Professional Documents
Culture Documents
STD Junctions (2 To 4 & 6)
STD Junctions (2 To 4 & 6)
5.5m
65.0m
Area= 1468.035 SQM
(Acceleration+deceleration
Area=122.087sqm
lane)
Unpaved Isand
5. 140.0m 50.0m
50.0m 100.0m 5m 5m
5.
3.5m
7.0m
7.0m
7.0m
50.0m (Taper)
7.0m
7.0m
m 5.5
90.0m 5.5 m 90.0m
(Direct Taper) (Direct Taper)
R2
0 .0m 0.0
Area=885.222 SQM R2
m
(Acceleration+deceleration Area=122.087sqm
lane) Unpaved Isand
65.0m
Cross
5.5m
H2-OB
100.0m
3.5m
Earthen Shoulder
Paved Shoulder
7.5m
7.5m
Carriageway Carriageway
7.5m
7.0m
7.0m
Carriageway Carriageway
5.5m 5.5m Paved Shoulder
Earthen Shoulder
5.
5m
5m
5.
30.0m
3.5m
50.0m (Taper) 140.0m (Auxillary lane) 100.0m (Auxillary lane) 50.0m (Taper)
R2
0.
H2-OB
0m
0m
Area=17.700sqm
0.
R2
Unpaved Isand
Area= 17.700sqm
Area=1507.497SQM
Unpaved Isand
65.0 m TAPER
(Acceleration+deceleration
lane) Area=514.218SQM
Cross Road
5.5m
Shoulder
Shoulder
Carriageway
Fig. 3.1
1 2 3 4 5 6 7 8
65.0m
H2-OB
R2
m
0.
140.0m 50.0m
0m
R20.0
1.5m
5m
5.
5m
5.
7.5m 7.5m
7.5m
7.0m
Carriageway Carriageway
25.0m
2.0m(raised)
Median 4.0m(raised) 5.0m(raised)
2.0m(raised)
5.0m(raised) Median 4.0m(raised)
7.5m
7.0m
Carriageway Carriageway
7.5m 7.5m
5.
5m
1.5m
5m
5.
100.0m(Auxillary lane) 50.0m
R
50.0m (Taper) 140.0m (Auxillary lane) 20
.0
0 .0m m
H2-OB
R2
Area=36.714sqm
Area=1692.028SQM Unpaved Isand
(Acceleration+deceleration
lane) Area=18.107sqm
Unpaved Isand
Area= 703.051SQM
65.0m
Cross Road
Fig. 3.3
1 2 3 4 5 6 7 8
H2-OB
100.0m 25.0m 80.0m 100.0m
3.5m
Earthen Shoulder
Paved Shoulder
0.5m
7.5m
7.5m
Carriageway 50.0m (Taper) Carriageway
7.5m
7.0m
7.0m
Carriageway Carriageway
Paved Shoulder
Earthen Shoulder
3.5m
m Stop
5.5
50.0m (Taper) 140.0m (Auxillary lane) 100.0m (Auxillary lane) 50.0m (Taper)
H2-OB
R3
R20.0m
5.0
Area=67.337sqm
m
Area=1994.607SQM Unpaved Isand
(Acceleration+deceleration
.0m
Area=188.497sqm
55
lane)
VR )
R
R
Unpaved Isand
(FO R OD
PE
)
TA
O
R
40. m (F
0m
0
Area= 653.560SQM
60.
Cross Road
W-
21(
b)
5.5
m
y
wa
ge
rria
Ca