Girder Lifting Permit
Girder Lifting Permit
Hyderabad
Health, Safety and Environment Work Instructions
Project Code & Name: Issue Date:
Location: PTW No:
Title: LIFTING PERMIT
LIFTING PERMIT
Objectives:
Permits must be posted at the lift site until lift is complete. Permits must be reissued if conditions (equipment, weather, and/or
ground) or scope of work has changed. A Critical Lift Plan & Crane Permit including all supporting documents must be submitted
and approved prior to any of the following types of lifts.
Responsibility: - Project Manager, Road & Structure In-charge, Plant and Machinery In-charge, HSE officer, Client Representative
Two or more cranes are used to lift Crane will ‘Walk” with Load
Lifts =/> 100 Kg Load will be upended and weighs >5 Tons
Crane will Lift Personnel Loads =/> 75% of Rated Load Capacity
GENERAL
Originator: Project Manager: Start Date/Time: Finish Date/Time:
Crane Owner: Emergency Phone Number: Crane Lift Location (Area/Building):
Competent Person (Crane Competent Person (Rigging): Contractor Safety Representative:
Operator):
Phone: Phone:
Phone:
LIFT DATA
1a. Describe Load and Enter Total Weight:
1. Load Weight: 1b. Total load weight as a percentage of total lifting capacity of crane:
TotalLoadWeight
100 % Example Calculation:
Crane Capacity
2a. Main Hoist Block, Auxiliary Boom Head / Third Party Inspection: Yes/ No
Headache Ball: Certificate No.:
Check One: Erected (not used): Erected (in use): Jib Stowed (on boom):
4. Lifting Height: Elevation drawing showing load height relation to crane and any obstructions is attached Is
maximum height of Crane Boom tip within Permit Limits Granted?
Current Permit Height: Yes No
CRANE DATA
Verify manufacturer's load chart indicates lifting capacity at stipulated load radius and boom lengths.
Note: If boom length and/or radius is between the stipulated or posted value on the load chart select the next lesser rating
capacity. The next lesser rating capacity may be the next longer or shorter boom length.
3. Attachments: Confirm Crane has an Anti-Two Blocking Device Installed and is operational
4. Counterweight:
Yes Total Weight Tons
1. Sling(s) and/or Indicate how slings are to be used: Basket Hook Straight Pick Choker
Shackles:
LIFT COMPUTATION
Maximum Boom Angle: Maximum Boom Length: Maximum Lift Radius:
Note: Cranes equipped with computers indicating boom length, angle, and radius are safety devices only and
should not be used in place of the operator's responsibility to actually determine the measurements required
to calculate a safe lift.
Note: Accessories, Crane Capacity, Parts of Line and Rope Capacity, and the working quadrant of the crane
should be considered when calculating Net Crane Capacities.
1. Net Crane Capacity: (Rated Lift Capacity - Block, Rigging, and Accessory Weights) = Tons
6. Wind Speed: Lifts are not allowed with wind speed in excess of:
15 (miles per hour) MPH or 7 (meters per second )M/s
APPROVALS
The Contractor, Rigger, and Crane Operator are the competent persons solely responsible for the safe
execution of the lift(s). Execution of the lift will be in complete accordance with regulations.
Erection In-charge:
Name: Signature: Date:
Structure In-charge:
Name: Signature: Date:
HSE Officer:
Name: Signature: Date:
Contractor Representative:
Name: Signature: Date:
Crane Operator:
Name: Signature: Date:
Project Manager:
Name: Signature: Date:
Client Representative:
Name: Signature: Date:
CALCULATIONS
A = ....................... m
B = ....................... m
C =........................ t
D = 0-2T 2-4T 6-8T 8-10T 10-12T
Total Weight (C+D) = ..............T
SIGH-OFF SECTION
Crane Operator …………………………………….. Competent Rigger ……………………………………..
ID Number …………………………………….. ID Number ……………………………………..
Time & Date …………………………………….. Time & Date ……………………………………..
Crane Type …………………………………….. Capacity ……………… License Plate ……………………..