PUN_3468 TS-Ch05 5.3.2.1 5.3.2.1 Power Transformers PUN_3469 TS-Ch05 5.3.2.1 [1] Power Transformers shall be in accordance with EN 60076. Complied for standards. Two transformers shall be provided in each ASS, Two transformers are provided in configured for redundant operation. each ASS, configured. for redundant operation as is shown in PML3-SMO-001205. PUN_3562 TS-Ch05 5.7.1.2 5.7.1.2 Two ASS transformers shall step down the 33 kV 3- Complied. phase to 415 V 3-phase and 240 V 1-phase supplies. Two ASS transformers installed in Each transformer and associated switchgear shall normally ASS step down the 33 kV 3-phase supply part of the ASS load and in the event of a to 415 V 3-phase. Hot standby failure or maintenance activities, one transformer shall transformer is capable of full load automatically assume the full load of the ASS. of the ASS as per designed capacity. PUN_13658 TS-Ch05_DELIB.REL.23 Final Deliberation: Contractor’s clarification and Complied understanding of the scope is accepted. for 33 kV dry type transformer CC: For RSS power transformers (oil filled) copper windings aluminium windings are used for are used. ASS and TSS. For 33 kV dry type transformer aluminium windings are used.
PUN_IF_0060_DELIB.REL.38 Final Deliberation: Contractor’s clarification and Concept & details are presented understanding of the scope is accepted. in following documents. CC: Contractor shall develop interface / interlocking / PML3-SMO-001208.D Final protection co-ordination between 33 kV breaker of Design - Overall Protection auxiliary transformer and it’s corresponding 415 V LT breaker Philosophy. during detailed design phase. PML3-SMO-002942.B Interlocking concept