Tools: Project: G+4+11 Typical Floor Method Statatement For Tower Crane Erection TC-1
Tools: Project: G+4+11 Typical Floor Method Statatement For Tower Crane Erection TC-1
FLOOR
METHOD STATATEMENT Ref. No. MS-0001
Rev. No. 00
FOR TOWER CRANE ERECTION Date: 01-04-19
TC-1 Page 5 of 19
4.5 THE HSE ENGINEER is responsible for ensuring the activities are carried
out as per project specific safety rules and regulations.
4.7 THE THIRD PARTY shall be responsible for testing certifying the use of
tower crane before operation.
5. TOOLS
Spanner
Hammer
Safety PPE
6. MATERIALS
7. PROCEDURE