BILL OF MATERIALS

PROJECT: RESIDENTIAL BUILDING


OWNER: Bryan Jumao-as
ADDRESS: Purok Kulo, Matan-ag 1, Bateria, Daanbantayan Cebu

DESCRIPTION UNIT QTY UNIT COST TOTAL COST

A. EARTHWORKS
Excavation lot 1 3,500.00 3,500.00

B. CONCRETING/MASONRY WORKS
Cement bgs 105 225.00 23,625.00
Sand cu.m 6 1,700.00 10,200.00
Gravel cu.m 3 1,700.00 5,100.00
CHB pcs 289 16.00 4,624.00
8mm rebar lgth 30 180.00 5,400.00
10mm rebar lgth 24 205.00 4,920.00

C. CARPENTRY
Hardiflex Board 1/4x4x8 sht 14 390.00 5,460.00
Tek screw pc 500 1.00 500.00
Common nails 2" kg 5 35.00 175.00
Good Lumber 4"x4"x8' lgth 3 1,066.00 3,198.00
Good Lumber 4"x4"x10' lgth 3 1,333.00 3,999.00

D. ROOFING WORKS
Good Lumber 2"x2x8' lgth 18 240.00 4,320.00
Good Lumber 2"x2x10' lgth 14 300.00 4,200.00
Good Lumber2"x2"x14' lgth 4 360.00 1,440.00
Corrugated roofing 0.51mm x 2.44mm shts 16 420.00 6,720.00
Common nails 1 1/2" kg 7 60.00 420.00
Common nails 2" kg 5 48.00 240.00
Umbrella nails kg 5 55.00 275.00

E. PLUMBING WORKS lot 1 25,000.00 25,000.00


F. ELECTRICAL WORKS lot 1 9,000.00 9,000.00
TOTAL 122,316.00

TOTAL COST 122,316.00

Prepared By:
Kaye Kathlene Basubas
Reg.No. 0152977
wall footing
L 34.5 V
H 2.88

A 99.36 COLUMN
AT #REF!
OPENING 1.4 8.4

.6x2.1(6) 5.04 #REF!


CHB #REF! #REF!
CEMENT #REF!
SAND #REF!
10MM 38(2.8) 19
23/6 12

12mm 18

Angle Bar 1"x1 1/2"x8' lgth 12 80.00 960.00


Corrugated roofing 0.51mm x 2.44mm shts 14 420.00 5,880.00
Common nails 1 1/2" kg 3 49.00 147.00
Common nails 2" kg 5 48.00 240.00
Umbrella nails kg 5 55.00 275.00
2x2x8 =18
2x2x10=14
2x2x14=4
2x4x12=8
4x4x8=3
4x4x10=3
10mm 24
pcs 9mm
50 pcs
gravel 3
cubic sand.
6 cubic

Enter
Kelsey
hardiflix 14
pc
40x40X20
0.032 0.288

.2X.2X2.8(9) 1.008

CEMENT 9.072