoxaxscrounszs2504 SCIWZTTZEA ENGINEERING LABORATORIES Da VA heer amert) = 9 zw HS kansec soo Aasec fesrance 20°C ‘Thermal cost fasisance 75% Lee Resistance (2 lent) [Total cone burdens Obs eo eaten ae | aw omen a = sate ttt te te Boros am tata ihe ms = 90K ohm/n eer Amer) 00383 Rap witset7s-20) oo4stese 0002827: 00055 shay = rsovo0ese = 058 ohm vat = oe = 01 ow Page 3 0f 154 OCNO-AL4SEDE5-70:4032 10470: AND VT SING CALCULATION rave [paonecr: Suri AnD iNSTALIATON OF 3/13hV BRICK BUILT PRIMARY SURSTATIONWTH ACCESONE| Jrciuoin can WORKS WAL ABEALSANAYAS [zrtoveR A. An oisTRBUTiON ComPAN AND [cousucran: coPaaNTERNATIONAL ENERGY CONSULTANTS GMBaLLC [conTRACTOR ENGINEERING SOLUTIONS ELECTRO MECHANICAL e GENERAL CORTRACTIG LLC 7 x rsetarreqiementis a flows. {14L Relay “Protection Mal -Page no. P2.10) (Refer Amend) exe HORII AYR 2d Ear - —_CTecaonvohagecoresponding othe IEC maximum permis ero ‘ ‘at curetinecandary amps resin Hom external aul the remote terminalia lees ore mani exe Fa rent (cure eiereta! eters) xm primate reactance over retance ati th emote tris R= Titra Resance 2% “wo way end Resitanestetween lay nd CT socndary Termin Mm = Bardenet the Relay = sacimensoning eter (etermine by factor testing) £8 Terdotanee elements nha and querlterat elements) DRDISTANICE FUNCTION Impedance tation Source tmpedanc Xe = hvot/Phew)antan "rp (GE nae aesiqaraNscn/eqt}°31500) = 068s ‘bm: B= (heck Pheu) (e2esonors s¢cosaraMSo)/ean*31500) = oon ‘ons 2 = Snt0.65502+ 0m:3°2) ows ‘nm nH, 3600 sq.m Cable parameter (Pete Annee a 78s -wOWe/im * OG7ES Ohms n 10077 Oden = 020877 Oba 0 26006 phe = 076006 Ohms/km xo sass _uohm/m = 005095 _ohme/km Page ist DOCNO-ALS405-7700.3092 ,20420-T AND YT SZING CALCULATION revs [pROIECT suprLv ax INSTATLATION OF 3/TzKV BRICK BUILT PRIMARY SUBSTATION AEESSONE) Imcwv016 CABLING WORKSIN AL AW-ALSANAYE3 [sMPiOVER AL Ain DISTRIBUTION COMPANY IAADG [CONSULTANT GPR-NTERNATIONAL ENERGY CONSULTANTS GALLE [cONTRACTOn-ENGIVEERING SOLUTIONS ELECTNG MECHANICAL & GENERAL CONTRACTING LLC ure impedance neler = 38 hn Niemen = 38030077 = 0388 om Risen = 38200788 = 0739 Ow ine. Impsdance at one: end (0% of tne ena Xt ‘aDKof tein eng Resctarce value Km = oReaaxas07 = 039 one ty = of thotinalengthaostance aun /Ky My = so%et:hetnalengthxReactance vais km te, = SOG nelerathaxResstnce valve Km rth ogg impedance (ene) 2 = meReeRO/aynE ROS = foxwoze23uy/3 4) (osia3is0389)/3 = oss 4 0275 Ohm Phase Ful current (Ero zone fa ‘otal mpadanes for end ofzone fait = ase =sec)osoxpeae sana) Seriocesea3ne/29(00331024)2) 817 ohm Four Curator end of sone fault Pavol (Gain (1087 «sane eam FOUL reRLICT a) = w7ssna/600 = ums 8 Earth out current Endo zoned ful) ‘Total mpeéance frend of rane fault = al eseteonpeaeinosta) Sa(665+0.275)7240.013-093)2) 335 ob Pages of 154 DOCNO-ALABIOES-700:.082 2042047 AND VT SING CALCULATION neve [PRORETE SUPPLY AND INSTAIATION OF 33 /AGRVwHIGK BUILT PRIRIANY SUBSTATION WITT REEETOR| INCLUDING CABLING WORKS NAL AIN-ALSANAYA IeMPLovER = fw D1sTGUTION COMPANY (AAD [connor : ENGINEERING SOLUTIONS ELECTRO MECHANICAL ult erent Foren of zone fat = Phsol/Pme (33*1000/ (25515 xs) 110 & mas Foul crt Trai) = wn feo ne impedance 2 one2 on 825% of Considering 25% the bn lng for Zane sans per Rely arutaturer’ reconmendstar. {Une impedance: ssi of heLine length Reatnce vale / Km ase Ohm {25H fhe Line onthe Resitance value i 125428x00788 ox of 125% ofthe tine leet x Reseance ale / en 1asi38x00009 02 Ohm 1256 ofthe Une length x Restace val / Km 1asxaaxo7em0s won Earth loos Inoedance (ane) z (81 6R2R0)/24ypd 4262/3 (arrvosrsecin)/3 4 (0A96/049910201/3, = ase 4 oa Obm Phase Fal crrent (rd af one at) Total impedance fore of one ot zoel = S(t 26 8492) = Serl(sns10 4582600130375 72] 227 Ohm aul Curent for nd of one att Pavol Pimp (estioon/ (1227 «san ee FR cueNRT ratio sssza% 1/500 ath Fulmer Endo one? ft) Tal lrpedance for end of one ut =e =sentooneinesta) ave 450f 156 ‘DOCNO-AN4S404S-7700:.032 20820-CT AND VT SING CALCULATION neva [PRGRET: SUPPLY AND INSTALIATION OF 357K” BRICK BUIET PRINARY SUBSTATION WITH ACCESSORIES) fcr von CABLING WORKSIN AL AIAL SANA [ewetovER aL AlN OSTRGUTION COTAPANY TOUT [conrRactor enainethive SolUTioNS FLEcTRO MECHANICAL & GENERAL CONTRACTING LL Soro. s65-0.423y2s)001341.450/2) ESL Ohm Fut Caren forend of ne? fault Phong. (aaron (1 ages cna (eure ti = 101061 /600 Cnidering 20% of heirs gh for Zone ets pee Rly maruacre’s tezommendation. {Une impedance: xz = 200sofhetinelereth< Reetnce valve /Kn 200% of theLineareth Resistance vale Xm os bm 200% ofthe inert Reactance val Km 2waexc.0com O45 Obm won = 200%ofthetneergth xResitance vl on = zxa8x076006 voz EethloopInoedance (ane) (i oR2 RO}/asipd He SV = (eserasmrsz79/3 i (o7sra797404601/3 = as 4 Osa Ohm Phase Fault crrent End of zane ft) ‘Total mpedance for end nefat etl = Sq 26 R42) Sar 68510 797)2H40.013-0585)2) = 1585 ohm Ful curent for end fxn fuk = PhoiPhim, © (33 000/585 xq) im « Ine Fe curenh rat) 1021x1600 Page of 254 OC NO-AL48405-72003032 2OK2OCTAND VI SZING CALCULATION neve [PROIEET: SURPCV ano STAILATION OF 33/L3R7 BRICK BUILT PRIWARY SUBSTANION WH ACCESSORIES] mc.UOING CARLING WORKS AL ANAL SANAYAS [SAP\OvER : At Av D'sTRSUTION COMPAR [RADE] [coNSUCTANT copa TERNATIONAL ENERGY CONSULTANTS GM LLC [cowTRacron:ENiNETTiNG SOLUTIONS ELECTRO MECHANICA & GENERAL CONTRACTING LLC ath Ful carrent (nd ones fet) Total mpedines form fone fs = 2 ase osrn2Rs 2) Sars se)2(0.03-2325/2) aan Ohm Ful Curent for end of re fat Phen © (*i000/ (2.702 xsort3 = mk ee Fe crrent Tati) = 7ostx1 /600 = usw ET Knce Point Voltage Requirement *ORDIFERENTALFUNCTON: ‘Through Fault Curent leon 2st = S(t 25 [699] = Sertses+0358)%25(0.0531029972) Prvel/Phima. {stan (1.08 * sais) ‘hugh a Curent (faut arent ras) = yng 1/ 600 FOR DIFFERENTIAL FUNCTION: Ear HAMRAIR ARR 2 2866" (sI)* (0561031/75 sev ‘ompistance ruycron: Zoned End Ph-Phiaut Bar WARING aR = -siz25*(s0r0}* araseraaN/6 Zone-Lend: Ph faut fae ‘ATRIA RA > mas? G0)" anseo.)/6 Page cao 154 DOCND-AIg84045:7700:4032 64704 ANDVTSING CALCULATION kev [pout SuPPLy AND INSTATLATION OF 3/Sahv BRICK BUILT PRIMARY SUBSTATIONWITH ACCESONT| Inco CABLING WORKSIN AL ANAL SANA [swrlove : Al lv o|sauBUTION COMPAR AND [conSULTANT: GOPAINTERNATIONAL ENERGY CONSULTANTS GuBHLLC [conrRACToa ENGINEERING SOLUTIONS ELECTRO MECHAVICA.e GENERAL CONTRACTING LLC Ear = NOURAKR ARRIVE > Bee" S011} rOsEON)/6 ‘Zone 2 End Pht fault car = MAMMA 217343" (s0e1}* [408603176 one End PhP alt Ee = WARK HaRAMIE 2 2005 "(S044)" (0 s6102)/6 = ay ona End :Ph- fault Ee UMN ARAM > anys? "(son)" uaseon/6 From the above cekaion ghee pin vetags hae hea oneeree onsering 205 mee “ = rosa ences k= #472 < proposed Vk 50M, Sondusion: 1. For the above calalstan requed knee point voltage as than the recommonded vale forthe maninum fal curen selected Tparreters are sucent. 2. Surmatyaf Cr recone porometrs ferratio ware fase mK lcrunee powcvotiage > 850 Vv Ince s2 8 lm = 40 mow Page a5 154 ostiv0ss8eg st | sero | evonraomce ae am ram 2 vas] ororrmaxoararearse| nooo or or | sete | ornare Tava STII a] | Ex ox | aise | eyocvenoee vas} sareeersixaoeapenxoiti| ieee Natal e "71 SNLDWiINOD TEAN39 @ WOINWIO3W OVID7a ENOLNTOS ONNSSNIONS = VOLSVALNOD ‘STIHGN SIN¥LINSNOD ADBINE WONOUYNAaLNFY 40D -weLTSNOD “VRE FRY SRT SHUT SHOSSSIY RUIN NOUISUTS VAIN WTS Oa TT/EE ZO NOUWTTWISM! ONY Aiwa DarO¥ eau ouynnows swmsin anv 2-c2t0er eo oce-ss-orerrw-on200 0C NO-ANASEDES- 77004032 204207 AND VT SZING CALCULATION nave [PROREC: SUPPLY AnD NSTALAION OF 3k BRICK BUI PINAY SUBSTATIONWTH [ACCESSORIES INCWJOING CABLING WORKS ILALAIN-AL SANA [EwPioveR AL an si wiBUiOn Compan ARO [coNSULTANT : coPAsNTERNATIONAL ENERGY CONSULTANTS Gag LLC [CONTRACTOR ENGWLECRNG SOLUTIONS ELECTRO MECHANICAL & GENERAL CONTRACTING LLC 33KV LINE VT, CORE-1 & 2 Page 51 54 BOC NO-ALAOK04-77001:032 20120 CT AND VT SZING CACIRATION neve [PROIEC: SUPPLY ANB INSTATATION OF 3/S38VaRICK BOI PNA SUBETATION WIT |ACCESSORIESINCLUDING CABLING WORKS IN LAIN: SAWAYA [oven :at av b1sTuBUTTON COMPANY RAD. [coNSUCTANT: GOP: NTERNATIONAL ENERGY CONSULTANTS GMOWLLE ere f the Sestaton SB/AV AL aN PAY SUISTATON te the feeder 234 emer Seymamber ieavosioraat Poposed Vt parmetes (4850730) Sey wae ‘ore [nar comecion | arta) | Sony * i sa Tf + —fosar| a0 2 sr one pose] a0 Gnneetdeusnent [Hale a aa ae aor =| oasseracaanSS TES | — on retested fenuredVAbuden oxor va Viesoneh so mest) ference 2c R= aor ohn Redon “eral cotiek o> comes tenance Be fn 520) + acorns on375200 Soon tn ea Resstne 2 wy ee) = rsragoon eed Burden = VARA = (o2%rosor)fna0/soRrth2 ons / 40033 Total connected burden zsccon0n zur vA Proposed VABunden wow Pape 2 of 154 DOC NO-A1ENO-ES-77004508 120K)0CT AND YT SING CALCULATION nos (PRONE: SUPDCY Afb WASTATATION OF 5 /138V BRICK BUILT PRIA SUBSTATION UATE lAcceSSORIES INCLUDING CABLING WORKS WAL ANAL SANAYAS [zevove a ain oisTHiBUTION COMPAR TARDE] [cousuLTatr: coPa.NTERNATIONAL ENERGY CONSULTANTS GIBHLLE [conmAcron: ENGINEERING SOLUTIONS ELECTRO MECHANCRz GeneRAL CONTRACTING LLC Coroested uiprens [ ae Te Baa okmaer awe 1096 055 refer Amex?) Muti Transdeer | AMIE so i maokohne (eter Annee ‘wutturaion meter | chWe cor) Ther Arner Durden of uli vanscar = niorataaoi09) egured VAburden = ossioose asp va Proposed VA buen =o ead Burden = warn! = (asmzyosony/anosernsy2 221506) 40333 1.5806 VA Proposed VA burden - 0 ow Sonehsion: “hm Proposed VTsratd burden ihr then the Connected VAburden, enee proposed V's tate ferences function. Page sof 58 DOCND-AN#940:5:7700:3022 126420. AND VTSIING CALCULATION reve [PROIECT: SUPPLY AND INSTATATION OF 373K BRICK BUT PRIMARY SUBSTATION WITH |accessORies FvCLUOING CABLING WORKS IN AL ANAL SANAYA [cowrmacr no. 14500 [buPioven: aL Av DISTRIBUTION COMPANY RADE] [CONTRACTOR ENGINEERING SOLUTIONS ELECTRO MlECKANAL & GENERAL CONTRACTING LLC 33kV BUS VT, CORE-1 & 2 Page sof 54 OC NO-A249404577004032 2OK2DT AND VT SZING CALOUATION neva [PECT: SUrPLV AND IRSTAIUANON OF 3/SiRV ARIGK BUT PRIMARY SUBSTATION WT JaccesSORIES INCLUDING CABLING WORKS IN AL ANAL SANAYA [conrmact no. :au4540 JEMPLOVER :AL AN D'sTHIBUTION COMPANT [AAD [conSUCTANT: GOPAsICERNATIONAL ENERGY CONSULTANTS GMBHLLC [conTRACTOR / ENGINEERING SOLUTIONS ELECTRO MECHANICAL & GENERAL CONTRACTING LE rman Syn a anal van AsO 4 Va) tinaysatie | Sane” [eons [ome |e | sere — tae — Pos] ee et ae Se RE ‘Mufti trensducer eee sez U'/400KOhms (Refer Annex) Veet [Em + frit Dede = noarieaco) aR tent + cnvome 2 ee thd tna pcos oe toner & Sem atten tomatoe 2 cre Micoeaste i viva) SSageamannsaiy cen “cn nt ey gh wedi esd burden arn = (Bor2Posona0saRTEN2 > ane yawns “ot connec buen 040.0021 2 aon A Proposed VAbucden MM Page of 154 oC Ho-AL49405-77004032 120120.T AND VT SING CALCULATION rev [PRGRECT SUPPL AND STALIATION OF 357 BRI BUI PRIMARY SUBSTATION WTA laccESSORIES INCLUDING CABLING WORKS NAL AINA SANAYAAS [eweLovEn ALAN ISTRBUTION COMPANY Comected apa WaT cod aa Voki EWE 1096 (55 Refer Amer?) Mul Tensducer | AMIE sso Jackone Refer ker BAe we i H vide eecn | S| 7toxoiooomixex0 [001 fRelerkmert) Reward vA burden = assvacavoo1 usd Burden (waren (oswe2y0 anyon = on6/ oan “otal compacta burden = assnoso: Proposed VA burden = os ows ‘ondiion For Cores & core “he Proposed V's ated burden Wher thas the Canrected VA burden. ones propoed VT uta er intends fin, Pore Sof 154 ‘A-14940 Supply & Installation of 39/11kV Brick Built Primary Substation with Accessories Including Cabling Works in Al Ain - Al Sanaya-1 11KV CT VT CALCULATION a aa 1 re DOCNO-ALIS40-5-700-4032 25420-T ANDVTSING CALCULATION revs (PROTECT: SUPPLY AND WSTAILATION OF 3/STRV BRICK BUILT PRRIARYSUBSTANON WT [ACCESSORIES FUCLUOING CABLING WORKS IN ALAII-ALSANAYA [cowrmacr no. aciaoe0 [naPtOvER ALAIN DISTRIBUTION COMPAR RADE] [CONSULTANT GOPA:NTERNATIONAL ENERGY CONSULTANTS GMI LLC CT SIZING CALCULATION FOR 11kV INCOMER FEEDER CT- T1, CORE-1 - TRANSFORMER DIFFERENTIAL PROTECTION Pape sof 158 OCNO.-AL434045-70:.082 204207 ANDY SEING CACULATION nove [pROnEC: SUPPL AND INSTALLATION OF 35/17 BIE BUILT PRIMARY SUBSTATION TT [ACCESSORIES INCLUDING CABLING WOR IN AL AIN-ALSANAYA 2. [cowAcT No. 1ap40 [PLOVER AA oISTNBUTION COMPATW [ARDC] [CONSULTANT GOPA:NTERVATIONAL cNEAGY CONSULTANTS GML (civIRACTOR = ENGINEERING SOLUTIONS ELECTRO MECHANICAL E. GENERAL CONTRACTING LC Nar of he Stton Sty aera Puan sueaTON toe oe fer {3h nomena tr ternanr ‘coraone Tipe of precton “leit Pec ly tear meted on 2S) eat ve osmnuoacront0n We Schaar tenn SBORATONES Veiden oa va Maeno) owe Tasorme Da fated ade votne ar fated eo hs Ww erates pen arr Maclaren de THs tame = atson tae som teeny lee ops garantie. a (rua) at] ease] te | in femur oe eg VV reste 2 meine contort ooo fesoncest2PC yo EL ahve Theimaconticens 2 coma feance 7 he fe as520 J tomenxaracox7320y tons ten endesace (eye) 2 Pomone Re em ft cnc den he = we + oma & Letom Page 8 F154 DOC NO-ALABI0.S-77004.082 J2OK20CT AND VT SZING CALCULATION [PROIET: SUPPLY ANB INSTALLATION OF3/S1RV BRICK NLT PRIMARY SUBSTATION WT [ACCESSORIES INCLUDING CABLING WORKS IN ALAN-ALSANAYA1 [PLOVER : i Ann DISTRIBUTION COMPATW [RADE] [EONSUETANT GOPA:NTERNATIONAL ENERGY CONSULTANTS GMBH LE [CONTRACTOR ENGINECANG SOLUTIONS ELECTRO RIECKANICA & GENERAL CONTRACTING LLC \ondhtin:1 Asc ieley manufetuec recommendation [cree Pt Votage Regulement ‘ > YR ARR] — (ler Amees) 4 masinur though fu arent nC secondary Rey = riera esitance am “we wy Led esstance betwee ely and CT aconry Terminals fe arden fhe Rloy coset Consider 2 fhe ranstormer i ates asia oacco00(sn323500"032) Considering 5% terancetor of = wess 1s mas = 102% ‘ 2e0c020(3)41500°010) = ok ghee vale of thug ol curen fram Case & 2 shal be eonsred for cleistin ‘Secondary faut carer, = steyiz00 Kee point vohagerequrenert Vy = rre203"(0 56000) omiderng20%marae sor ze7e12 (ondtion:2-As pec E3403. ‘apo E83 conten 16 tine allo current on sconéay se (Rete Aonan) Fallad curent, ne = Tet. ating fr) x59) = owas 7a sHM 10s A 16 ines offload cue = seron5 Second toute curent 60/1200 na A Page 60 158 DOC NO-AL4S40:5-7700,4082 120120CT ANOVTSZING CALCULATION nove [PRGIECT:SUPPAv AND ETALLATION OF S57 BRICK BUNT PRIMARY SUBSTATION WT {ACCESSORIES INCLUDING CABLING WORKS INALAIN-ALSANAYA.2 [conrmact no. aa540 leuPioVER :AL AN bSSTRIBUTION COMPANY AAD) [CONTRACTOR ENGINEERING SOLUTIONS ELECTRO MECHANICAL & GENERAL CONTRACTING LUC nee point otage requrement riseteoseoon > meme v Considering 20%marin = memes Sondtion As pes AADC euirement ‘spe ABDC teuirement conse mu felt crent at IK se Masia ful ure a1 ie 3150071200 + 325k nee point age requirement = 2'2625"10 56-00) onsdaring 0% marin Ye = suasns2 Neher vale of irom contin, & 3 sabe taken it eonsidration ane, cleat k= 413 91¥ «popes Vk (ASO, ‘Soncison: {Lom the sore eleuton, requ nes por vag les than the rscommentad aise Hence selected parameters ar sien. 2. Summary of Crespwnended parameters ferratio 7 OTT A lcass Px lcrrncepoinvotage 2 4500 V fre fe oa lw 5 0 mews BOC NOLALIOKOES-77004052 2DIRE-CTAND VT SZING CALCULATION rove [PROTEC SUPPLY AND INSTALLATION OF 33RRV BRICK BURT PRINT SUBSTATION WIT |AcceSSORIcsINCLUDING CABLING WORKS ALAIN-AL ARAYA [nupiovER sat ans oisTRaUTION COMPANY AAD [CONSULTANT : Gor ITERNATIONAL ENERGY CONSULTANTS GUBTLLE CT SIZING CALCULATION FOR 1.1kV INCOMER FEEDER CT- T2, CORE-1 - O/C & E/F PROTECTION+BCPU+AVR Page 62 of 154 DOC O.-81494057200:4032,2OK2OCTANOVT SING CALCULATION neve [PRORET:suePL AnD misTALATION OF 3/iaW BRICK BUILT FRITARY SUBSTATION WiTH [conTaAcr no. :-4e540 [EMPLOvER ALA o1sTRBUTION COMPAR” ARBC] [conSUETANT GOPaANTERNATIONAL ENFRGY CONSUITANTS GMBNLLC [CONTRACTOR ENGINEERING SOUUTIONS ELECTRO VEGHANICALE GENERAL CONTACTING LLC Name ofthe Substation "2/128 AL SAAN PRMARY SUBSTATION Ne ofthe teaser 1k Trenfomer neon Fee Protection bnetion ‘Woe or pratection ‘OcaErsBcrusav locate ats We sr20x0n02xm813630 Mace SCHRVETZEREWGNETING LABORATORIES VaBicien Oo vA Refer Arex) vaBursen a YA RaterArnoe3) 4 nce Dasa Hisnssan-s2xi-mMoess. 0100.1] al wove Us-c2A2 vaburden 05 VA (eterAmnex) Power Transformer Data ats HV side otge - ow fated Vs vatage sous ow erento mda 2% system frequency 5 0 He i fut arent ot 10 sde Sms wane = ns Alec Proposed CT parameters vin eee 3 wot |r as az [zoo 7 Ta x 600) s 2 rato =m ein cdr et rena he Stl tert ‘erat cn : nce i 209 Page 6 of 56 DOC NO-ALSEDES-7700:4052 00420. ANDVTSZING CALCULATION reve [pROIEET: SUPPLY AnD STALATION OF 3/STRV HTEKBULT PRIMARY SUBSTATION WIT [ACCESSORIES NCIUDING CABLING WORKS AIN-ALSANAYA 2 [EMPLOVER:AL AuW DISTRIBUTION COMPAR IARDG [coNSUCTANT : GOPR-NTERNATIONAL ENERGY CONSOTTANTS GBHLLE [cONTRACTOR ENGINEERING SOLUTIONS ELECTRG MECHANICAL & GENERAL CONTRACTING LLC Doodsts3+0.0039505.20) = 00056 onmin Lead Resistance (2 way ene) 2so'0 0056, am = 055 ohm Totalburdencomectedsa ct oouosas ‘Total connected burden in Che = et = sine Pe = 061 om Ipfeutcuran/c tn 150092 /1200| Calealtion of CT Kee point vag requirement w are wert) were ve minimum nee pon voase ‘naan ft cant in Tstcondry Re = Ctieral estance 2m Two way Leo Ressance bese lay ard CT secondary Terminale Re -— Gurdenotthe Relay noo point wohagerequrement Vi, 2e2s"(610561061 a2 v Comsidermg20%marem aewasea2 = ma Vv Hence, cleat Vi 25367 proposed Ve 6000) ‘onduson; {Lom the above cael, required ee point ogee thn the ecommenced ae Hence, elected CT parametarsare suet 2 Summary of CT recommended parameters icrnaio wae07T as 2m Icrkneepoinvoiags > 600 V lin 5. mewn rage tof 58 DDOCNO-AI4S0.5-7001082 120420 CT AND VI SZING CALCULATION pes [pROTECT SUPPLY AND INSTATLATION OF 33/TRV BRICK BUILT PRINIART SUBSTATION WIT /ACCESSORIESINCLUDING CABLING WORKS ML AIN-ALSAWAYAL (CONTRACT NO. 10500, Inwpioven :al Av DISTRIBUTION COMPANY [AAD [conSULTANT: GOPA INTERNATIONAL ENERGY cONSOLTANTS GuHLE [cONTRACTOR-ENGWLEFRNG SOLUTIONS ELECING MECHANICAL & GENERAL CONTRACTING LLC CT SIZING CALCULATION FOR 11kV INCOMER FEEDER CT- T2, CORE-2 - METERING Page of 186 OCHO -A34840-5-7700-082120820-CT AND VT SING CALCULATION reve FRR Ta RON TROT RTT lures nn [ee Acero pa Ebert concen tat Oca [smacto:echns inon ao GUN € Gna GATOCNGTCE Taneot esha TUE A sane rveTETAPON wont couaae = ss ‘needs oe re) nt ae = wos ‘aon fact ie perms ——— Sean tne = 8 Sewers 2 ep crpancen Fg} Burden nn ee ee i a rie ee - mtn coacoeee ia oe pemwerea'c yo ath. lancet Temdents coms coment te wt ote a0 tout ev stn + wee RD eam td cnt eT desraa rane 66 of 154 DOCNO-AIASKDS 770011032. 0420-T AND YTSIING CALCINATION revs [PROIECT: SUPPLY AND INSTALLATION OF 35/1387 BRICK GUILT PRIMIARY SUBSTATION WT |pccessOnes INCLUDING CABLING WORKS IN AL AIC ALSANAYA [cowrancr no. 0-190 [SMPLOVER : A ANN DISTIBUTION COMPATW [RADE] [CONSULTANT GOPA INTERNATIONAL ENERGY CONSULTANTS GMDH LLC “Total connects brsenin Obs - wt = oss 258 ohm Totalburdenindidngleadrestance == S056 = ak obm Total Burden invA ® an ve meter = Soimactorasee afer Aren7) Mult anssucer ORG See‘ Red) Operating FtecT, Kar = Kt) ae fated nstrmene Secu Factor = etinteral burden i Rates burn of he CE 5 Atul burden elacig ead nel See 497 sys +20) +1125 Kae =e short ime Thermal rating of meters are well above Operating Instrument eeu Faro the C. Sanson: 1 from the ove cluintonconnecte CT burden lesser than the capt of Cate burden ena the sled CI parameters sree 2 summary CT recommendes parameters (crass are fam as Page 6 of 154 DOCNO-A16540-7700:4032_ 12060. ANDVTSZING CALCULATION neva [PROIEC: SUPPLY AND INSTALLATION OF 3/138 BRICK BUILT PRIMARY SUBSTATION WT [narioveR al Ain bIsTRBUTION COMPAR [AADE] [coNSUeTaNr capa: TERNATIONAL ENERGY CONSULTANTS GM LLC CT SIZING CALCULATION FOR 11kV BUS SECTION CT-T1, CORE-1 - O/C & E/F PROTECTION+BCPU Page of 54 [PRORET: SUPPLY AR WISTALATION OF 3/1587 BRICK BUILT PINAY SUBSTATION WT [ACCESSORIES INCLUDING CABLING WORKS IN ALAIW-ALSANAYAI [CONTACT nO. 436580 [EMPLOYER = AL All CISTIBUTION COMPANT [ARDS] [CONTRACTOR ENGINEGRNG SOLUTIONS ELECTRO MECHANICAL € GENGRAL CONTRACTING LLC tue ofthe Sosron SS/LNV AL SAAR PUNARYSUBSATON hae of he feeder WV euesecon toyrumber vareasian Pratetonkncon Type" preteen oxasrcry caer Rta onte vse 2sszo.oap2an1s610 thexden Oo vA eer teens Te ovstssuncovornt aeicden on vA aera) ower sytem Data Tedecoge -u ow Spe reaeney ars Wa fo ert 107 se 2 OHs ties = asso Ate Progoed parameters ae arene] pate cx | ae ponmaers| tw oe Ta psol 7] 1 | me | Ts) crea ern Sm stinate) Constr oe = 8 ann fessarce 0" fo dloest chm (eter Aes] Terao a = ames feaance 7c he Re ar7520) > onpastteoo38375207 = Oimss min Less esas 2 yang) 2 Hoaaose AF 056 atm Twsatbrdenconected ter owas Tottcomectedbuen i ohn wt sone DOC NO-ALEK05:7700,4032 12OK20CT AND VT SZING CALCULATION [ROWE SuPPLY AND STALATIOW OF 35/iTeV BRICK BUILT PRATARY SUBSTATION WTA [ACCESSORIES CLUDING CABLING WOR IN ALAIN-ALSANAYAL [conTAcr no. =. 24580 [suPloven a ari DISTRIBUTION COMPANY ARDC) [conSUETANT: COPA: TERNATIONAL EMr Gy CONSULTANTS GMTLLE [COMTRACTOR: ENGINEERING SOLUTIONS ELECTRO MECHANICAL. GENGRAL CONTRACTING LLC i (feutceurene/cr ea) = s1s00%2/2500 = us 8 ‘Glaation of Tne pin wotogerqurement % WURce2RaR) where ‘k+l tigen i iv vi iar Ie = seman oi eran incr cor sory Raq = CTietemal Resta 2A = Twoway esd Resistance Loran Relay and CT secondaty Terns Be Burdon of he Rley a > rzerusossioxn) Conserng 20% marin aziz 286 Hevea, calasated k= 20669 < proposed vk(S000) Sendsion: {From the above clan knee point vases tha the recommenda vile Herc selctd CT parameters are suet 2: Sommary of recarmende parameters fernats Bote lass mx [crkneepoimvonmge > 500 V lo =m mown OCINO-A2454045-77004022 s2O120-T ANDVTSZING CALCULATION res [pRover:SuPPA¥ Ano STALLATIOW OF 3/3 BaCKBUIT PRIMARY SUBSTATION WTA |accESSORIES INCLUDING CABLING WORKS IN ALAIN-ALSANAYAG [comraAacr no: 44340 [eqPLovER A ln IS TIBUTION COMPANY ADE] [conraacron: ENGINEERING SOUTIONS ELECTRO MECHANICAL & GENERAL CONTRACTING LLE CT SIZING CALCULATION FOR 11kV BUS SECTION, CT-T1, CORE-2 - METERING DOCNO-ALS4O-S7700-4032 2OK2O-T AND YTSIING CALCULATION revs (PROTECT: SUPPLY AND INSTALLATION OF 35/S3RV BRICK BUILT PRIRIARY SUBSTATION WHT [cowrmact no. :ac14900 [nuPtoveR AL Av DISTRIBUTION COMPA AADC] [consucraNr GOPA:NTERNATIONAL ENERGY CONSULTANTS GRIN LLE [CONTRACTOR ENGINEERING SOLUTIONS ELECTRO MECHANICAL & GENERAL CONTRACTING LLC area te seston 52/8 sat RDA SESTATION Name th eae 1147 Becton Seymomber rors ‘ive 109% Mae eve eden O58 vA ferames) tat enter we see woke cauuceaen abun aot VA iferArmers owe system ate advance -n ow Ser reenene ar Moe sure 16 os Base 500 Awe Proesed ct panmeters Pee (ore. Ratio ass | omeist 75] Eaten lsle apse 77 3 | os a CL crlestensh a) Conair sea 2 mm fesse 20°C fay Om chen fer ten) Themalcoerict c+ ome feamans 75 Re Ray 420 oes) ans min les feitne 2 wy) pscranse a ose ohm Tot been connect het + assen00n as6 A Tot anmece bien Ons vat = Oso Total burden inusingeadresitanes OCKO-ALASHOS-7700-H032 OKZO-T ANDVTSZING CALCULATION neve [PRORECT: SUPPLY AnD WETALLATION OF 3/TSbv BRICK BUILT PRAY SUBSTATION TH] [ACCESSORIES INCLUDING CABLING WORKS IN ALAN-ALSANAYAL [CONTACT NO. 416580 EMPLOYER: AU CISTRIBUTION COMPANY AAD] [CONTRACTOR :eNG NEERING SOLUTIONS ELECTRO MECHANICAL e GENERAL CONTIDCTING LE 12 Ohm Total Burden invA we az vA Shot ime thera tng of meters enmeter = Simmer Sec Refer Arve) tl ranaeucer| wonfor See Meer Ares) Operating ofthe, Nace Kee BAIS were oe ~— iatednntrarment Secu Factor 5 crieteral burden So (uae ae mys +102) 1.22) Ke = a [hor sme Therma ating of meters ate wel above Operating Instrument Seer Fara the Cr {Lom the above calaetn connect Care ester than the apacty ot Ta burden, ones the seleiad CT parameter aresuient, 2 Summary of Cr rearnendes parmeters icrnaes 7 aor & la os let sB oa [ate arden fw va Page 73 0f 54 DOCNO-ALSEKGES 770014032 s20420.C ANDVT SING CALCINATION revs [PROJECT SUPPLY AND WSTAMATION OF 3/138 GRIOK BUILT PRIMARY SUBSTATION WH \CESSORIES INCLUDING CABLING WORKS IN ALAR ALSANAYA1 [concer no. 14880 [uPtoven at atv o/stwiBUTIOW COMPAR [RADE] [conSULTANT: GOPA: TERNATIONAL ENERGY CONSULTANTS GMHLLC [contRACTOR ENGIEERIVGSOLITIONS FLECTRO MECHANICAL B GENERA CONTRECTING LE CT SIZING CALCULATION FOR 11kV CAPACITOR FEEDER CT; TL, CORE-1 - O/C & E/F PROTECTION age of 58 DOCND-AISEKOS 700,032 0420-CTANDVTSIING CALCULATION rvs [PRONE SUPPLY AND INSTAUATION OF 35/3 BRICK BUILT PRIMARY SUBSTATION WT [ACCESSORIES ANCLUOING CABLING WORKS IN AL IN SANAYAS [eMPLOvER ACA DISTRIBUTION COMPAR [AADC] [coNSUETANT:: GOPA:NTERNATIONAL ENERGY CONSULTANTS Gkagm LLC [conTRACTon: ENGINEERING SOWUTIONS ELECTRO VEGHAVUCALE GENERAL CONTRACTING LLC Name ofthe Subst ‘33/114 AL SANYAL PRIMARY SUBSTATION Name of te fesse 1k Caper Feder 5yrumber M7 Ea Type of pratecion caer aorecnon ‘verond rotation Rely Date wee sxzoxpioz.ove13610 awe SCHWEITZER ENGINEERING LABORATORIES va burden om vA Matera} ower System oata fasted weer -n ow Systm teauency soit a alt cron 3218 le HS tate sisoo Aste Proposed C parameters CF oven. ato cass | vue |ronmat7s|, em svi eg Teer [eo] 7] 1 os 0 re rica iene 0m estima esitanee 920°C ow = 00464. chim/n—_(Refersarex 2) “haa xen « ones ecrance at 7'¢ Re Rap atS 209) ‘og046usas 0002927520) 90056 obm/m lead Resistance (2 way eth) 2sor0.css 2 055 ohm ‘ota comcte burden in he vot oon | faltcurenier rating) 21800 /<00 = os 8 Peep 75.0158 OCHO-ALA8H0-5-700.4022 120820T AND VT SING CALCULATION reve [Rone SomPA¥ an iS TALATIOW OF 3/ATAAIC BUNT PaAARY SUSTATON aT laccESSORIES NCLUDING CABLING WORKS IN ALAIN ALSANAYA 3 [swPLoveR AL OsTRGUTION COMPANY ADE] [conSULTANT: GoPAAWTERNATIONAL ENERGY CONSULTANTS CMH LLC Caleltion of CT Kee ptt vltage requirement % le UReA2R8) We = raximumvotage eon riy cut ring aug au condtion . roku fet cent econeary he (Cintra Resitnce am Two wy lend oitzis otween oy pd CT secondary Terminals ™ buncen ofthe Rly % > s2sttaseroon) Conddering20H marin = nasas12 = wv ence, cae Vk= 28710 «proposes Ve 4004) Sonshson: 1. From the above clan requrestnge pint voles isles han he recomend value 2 summary fC recommenced parameters ferro wort fetes r* lcrknee point woitage > 400 V lim <2 move Pape 7501154 (PROTECT: SUPPLY AND INSTALLATION OF 3/TTRV BRICK BUILT PRIMARY SUBSTATION WT |accessOmies FYCLUOIG CABLING WORKS IN AL IAL SANAYA Icowracr no.:a-iaoe0 [SaPLOvER : A AN DISTRIBUTION COMPAR [RADE] [CONSULTANT GOPA INTERNATIONAL ENERGY CONSULTANTS GMI LLC CT SIZING CALCULATION FOR 11kV CAPACITOR FEEDER CT: T1, CORE-2 - BCPU DOCND-ALSO40-700:3022 20420. AND VTSZING CALCULATION revs [poner SUPPL AND INSTATATION OF 371K BRIE BUILT PRAY SUBSTATION WT |AccSSORIES WCLUOIG CABLING WORKS IN AL AIN-ALSANAYA2. [SarioveR AL Av DISTRIBUTION COMPANY ARDC] [coNSUETANT: GOPA:NTERNATIONAL ENERGY CONSULTANTS GMOTLLEC Nae af he Sutstion 32/3341 AL SANAYA-1 PRIMARY SUBSTATION Name of he feeder {nh Caper Feeder ‘ay number roared ‘Typeet protection ecu wpe owsiseiicsr243x0K1 Make SCHWEITZER ENGINEERING LABORATORIES aBurden OL VA Maer Areva) Powe Systm Data Fatedvatage =n ow Soe bevel - 2 Nae fo caren 93202 ms Mase ss00Aasec Proposed Ct parameters were] nme | can | vir [mnie] | aa a craton rr) fess 20" he 5 cco Shum tren} ‘eel cnc ik aoe nonmea Bet a5 209 ment aann a0 2 ene sodden arose ~ tae aes {econ dat ohm = Dota er a nt con + noes Pane 7801154 OCHO.AI#840657700,.022 129420.CT AMD VTSZING CALCULATION nove [PRORET: SUPPLY AND ISTAIIATION OF 3/SShV BRICK DONT PRIMARY SUBSTATION TH [ACCESSORIES INCLUDING CABLING WORKS IN ALAN-ALSANAYA. [EMPLOYER AL AN DISTRIBUTION COMPANY [ARO] [CONSULTANT GOPRNTERNATIONAL ENERGY CONSULTANTS GMNLLE [CONTAACTOR: (NGINEERING SOLUTIONS CECTRO MECHANICAL GENRAL CONTRACTING LLC elation ofr kre pole voltage requirement % 2 WAAR) Ve + maximum vonage eos rely erat eng tveugh faut conon . axes foul curentinCT secondary Me (Cintra estance 2 ‘hoo oa Reston bean Rely ap CT acne Terminals Fe = Bardenof te Rly % 2 s2saas603) > mes Vv Cconsiderng20%mein dessa ence caleustesVi=25358V

You might also like