Bill of Materials
Bill of Materials
Bill of Materials
A. EARTHWORKS
Excavation lot 1 3,500.00 3,500.00
B. CONCRETING/MASONRY WORKS
Cement bgs 105 225.00 23,625.00
Sand cu.m 6 1,700.00 10,200.00
Gravel cu.m 3 1,700.00 5,100.00
CHB pcs 289 16.00 4,624.00
8mm rebar lgth 30 180.00 5,400.00
10mm rebar lgth 24 205.00 4,920.00
C. CARPENTRY
Hardiflex Board 1/4x4x8 sht 14 390.00 5,460.00
Tek screw pc 500 1.00 500.00
Common nails 2" kg 5 35.00 175.00
Good Lumber 4"x4"x8' lgth 3 1,066.00 3,198.00
Good Lumber 4"x4"x10' lgth 3 1,333.00 3,999.00
D. ROOFING WORKS
Good Lumber 2"x2x8' lgth 18 240.00 4,320.00
Good Lumber 2"x2x10' lgth 14 300.00 4,200.00
Good Lumber2"x2"x14' lgth 4 360.00 1,440.00
Corrugated roofing 0.51mm x 2.44mm shts 16 420.00 6,720.00
Common nails 1 1/2" kg 7 60.00 420.00
Common nails 2" kg 5 48.00 240.00
Umbrella nails kg 5 55.00 275.00
Prepared By:
Kaye Kathlene Basubas
Reg.No. 0152977
wall footing
L 34.5 V
H 2.88
A 99.36 COLUMN
AT #REF!
OPENING 1.4 8.4
12mm 18
Enter
Kelsey
hardiflix 14
pc
40x40X20
0.032 0.288
.2X.2X2.8(9) 1.008
CEMENT 9.072