UTOC ENGINEERING PTE LTD
Method Statement of Piping Installation Page: 3 of 5
Task: Piping, Supports & Valve Installation Works
Location: Shell Chemicals Seraya Pte Ltd, Jurong Island, Singapore
Work order no 91545522
1.0 SCOPE
The objective of this method statement is to fabricate & replace new line for 63LT055A Service
water choke line for Shell Chemicals Seraya Pte Ltd, Jurong Island, Singapore.
2.0 PURPOSE
2.1 The purpose of this method statement is to provide the fabrication/replacement for
(63LT055A – SERVICE WATER LINE CHOKE)
2.2 Ensure to measure the dimensions before and after fit up & welding, work sequence and
WPS, WQT to ensure that quality works are provided.
3. DEFINITIONS
3.1 SCSL-Shell Chemicals Seraya PTE LTD /SJI-Shell Jurong Island
3.2 UTOC-Utoc Engineering Pte Ltd
3.3 Clearance Certificate (Permit to Work)
4. REFERENCE
OWNER: Shell Chemicals Seraya PTE LTD
CLIENT: Shell Chemicals Seraya PTE LTD
CONTRACTOR: UTOC ENGINEERING PTE LTD
NDT CONTRACTOR: SETSCO
WPS NO: P1-009A
WORK SCOPE: 63LT055A – SERVICE WATER CHOKE LINE REPLACEMENT.
5. RESPONSIBILITY
It is the overall responsibility of the personnel in the site who are directly or indirectly
involved for establishment, successful implementation maintenance of this procedure.
5.1 Superintendent (UTOC)
To carry out required planning involving manpower.
UTOC ENGINEERING PTE LTD
Method Statement of Piping Installation Page: 4 of 5
Task: Piping, Supports & Valve Installation Works
Location: Shell Chemicals Seraya Pte Ltd, Jurong Island, Singapore
Work order no 91545522