22,400 (14.9%)
No LNG-to-power will be The LNG-to-power projects will
6oK newly developed after 2035 gradually switch to use hydrogen after
10 year of their operation if there is a
reasonable price.
2030 • Onshore wind
40K
• Offshore wind
• Solar power
By 2050, the majority of gas To develop the economic sector of
20K
Hydropower thermal power plants entirely hydrogen production from renewable
switch to use hydrogen. energy ( i.e., wind and solar power)
30,127 (20.0%) • Coal-fired thermal power (by 2050
using biomass/ ammonia)
oK
2030 2050
• Domestic gas-fired thermal power
(by 2050 converting to LNG/Hydrogen)
• Offshore wind • Onshore wind
LNG Projects
60,050 (12-4%)
• LNG-to-power (by 2050 co-generation
with/converting to Hydrogen)
Note: Excluding the extra capacity of offshore wind to produce new energies which are approximately 15000 MW Nearshore projects (Under construction)
by 2035 and 240000 MW by 2050. ············································· LNG Hai Lang Phase 1 (1500 MW}
3,35K (2%)
29 (4,6%) 3,35K ( 2%)
\
l----- ·-
3,7K (2, 2%) \
\
·.
RENEWABLE ENERGY
4,11K (2,4%) \ 30,2K (18%)
..
4,9K (2,9%)\
149 (23,8%) ••
5K (2,9%)" I
•
5,26K (3,1%)
6K (3,5%)
• 2030 • 2050
6,16K (3,6%)
100K -----1
Nearshore projects (Operating) (1500 MW} LNG Long An I ···
(1500 MW} LNG Long An II··· ··········· LNG Ca Na (1500 MW}
•
8,6K (5,1%)
.,
• Quang Ninh Phu Yen 16,2K (9,7%)
10,3K (6,1%) ········ •·······••·••·••·••········ •····· Son My IIThermal Power Plant (2250 MW}
Thanh Hoa • HaTinh
50K
• Vinh Long 12K (7,2%) . \ \ ....................................... Son My IBOT Thermal Power Plant (2250 MW}
• BinhThuan (3200 MW} LNG Bae Lieu ·················· - \
• NinhThuan • Kien Giang
LNG Long Son (1500 MW}
Potential projects
OK �11111 • Hai Phong • Quang Binh
e Thai Binh
Solar power Offshore wind Onshore wind Thermal power Biomass electricity, Pumped-storage
• Binh Dinh Period 2021-2030 e ·............................. .......... Nhon Trach 3 & Nl;ionTl'acfi 4
Power Plants•(1624 MW}
using biomass and
ammonia
Waste-to-Power hydrogen • Ba Ria VungTau QuangTri
Period 2031-2035 e