2 .Laporan Reschedule Cv. Barona Usaha

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 120

RE - SCHEDULE

JADWAL WAKTU PELAKSANAAN PEKERJAAN (KURVA S)


PEKERJAAN : OPTIMALISASI IKK KLUET TIMUR KAB. ACEH SELATAN
LOKASI KAB. ACEH SELATAN 7,200,000.00

TAHUN ANGGARAN : 2020 7,920,000.00

DURASI
RE - SCHEDULE
NO. URAIAN VOLUME HARGA SATUAN JUMLAH HARGA BOBOT MINGGU KET
SEPTEMBER 2020 OKTOBER 2020 NOPEMBER 2020 DESEMBER 2020 JANUARI 2021 FEBRUARI 2021 MARET 2021 APRIL 2021 MEI 2021
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

I. PEKERJAAN PERSIAPAN
100
1 Mobilisasi dan Demobilisasi (Direksi Keet/sewa, 1.00 Ls 7,500,000.00 7,500,000.00 0.28 35.00 0.03 0.03 0.03 0.03 0.03 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tenaga kerja, Alat, Bahan)


2 Setting-Out 13,756.00 M' 1,870.00 25,723,720.00 0.98 1.00 0.98

3 Administrasi (Dok. Kontrak, Shop Drawing dan As-built 1.00 Ls 5,000,000.00 5,000,000.00 0.19 35.00 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Drawing, Site management, Dok. Proyek, Fasilitas Sementara)


4 SMK3 Konstruksi 1.00 Ls 20,270,000.00 20,270,000.00 0.77 35.00 0.77 - - - - - - - - - - - - -

II. PENGADAAN PIPA DAN ACCESSORIES


1 Pengadaan Pipa
- Pipa HDPE SDR 17 (PN 10) ND. 110 mm 10,656.00 M' 111,000.00 1,182,816,000.00 44.91 4.00 8.43 18.96 8.43 8.64 - - - - - - - - - - - -

- Pipa HDPE SDR 17 (PN 10) ND. 90 mm 3,100.00 M' 75,000.00 232,500,000.00 8.83 6.00 1.71 - 3.13 0.85 - - - - - - - - - -

2 Pengadaan Accessories
- Tee Steel dia. 250mm x 100mm 2.00 Bh 1,750,000.00 3,500,000.00 0.13 1.00 - - - - - - - - - - - - -
90
- Gate Valve Cl dia. 250mm 1.00 Bh 5,300,000.00 5,300,000.00 0.20 1.00 - - - - - - - - - - - - -

- Gate Valve Cl dia. 100mm 4.00 Bh 2,700,000.00 10,800,000.00 0.41 1.00 - - - - - - - - - - - - -

- Gate Valve Cl dia. 75mm 16.00 Bh 1,750,000.00 28,000,000.00 1.06 1.00 - - - - - - - - - - - - -

- Loose Flange dia. 250mm 4.00 Bh 400,000.00 1,600,000.00 0.06 1.00 - - - - - - - - - - - - -

- Loose Flange dia. 100mm 2.00 Bh 175,000.00 350,000.00 0.01 1.00 - - - - - - - - - - - - -

- Flange Socket dia. 250mm 2.00 Bh 1,500,000.00 3,000,000.00 0.11 1.00 - - - - - - - - - - - - -

- Stube Flang dia. 110mm 10.00 Bh 500,000.00 5,000,000.00 0.19 1.00 - - - - - - - - - - - - -

- Stube Flange dia. 90mm 32.00 Bh 400,000.00 12,800,000.00 0.49 1.00 - - - - - - - - - - - - -

- Butt Fusion Reduser Tee ND 110mm x 90mm 16.00 Bh 500,000.00 8,000,000.00 0.30 1.00 - - - - - - - - - - - - -

- Butt Fusion Cup dia 110 mm 2.00 Bh 300,000.00 600,000.00 0.02 1.00 - - - - - - - - - - - - -

- Butt Fusion Cup dia 90 mm 16.00 Bh 150,000.00 2,400,000.00 0.09 1.00 - - - - - - - - - - - - -

- Street Box 21.00 Bh 500,000.00 10,500,000.00 0.40 2.00 - - - - - - - - - - - - -

- Pipa Selubung Street Box 21.00 Bh 100,000.00 2,100,000.00 0.08 2.00 - - - - - - - - - - - - -

- Baut Lengkap Ring dan Mur Untuk Flange 200.00 Bh 10,000.00 2,000,000.00 0.08 2.00 - - - - - - - - - - - - - 80
- Paking/Gasket untuk Flange 2.00 M2 325,000.00 650,000.00 0.02 2.00 - - - - - - - - - - - - -

III. PEKERJAAN PEMASANGAN PIPA, ACESSORIES TERMASUK FITTING VALVE DAN PENGETESAN
1 Pekerjaan Tanah
- Galian Tanah Keras 3,874.93 M3 102,520.00 397,257,823.60 15.08 15.00 5.25 4.67 1.17 0.58 0.41 0.43 0.43 0.43 0.43 - - - - - -

- Mengurug Kembali Galian 3,754.00 M3 33,916.00 127,320,664.00 4.83 15.00 1.68 1.50 0.37 0.19 0.13 0.14 0.14 0.14 0.14 - - - - - -

- Urugan Tanah Bekas Galian Termasuk Perataan dan 120.93 M3 56,650.00 6,850,684.50 0.26 15.00 0.09 0.08 0.02 0.01 0.01 0.01 0.01 0.01 0.01 - - - - - -

Pemadatan
JADWAL
2 Pemasangan Pipa Termasuk Fitting, accessories dan Valve
PELAKSANAAN
KONTRAK AWAL
- Pipa HDPE SDR 17 (PN 10) ND. 110 mm 10,656.00 M' 6,490.00 69,157,440.00 2.63 9.00 1.11 0.99 0.25 0.17 0.09 - - - - - - - - - -

- Pipa HDPE SDR 17 (PN 10) ND. 90 mm 3,100.00 M' 6,030.00 18,693,000.00 0.71 6.00 - - - 0.11 0.11 0.11 0.11 - - - - - -

Pemasangan Accessories
- Accessories dia. 250 mm 4.00 Bh 52,937.00 211,748.00 0.01 2.00 - - - - - - - - - - - - -
70

- Accessories dia. 100 mm 28.00 Bh 17,242.00 482,776.00 0.02 2.00 - - - - - - - - - - - - -

- Accessories dia. 75 mm 48.00 Bh 17,242.00 827,616.00 0.03 1.00 - - - - - - - - - - - - -

Pengelasan Loose Flange


- Loose Flange dia. 250 mm 4.00 Bh 659,313.00 2,637,252.00 0.10 2.00 - - - - - - - - - - - - -
JADWAL
- Loose Flange dia. 100 mm 2.00 Bh 278,179.00 556,358.00 0.02 1.00 - - - - - - - - - - - - -
RENCANA
Pemasangan Gate Valve PELAKSANAAN
- Gate Valve Cl dia. 250 mm 1.00 Bh 278,052.00 278,052.00 0.01 1.00 - - - - - - - - - - - - -

- Gate Valve Cl dia. 100 mm 4.00 Bh 231,918.00 927,672.00 0.04 1.00 - - - - - - - - - - - - -

- Gate Valve Cl dia. 75 mm 16.00 Bh 231,918.00 3,710,688.00 0.14 1.00 - - - - - - - - - - - - -

3 Penyambungan Pipa dan Acesories


- Penyambungan Pipa HDPE SDR 17 (PN 10) ND. 110 mm 214.00 Titik 50,001.00 10,700,214.00 0.41 9.00 0.15 0.15 - 0.04 0.04 - - - - - - - - - -

- Penyambungan Pipa HDPE SDR 17 (PN 10) ND. 90 mm 31.00 Titik 37,876.00 1,174,156.00 0.04 6.00 - - - 0.01 0.01 0.01 0.01 - - - - - -
60
- Penyambungan AcessoriesPipa HDPE SDR 17 (PN 10) ND. 110 mm 44.00 Titik 50,001.00 2,200,044.00 0.08 9.00 - 0.01 0.01 - - - - - - - - - -

- Penyambungan Acessories Pipa HDPE SDR 17 (PN 10) ND. 90 mm 64.00 Titik 37,876.00 2,424,064.00 0.09 6.00 - - - 0.01 0.00 0.01 0.00 - - - - - -
60
DURASI
RE - SCHEDULE
NO. URAIAN VOLUME HARGA SATUAN JUMLAH HARGA BOBOT MINGGU KET
SEPTEMBER 2020 OKTOBER 2020 NOPEMBER 2020 DESEMBER 2020 JANUARI 2021 FEBRUARI 2021 MARET 2021 APRIL 2021 MEI 2021
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
4 Pengetesan Pipa
- Pipa HDPE SDR 17 (PN 10) ND. 110 mm 10,656.00 M' 2,125.00 22,644,000.00 0.86 1.00 REALISASI - - - - - - - - - - - - -
100
- Pipa HDPE SDR 17 (PN 10) ND. 90 mm 3,100.00 M' 1,905.00 5,905,500.00 0.22 1.00 PELAKSANAAN - - - - - - - - - - - - -
DILAPANGAN
5 Interkoneksi dengan Pipa Lama/Eksisting dan Boring Pipa
- Galian tanah untuk koneksi 39.55 M3 102,520.00 4,054,666.00 0.15 2.00 - - - - - - - - - - - - -

- Mengurug Tanah kembali 38.90 M3 33,916.00 1,319,332.40 0.05 2.00 - - - - - - - - - - - - -

- Interkoneksi dengan Pipa Lama dia. 150 mm 15.00 Titik 423,720.00 6,355,800.00 0.24 2.00 - - - - - - - - - - - - -

IV. PENGADAAN DAN PEMASANGAN PIPA UNTUK PERLINTASAN


1 Pengadaan/Pemasangan Perlintasan Pipa Steel dia. 100mm 1.00 Pkt 37,150,191.36 37,150,191.36 1.41 4.00 - - - - - - 0.28 - - - - - - 50
dan Accessories L = 1m - 5m
2 Pengadaan/Pemasangan Perlintasan Pipa Steel dia. 75 mm 1.00 Pkt 29,491,631.81 29,491,631.81 1.12 4.00 - - - - - - - - - - - - -

dan Accessories L = 1m - 5m

V. PEKERJAAN REKONDISI M/E, PIPA SADAP INTAKE,


90
PENYAMBUNGAN DAYA PLN, REKONDISI PIPA BOCOR,
REKONDISI FASILITAS UMUM DAN WASH OUT (WO)
1 Rekondisi M/E dan pembersihan lokasi IPA 1.00 Ls 35,000,000.00 35,000,000.00 1.33 8.00 0.27 0.27 0.27 0.27 - - - - - - - - - - - - -

- Rekondisi Panel dan asseccories


- Rekondisi Genset
- Rekondisi Pompa Transmisi dan Distribusi
- Rekondisi Lampu Penerangan
- Pembersihan Lokasi IPA
40
2 Pekerjaan Pengadaan dan Pemasangan Pipa Sadap untuk Intake
- Pipa Steel dia. 300 mm 48.00 M 1,650,000.00 79,200,000.00 3.01 8.00 3.01 - - - - - - - - - - - - -

- Wallface dia. 300 mm 1.00 Bh 2,000,000.00 2,000,000.00 0.08 8.00 - - - - 0.08 - - - - - - - -

- Loose Flange dia. 300 mm 16.00 Bh 600,000.00 9,600,000.00 0.36 8.00 0.36 - - - - - - - - - - - - -

- Pemasangan Pipa Steel dia. 300 mm 48.00 M 185,168.00 8,888,064.00 0.34 8.00 - - - - - 0.34 - - - - - - - 80
- Pengelasan Flange dia. 300 mm 16.00 Bh 792,950.00 12,687,200.00 0.48 8.00 - - - - 0.48 - - - - - - - -

- Pemasangan Asseccories dia. 300 mm 1.00 Bh 70,785.00 70,785.00 0.00 8.00 - - - - - 0.00 - - - - - - -

- Galian tanah 36.00 M3 102,520.00 3,690,720.00 0.14 8.00 - - - - - 0.14 - - - - - - -

- Urugan tanah kembali 32.26 M3 33,916.00 1,094,130.16 0.04 8.00 - - - - - 0.04 - - - - - - -

- Bongkar batu kali (tebal >50 cm) 12.00 M3 66,661.00 799,932.00 0.03 8.00 - - - - - 0.03 - - - - - - -

3 Penyambungan Daya PLN 66 KVA BP material dan pemasangan 1.00 Pkt 73,210,000.00 73,210,000.00 2.78 4.00 2.50 - - - 0.14 - - - - - - - - -

30
4 Rekondisi Pipa Bocor
- Giboul Join dia. 250 mm 10.00 Bh 2,000,000.00 20,000,000.00 0.76 6.00 - - - - - - - - - - - - -

- Giboul Join dia. 200 mm 20.00 Bh 1,000,000.00 20,000,000.00 0.76 6.00 - - - - - - - - - - - - -

- Pipa HDPE SDR 17 (PN 10) ND. 250 mm 12.00 M 700,000.00 8,400,000.00 0.32 6.00 - - - - - - - - - - - - -

- Pipa HDPE SDR 17 (PN 10) ND. 200 mm 24.00 M 450,000.00 10,800,000.00 0.41 6.00 - - - - - - - - - - - - -

- Galian tanah 32.80 M3 102,520.00 3,362,656.00 0.13 6.00 - - - - - - - - - - - - -


70

- Urugan tanah kembali 32.18 M3 33,916.00 1,091,416.88 0.04 6.00 - - - - - - - - - - - - -

- Pemasangan Pipa HDPE SDR 17 (PN 10) ND. 250 mm 12.00 M 21,598.00 259,176.00 0.01 6.00 - - - - - - - - - - - - -

- Pemasangan Pipa HDPE SDR 17 (PN 10) ND. 200 mm 24.00 M 16,527.00 396,648.00 0.02 6.00 - - - - - - - - - - - - -

- Pemasangan Accessories dia. 250 mm 10.00 Bh 52,937.00 529,370.00 0.02 6.00 - - - - - - - - - - - - -

- Pemasangan Accessories dia. 200 mm 20.00 Bh 35,090.00 701,800.00 0.03 6.00 - - - - - - - - - - - - -

5 Rekondisi fasilitas Sosial / Fasilitas Umum


- Bongkaran Aspal Hotmix dan Beton 43.73 M2 66,661.00 2,915,085.53 0.11 6.00 - - 0.05 0.03 0.03 0.03 - - - - - - - 20
- Rekondisi kembali jalan beton K 175 6.53 M3 856,243.00 5,591,266.79 0.21 6.00 - - 0.07 0.03 0.03 0.03 - - - - - - -

6 Pembuatan Wash Out dia. 75 mm pada Jaringan Pipa dia. 100 mm (1 Unit)
Pengadaan Pipa dan Accessories
- Gate Valve dia. 100 mm 1.00 Bh 2,700,000.00 2,700,000.00 0.10 1.00 - - - - - - - - - - - - -
60
- Gate Valve dia. 75 mm 1.00 Bh 1,750,000.00 1,750,000.00 0.07 1.00 - - - - - - - - - - - - -

- Tee Steel dia. 100 x 75 mm 1.00 Bh 750,000.00 750,000.00 0.03 1.00 - - - - - - - - - - - - -

- Stub Flange HDPE ND. 90 mm 1.00 Bh 400,000.00 400,000.00 0.02 1.00 - - - - - - - - - - - - -

- Loose Flange dia. 100 mm 2.00 Bh 175,000.00 350,000.00 0.01 1.00 - - - - - - - - - - - - -

- Loose Flange dia. 75 mm 1.00 Bh 125,000.00 125,000.00 0.00 1.00 - - - - - - - - - - - - -

- Butt Fusion Elbouw ND. 90 mm x 90º 1.00 Bh 750,000.00 750,000.00 0.03 1.00 - - - - - - - - - - - - -

- Pipa HDPE SDR 17 (PN 10) ND. 90 mm 6.00 M 80,000.00 480,000.00 0.02 1.00 - - - - - - - - - - - - -

- Pipa PVC dia. 150 mm Untuk Selubung Street Box 2.00 Bh 150,000.00 300,000.00 0.01 1.00 - - - - - - - - - - - - -

- Street Box 2.00 Bh 500,000.00 1,000,000.00 0.04 1.00 - - - - - - - - - - - - - 10


- Baut Lengkap Ring dan Mur Untuk Flange 46.00 Bh 10,000.00 460,000.00 0.02 1.00 - - - - - - - - - - - - -

- Paking / Gasket Untuk Flange 0.48 M2 325,000.00 156,000.00 0.01 1.00 - - - - - - - - - - - - -

50
10

DURASI
RE - SCHEDULE
NO. URAIAN VOLUME HARGA SATUAN JUMLAH HARGA BOBOT MINGGU KET
SEPTEMBER 2020 OKTOBER 2020 NOPEMBER 2020 DESEMBER 2020 JANUARI 2021 FEBRUARI 2021 MARET 2021 APRIL 2021 MEI 2021
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
7 Pekerjaan Pemasangan Pipa dan Accessories
- Galian tanah 2.31 M3 102,520.00 236,821.20 0.01 1.00 - - - - - - - - - - - - -
100
- Mengurug kembali 2.19 M3 33,916.00 74,276.04 0.00 1.00 - - - - - - - - - - - - -

- Pengelasan Flange dia. 100 mm 2.00 Bh 278,179.00 556,358.00 0.02 1.00 - - - - - - - - - - - - -

- Pengelasan Flange dia. 75 mm 1.00 Bh 210,726.00 210,726.00 0.01 1.00 - - - - - - - - - - - - -

- Pemasangan Valve dia. 100 mm 1.00 Bh 231,918.00 231,918.00 0.01 1.00 - - - - - - - - - - - - -

- Pemasangan Valve dia. 75 mm 1.00 Bh 231,918.00 231,918.00 0.01 1.00 - - - - - - - - - - - - -

- Pemasangan Accessories dia. 100 mm 1.00 Bh 17,242.00 17,242.00 0.00 1.00 - - - - - - - - - - - - -

- Pemasangan Accessories dia. 75 mm 2.00 Bh 17,242.00 34,484.00 0.00 1.00 - - - - - - - - - - - - -

- Pemasangan Pipa HDPE SDR 17 (PN 10) ND. 90 mm 6.00 M 5,571.00 33,426.00 0.00 1.00 - - - - - - - - - - - - -
-
PHO

JUMLAH HARGA 2,633,877,513.27

JUMLAH BOBOT PEKERJAAN 100.00

RENCANA KEMAJUAN PEKERJAAN KOMULATIF KONTRAK AWAL - 0.09 0.18 2.30 4.42 7.38 10.34 13.31 16.27 22.20 28.12 34.05 39.97 46.63 53.29 56.80 60.30 63.81 67.31 71.18 75.05 78.91 82.78 86.47 90.16 93.54 94.60 95.65 96.06 97.59 98.12 98.57 100.0
90
RENCANA KEMAJUAN PEKERJAAN MINGGUAN 0.01 0.01 0.99 0.40 0.18 0.18 7.96 6.95 6.05 6.12 6.12 6.12 6.12 6.12 2.01 0.03 4.24 8.31 2.70 1.97 3.73 2.87 3.50 3.34 3.47 2.08 1.64 1.71 1.97 1.10 1.26 0.72

RENCANA KEMAJUAN PEKERJAAN MINGGUAN KOMULATIF - 0.01 0.03 1.02 1.42 1.60 1.78 9.74 16.69 22.74 28.86 34.98 41.10 47.21 53.33 55.34 55.37 59.61 67.93 70.63 72.60 76.34 79.21 82.71 86.05 89.52 91.60 93.24 94.95 96.92 98.02 99.28 100.0

KEMAJUAN REALISASI PEKERJAAN MINGGUAN 0.02 1.01 0.77 0.05 0.05 0.05 0.05 8.74 27.11 15.67 0.16 0.16 1.98 3.65 0.27 0.01 2.51 0.01 0.01 10.46 4.14 1.66 0.91 1.32 1.32 0.98 0.01

KEMAJUAN REALISASI PEKERJAAN MINGGUAN KOMULATIF - 0.02 1.02 1.79 1.84 1.89 1.94 1.98 10.73 37.84 53.51 53.67 53.83 55.81 59.45 59.73 59.74 62.25 62.25 62.26 72.72 76.86 78.52 79.43 80.75 82.07 83.05 100.0

DEVIASI 0.01 1.00 0.78 0.43 0.29 0.16 (7.75) (5.97) 15.10 24.65 18.69 12.73 8.60 6.12 4.38 4.37 2.63 (5.67) (8.37) 0.11 0.52 (0.69) (3.28) (5.30) (7.45) (8.55) -

Banda Aceh, 12 Maret 2020


CV. BARONA USAHA

RENALDI PURBA, ST
Manager Proyek
80

70

60

50
BENTUK RENCANA KESELAMATAN KONSTRUKSI (RKK)

RENCANA KESELAMATAN KONSTRUKSI


#REF!

#REF!

DAFTAR ISI
A. Kepemimpinan dan Partisipasi Pekerja dalam Keselamatan Konstruksi
A.1 Kepedulian pimpinan terhadap Isu eksternal dan internal
A.2 Komitmen Keselamatan Konstruksi
B. Perencanaan keselamatan konstruksi
B.1 Identifikasi bahaya, Penilaian risiko, Pengendalian dan Peluang.
B.2 Rencana tindakan (sasaran & program)
B.3 Rencana tindakan (sasaran & program)
C. Dukungan Keselamatan Konstruksi
C.1 Sumber daya
C.2 Kompetesni
C.3 Kepedulian
C.4 Komunikasi
C.5 Informasi Terdokumentasi
D. Operasi Keselamatan Konstruksi
D.1 Perencanaan Operasi
E. Evaluasi Kinerja Keselamatan Konstruksi
E.1 Pemantauan dan evaluasi
E.2 Tinjauan manajemen
E.3 Peningkatan kinerja keselamatan konstruksi

Standar dan peraturan perundang


Daftar Peraturan Perundang - undangan dan Persyaratkan K3 yang digunakan sebagai acuan dalam melaksanakan SMK3 Konstruksi
Bidang PU antara lain sebagai berikut :
1 UU No. 1/1970 Tentang Keselamatan Kerja
2 UU NO. 18/1999 Tentang Jasa Konstruksi , diganti dengan UU No. 02/2017
3 UU No. 13/2003 Tentang Ketenagakerjaan
4 Permanaker No. 1/1980 Keselamatan & Kesehatan Kerja pada Konstruksi Bangunan
5 Keputusan Bersama Menaker-MenPU No. 174/MEN/1986 dan 104/KPTS/1986 Tentang Keselamatan dan Kesehatan Kerja
pada Kegiatan Konstruksi
6 Permanaker No. 5/1996 Sistem Managemen Keselamatan & Kesehatan Kerja (SMK3)
7 Permen PU No. 09/2008 diganti (Permen PU No. 05/2014) Pedoman Sistem Manajemen K3 Konstruksi Bidang Pekerjaan Umum
PAKTA KOMITMEN KESELAMATAN KONSTRUKSI

Saya yang bertanda tangan di bawah ini:


Nama : #REF!
Jabatan : #REF!
Bertindak untuk dan atas nama : #REF!

Dalam rangka pengadaan Pekerjaan Optimalisasi IKK Kluet Timur Kab. Aceh Selatan berkomitmen melaksanakan konstruksi berkeselamatan demi terciptanya Zero Accident, dengan memastikan bahwa seluruh pelaksanaan konstruksi.

1 Memenuhi ketentuan Keselamatan dan Kesehatan Kerja (K3) Konstruksi;


2 Menggunakan tenaga kerja kompeten bersertifikat;
3 Menggunakan peralatan yang memenuhi standar kelaikan;
4 Menggunakan peralatan yang memenuhi standar kelaikan;
5 Menggunakan teknologi yang memenuhi standar kelaikan; dan
6 Melaksanakan Standar Operasi dan Prosedur (SOP)

#REF!
#REF!

#REF!
#REF!
B.1. Identifikasi bahaya, Penilaian risiko, Pengendalian dan Peluang.

TABEL 1. IDENTIFIKASI BAHAYA, PENILAIAN RISIKO, PENETAPAN PENGENDALIAN RISIKO K3

Nama Perusahaan : #REF!


Pekerjaan : #REF!
Tanggal Dibuat : #REF!

PENILAIAN RISIKO
PENETAPAN PENGENDALIAN
NO JENIS/TIPE PEKERJAAN IDENTIFIKASI BAHAYA DAMPAK SKALA PRIORITAS
TINGKAT RISIKO K3
KEKERAPAN KEPARAHAN
RESIKO
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1 Setting - out Terjatuh, Luka Ringan, Berat 3 3 9 Sedang
a. Pengendalian Kehati-hatian dalam
dan Meninggal
Tertabrak Truck, pengendalian alat
Tertusuk Benda Tajam dan Material Lainnya
b. Pengendalian arahan pada pekerja
lapangan
c. Memeriksa kelengkapan alat yang
dibawa beserta sefty lainya
2 Mobilisasi Pipa Tertimpa Material Luka Ringan, dan 3 2 6 Sedang
a. Pengendalian Kehati-hatian dalam
Sedang
pengendalian alat
b. Pengendalian arahan pada pekerja
lapangan
c. Memeriksa kelengkapan alat yang
dibawa beserta sefty lainya
3 Mobilisasi dan Demolisasi Pekerja Tertabrak Truck Luka Ringan, Berat 3 3 9 Sedang
a. Pengendalian Kehati-hatian dalam
dan Meninggal
pengendalian alat

b. Pengendalian arahan pada Op. trado


c. Memeriksa kelengkapan alat yang
Mobilisasi Accessories, Pompa, Panel, Dan Kabel dibawa beserta sefty lainya
4 Tertimpa Material Luka Ringan, dan 3 2 6 Sedang
a. Pengendalian Kehati-hatian dalam
Sedang
pengendalian alat
b. Pengendalian arahan pada pekerja
lapangan
c. Memeriksa kelengkapan alat yang
Pekerjaan Galian Tanah Cadas / Tanah Keras dibawa beserta sefty lainya
5 Tergelincir, Luka Ringan, dan 3 2 6 Sedang
a. Pengendalian Menjaga jarak antara
Sedang
Tebing longsor, alat dengan tenaga pengarah
Tertimpah Runtuhan Galian, dan b. Pengendalian memberikan
Terkena Alat Kerja gambangan pada titik-titik tanah labil
c. Pengendalian memotong pepohonan
disekitar area galian
d. Pengendalian memberikan polis lane
pada titik bahaya disekitar galian
d. Pengendalian memberikan polis lane
pada titik bahaya disekitar galian
6 Timbun Kembali Galian Tanah Cadas / Tanah Keras Terkena Alat Kerja Luka Ringan, dan 3 2 6 Sedang
a) memberikan turap-turap penahan
Sedang
tanah

b) memberikan polis lane pada titik


bahaya disekitar timbunan saat
penimbunan kembali
c) Pengendalian jarak antara pekerja
dengan pekerja
7 Rekondisi Lampu Penerangan Terjatuh, Tertimpa Material Kerja Luka Ringan, dan 3 3 9 Sedang
a. Pengendalian Menjaga jarak antara
Berat
alat dengan tenaga pengarah

b) memberikan polis lane pada titik


bahaya disekitar rekondisa lampu
penerangan
c) Pengendalian jarak antara pekerja
dengan pekerja
8 Pekerjaan Perataan dan Pemadatan Tanah Urugan Terkena Alat Kerja Luka Ringan, dan 3 2 6 Sedang
a) memberikan turap-turap penahan
Sedang
tanah

b) memberikan polis lane pada titik


bahaya disekitar timbunan saat
penimbunan kembali
c) Pengendalian jarak antara pekerja
dengan pekerja
9 Rekondisi Pompa Transmisi Dan Distribusi Tegelincir, Terkena Alat Kerja Luka Ringan, dan 3 3 9 Sedang
a. Pengendalian Menjaga jarak antara
Berat
alat dengan tenaga pengarah

b) memberikan polis lane pada titik


bahaya disekitar Rekondisi Pompa
Transmisi Dan Distribusi
c) Pengendalian jarak antara pekerja
dengan pekerja
10 Urugan Tanah Tertimpa Material Luka Ringan, dan 3 1 3 Kecil
a. Pengendalian Menjaga jarak antara
Sedang
alat dengan tenaga pengarah
b. Pengendalian memberikan
gambangan pada titik-titik tanah labil
c) Pengendalian jarak antara pekerja
dengan pekerja
11 Bekisting Dinding Tertimpa Material, Tertimpa Kayu Luka Ringan, dan 3 2 6 Sedang
a) Pengendalian Menempatkan tenaga
Sedang
bekesting/mal yang propesional, serta
melihat sambungan kayu yg terpasang
dengan kuat.

b) Gunakanlah alat dengan tepat

c) berhati-hati dalam mengangkat kayu


12 Bekisting Tutup Tertimpa Material, Tertimpa Kayu Luka Ringan, dan 3 2 6 Sedang
a) Pengendalian Menempatkan tenaga
Sedang
bekesting/mal yang propesional, serta
melihat sambungan kayu yg terpasang
dengan kuat.

b) Gunakanlah alat dengan tepat

c) berhati-hati dalam mengangkat kayu

13 Pemasangan Pipa Steel Terjepit, Terluka Oleh Alat kerja, Tertimpa Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu Kerja
d) Menggunakan masker penutup
mulut
14 Pemasangan Pipa HDPE Terjepit, Terluka Oleh Alat kerja, Tertimpa Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu Kerja
d) memberikan turap-turap penahan
tanah
e) Menggunakan masker penutup
mulut
15 Pekerjaan Pembesian Tertimpa Material Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu kerja
d) Menggunakan masker penutup
mulut
Terluka, Terkena Material, Cat Terkena Mata
16 Pengecatan Engsel, Dan Gembok Luka Ringan, dan 3 2 6 Sedang a) Menggunakan masker penutup
Sedang mulut
b) Pengecatan tidak berlawanan arah
angin
Terjepit, Terluka Oleh Alat kerja, Tertimpa
17 Pemasangan Pompa Luka Ringan, dan 3 3 9 Sedang a) Menggunakan Sarung tangan
Berat b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu Kerja
d) Berhati-hati dalam pemasangan
pompa
18 Rekondisi Panel Dan Kabel Terjepit, Terluka Oleh Alat kerja, Tersetrum Luka Ringan, dan 3 3 9 Sedang
a. Pengendalian Menjaga jarak antara
Berat
alat dengan tenaga pengarah

b) memberikan polis lane pada titik


bahaya disekitar Rekondisi Panel Dan
Kabel
c) Pengendalian jarak antara pekerja
dengan pekerja
19 Bekisting Tertimpa Material, Tertimpa Kayu Luka Ringan, dan 3 2 6 Sedang
a) Pengendalian Menempatkan tenaga
Sedang
bekesting/mal yang propesional, serta
melihat sambungan kayu yg terpasang
dengan kuat.

b) Gunakanlah alat dengan tepat

c) berhati-hati dalam mengangkat kayu

20 Pemotongan Pipa Steel Terluka Oleh Alat Kerja Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu kerja
d) Menggunakan masker penutup
mulut
21 Pengelasan Pipa Steel Terkena Percikan Material Las Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu kerja
d) Menggunakan kaca mata las
d) Menggunakan masker penutup
mulut
22 Pengelasan Accessories Pipa Steel Terkena Percikan Material Las Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu kerja
d) Menggunakan kaca mata las
d) Menggunakan masker penutup
mulut
23 Pengelasan Flange Terkena Percikan Material Las Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu kerja
d) Menggunakan kaca mata las
e) Menggunakan masker penutup
mulut
24 Penyambungan dan Pemasangan Accessories PIPA Terluka Oleh Alat Kerja, Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu Kerja
d) Menggunakan masker penutup
mulut
25 Pemasangan Gate Valve Terluka Oleh Alat Kerja Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu Kerja
d) Menggunakan masker penutup
mulut
26 Penyambunggan Pipa HDPE Terluka Oleh Alat Kerja, Tertimpa Material Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu Kerja
d) Menggunakan masker penutup
mulut
27 Pengecatan Pipa dan Baja Profil Siku Terluka, Terkena Material, Cat Terkena Mata Luka Ringan, dan 3 2 6 Sedang a) Menggunakan masker penutup
Sedang mulut
b) Pengecatan tidak berlawanan arah
angin
28 Pekerjaan Galian Tanah Untuk Koneksi Terluka Oleh Alat Kerja Luka Ringan, dan 3 1 3 Kecil
a. Pengendalian Menjaga jarak antara
Sedang
alat dengan tenaga pengarah
b. Pengendalian memberikan
gambangan pada titik-titik tanah labil
c) Pengendalian jarak antara pekerja
dengan pekerja
29 Pekerjaan Interkoneksi Pipa Lama Terluka Oleh Alat Kerja Luka Ringan, dan 3 2 6 Sedang
a. Pengendalian Menjaga jarak antara
Sedang
alat dengan tenaga pengarah
b. Pengendalian memberikan
gambangan pada titik-titik tanah labil
c) Pengendalian jarak antara pekerja
dengan pekerja
30 Pengerjaan Beton K -175 Untuk Umpak Tertimpa Material dan Terluka Karena Material Luka Ringan, dan 3 2 6 Sedang
a. Pengendalian Menjaga jarak antara
Sedang
alat dengan tenaga pengarah
b. Pengendalian memberikan
gambangan pada titik-titik tanah labil
c) Pengendalian jarak antara pekerja
dengan pekerja
31 Pekerjaan Bongkaran Aspal Hotmix dan Beton Terluka Oleh Alat Kerja Luka Ringan, dan 3 3 9 Sedang a) Menggunakan Sarung tangan
Berat b) memberikan polis lane pada titik
bahaya disekitar Bongkaran Aspal
Hotmix dan Beton
c) Pengendalian jarak antara pekerja
dengan pekerja
32 Pembersian Lokasi IPA Terluka Oleh Alat Kerja Luka Ringan, dan 3 2 6 Sedang
a. Pengendalian Kehati-hatian dalam
Sedang
pengendalian alatarahan
b. Pengendalian kerja pada pekerja
lapangan
c. Memeriksa kelengkapan alat yang
Terluka Oleh Alat Kerja, Tertimpa Material dibawa beserta sefty lainya
33 Pemasangan Pipa Sadap Untuk Intek Luka Ringan, dan 3 3 9 Sedang a) Menggunakan Sarung tangan
Berat b) Gunakanlah alat dengan tepat
Terluka Oleh Alat Kerja, Tertimpa Material, c) Menggunakan Sepatu Kerja
Tersetrum d) Menggunakan masker penutup
mulut
34 Pekerjaan Bongkar Batu Kali Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang
b) memberikan polis lane pada titik
bahaya disekitar Bongkaran batu kali

c) Pengendalian jarak antara pekerja


dengan pekerja
35 Penyambungan Daya PLN 66 KVA BP Material dan Terluka Oleh Alat Kerja, Tertimpa Material, Luka Ringan, dan 3 3 9 Sedang a) Menggunakan Sarung tangan
Pemasangan Tersetrum Berat b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu kerja
d) Berhati-hati dalam penyambungan
kabel
36 Pekerjaan Rekondisi Pipa Bocor Terjepit, Terluka Oleh Alat kerja Luka Ringan, dan 3 2 6 Sedang
a. Pengendalian Menjaga jarak antara
Sedang
alat dengan tenaga pengarah

b) memberikan polis lane pada titik


bahaya disekitar Rekondisi Pipa Bocor
c) Pengendalian jarak antara pekerja
dengan pekerja
37 Pengetesan Pipa Tertimpa Material Luka Ringan, dan 3 2 6 Sedang a) Menggunakan Sarung tangan
Sedang b) Gunakanlah alat dengan tepat
c) Menggunakan Sepatu Kerja
d) Menggunakan masker penutup
mulut
38 Pekerjaan Rekondisi Genset Terluka Oleh Alat Kerja, Tertimpa Material Luka Ringan, dan 3 2 6 Sedang
a. Pengendalian Menjaga jarak antara
Sedang
alat dengan tenaga pengarah
b) memberikan polis lane pada titik
bahaya disekitar Rekondisi Genset
c) Pengendalian jarak antara pekerja
dengan pekerja
39 Plesteran 1 : 2 Terkena Iritasi Kulit Dari Percikan Adukan Semen Luka Ringan, dan 3 2 6 Sedang a) Pengendalian Menempatkan
Sedang perancah yg baik dan benar pada
posisi yang diizinkan

b) Pengendalian bahan yang


dipergunkan untuk bahan perancah,
menempatkan tanaga yang ahli.

c) Pengendalian sefty ditempatkan


sesuai dengan arahan pengawas

#REF!
#REF!

#REF!
#REF!
B.2. Rencana tindakan (sasaran & program)

Nama Perusahaan : #REF!


Pekerjaan : #REF!
Tanggal Dibuat : #REF!

SASARAN KHUSUS PROGRAM


NO TIPE/JENIS PEKERJAAN PENGENDALIAN RISIKO SUMBER JANGKA INDIKATOR MONITORI
URAIAN TOLOK UKUR PENANGGUNG JAWAB
DAYA WAKTU PENCAPAIAN NG
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1 Setting - out a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang baik, menyusun Kebugaran, Kondisi sesuai dengan rambu, modul metode
intruksi kerja b) Mengunakan Pelindung mental, Bekerja spesifikasi kerja
Pernapasan dan Mulut (Masker) sendirian.

2 Mobilisasi Pipa a)Pengendalian Kehati-hatian dalam pengendalian Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
alat b) Pengendalian arahan pada Op. trado c) Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
Memeriksa kelengkapan alat yang dibawa beserta Kebugaran, Kondisi sesuai dengan rambu, modul metode
sefty lainya mental, Bekerja spesifikasi kerja
sendirian.

3 Mobilisasi dan Demolisasi Pekerja a)Pengendalian Kehati-hatian dalam pengendalian Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
alat b) Pengendalian arahan pada Op. trado c) Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
Memeriksa kelengkapan alat yang dibawa beserta Kebugaran, Kondisi sesuai dengan rambu, modul metode
sefty lainya mental, Bekerja spesifikasi kerja
sendirian.

4 Mobilisasi Accessories, Pompa, Panel, Dan Kabel a)Pengendalian Kehati-hatian dalam pengendalian Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
alat b) Pengendalian arahan pada Op. trado c) Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
Memeriksa kelengkapan alat yang dibawa beserta Kebugaran, Kondisi sesuai dengan rambu, modul metode
sefty lainya mental, Bekerja spesifikasi kerja
sendirian.

5 Pekerjaan Galian Tanah Cadas / Tanah Keras a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang baik, menyusun Kebugaran, Kondisi sesuai dengan rambu, modul metode
intruksi kerja b) Pengendalian Menjaga jarak mental, Bekerja spesifikasi kerja
antara alat dengan tenaga pengarah c) sendirian.
Mengunakan Pelindung Pernapasan dan Mulut
(Masker)
6 Timbun Kembali Galian Tanah Cadas / Tanah Keras a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang baik, menyusun Kebugaran, Kondisi sesuai dengan rambu, modul metode
intruksi kerja b) Memakai sarung tangan. mental, Bekerja spesifikasi kerja
sendirian.

7 Rekondisi Lampu Penerangan a. Pengendalian Menjaga jarak antara alat dengan Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
tenaga pengarah b) memberikan polis lane pada Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
titik bahaya disekitar rekondisa lampu penerangan Kebugaran, Kondisi sesuai dengan rambu, modul metode
c) Pengendalian jarak antara pekerja dengan mental, Bekerja spesifikasi kerja
pekerja sendirian.

8 Pekerjaan Perataan dan Pemadatan Tanah Urugan a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang baik, menyusun Kebugaran, Kondisi sesuai dengan rambu, modul metode
intruksi kerja b) Memakai sarung tangan. mental, Bekerja spesifikasi kerja
sendirian.

9 Rekondisi Pompa Transmisi Dan Distribusi a. Pengendalian Menjaga jarak antara alat dengan Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
tenaga pengarah b) memberikan polis lane pada Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
titik bahaya disekitar rekondisa lampu penerangan Kebugaran, Kondisi sesuai dengan rambu, modul metode
c) Pengendalian jarak antara pekerja dengan mental, Bekerja spesifikasi kerja
pekerja sendirian.

10 Urugan Tanah a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang baik, menyusun Kebugaran, Kondisi sesuai dengan rambu, modul metode
intruksi kerja b) Memakai sarung tangan. mental, Bekerja spesifikasi kerja
sendirian.

11 Bekisting Dinding a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Pengendalian Menjaga jarak antara alat mental, Bekerja spesifikasi kerja
dengan tenaga pengarah sendirian.
c) Pengendalian memberikan
gambangan pada titik-titik tanah labil

12 Bekisting Tutup a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Pengendalian Menjaga jarak antara alat mental, Bekerja spesifikasi kerja
dengan tenaga pengarah sendirian.
c) Pengendalian memberikan
gambangan pada titik-titik tanah labil
13 Pemasangan Pipa Steel a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

14 Pemasangan Pipa HDPE a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

15 Pekerjaan Pembesian a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

16 Pengecatan Engsel, Dan Gembok a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan masker penutup mulut c) mental, Bekerja spesifikasi kerja
Pengecatan tidak berlawanan arah angin sendirian.

17 Pemasangan Pompa a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Berhati-hati dalam pemasangan
pompa

18 Rekondisi Panel Dan Kabel a. Pengendalian Menjaga jarak antara alat dengan Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
tenaga pengarah b) memberikan polis lane pada Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
titik bahaya disekitar rekondisa panel dan kabel c) Kebugaran, Kondisi sesuai dengan rambu, modul metode
Pengendalian jarak antara pekerja dengan pekerja mental, Bekerja spesifikasi kerja
sendirian.
19 Bekisting a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Pengendalian Menjaga jarak antara alat mental, Bekerja spesifikasi kerja
dengan tenaga pengarah sendirian.
c) Pengendalian memberikan
gambangan pada titik-titik tanah labil

20 Pemotongan Pipa Steel a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

21 Pengelasan Pipa Steel a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

22 Pengelasan Accessories Pipa Steel a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

23 Pengelasan Flange a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut
24 Penyambungan dan Pemasangan Accessories PIPA a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

25 Pemasangan Gate Valve a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

26 Penyambunggan Pipa HDPE a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

27 Pengecatan Pipa dan Baja Profil Siku a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan masker penutup mulut c) mental, Bekerja spesifikasi kerja
Pengecatan tidak berlawanan arah angin sendirian.

28 Pekerjaan Galian Tanah Untuk Koneksi a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang baik, menyusun Kebugaran, Kondisi sesuai dengan rambu, modul metode
intruksi kerja b) Pengendalian Menjaga jarak mental, Bekerja spesifikasi kerja
antara alat dengan tenaga pengarah c) sendirian.
Mengunakan Pelindung Pernapasan dan Mulut
(Masker)

29 Pekerjaan Interkoneksi Pipa Lama a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang baik, menyusun Kebugaran, Kondisi sesuai dengan rambu, modul metode
intruksi kerja b) Pengendalian Menjaga jarak mental, Bekerja spesifikasi kerja
antara alat dengan tenaga pengarah c) sendirian.
Mengunakan Pelindung Pernapasan dan Mulut
(Masker)
30 Pengerjaan Beton K -175 Untuk Umpak a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang baik, menyusun Kebugaran, Kondisi sesuai dengan rambu, modul metode
intruksi kerja b) Pengendalian Menjaga jarak mental, Bekerja spesifikasi kerja
antara alat dengan tenaga pengarah c) sendirian.
Mengunakan Pelindung Pernapasan dan Mulut
(Masker)

31 Pekerjaan Bongkaran Aspal Hotmix dan Beton a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang baik, menyusun Kebugaran, Kondisi sesuai dengan rambu, modul metode
intruksi kerja b) Pengendalian Menjaga jarak mental, Bekerja spesifikasi kerja
antara alat dengan tenaga pengarah c) sendirian.
Mengunakan Pelindung Pernapasan dan Mulut
(Masker)

32 Pembersian Lokasi IPA a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang baik, menyusun Kebugaran, Kondisi sesuai dengan rambu, modul metode
intruksi kerja b). Pengendalian arahan pada mental, Bekerja spesifikasi kerja
pekerja lapangan c). Memeriksa kelengkapan alat sendirian.
yang dibawa beserta sefty lainya

33 Pemasangan Pipa Sadap Untuk Intek a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

34 Pekerjaan Bongkar Batu Kali a. Pengendalian Menjaga jarak antara alat dengan Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
tenaga pengarah b) memberikan polis lane pada Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
titik bahaya disekitar bongkaran batu kali c) Kebugaran, Kondisi sesuai dengan rambu, modul metode
Pengendalian jarak antara pekerja dengan pekerja mental, Bekerja spesifikasi kerja
sendirian.

35 Penyambungan Daya PLN 66 KVA BP Material dan Pemasaa) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Berhati-hati dalam penyambungan
kabel
36 Pekerjaan Rekondisi Pipa Bocor a. Pengendalian Menjaga jarak antara alat dengan Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
tenaga pengarah b) memberikan polis lane pada Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
titik bahaya disekitar rekondisi pipa bocor c) Kebugaran, Kondisi sesuai dengan rambu, modul metode
Pengendalian jarak antara pekerja dengan pekerja mental, Bekerja spesifikasi kerja
sendirian.

37 Pengetesan Pipa a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Menggunakan Sarung tangan c) mental, Bekerja spesifikasi kerja
Gunakanlah alat dengan tepat d) Menggunakan sendirian.
Sepatu Kerja e) Menggunakan masker penutup
mulut

38 Pekerjaan Rekondisi Genset a. Pengendalian Menjaga jarak antara alat dengan Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
tenaga pengarah b) memberikan polis lane pada Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
titik bahaya disekitar rekondisi genset c) Kebugaran, Kondisi sesuai dengan rambu, modul metode
Pengendalian jarak antara pekerja dengan pekerja mental, Bekerja spesifikasi kerja
sendirian.

39 Plesteran 1 : 2 a) Menggunakan peralatan kerja dan APD yang Kompetensi, Mengoptimalka Alat Pelindung Sesuai Jadwal Tertib melaksanakan Cheklist Ahli K3
benar, Menggunakan metode / cara kerja yang Kesehatan & n pekerjaan Diri, Rambu- Pelaksanaan Pekerjaan sesuai
benar dan peralatan kerja yang, menyusun intruksi Kebugaran, Kondisi sesuai dengan rambu, modul metode
kerja b) Pengendalian Menempatkan perancah yg mental, Bekerja spesifikasi kerja
baik dan benar pada posisi yang diizinkan c) sendirian.
Pengendalian bahan yang dipergunkan untuk
bahan perancah, menempatkan tanaga yang ahli.
d) Pengendalian sefty ditempatkan sesuai dengan
arahan pengawas

#REF!
#REF!

#REF!
#REF!
PELAKSANAAN TA 2020
PEKERJAAN : OPTIMALISASI IKK KLUET TIMUR KAB. ACEH SELATAN

LOKASI KAB. ACEH SELATAN

TAHUN ANGGARAN : 2020

NO. URAIAN VOLUME HARGA SATUAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi (Direksi Keet/sewa, 0.72 Ls 7,500,000.00 5,375,000.00
0 Tenaga kerja, Alat, Bahan)
2 Setting-Out 13,756.00 M' 1,870.00 25,723,720.00
3 Administrasi (Dok. Kontrak, Shop Drawing dan As-built 0.72 Ls 5,000,000.00 3,583,333.33
Drawing, Site management, Dok. Proyek, Fasilitas Sementara)
4 SMK3 Konstruksi 1.00 Ls 20,270,000.00 20,270,000.00

II. PENGADAAN PIPA DAN ACCESSORIES


1 Pengadaan Pipa
- Pipa HDPE SDR 17 (PN 10) ND. 110 mm 8,500.00 M' 111,000.00 943,500,000.00
- Pipa HDPE SDR 17 (PN 10) ND. 90 mm

2 Pengadaan Accessories
- Tee Steel dia. 250mm x 100mm - Bh 1,750,000.00 -
- Gate Valve Cl dia. 250mm - Bh 5,300,000.00 -
- Gate Valve Cl dia. 100mm - Bh 2,700,000.00 -
- Gate Valve Cl dia. 75mm
- Loose Flange dia. 250mm - Bh 400,000.00 -
- Loose Flange dia. 100mm - Bh 175,000.00 -
- Flange Socket dia. 250mm - Bh 1,500,000.00 -
- Stube Flang dia. 110mm - Bh 500,000.00 -
- Stube Flange dia. 90mm
- Butt Fusion Reduser Tee ND 110mm x 90mm - Bh 500,000.00 -
- Butt Fusion Cup dia 110 mm - Bh 300,000.00 -
- Butt Fusion Cup dia 90 mm
- Street Box - Bh 500,000.00 -
- Pipa Selubung Street Box - Bh 100,000.00 -
- Baut Lengkap Ring dan Mur Untuk Flange - Bh 10,000.00 -
- Paking/Gasket untuk Flange - M2 325,000.00 -

III. PEKERJAAN PEMASANGAN PIPA, ACESSORIES TERMASUK FITTING VALVE D


1 Pekerjaan Tanah
- Galian Tanah Keras 2,550.00 M3 102,520.00 261,426,000.00
- Mengurug Kembali Galian 2,469.26 M3 33,916.00 83,747,515.43
- Urugan Tanah Bekas Galian Termasuk Perataan dan 80.74 M3 56,650.00 4,573,765.21
Pemadatan

2 Pemasangan Pipa Termasuk Fitting, accessories dan Valve


- Pipa HDPE SDR 17 (PN 10) ND. 110 mm 8,500.00 M' 6,490.00 55,165,000.00
- Pipa HDPE SDR 17 (PN 10) ND. 90 mm
Pemasangan Accessories
- Accessories dia. 250 mm - Bh 52,937.00 -
- Accessories dia. 100 mm - Bh 17,242.00 -
- Accessories dia. 75 mm
Pengelasan Loose Flange
- Loose Flange dia. 250 mm - Bh 659,313.00 -
- Loose Flange dia. 100 mm - Bh 278,179.00 -
Pemasangan Gate Valve
- Gate Valve Cl dia. 250 mm - Bh 278,052.00 -
NO. URAIAN VOLUME HARGA SATUAN JUMLAH HARGA

- Gate Valve Cl dia. 100 mm - Bh 231,918.00 -


- Gate Valve Cl dia. 75 mm
NO. URAIAN VOLUME HARGA SATUAN JUMLAH HARGA

3 Penyambungan Pipa dan Acesories


- Penyambungan Pipa HDPE SDR 17 (PN 10) ND. 110 mm 160.00 Titik 50,001.00 8,000,160.00
- Penyambungan Pipa HDPE SDR 17 (PN 10) ND. 90 mm
- Penyambungan AcessoriesPipa HDPE SDR 17 (PN 10) ND. 110 mm - Titik 50,001.00 -
- Penyambungan Acessories Pipa HDPE SDR 17 (PN 10) ND. 90 mm

4 Pengetesan Pipa
- Pipa HDPE SDR 17 (PN 10) ND. 110 mm
- Pipa HDPE SDR 17 (PN 10) ND. 90 mm

5 Interkoneksi dengan Pipa Lama/Eksisting dan Boring Pipa


- Galian tanah untuk konelsi
- Mengurug Tanah kembali
- Interkoneksi dengan Pipa Lama dia. 150 mm

IV. PENGADAAN DAN PEMASANGAN PIPA UNTUK PERLINTASAN


1 Pengadaan/Pemasangan Perlintasan Pipa Steel dia. 100mm
dan Accessories L = 1m - 5m
2 Pengadaan/Pemasangan Perlintasan Pipa Steel dia. 75 mm
dan Accessories L = 1m - 5m

V PEKERJAAN REKONDISI M/E, PIPA SADAP INTAKE,


PENYAMBUNGAN DAYA PLN, REKONDISI PIPA BOCOR,
REKONDISI FASILITAS UMUM DAN WASH OUT (WO)
1 Rekondisi M/E dan pembersihan lokasi IPA 0.80 Ls 35,000,000.00 28,000,000.00
- Rekondisi Panel dan asseccories
- Rekondisi Genset
- Rekondisi Pompa Transmisi dan Distribusi
- Rekondisi Lampu Penerangan
- Pembersihan Lokasi IPA

2 Pekerjaan Pengadaan dan Pemasangan Pipa Sadap untuk Intake


- Pipa Steel dia. 300 mm
- Wallface dia. 300 mm
- Loose Flange dia. 300 mm
- Pemasangan Pipa Steel dia. 300 mm
- Pengelasan Flange dia. 300 mm
- Pemasangan Asseccories dia. 300 mm
- Galian tanah
- Urugan tanah kembali
- Bongkar batu kali (tebal >50 cm)

3 Penyambungan Daya PLN 66 KVA BP material dan pemasangan

4 Rekondisi Pipa Bocor


- Giboul Join dia. 250 mm
- Giboul Join dia. 200 mm
- Pipa HDPE SDR 17 (PN 10) ND. 250 mm
- Pipa HDPE SDR 17 (PN 10) ND. 200 mm
- Galian tanah
- Urugan tanah kembali
- Pemasangan Pipa HDPE SDR 17 (PN 10) ND. 250 mm
- Pemasangan Pipa HDPE SDR 17 (PN 10) ND. 200 mm
- Pemasangan Accessories dia. 250 mm
- Pemasangan Accessories dia. 200 mm

5 Rekondisi fasilitas Sosial / Fasilitas Umum


- Bongkaran Aspal Hotmix dan Beton
- Rekondisi kembali jalan beton K 175
NO. URAIAN VOLUME HARGA SATUAN JUMLAH HARGA

6 Pembuatan Wash Out dia. 75 mm pada Jaringan Pipa dia. 100 mm (1 Unit)
Pengadaan Pipa dan Accessories
- Gate Valve dia. 100 mm
- Gate Valve dia. 75 mm
- Tee Steel dia. 100 x 75 mm
- Stub Flange HDPE ND. 90 mm
- Loose Flange dia. 100 mm
- Loose Flange dia. 75 mm
- Butt Fusion Elbouw ND. 90 mm x 90º
- Pipa HDPE SDR 17 (PN 10) ND. 90 mm
- Pipa PVC dia. 150 mm Untuk Selubung Street Box
- Street Box
- Baut Lengkap Ring dan Mur Untuk Flange
- Paking / Gasket Untuk Flange

7 Pekerjaan Pemasangan Pipa dan Accessories


- Galian tanah
- Mengurug kembali
- Pengelasan Flange dia. 100 mm
- Pengelasan Flange dia. 75 mm
- Pemasangan Valve dia. 100 mm
- Pemasangan Valve dia. 75 mm
- Pemasangan Accessories dia. 100 mm
- Pemasangan Accessories dia. 75 mm
- Pemasangan Pipa HDPE SDR 17 (PN 10) ND. 90 mm
PHO

JUMLAH HARGA : 1,439,364,493.97

PPN 10% : 143,936,449.40

JUMLAH TOTAL : 1,583,300,943.37

DIBULATKAN : 1,590,228,000.00
TABEL 1. IDENTIFIKASI BAHAYA, PENILAIAN RISIKO, PENGENDALIAN RISIKO K3,
PROGRAM K3, DAN BIAYA
#REF! : #REF!
#REF! : #REF!
#REF! : #REF!

Sasaran K3 Pengendalian Resiko


No Uraian Pekerjaan Identifikasi Jenis Bahaya & Risiko K3 Proyek Program Sumber Daya Biaya (Rp)
Proyek
1 2 3 4 5 6 7 ###

1 Mobilisasi dan Demobilisasi a) Terjadi Kecelakaan lalu lintas/Tabrakan ˃ Rusak alat dan korban jiwa mencegah Ketrampilan dan berhati- Peralatan : 1 Unit Trado 560,000.00
b). Terjepit/tertabrak dengan alat berat dan pengangkutnya ˃ luka berat terjadinya hati dalam menjalankan Bahan : -
kecelakaan trado
c.) Lepasnya alat berat dari mobil angkutan / jatuh ˃ Rusak ringan SDM : 1 Sopir Trado
d.) Terkena alat berat ˃ luka berat 1 Kenek Trado
e) Kesetrum arus listrik dari Kabel listrik dijalan raya ˃ luka berat/Meninggal

2 Pengukuran dan Setting Out a). Gangguan kesehatan ˃ luka ringan


b). Terluka karena tersayat meteran ˃ luka ringan mencegah Menggunakan Sarung SDM : 4 org pekerja 683,882.46
c). Terluka/tertusuk karena paku ˃ luka ringan terjadinya Tangan Kerja 1 org pengawas
kecelakaan
d). Terluka/terjepit/tertusuk oleh kayu patok ˃ luka sedang

3 Direksi keet + Gudang a). Terjepit anggota tubuh oleh kayu ˃ luka berat/luka ringan a) Gunakanlah alat dengan
b). Terkena paku/luka ringan, luka sedang ˃ luka ringan, luka sedang mencegah tepat Peralatan : alat bantu 140,000.00
terjadinya Bahan : kayu
kecelakaan b) berhati-hati dalam
mengangkat kayu SDM : 10 org pekerja
1 org pengawas

4 Galian Tanah Biasa a). Terkena peralatan kerja ˃ luka ringan/berat a) memberikan turap-turap
b). Pekerja/Orang jatuh ke dalam galian ˃ luka ringan/berat mencegah penahan tanah 9,670,350.00
˃ luka ringan/berat terjadinya b) memberikan polis lane Peralatan : alat bantu
kecelakaan pada titik bahaya disekitar Bahan : -
galian saat pengalian
SDM : 5 org pekerja
1 org pengawas
c) Pengendalian jarak
dengan patok-patok yang
akan digali

5 Urugan Kembali a). Terkena peralatan kerja, cangkul ˃ Luka berat/Luka ringan a) memberikan turap-turap
mencegah penahan tanah Peralatan : alat bantu 2,424,800.00
terjadinya b) memberikan polis lane Bahan : -
kecelakaan pada titik bahaya disekitar SDM : 5 org pekerja
timbunan saat penimbunan
kembali 1 org pengawas

c) Pengendalian jarak
antara pekerja dengan
pekerja
6 Beton Cor K. 175 a). Mengalami luka tangan saat memasukkan material ke dalam ˃ Luka berat/Luka sedang a) Pengendalian
Molen mencegah Menempatkan tenaga 158,800.00
terjadinya bekesting/mal yang
˃ Luka berat/Luka sedang propesional, serta melihat Peralatan : molen
kecelakaan
b). Mengalami gangguan pernafasan akibat penggunaan bahan semen sambungan kayu yg Bahan : Semen Portland
˃ Luka berat/Luka sedang terpasang dengan kuat. Pasir Pasang
c). Terjadi iritasi pada kulit dan mata akibat percikan semen atau
adukan semen Kerikil
d). Terkena percikan beton saat kerja beton ˃ Luka berat/Luka sedang SDM : 6 org pekerja
b) Pengendalian alat kerja 1 org pengawas
ditempatkan sesuai dengan
arahan pengawas

c) Pengendalianya
membuat jalan menuju
tempat pengecoran yang
kuat dan bisa dilalui tenaga
untuk pengecoran

7 Pemotongan PIPA GIP/CI a). Tetimpa Pipa GIP/CI ˃ Luka ringan/Luka sedang a) Menggunakan Sarung
b). Terjepit Pipa GIP/CI ˃ Luka ringan/Luka sedang mencegah tangan Peralatan : Pemotong GIP/CI 213,800.00
terjadinya
c). Terkena Peralatan kerja ˃ Luka ringan/Luka sedang
kecelakaan b) Gunakanlah alat dengan Bahan : -
tepat SDM : 4 org pekerja
c) Menggunakan Sepatu 1 org pengawas
Sefte

8 Pemotongan PIPA PVC a). Tetimpa Pipa PVC ˃ Luka ringan/Luka sedang a) Menggunakan Sarung
b). Terjepit Pipa PVC ˃ Luka ringan/Luka sedang mencegah tangan Peralatan : Pemotong PVC 320,000.00
terjadinya
c). Terkena Peralatan kerja ˃ Luka ringan/Luka sedang
kecelakaan b) Gunakanlah alat dengan Bahan : -
tepat SDM : 4 org pekerja
c) Menggunakan Sepatu 1 org pengawas
kerja
9 Pemotongan PIPA HDPE a). Tetimpa Pipa PVC ˃ Luka ringan/Luka sedang a) Menggunakan Sarung
b). Terjepit Pipa PVC ˃ Luka ringan/Luka sedang mencegah tangan Peralatan : Pemotong HDPE 800,000.00
terjadinya
c). Terkena Peralatan kerja ˃ Luka ringan/Luka sedang
kecelakaan b) Gunakanlah alat dengan Bahan : -
tepat SDM : 4 org pekerja
c) Menggunakan Sepatu 1 org pengawas
kerja

10 Penyambungan PIPA GIP/CI a). Tetimpa Pipa GIP/CI ˃ Luka ringan/Luka sedang a) Menggunakan Sarung
b). Terjepit Pipa GIP/CI ˃ Luka ringan/Luka sedang mencegah tangan Peralatan : Katrol, Mesin Las
terjadinya
c). Terkena Peralatan kerja (Katrol, Mesin Las, Alat Bantu, Dll) ˃ Luka ringan/Luka sedang
kecelakaan b) Gunakanlah alat dengan Bahan : Kawat Las 356,450.00
d). Terperosok kedalam kedalam lubang ˃ Luka ringan/Luka sedang tepat SDM : 4 org pekerja
c) Menggunakan Sepatu 1 org pengawas
Kerja
d) memberikan turap-turap
penahan tanah

e) Menggunakan masker
penutup mulut

11 Penyambungan PIPA PVC a). Tetimpa Pipa PVC ˃ Luka ringan/Luka sedang a) Menggunakan Sarung
b). Terjepit Pipa PVC ˃ Luka ringan/Luka sedang mencegah tangan Peralatan : Katrol, A. Bantu 235,650.00
terjadinya
c). Terkena Peralatan kerja (Katrol, Alat Bantu, Dll) ˃ Luka ringan/Luka sedang
kecelakaan b) Gunakanlah alat dengan Bahan : Lem Pipa
d). Terperosok kedalam kedalam lubang ˃ Luka ringan/Luka sedang tepat SDM : 6 org pekerja
c) Menggunakan Sepatu 1 org pengawas
Kerja
d) memberikan turap-turap
penahan tanah

e) Menggunakan masker
penutup mulut

12 Penyambungan PIPA HDPE a). Tetimpa Pipa PVC ˃ Luka ringan/Luka sedang a) Menggunakan Sarung
b). Terjepit Pipa PVC ˃ Luka ringan/Luka sedang mencegah tangan Peralatan : Mesin penyambung HDPE 1,000,000.00
terjadinya
c). Terkena Peralatan kerja (Katrol, Alat Bantu, Dll) ˃ Luka ringan/Luka sedang
kecelakaan b) Gunakanlah alat dengan Bahan : Solar
d). Terperosok kedalam kedalam lubang ˃ Luka ringan/Luka sedang tepat Minyak pelumas
c) Menggunakan Sepatu SDM : 6 org pekerja
Kerja 1 org pengawas
d) memberikan turap-turap
penahan tanah

e) Menggunakan masker
penutup mulut
13 Interkoneksi a). Tetimpa Pipa PVC ˃ Luka ringan/Luka sedang a) Menggunakan Sarung
dengan Pipa Eksisting b). Terjepit Pipa PVC ˃ Luka ringan/Luka sedang mencegah tangan Peralatan : Katrol, A. Bantu 650,250.00
terjadinya
c). Terkena Peralatan kerja (Katrol, Alat Bantu, Dll) ˃ Luka ringan/Luka sedang
kecelakaan b) Gunakanlah alat dengan Bahan : -
d). Terperosok kedalam kedalam lubang ˃ Luka ringan/Luka sedang tepat SDM : 8 org pekerja
c) Menggunakan Sepatu 1 org pengawas
Kerja
d) memberikan turap-turap
penahan tanah

14 Pemotongan Jalan dan a). Tetimpa Peralatan kerja ˃ Luka ringan/Luka sedang a) memberikan turap-turap
perbaikan kembali b). Terjepit Alat Kerja ˃ Luka ringan/Luka sedang mencegah penahan tanah Peralatan : Alat Bantu 800,000.00
c). Terjatuh dalam galian ˃ Luka ringan/Luka sedang terjadinya Bahan : -
kecelakaan
˃ Luka ringan/Luka sedang SDM : 8 org pekerja
b) memberikan polis lane
pada titik bahaya disekitar 1 org pengawas
galian saat pengalian
c) Pengendalian jarak
dengan patok-patok yang
akan digali

B.2. Pemenuhan Perundang-Undangan dan Persyaratan Lainnya.


Daftar Peraturan Perundang-Undangan dan Persyaratan K3 yang digunakan sebagai acuan dalam melaksanakan SMK3 Konstruksi Bidang PU
antara lain sebagai berikut :
1. UU No. 18 Tahun 1999 tentang Jasa Konstruksi;
2. Peraturan Pemerintah Nomor 50 tahun 2012 tentang Penerapan SMK3;
3. Peraturan Menteri Tenaga Kerja Nomor. PER-02/Men/1992 tentang Tata cara penunjukan kewajiban dan wewenang ahli keselamatan dan kesehatan kerja
4. Peraturan Menteri Tenaga Kerja Nomor. PER-05/Men/1996, tentang Pedoman teknis Audit sistem Manajemen keselamatan dan kesehatan kerja Banda Aceh, 27 Maret 2019
Penawar
CV. BARONA USAHA

SAIFULLAH, SE
Direktur
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

NO URAIAN SATUAN ANALISA HARGA SATUAN

1 2 3 4
PEKERJAAN PERSIAPAN
1 Uitset Pengukuran Jarak M' AHSP PU - T.04 -
2 Pengukuran M' AHSP PU - T.04.1 2,046.00
PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 Meter M3 AHSP PU A.2.3.1.1 77,275.00
2 Galian Tanah Keras Sedalam 1 Meter M3 AHSP PU A.2.3.1.4 102,872.00
3 Galian tanah cadas sedalam 1 meter M3 AHSP PU A.2.3.1.5 -
4 Galian Tanah Tanah Lumpur Sedalam 1 Meter M3 AHSP PU A.2.3.1.6 -
5 Mengurug Kembali Galian M3 AHSP PU A.2.3.1.9 34,829.30
6 Urugan Tanah Bekas Galian Termasuk Perataan dan Pemadatan (stamper) M3 AHSP PU - T.14 b 59,950.00
7 Urugan Pasir M3 AHSP PU A.2.3.1.11 149,710.00
PEKERJAAN PASANGAN
1 Pondasi Batu Belah/Kali Campuran 1:4 M3 AHSP PU A.3.2.1.2 -
2 Pekerjaan Batu Kosong (Aantamping) M3 AHSP PU A.3.2.1.9 -
PEKERJAAN BETON
1 Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K 100), Slump (3-6) cm, W/c = 0,87 M3 AHSP PU A.4.1.1.4 -
2 Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66 M3 AHSP PU A.4.1.1.5 876,007.17
3 Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56 M3 AHSP PU A.4.1.1.8 959,285.61
4 Pembesian 1 Kg Dengan Besi Polos Atau Besi Ulir KG AHSP PU A.4.1.1.17 17,301.90
5 Memasang Bekisting Untuk Pondasi M2 AHSP PU A.4.1.1.20 87,208.00
PEKERJAAN PENGELASAN
1 Pengelasan dengan Listrik M' AHSP PU A.4.2.1.5 -
2 Pemasangan Baja Profil Kg AHSP PU A.4.2.1.1 13,695.00
3 1 M' Pengelasan Pipa HDPE M Anl. HDPE. A -
PEKERJAAN PEMASANGAN PIPA PVC
1 Pemasangan 1 m pipa HDPE Ø 75 mm M' AHSP PU A.8.4.1.14 -
2 Pemasangan 1 m pipa HDPE Ø 90 mm M' AHSP PU A.8.4.1.17 #REF!
3 Pemasangan 1 m pipa HDPE Ø 110 mm M' AHSP PU A.8.4.1.18 #REF!
4 Memasang 1 M' pipa PVC dia. 150 mm M' AHSP PU A.8.4.1.4 19,624.00
5 Memasang 1 M' pipa PVC dia. 200 mm M' AHSP PU A.8.4.1.5 31,460.00
PEKERJAAN PEMASANGAN PIPA STEEL
1 Memasang 1 M' pipa Steel dia. 75 mm M' AHSP PU A.8.4.1.64 66,451.00
2 Memasang 1 M' pipa Steel dia. 75 mm M' AHSP PU A.8.4.1.64.a 71,775.00
3 Memasang 1 M' pipa Steel dia. 100 mm M' AHSP PU A.8.4.1.65 77,099.00
4 Memasang 1 M' pipa Steel dia. 150 mm M' AHSP PU A.8.4.1.67 94,303.00
5 Memasang 1 M' pipa Steel dia. 200 mm M' AHSP PU A.8.4.1.68 148,148.00
PEKERJAAN PEMASANGAN PIPA HDPE
1 Memasang 1 M' pipa HDPE dia. 50 mm M' AHSP PU A.8.1.17 5,698.00
2 Memasang 1 M' pipa HDPE dia. 75 mm M' AHSP PU A.8.1.17.a 6,171.00
3 Memasang 1 M' pipa HDPE dia. 100 mm M' AHSP PU A.8.1.18 6,644.00
4 Memasang 1 M' pipa HDPE dia. 150 mm M' AHSP PU A.8.1.20 10,274.00
5 Memasang 1 M' pipa HDPE dia. 200 mm M' AHSP PU A.8.1.21 16,918.00
6 Memasang 1 M' pipa HDPE dia. 250 mm M' AHSP PU A.8.1.22 20,900.00
7 Memasang 1 M' pipa HDPE dia. 300 mm M' AHSP PU A.8.1.23 28,237.00
8 Memasang 1 M' pipa HDPE dia. 350 mm M' AHSP PU A.8.1.23.a 38,203.00
9 Memasang 1 M' pipa HDPE dia. 400 mm M' AHSP PU A.8.1.24 48,169.00
PEKERJAAN PENGELASAN PIPA STEEL
1 Pengelasan Pipa Steel dia. 75 mm Titik Anl. L.1 114,910.88
2 Pengelasan Pipa Steel dia. 75 mm Titik Anl. L.2 114,910.88
3 Pengelasan Pipa Steel dia. 100 mm Titik Anl. L.3 152,007.01
4 Pengelasan Pipa Steel dia. 150 mm Titik Anl. L.4 221,116.02
5 Pengelasan Pipa Steel dia. 200 mm Titik Anl. L.5 290,696.04
PEKERJAAN PENGELASAN FLANGE
1 Pengelasan Flange dia. 250 mm Bh Anl. L. F. 6 539,972.35
2 Pengelasan Flange dia. 200 mm Bh Anl. L. F. 5 436,210.38
3 Pengelasan Flange dia. 150 mm Bh Anl. L. F. 4 331,650.01
4 Pengelasan Flange dia. 100 mm Bh Anl. L. F. 3 227,889.21
NO URAIAN SATUAN ANALISA HARGA SATUAN

1 2 3 4
5 Pengelasan Flange dia. 75 mm Bh Anl. L. F. 2 172,689.54
6 Pengelasan Flange dia. 50 mm Bh Anl. L. F. 1 -
NO URAIAN SATUAN ANALISA HARGA SATUAN

1 2 3 4
PEKERJAAN PEMOTONGAN PIPA STEEL
1 Pemotongan Pipa Steel dia. 200 mm Bh AHSP PU A.8.4.2.68 66,682.00
2 Pemotongan Pipa Steel dia. 150 mm Bh AHSP PU A.8.4.2.67 26,939.00
3 Pemotongan Pipa Steel dia. 100 mm Bh AHSP PU A.8.4.2.65 13,453.00
4 Pemotongan Pipa Steel dia. 75 mm Bh AHSP PU A.8.4.2.64.a 9,724.00
5 Pemotongan Pipa Steel dia. 50 mm Bh AHSP PU A.8.4.2.64 5,830.00
PEKERJAAN PENYAMBUNGAN PIPA HDPE
1 Penyambungan Pipa HDPE dia. 75 mm Titik Anl. HDPE. A1 28,646.48
2 Penyambungan Pipa HDPE dia. 75 mm Titik Anl. HDPE. A2 28,646.48
3 Penyambungan Pipa HDPE dia. 100 mm Titik Anl. HDPE. A3 38,021.91
4 Penyambungan Pipa HDPE dia. 150 mm Titik Anl. HDPE. A4 55,265.93
5 Penyambungan Pipa HDPE dia. 200 mm Titik Anl. HDPE. A5 72,662.63
6 Penyambungan Pipa HDPE dia. 250 mm Titik Anl. HDPE. A6 89,907.68
7 Penyambungan Pipa HDPE dia. 300 mm Titik Anl. HDPE. A7 108,296.86
8 Penyambungan Pipa HDPE dia. 350 mm Titik Anl. HDPE. A8 125,651.90
PENGETESAN PIPA
1 Pengetesan Pipa dia. 75 mm M' AHSP PU A.8.4.5.1 -
2 Pengetesan Pipa dia. 75 mm M' AHSP PU A.8.4.5.2 2,065.80
3 Pengetesan Pipa dia. 100 mm M' AHSP PU A.8.4.5.3 2,439.80
3 Pengetesan Pipa dia. 150 mm M' AHSP PU A.8.4.5.4 3,374.80
4 Pengetesan Pipa dia. 200 mm M' AHSP PU A.8.4.5.5 4,590.30
PEKERJAAN PEMASANGAN AKSESORIS PIPA
1 Pemasangan Valve dia. 50 - 150 mm BH AHSP PU A.8.4.3.1 237,424.00
2 Pemasangan Valve dia. 200 mm BH AHSP PU A.8.4.3.2 284,647.00
3 Pemasangan Accessories dia. 50 - 150 mm BH AHSP PU A.8.4.3.15 17,655.00
4 Pemasangan Accessories dia. 200 mm BH AHSP PU A.8.4.3.16 35,926.00
5 Pemasangan Accessories dia. 250 mm BH AHSP PU A.8.4.3.17 54,197.00
6 Pemasangan Accessories dia. 300 mm BH AHSP PU A.8.4.3.18 72,468.00
PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA
1 Penyambungan Pipa Baru Ke Pipa Lama dia. 80 mm Titik AHSP PU A.8.4.4.1 274,901.00
2 Penyambungan Pipa Baru Ke Pipa Lama dia. 100 mm Titik AHSP PU A.8.4.4.2 309,199.00
3 Penyambungan Pipa Baru Ke Pipa Lama dia. 150 mm Titik AHSP PU A.8.4.4.3 389,994.00
4 Penyambungan Pipa Baru Ke Pipa Lama dia. 200 mm Titik AHSP PU A.8.4.4.4 470,789.00
5 Penyambungan Pipa Baru Ke Pipa Lama dia. 250 mm Titik AHSP PU A.8.4.4.5 551,584.00
PEKERJAAN PENGECATAN
1 Pengecatan Pipa M2 AHSP PU A.4.7.1.20 150,535.00
PEKERJAAN ACCESSORIS LAINNYA
1 Pemasangan Baja Profil Kg AHSP PU A.4.2.1.1 45,320.00
2 Lps. Pond. Ag. Kls. A (LPA) M2 Analisa EI-421.1 317,664.60
3 Lps. Pond. Ag. Kls. B (LPB) M3 Analisa EI-422.1 310,824.80
4 Lapis Resap Perekat (Prime Coat) M3 Analisa EI-427.A 31,420.40
5 Bongkaran Aspal Hotmix dan Beton M2 Analisa EI-428.A 90,200.00
6 Pembongkaran Beton M3 Analisa EI-7152 110,891.00
7 Laston Lapis Aus (AC-WC) M3 Analisa EI 635a 1,899,561.13
8 Borring Pipa Horizontal dia. 50 - 200 mm M' Analisa B.1 676,934.50

Banda Aceh, 27 Maret 2019


ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengukuran


Satuan / Unit : M1
Analisa : AHSP PU - T.04.1

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0120 90,000.00 1,080.00
2
3 Juru Ukur OH 0.0040 120,000.00 480.00
Jumlah Tenaga Kerja 1,560.00
B BAHAN -
-
Jumlah Bahan -
C PERALATAN -
1 Alat Bantu Ls 1.0000 300.00 300.00
Jumlah Peralatan 300.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 1,860.00
E Overhead & Profit 10.00 % x D 186.00
F Harga Satuan Pekerjaan (D+E) 2,046.00

II PEKERJAAN GALIAN
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja Galian Tanah OH 0.7500 90,000.00 67,500.00
2 Mandor OH 0.0250 110,000.00 2,750.00
Jumlah Tenaga Kerja 70,250.00
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 70,250.00
E Overhead & Profit 10.00 % x D 7,025.00
F Harga Satuan Pekerjaan (D+E) 77,275.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Galian Tanah Keras Sedalam 1 Meter
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.4

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja Galian Tanah OH 1.0000 90,000.00 90,000.00
2 Mandor OH 0.0320 110,000.00 3,520.00
Jumlah Tenaga Kerja 93,520.00
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 93,520.00
E Overhead & Profit 10.00 % x D 9,352.00
F Harga Satuan Pekerjaan (D+E) 102,872.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Mengurug Kembali Galian
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja Galian Tanah OH 0.2500 90,000.00 22,500.00
2 Mandor OH 0.0833 110,000.00 9,163.00
Jumlah Tenaga Kerja 31,663.00
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 31,663.00
E Overhead & Profit 10.00 % x D 3,166.30
F Harga Satuan Pekerjaan (D+E) 34,829.30
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Urugan Pasir
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja Galian Tanah OH 0.3000 90,000.00 27,000.00
2 Mandor OH 0.0100 110,000.00 1,100.00
Jumlah Tenaga Kerja 28,100.00
B BAHAN
1 Pasir Urug M3 1.2000 90,000.00 108,000.0000

Jumlah Bahan 108,000.0000


C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 136,100.00
E Overhead & Profit 10.00 % x D 13,610.00
F Harga Satuan Pekerjaan (D+E) 149,710.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengelasan Flange dia. 250 mm
Satuan / Unit : Bh
Analisa : Anl. L. F. 6

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.9800 90,000.00 88,200.00
2 Tukang OH 0.4900 100,000.00 49,000.00
3 Kepala Tukang OH 0.0490 120,000.00 5,880.00
4 Mandor OH 0.0490 110,000.00 5,390.00
Jumlah Tenaga Kerja 148,470.00
B BAHAN
1 Kawat Las Listrik Kg 9.7968 25,000.00 244,920.00
2 Solar Liter 7.3476 12,000.00 88,171.20
3 Minyak Pelumas Liter 0.9797 5,000.00 4,898.50
Jumlah Bahan 337,989.70
C PERALATAN
Sewa Mesin Las Jam 0.4164 10,625.00 4,424.25
Jumlah Peralatan 4,424.25
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 490,883.95
E Overhead & Profit 10.00 % x D 49,088.40
F Harga Satuan Pekerjaan (D+E) 539,972.35
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Timbunan Tanah didatangkan Termasuk Perataan dan pemadatan (Stamper)
Satuan / Unit : M3
Analisa : AHSP PU - T.14 b

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja Galian Tanah OH 0.5000 90,000.00 45,000.00
2 Mandor OH 0.0500 110,000.00 5,500.00
Jumlah Tenaga Kerja 50,500.00
B BAHAN

Jumlah Bahan -
C PERALATAN
1 Pemadat Timbunan (Stamper) Sewa-Hari 0.0500 80,000.00 4,000.00
Jumlah Peralatan 4,000.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 54,500.00
E Overhead & Profit 10.00 % x D 5,450.00
F Harga Satuan Pekerjaan (D+E) 59,950.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Pondasi
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.5200 90,000.00 46,800.00
2 Tukang OH 0.2600 100,000.00 26,000.00
3 Kepala Tukang OH 0.0260 120,000.00 3,120.00
4 Mandor OH 0.0260 110,000.00 2,860.00
Jumlah Tenaga Kerja 78,780.00
B BAHAN
1 Kayu kelas III M3 0.0400 4,000,000.00 160,000.00
2 Paku 5 cm - 10 cm Kg 0.3000 15,000.00 4,500.00
3 Minyak Bekisting Liter 0.1000 5,000.00 500.00
Jumlah Bahan 500.00
C PERALATAN

Jumlah Peralatan
` D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 79,280.00
E Overhead & Profit 10.00 % x D 7,928.00
F Harga Satuan Pekerjaan (D+E) 87,208.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 1.6500 90,000.00 148,500.00
2 Tukang OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang OH 0.0280 120,000.00 3,360.00
4 Mandor OH 0.0830 110,000.00 9,130.00
Jumlah Tenaga Kerja 188,490.00
B BAHAN
1 Semen Portland Kg 384.0000 1,375.00 528,000.00
2 Pasir Beton Kg 692.0000 71.43 49,428.57
3 Kerikil Kg 1,039.0000 81.48 84,659.26
4 Air Liter 215.0000 100.00 21,500.00
Jumlah Bahan 683,587.83
C PERALATAN -
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 872,077.83
E Overhead & Profit 10.00 % x D 87,207.78
F Harga Satuan Pekerjaan (D+E) 959,285.61
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Beton Mutu F¹C = 14,5 Mpa (K-175) Slump (12±2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 1.6500 90,000.00 148,500.00
2 Tukang OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang OH 0.0280 120,000.00 3,360.00
4 Mandor OH 0.0830 110,000.00 9,130.00
Jumlah Tenaga Kerja 188,490.00
B BAHAN
1 Semen Portland Kg 326.0000 1,375.00 448,250.00
2 Pasir Beton Kg 760.0000 71.43 54,285.71
3 Kerikil Kg 1,029.0000 81.48 83,844.44
4 Air Liter 215.0000 100.00 21,500.00
Jumlah Bahan 607,880.16
C PERALATAN -
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 796,370.16
E Overhead & Profit 10.00 % x D 79,637.02
F Harga Satuan Pekerjaan (D+E) 876,007.17

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos Atau Besi Ulir
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0700 90,000.00 6,300.00
2 Tukang OH 0.0700 100,000.00 7,000.00
3 Kepala Tukang OH 0.0070 120,000.00 840.00
4 Mandor OH 0.0400 110,000.00 4,400.00
Jumlah Tenaga Kerja 18,540.00
B BAHAN
1 Besi Beton Polos Kg 10.5000 13,000.00 136,500.00
2 Kawat Beton Kg 0.1500 15,000.00 2,250.00

Jumlah Bahan 138,750.00


C PERALATAN -
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 157,290.00
Per Kg Pembesian = D / 10 15,729.00
E Overhead & Profit 10.00 % x D 1,572.90
F Harga Satuan Pekerjaan (D+E) 17,301.90
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan 1 m pipa HDPE Ø 90 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.1.17

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0380 90,000.00 3,420.00
2 Tukang Pipa OH 0.0190 100,000.00 1,900.00
3 Mandor OH 0.0040 110,000.00 440.00
Jumlah Tenaga Kerja 5,760.00
B BAHAN
Pipa HDPE PN 10 SDR 17 Ø 90 mm
1 M' 1.0000 #REF! #REF!
Jumlah Bahan #REF!
C PERALATAN
1 Sewa Tripot/Tacket & hendle crane Hari 0.0190 250,000.00 4,750.00
Jumlah Peralatan 4,750.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) #REF!
E Overhead & Profit 10.00 % x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan 1 m pipa HDPE Ø 110 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.1.18

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0400 90,000.00 3,600.00
2 Tukang Pipa OH 0.0200 100,000.00 2,000.00
3 Mandor OH 0.0040 110,000.00 440.00
Jumlah Tenaga Kerja 6,040.00
B BAHAN
Pipa HDPE PN 10 SDR 17 Ø110 mm
1 M' 1.0000 #REF! #REF!
Jumlah Bahan #REF!
C PERALATAN
1 Sewa Tripot/Tacket & hendle crane Hari 0.0190 250,000.00 4,750.00
Jumlah Peralatan 4,750.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) #REF!
E Overhead & Profit 10.00 % x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 m1 Pipa PVC dia. 150 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.1.4

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.1180 90,000.00 10,620.00
2 Tukang Pipa OH 0.0590 100,000.00 5,900.00
3 Mandor OH 0.0120 110,000.00 1,320.00
Jumlah Tenaga Kerja 17,840.00
B BAHAN
1 -
Jumlah Bahan -
C PERALATAN
1 -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 17,840.00
E Overhead & Profit 10.00 % x D 1,784.00
F Harga Satuan Pekerjaan (D+E) 19,624.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 m1 Pipa PVC dia. 200 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.1.5

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.1890 90,000.00 17,010.00
2 Tukang Pipa OH 0.0950 100,000.00 9,500.00
3 Mandor OH 0.0190 110,000.00 2,090.00
Jumlah Tenaga Kerja 28,600.00
B BAHAN
-
Jumlah Bahan -
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 28,600.00
E Overhead & Profit 10.00 % x D 2,860.00
F Harga Satuan Pekerjaan (D+E) 31,460.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan Baja Profil
Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.1

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0600 90,000.00 5,400.00
2 Tukang OH 0.0600 100,000.00 6,000.00
3 Kepala Tukang OH 0.0060 120,000.00 720.00
4 Mandor OH 0.0030 110,000.00 330.00
Jumlah Tenaga Kerja 12,450.00
B BAHAN
1 Baja Profil Kg 1.1500 25,000.00 28,750.00
Jumlah Bahan 28,750.00
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 41,200.00
E Overhead & Profit 10.00 % x D 4,120.00
F Harga Satuan Pekerjaan (D+E) 45,320.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengetesan Pipa dia. 75 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.5.2

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.0080 90,000.00 720.00
4 Mandor OH 0.0008 110,000.00 88.00
Jumlah Tenaga Kerja 808.00
B BAHAN
1 Air Bersih Untuk Pengetesan M3 0.0040 85,000.00 340.00
2 Bahan Bakar Solar Liter 0.0600 12,000.00 720.00
3 Oli Liter 0.0020 5,000.00 10.00
Jumlah Bahan 1,070.00
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 1,878.00
E Overhead & Profit 10.00 % x D 187.80
F Harga Satuan Pekerjaan (D+E) 2,065.80

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengetesan Pipa dia. 100 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.5.3

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.0080 90,000.00 720.00
4 Mandor OH 0.0008 110,000.00 88.00
Jumlah Tenaga Kerja 808.00
B BAHAN
1 Air Bersih Untuk Pengetesan M3 0.0080 85,000.00 680.00
2 Bahan Bakar Solar Liter 0.0600 12,000.00 720.00
3 Oli Liter 0.0020 5,000.00 10.00
Jumlah Bahan 1,410.00
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 2,218.00
E Overhead & Profit 10.00 % x D 221.80
F Harga Satuan Pekerjaan (D+E) 2,439.80
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengetesan Pipa dia. 150 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.5.4

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.0080 90,000.00 720.00
4 Mandor OH 0.0008 110,000.00 88.00
Jumlah Tenaga Kerja 808.00
B BAHAN
1 Air Bersih Untuk Pengetesan M3 0.0180 85,000.00 1,530.00
2 Bahan Bakar Solar Liter 0.0600 12,000.00 720.00
3 Oli Liter 0.0020 5,000.00 10.00
Jumlah Bahan 2,260.00
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 3,068.00
E Overhead & Profit 10.00 % x D 306.80
F Harga Satuan Pekerjaan (D+E) 3,374.80

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengetesan Pipa dia. 200 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.5.5

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0080 90,000.00 720.00
4 Mandor OH 0.0008 110,000.00 88.00
Jumlah Tenaga Kerja 808.00
B BAHAN
1 Air Bersih Untuk Pengetesan M3 0.0310 85,000.00 2,635.00
2 Bahan Bakar Solar Liter 0.0600 12,000.00 720.00
3 Oli Liter 0.0020 5,000.00 10.00
Jumlah Bahan 3,365.00
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 4,173.00
E Overhead & Profit 10.00 % x D 417.30
F Harga Satuan Pekerjaan (D+E) 4,590.30
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Borring Pipa Horizontal dia. 50 - 200 mm
Satuan / Unit : M'
Analisa : Analisa B.1

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 1.0000 90,000.00 90,000.00
2 Operator OH 3.0000 150,000.00 450,000.00
3 Mandor OH 0.1000 110,000.00 11,000.00
Jumlah Tenaga Kerja 551,000.00
B BAHAN
1 Solar Liter 2.4500 12,000.00 29,400.00

Jumlah Bahan 29,400.00


C PERALATAN
1 Water Pump 4" Jam 2.3330 15,000.00 34,995.00

Jumlah Peralatan 34,995.00


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 615,395.00
E Overhead & Profit 10.00 % x D 61,539.50
F Harga Satuan Pekerjaan (D+E) 676,934.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Lapis Resap Pengikat (Prime Coat)
Satuan / Unit : M2
Analisa : Analisa El-427.A

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.0300 90,000.00 2,700.00
2 Mandor OH 0.0060 110,000.00 660.00
Jumlah Tenaga Kerja 3,360.00
B BAHAN
1 Aspal Kg 0.6340 25,000.00 15,850.00
2 Korosen Ltr 0.4840 8,500.00 4,114.00
Jumlah Bahan 19,964.00
C PERALATAN
1 Dump Truck Jam 0.0030 80,000.00 240.00
2 Alat Bantu Jam 1.0000 5,000.00 5,000.00
Jumlah Peralatan 5,240.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 28,564.00
E Overhead & Profit 10.00 % x D 2,856.40
F Harga Satuan Pekerjaan (D+E) 31,420.40
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Bongkaran Aspal Hotmix dan Beton
Satuan / Unit : M2
Analisa : Analisa El-428.A

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.2000 90,000.00 18,000.00
2 Mandor OH 0.2000 110,000.00 22,000.00
Jumlah Tenaga Kerja 40,000.00
B BAHAN
1 Solar Liter 1.0000 12,000.00 12,000.00
Jumlah Bahan 12,000.00
C PERALATAN
1 Sewa Jack Hammer dan Mesin Cutter Jam 0.2500 120,000.00 30,000.00
Jumlah Peralatan 30,000.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 82,000.00
E Overhead & Profit 10.00 % x D 8,200.00
F Harga Satuan Pekerjaan (D+E) 90,200.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan Accessories dia. Valve dia. 50 -150 mm
Accessories Mekanik (Gate Valve, Water Meter, Chek Valve, Butterfly Valve)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.1

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 1.4290 90,000.00 128,610.00
2 Tukang OH 0.7150 100,000.00 71,500.00
3 Mandor OH 0.1430 110,000.00 15,730.00
Jumlah Tenaga Kerja 215,840.00
B BAHAN

Jumlah Bahan -
C PERALATAN
1 - -

Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 215,840.00
E Overhead & Profit 10.00 % x D 21,584.00
F Harga Satuan Pekerjaan (D+E) 237,424.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Accessories dia. 200 mm
Accessories Mekanik (Gate Valve, Water Meter, Chek Valve, Butterfly Valve)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.2

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 1.7140 90,000.00 154,260.00
2 Tukang OH 0.8570 100,000.00 85,700.00
3 Mandor OH 0.1710 110,000.00 18,810.00
Jumlah Tenaga Kerja 258,770.00
B BAHAN

Jumlah Bahan -
C PERALATAN
1
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 258,770.00
E Overhead & Profit 10.00 % x D 25,877.00
F Harga Satuan Pekerjaan (D+E) 284,647.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan 1 buah Accesories dia. 50 -150 mm
Accessories Statis (Bend, Tee, Reducer, Flange Socket, Flange Spigot, Valve Socket
Repair Socket, Gibolt Joint, Clamp Sadle)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.15

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.1060 90,000.00 9,540.00
2 Tukang OH 0.0530 100,000.00 5,300.00
3 Mandor OH 0.0110 110,000.00 1,210.00
Jumlah Tenaga Kerja 16,050.00
B BAHAN

Jumlah Bahan -
C PERALATAN

1 - -

Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 16,050.00
E Overhead & Profit 10.00 % x D 1,605.00
F Harga Satuan Pekerjaan (D+E) 17,655.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Accesories dia. 200 mm
Accessories Statis (Bend, Tee, Reducer, Flange Socket, Flange Spigot, Valve Socket
Repair Socket, Gibolt Joint, Clamp Sadle)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.16

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.2160 90,000.00 19,440.00
2 Tukang OH 0.1080 100,000.00 10,800.00
3 Mandor OH 0.0220 110,000.00 2,420.00
Jumlah Tenaga Kerja 32,660.00
B BAHAN

Jumlah Bahan -
C PERALATAN
1 -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 32,660.00
E Overhead & Profit 10.00 % x D 3,266.00
F Harga Satuan Pekerjaan (D+E) 35,926.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan Accesories dia. 250 mm
Accessories Statis (Bend, Tee, Reducer, Flange Socket, Flange Spigot, Valve Socket
Repair Socket, Gibolt Joint, Clamp Sadle)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.17

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.3260 90,000.00 29,340.00
2 Tukang OH 0.1630 100,000.00 16,300.00
3 Mandor OH 0.0330 110,000.00 3,630.00
Jumlah Tenaga Kerja 49,270.00
B BAHAN

Jumlah Bahan -
C PERALATAN
1 -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 49,270.00
E Overhead & Profit 10.00 % x D 4,927.00
F Harga Satuan Pekerjaan (D+E) 54,197.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Accesories dia. 300 mm
Accessories Statis (Bend, Tee, Reducer, Flange Socket, Flange Spigot, Valve Socket
Repair Socket, Gibolt Joint, Clamp Sadle)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.18

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.4360 90,000.00 39,240.00
2 Tukang OH 0.2180 100,000.00 21,800.00
3 Mandor OH 0.0440 110,000.00 4,840.00
Jumlah Tenaga Kerja 65,880.00
B BAHAN

Jumlah Bahan -
C PERALATAN
1 -

Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 65,880.00
E Overhead & Profit 10.00 % x D 6,588.00
F Harga Satuan Pekerjaan (D+E) 72,468.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan Pipa Baru ke Pipa Lama dia. 100 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.4.2

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 1.6460 90,000.00 148,140.00
2 Tukang OH 0.8230 100,000.00 82,300.00
3 Mandor OH 0.1650 110,000.00 18,150.00
Jumlah Tenaga Kerja 248,590.00
B BAHAN

Jumlah Bahan -
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Cli Hari 0.6500 50,000.00 32,500.00
Jumlah Peralatan 32,500.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 281,090.00
E Overhead & Profit 10.00 % x D 28,109.00
F Harga Satuan Pekerjaan (D+E) 309,199.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengelasan Pipa Steel dia. 100 mm
Satuan / Unit : Titik
Analisa : Anl. L.3

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.2760 90,000.00 24,840.00
2 Tukang OH 0.1380 100,000.00 13,800.00
3 Kepala Tukang OH 0.0140 120,000.00 1,680.00
4 Mandor OH 0.0140 110,000.00 1,540.00
Jumlah Tenaga Kerja 41,860.00
B BAHAN
1 Kawat Las Listrik Kg 2.7560 25,000.00 68,900.00
2 Solar Liter 2.0670 12,000.00 24,804.00
3 Minyak Pelumas Liter 0.2760 5,000.00 1,380.00
Jumlah Bahan 95,084.00
C PERALATAN
1 Sewa Mesin Las Jam 0.1171 10,625.00 1,244.19
Jumlah Peralatan 1,244.19
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 138,188.19
E Overhead & Profit 10.00 % x D 13,818.82
F Harga Satuan Pekerjaan (D+E) 152,007.01

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengelasan Pipa Steel dia. 150 mm
Satuan / Unit : Titik
Analisa : Anl. L.4

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.4010 90,000.00 36,090.00
2 Tukang OH 0.2010 100,000.00 20,100.00
3 Kepala Tukang OH 0.0200 120,000.00 2,400.00
4 Mandor OH 0.0200 110,000.00 2,200.00
Jumlah Tenaga Kerja 60,790.00
B BAHAN
1 Kawat Las Listrik Kg 4.0120 25,000.00 100,300.00
2 Solar Liter 3.0090 12,000.00 36,108.00
3 Minyak Pelumas Liter 0.4010 5,000.00 2,005.00
Jumlah Bahan 138,413.00
C PERALATAN
1 Sewa Mesin Las Jam 0.1705 10,625.00 1,811.56
Jumlah Peralatan 1,811.56
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 201,014.56
E Overhead & Profit 10.00 % x D 20,101.46
F Harga Satuan Pekerjaan (D+E) 221,116.02
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengelasan Pipa Steel dia. 200 mm
Satuan / Unit : Titik
Analisa : Anl. L.5

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.5280 90,000.00 47,520.00
2 Tukang OH 0.2640 100,000.00 26,400.00
3 Kepala Tukang OH 0.0260 120,000.00 3,120.00
4 Mandor OH 0.0260 110,000.00 2,860.00
Jumlah Tenaga Kerja 79,900.00
B BAHAN
1 Kawat Las Listrik Kg 5.2750 25,000.00 131,875.00
2 Solar Liter 3.9560 12,000.00 47,472.00
3 Minyak Pelumas Liter 0.5280 5,000.00 2,640.00
Jumlah Bahan 181,987.00
C PERALATAN
1 Sewa Mesin Las Jam 0.2242 10,625.00 2,382.13
Jumlah Peralatan 2,382.13
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 264,269.13
E Overhead & Profit 10.00 % x D 26,426.91
F Harga Satuan Pekerjaan (D+E) 290,696.04

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengelasan Flange dia. 200 mm
Satuan / Unit : Bh
Analisa : Anl. L. F. 5

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.7910 90,000.00 71,190.00
2 Tukang OH 0.3960 100,000.00 39,600.00
3 Kepala Tukang OH 0.0400 120,000.00 4,800.00
4 Mandor OH 0.0400 110,000.00 4,400.00
Jumlah Tenaga Kerja 119,990.00
B BAHAN
1 Kawat Las Listrik Kg 7.9128 25,000.00 197,820.00
2 Solar Liter 5.9346 12,000.00 71,215.20
3 Minyak Pelumas Liter 0.7913 5,000.00 3,956.50
Jumlah Bahan 272,991.70
C PERALATAN
Sewa Mesin Las Jam 0.3363 10,625.00 3,573.19
Jumlah Peralatan 3,573.19
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 396,554.89
E Overhead & Profit 10.00 % x D 39,655.49
F Harga Satuan Pekerjaan (D+E) 436,210.38
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengelasan Flange dia. 100 mm
Satuan / Unit : Bh
Analisa : Anl. L. F. 3

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.4130 90,000.00 37,170.00
2 Tukang OH 0.2070 100,000.00 20,700.00
3 Kepala Tukang OH 0.0210 120,000.00 2,520.00
4 Mandor OH 0.0210 110,000.00 2,310.00
Jumlah Tenaga Kerja 62,700.00
B BAHAN
1 Kawat Las Listrik Kg 4.1335 25,000.00 103,337.50
2 Solar Liter 3.1001 12,000.00 37,201.20
3 Minyak Pelumas Liter 0.4133 5,000.00 2,066.50
Jumlah Bahan 142,605.20
C PERALATAN
Sewa Mesin Las Jam 0.1757 10,625.00 1,866.81
Jumlah Peralatan 1,866.81
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 207,172.01
E Overhead & Profit 10.00 % x D 20,717.20
F Harga Satuan Pekerjaan (D+E) 227,889.21

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengelasan Flange dia. 75 mm
Satuan / Unit : Bh
Analisa : Anl. L. F. 4

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.6020 90,000.00 54,180.00
2 Tukang OH 0.3010 100,000.00 30,100.00
3 Kepala Tukang OH 0.0300 120,000.00 3,600.00
4 Mandor OH 0.0300 110,000.00 3,300.00
Jumlah Tenaga Kerja 91,180.00
B BAHAN
1 Kawat Las Listrik Kg 6.0175 25,000.00 150,437.50
2 Solar Liter 4.5131 12,000.00 54,157.20
3 Minyak Pelumas Liter 0.6017 5,000.00 3,008.50
Jumlah Bahan 207,603.20
C PERALATAN
Sewa Mesin Las Jam 0.2557 10,625.00 2,716.81
Jumlah Peralatan 2,716.81
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 301,500.01
E Overhead & Profit 10.00 % x D 30,150.00
F Harga Satuan Pekerjaan (D+E) 331,650.01
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengelasan Pipa Steel dia. 75 mm
Satuan / Unit : Titik
Analisa : Anl. L.2

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.2090 90,000.00 18,810.00
2 Tukang OH 0.1040 100,000.00 10,400.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0100 110,000.00 1,100.00
Jumlah Tenaga Kerja 31,510.00
B BAHAN
1 Kawat Las Listrik Kg 2.0870 25,000.00 52,175.00
2 Solar Liter 1.5660 12,000.00 18,792.00
3 Minyak Pelumas Liter 0.2090 5,000.00 1,045.00
Jumlah Bahan 72,012.00
C PERALATAN
1 Sewa Mesin Las Jam 0.0887 10,625.00 942.44
Jumlah Peralatan 942.44
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 104,464.44
E Overhead & Profit 10.00 % x D 10,446.44
F Harga Satuan Pekerjaan (D+E) 114,910.88

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengelasan Flange dia. 75 mm
Satuan / Unit : Bh
Analisa : Anl. L. F. 2

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.3130 90,000.00 28,170.00
2 Tukang OH 0.1570 100,000.00 15,700.00
3 Kepala Tukang OH 0.0160 120,000.00 1,920.00
4 Mandor OH 0.0160 110,000.00 1,760.00
Jumlah Tenaga Kerja 47,550.00
B BAHAN
1 Kawat Las Listrik Kg 3.1312 25,000.00 78,280.00
2 Solar Liter 2.3484 12,000.00 28,180.80
3 Minyak Pelumas Liter 0.3131 5,000.00 1,565.50
Jumlah Bahan 108,026.30
C PERALATAN
Sewa Mesin Las Jam 0.1331 10,625.00 1,414.19
Jumlah Peralatan 1,414.19
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 156,990.49
E Overhead & Profit 10.00 % x D 15,699.05
F Harga Satuan Pekerjaan (D+E) 172,689.54
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Penyambungan Pipa Baru ke Pipa Lama dia. 80 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.4.1

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 1.4460 90,000.00 130,140.00
2 Tukang OH 0.7330 100,000.00 73,300.00
3 Mandor OH 0.1470 110,000.00 16,170.00
Jumlah Tenaga Kerja 219,610.00
B BAHAN

Jumlah Bahan -
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Cli Hari 0.6060 50,000.00 30,300.00
Jumlah Peralatan 30,300.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 249,910.00
E Overhead & Profit 10.00 % x D 24,991.00
F Harga Satuan Pekerjaan (D+E) 274,901.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan Pipa Baru ke Pipa Lama dia. 150 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.4.3

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 2.0960 90,000.00 188,640.00
2 Tukang OH 1.0480 100,000.00 104,800.00
3 Mandor OH 0.2100 110,000.00 23,100.00
Jumlah Tenaga Kerja 316,540.00
B BAHAN

Jumlah Bahan -
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Cli Hari 0.7600 50,000.00 38,000.00
Jumlah Peralatan 38,000.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 354,540.00
E Overhead & Profit 10.00 % x D 35,454.00
F Harga Satuan Pekerjaan (D+E) 389,994.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Penyambungan Pipa Baru ke Pipa Lama dia. 200 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.4.4

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 2.5460 90,000.00 229,140.00
2 Tukang OH 1.2730 100,000.00 127,300.00
3 Mandor OH 0.2550 110,000.00 28,050.00
Jumlah Tenaga Kerja 384,490.00
B BAHAN

Jumlah Bahan -
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Cli Hari 0.8700 50,000.00 43,500.00
Jumlah Peralatan 43,500.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 427,990.00
E Overhead & Profit 10.00 % x D 42,799.00
F Harga Satuan Pekerjaan (D+E) 470,789.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan Pipa Baru ke Pipa Lama dia. 250 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.4.5

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 2.9960 90,000.00 269,640.00
2 Tukang OH 1.4980 100,000.00 149,800.00
3 Mandor OH 0.3000 110,000.00 33,000.00
Jumlah Tenaga Kerja 452,440.00
B BAHAN

Jumlah Bahan -
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Cli Hari 0.9800 50,000.00 49,000.00
Jumlah Peralatan 49,000.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 501,440.00
E Overhead & Profit 10.00 % x D 50,144.00
F Harga Satuan Pekerjaan (D+E) 551,584.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Baja Profil
Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.1

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0600 90,000.00 5,400.00
2 Tukang OH 0.0600 100,000.00 6,000.00
3 Kepala Tukang OH 0.0060 120,000.00 720.00
3 Mandor OH 0.0030 110,000.00 330.00
Jumlah Tenaga Kerja 12,450.00
B BAHAN
1 Baja Profil Kg - 25,000.00 -

Jumlah Bahan -
C PERALATAN
-
Jumlah Peralatan -
` Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 12,450.00
E Overhead & Profit 10.00 % x D 1,245.00
F Harga Satuan Pekerjaan (D+E) 13,695.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengecatan Permukaan Baja Secara Manual 2 Lapis
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.20

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.4000 90,000.00 36,000.00
2 Tukang OH 0.8000 100,000.00 80,000.00
3 Kepala Tukang OH 0.0800 120,000.00 9,600.00
3 Mandor OH 0.0200 110,000.00 2,200.00
Jumlah Tenaga Kerja 127,800.00
B BAHAN
1 Cat Dasar Kg 0.1100 45,000.00 4,950.00
2 Cat Penutup/Epoxy Kg 0.0800 45,000.00 3,600.00
3 Kuas Bh 0.0100 38,000.00 380.00
4 pengencer Liter 0.0100 12,000.00 120.00
Jumlah Bahan 9,050.00
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 136,850.00
E Overhead & Profit 10.00 % x D 13,685.00
F Harga Satuan Pekerjaan (D+E) 150,535.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' Pipa Steel dia. 200 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.68

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 1.1130 90,000.00 100,170.00
2 Tukang OH 0.2230 100,000.00 22,300.00
3 Mandor OH 0.1110 110,000.00 12,210.00
Jumlah Tenaga Kerja 134,680.00
B BAHAN

Jumlah Bahan -
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 134,680.00
E Overhead & Profit 10.00 % x D 13,468.00
F Harga Satuan Pekerjaan (D+E) 148,148.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 M' Pipa Steel dia. 150 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.67

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.7080 90,000.00 63,720.00
2 Tukang OH 0.1420 100,000.00 14,200.00
3 Mandor OH 0.0710 110,000.00 7,810.00
Jumlah Tenaga Kerja 85,730.00
B BAHAN

Jumlah Bahan -
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 85,730.00
E Overhead & Profit 10.00 % x D 8,573.00
F Harga Satuan Pekerjaan (D+E) 94,303.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemotongan Pipa Steel dia. 200 mm
Satuan / Unit : Bh
Analisa : AHSP PU A.8.4.2.68

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.4760 90,000.00 42,840.00
2 Tukang OH 0.0950 100,000.00 9,500.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0480 110,000.00 5,280.00
Jumlah Tenaga Kerja 57,620.00
B BAHAN
1 -
2 -
3 -
4 -
Jumlah Bahan -
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Cli Hari 0.0600 50,000.00 3,000.00
Jumlah Peralatan 3,000.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 60,620.00
E Overhead & Profit 10.00 % x D 6,062.00
F Harga Satuan Pekerjaan (D+E) 66,682.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemotongan Pipa Steel dia. 150 mm
Satuan / Unit : Bh
Analisa : AHSP PU A.8.4.2.67

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.1840 90,000.00 16,560.00
2 Tukang OH 0.0370 100,000.00 3,700.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0180 110,000.00 1,980.00
Jumlah Tenaga Kerja 22,240.00
B BAHAN
1 -
2 -
3 -
4 -
Jumlah Bahan -
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Cli Hari 0.0450 50,000.00 2,250.00
Jumlah Peralatan 2,250.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 24,490.00
E Overhead & Profit 10.00 % x D 2,449.00
F Harga Satuan Pekerjaan (D+E) 26,939.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' Pipa Steel dia. 100 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.65

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.5790 90,000.00 52,110.00
2 Tukang OH 0.1160 100,000.00 11,600.00
3 Mandor OH 0.0580 110,000.00 6,380.00
Jumlah Tenaga Kerja 70,090.00
B BAHAN

Jumlah Bahan -
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 70,090.00
E Overhead & Profit 10.00 % x D 7,009.00
F Harga Satuan Pekerjaan (D+E) 77,099.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemotongan Pipa Steel dia. 100 mm
Satuan / Unit : Bh
Analisa : AHSP PU A.8.4.2.65

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0850 90,000.00 7,650.00
2 Tukang OH 0.0170 100,000.00 1,700.00
3 Kepala Tukang OH - -
3 Mandor OH 0.0080 110,000.00 880.00
Jumlah Tenaga Kerja 10,230.00
B BAHAN
1 -
2 -
3 -
4 -
Jumlah Bahan -
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Cli Hari 0.0400 50,000.00 2,000.00
Jumlah Peralatan 2,000.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 12,230.00
E Overhead & Profit 10.00 % x D 1,223.00
F Harga Satuan Pekerjaan (D+E) 13,453.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' Pipa Steel dia. 50 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.64

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.4990 90,000.00 44,910.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Mandor OH 0.0500 110,000.00 5,500.00
Jumlah Tenaga Kerja 60,410.00
B BAHAN

Jumlah Bahan -
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 60,410.00
E Overhead & Profit 10.00 % x D 6,041.00
F Harga Satuan Pekerjaan (D+E) 66,451.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemotongan Pipa Steel dia. 50 mm
Satuan / Unit : Bh
Analisa : AHSP PU A.8.4.2.64

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0280 90,000.00 2,520.00
2 Tukang OH 0.0060 100,000.00 600.00
3 Kepala Tukang OH - -
3 Mandor OH 0.0030 110,000.00 330.00
Jumlah Tenaga Kerja 3,450.00
B BAHAN
1 -
2 -
3 -
4 -
Jumlah Bahan -
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Cli Hari 0.0370 50,000.00 1,850.00
Jumlah Peralatan 1,850.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 5,300.00
E Overhead & Profit 10.00 % x D 530.00
F Harga Satuan Pekerjaan (D+E) 5,830.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' Pipa Steel dia. 75 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.64.a

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.5390 90,000.00 48,510.00
2 Tukang OH 0.1080 100,000.00 10,800.00
3 Mandor OH 0.0540 110,000.00 5,940.00
Jumlah Tenaga Kerja 65,250.00
B BAHAN

Jumlah Bahan -
C PERALATAN
-
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 65,250.00
E Overhead & Profit 10.00 % x D 6,525.00
F Harga Satuan Pekerjaan (D+E) 71,775.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemotongan Pipa Steel dia. 75 mm
Satuan / Unit : Bh
Analisa : AHSP PU A.8.4.2.64.a

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0570 90,000.00 5,130.00
2 Tukang OH 0.0120 100,000.00 1,200.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0060 110,000.00 660.00
Jumlah Tenaga Kerja 6,990.00
B BAHAN
1 -
2 -
3 -
4 -
Jumlah Bahan -
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Cli Hari 0.0370 50,000.00 1,850.00
Jumlah Peralatan 1,850.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 8,840.00
E Overhead & Profit 10.00 % x D 884.00
F Harga Satuan Pekerjaan (D+E) 9,724.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Lps. Pond. Ag. Kls. A (LPA)
Satuan / Unit : M3
Analisa : Analisa EI 421.1

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.1540 90,000.00 13,860.00
2 Mandor OH 0.0220 110,000.00 2,420.00
Jumlah Tenaga Kerja 16,280.00
B BAHAN
1 Aggregat Kasar M3 0.6600 200,000.00 132,000.00
2 Agregat Halus M3 0.5400 230,000.00 124,200.00
Jumlah Bahan 256,200.00
C PERALATAN
1 Wheel Loader Jam 0.0178 180,000.00 3,204.00
2 Dump Truck Jam 0.0820 80,000.00 6,560.00
3 Stamper Jam 0.1542 10,000.00 1,542.00
4 Alat Bantu Hari 1.0000 5,000.00 5,000.00
Jumlah Peralatan 16,306.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 288,786.00
E Overhead & Profit 10.00 % x D 28,878.60
F Harga Satuan Pekerjaan (D+E) 317,664.60

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Lps. Pond. Ag. Kls. B (LPB)
Satuan / Unit : M3
Analisa : Analisa EI 422.1

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.1450 90,000.00 13,050.00
2 Mandor OH 0.0210 110,000.00 2,310.00
Jumlah Tenaga Kerja 15,360.00
B BAHAN
1 Aggregat Kasar M3 0.4200 200,000.00 84,000.00
2 Agregat Halus M3 0.2400 230,000.00 55,200.00
3 Pasir Batu (Sirtu) Material Jalan M3 0.5400 200,000.00 108,000.00
Jumlah Bahan 247,200.00
C PERALATAN
1 Wheel Loader Jam 0.0178 180,000.00 3,204.00
2 Dump Truck Jam 0.0820 80,000.00 6,560.00
3 Stamper Jam 0.1446 10,000.00 1,446.00
4 Water Tanker Jam 0.0211 180,000.00 3,798.00
5 Alat Bantu Hari 1.0000 5,000.00 5,000.00
Jumlah Peralatan 20,008.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 282,568.00
E Overhead & Profit 10.00 % x D 28,256.80
F Harga Satuan Pekerjaan (D+E) 310,824.80
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Laston Lapis Aus (AC-WC)
Satuan / Unit : M3
Analisa : Analisa EI 635a

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga

A TENAGA
1 Pekerja OH 0.2410 90,000.00 21,690.00
2 Mandor OH 0.0241 110,000.00 2,651.00
Jumlah Tenaga Kerja 24,341.00
B BAHAN
1 Lolos screen2 ukuran ( 9.5 - 19,0) M3 0.2978 200,000.00 59,560.00
2 Lolos screen2 ukuran ( 0 - 5) M3 0.3513 230,000.00 80,799.00
3 Semen Kg 12.4900 1,375.00 17,173.75
4 Aspal Kg 61.8000 25,000.00 1,545,000.00
Jumlah Bahan 1,702,532.75
C PERALATAN
1 -
2 -
3 -
4 -
5 -
6 -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 1,726,873.75
E Overhead & Profit 10.00 % x D 172,687.38
F Harga Satuan Pekerjaan (D+E) 1,899,561.13

Banda Aceh, 27 Maret 2019


Penawar
CV. BARONA USAHA

SAIFULLAH, SE
Direktur
Memasang 1 M'ANALISA
pipa HDPEHARGA SATUAN PEKERJAAN
dia. 50 mm
Jenis Pekerjaan :
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.17

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0350 90,000.00 3,150.00
2 Tukang OH 0.0170 100,000.00 1,700.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0030 110,000.00 330.00
Jumlah Tenaga Kerja 5,180.00
B BAHAN
1 -
2 -
Jumlah Bahan -
C PERALATAN
- -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 5,180.00
E Overhead & Profit 10.00 % x D 518.00
F Harga Satuan Pekerjaan (D+E) 5,698.00

Memasang 1 M'ANALISA
pipa HDPEHARGA SATUAN PEKERJAAN
dia. 75 mm
Jenis Pekerjaan :
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.17.a

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0375 90,000.00 3,375.00
2 Tukang OH 0.0185 100,000.00 1,850.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0035 110,000.00 385.00
Jumlah Tenaga Kerja 5,610.00
B BAHAN
1 -
2 -
Jumlah Bahan -
C PERALATAN
- -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 5,610.00
E Overhead & Profit 10.00 % x D 561.00
F Harga Satuan Pekerjaan (D+E) 6,171.00
Memasang 1 M'ANALISA
pipa HDPEHARGA SATUAN PEKERJAAN
dia. 100 mm
Jenis Pekerjaan :
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.18

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0400 90,000.00 3,600.00
2 Tukang OH 0.0200 100,000.00 2,000.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0040 110,000.00 440.00
Jumlah Tenaga Kerja 6,040.00
B BAHAN
1 -
2 -
Jumlah Bahan -
C PERALATAN
- -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 6,040.00
E Overhead & Profit 10.00 % x D 604.00
F Harga Satuan Pekerjaan (D+E) 6,644.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 150 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.20

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.0620 90,000.00 5,580.00
2 Tukang OH 0.0310 100,000.00 3,100.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0060 110,000.00 660.00
Jumlah Tenaga Kerja 9,340.00
B BAHAN
1 -
2 -
Jumlah Bahan -
C PERALATAN
- -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 9,340.00
E Overhead & Profit 10.00 % x D 934.00
F Harga Satuan Pekerjaan (D+E) 10,274.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 200 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.21

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.1020 90,000.00 9,180.00
2 Tukang OH 0.0510 100,000.00 5,100.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0100 110,000.00 1,100.00
Jumlah Tenaga Kerja 15,380.00
B BAHAN
1 -
2 -
Jumlah Bahan -
C PERALATAN
- -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 15,380.00
E Overhead & Profit 10.00 % x D 1,538.00
F Harga Satuan Pekerjaan (D+E) 16,918.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 250 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.22

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.1330 90,000.00 11,970.00
2 Tukang OH 0.0670 100,000.00 6,700.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0030 110,000.00 330.00
Jumlah Tenaga Kerja 19,000.00
B BAHAN
1 -
2 -
Jumlah Bahan -
C PERALATAN
- -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 19,000.00
E Overhead & Profit 10.00 % x D 1,900.00
F Harga Satuan Pekerjaan (D+E) 20,900.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 300 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.23

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.1700 90,000.00 15,300.00
2 Tukang OH 0.0850 100,000.00 8,500.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0170 110,000.00 1,870.00
Jumlah Tenaga Kerja 25,670.00
B BAHAN
1 -
2 -
Jumlah Bahan -
C PERALATAN
- -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 25,670.00
E Overhead & Profit 10.00 % x D 2,567.00
F Harga Satuan Pekerjaan (D+E) 28,237.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 350 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.23a

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.2300 90,000.00 20,700.00
2 Tukang OH 0.1150 100,000.00 11,500.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0230 110,000.00 2,530.00
Jumlah Tenaga Kerja 34,730.00
B BAHAN
1 -
2 -
Jumlah Bahan -
C PERALATAN
- -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 34,730.00
E Overhead & Profit 10.00 % x D 3,473.00
F Harga Satuan Pekerjaan (D+E) 38,203.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 400 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.24

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.2900 90,000.00 26,100.00
2 Tukang OH 0.1450 100,000.00 14,500.00
3 Kepala Tukang OH - - -
3 Mandor OH 0.0290 110,000.00 3,190.00
Jumlah Tenaga Kerja 43,790.00
B BAHAN
1 -
2 -
Jumlah Bahan -
C PERALATAN
- -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 43,790.00
E Overhead & Profit 10.00 % x D 4,379.00
F Harga Satuan Pekerjaan (D+E) 48,169.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan pipa HDPE dia. 75 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A2

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.1040 90,000.00 9,360.00
2 Tukang OH 0.0520 100,000.00 5,200.00
3 Kepala Tukang OH 0.0050 120,000.00 600.00
3 Mandor OH 0.0050 110,000.00 550.00
Jumlah Tenaga Kerja 15,710.00
B BAHAN
1 Solar Liter 0.7830 12,000.00 9,396.00
2 Minyak Pelumas Liter 0.1040 5,000.00 520.00
Jumlah Bahan 9,916.00
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.0444 9,375.00 416.25
Jumlah Peralatan 416.25
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 26,042.25
E Overhead & Profit 10.00 % x D 2,604.23
F Harga Satuan Pekerjaan (D+E) 28,646.48
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Penyambungan pipa HDPE dia. 100 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A3

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.1380 90,000.00 12,420.00
2 Tukang OH 0.0690 100,000.00 6,900.00
3 Kepala Tukang OH 0.0070 120,000.00 840.00
3 Mandor OH 0.0070 110,000.00 770.00
Jumlah Tenaga Kerja 20,930.00
B BAHAN
1 Solar Liter 1.0330 12,000.00 12,396.00
2 Minyak Pelumas Liter 0.1380 5,000.00 690.00
Jumlah Bahan 13,086.00
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.0586 9,375.00 549.38
Jumlah Peralatan 549.38
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 34,565.38
E Overhead & Profit 10.00 % x D 3,456.54
F Harga Satuan Pekerjaan (D+E) 38,021.91

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan pipa HDPE dia. 150 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A4

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.2010 90,000.00 18,090.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
3 Mandor OH 0.0100 110,000.00 1,100.00
Jumlah Tenaga Kerja 30,390.00
B BAHAN
1 Solar Liter 1.5040 12,000.00 18,048.00
2 Minyak Pelumas Liter 0.2010 5,000.00 1,005.00
Jumlah Bahan 19,053.00
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.0852 9,375.00 798.75
Jumlah Peralatan 798.75
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 50,241.75
E Overhead & Profit 10.00 % x D 5,024.18
F Harga Satuan Pekerjaan (D+E) 55,265.93
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Penyambungan pipa HDPE dia. 200 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A5

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.2640 90,000.00 23,760.00
2 Tukang OH 0.1320 100,000.00 13,200.00
3 Kepala Tukang OH 0.0130 120,000.00 1,560.00
3 Mandor OH 0.0130 110,000.00 1,430.00
Jumlah Tenaga Kerja 39,950.00
B BAHAN
1 Solar Liter 1.9780 12,000.00 23,736.00
2 Minyak Pelumas Liter 0.2640 5,000.00 1,320.00
Jumlah Bahan 25,056.00
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.1121 9,375.00 1,050.94
Jumlah Peralatan 1,050.94
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 66,056.94
E Overhead & Profit 10.00 % x D 6,605.69
F Harga Satuan Pekerjaan (D+E) 72,662.63

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan pipa HDPE dia. 250 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A6

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.3270 90,000.00 29,430.00
2 Tukang OH 0.1630 100,000.00 16,300.00
3 Kepala Tukang OH 0.0160 120,000.00 1,920.00
3 Mandor OH 0.0160 110,000.00 1,760.00
Jumlah Tenaga Kerja 49,410.00
B BAHAN
1 Solar Liter 2.4490 12,000.00 29,388.00
2 Minyak Pelumas Liter 0.3270 5,000.00 1,635.00
Jumlah Bahan 31,023.00
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.1388 9,375.00 1,301.25
Jumlah Peralatan 1,301.25
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 81,734.25
E Overhead & Profit 10.00 % x D 8,173.43
F Harga Satuan Pekerjaan (D+E) 89,907.68
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Penyambungan pipa HDPE dia. 300 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A7

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.3930 90,000.00 35,370.00
2 Tukang OH 0.1960 100,000.00 19,600.00
3 Kepala Tukang OH 0.0200 120,000.00 2,400.00
3 Mandor OH 0.0200 110,000.00 2,200.00
Jumlah Tenaga Kerja 59,570.00
B BAHAN
1 Solar Liter 2.9460 12,000.00 35,352.00
2 Minyak Pelumas Liter 0.3930 5,000.00 1,965.00
Jumlah Bahan 37,317.00
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.1669 9,375.00 1,564.69
Jumlah Peralatan 1,564.69
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 98,451.69
E Overhead & Profit 10.00 % x D 9,845.17
F Harga Satuan Pekerjaan (D+E) 108,296.86

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan pipa HDPE dia. 350 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A8

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.4560 90,000.00 41,040.00
2 Tukang OH 0.2280 100,000.00 22,800.00
3 Kepala Tukang OH 0.0230 120,000.00 2,760.00
3 Mandor OH 0.0230 110,000.00 2,530.00
Jumlah Tenaga Kerja 69,130.00
B BAHAN
1 Solar Liter 3.4170 12,000.00 41,004.00
2 Minyak Pelumas Liter 0.4560 5,000.00 2,280.00
Jumlah Bahan 43,284.00
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.1936 9,375.00 1,815.00
Jumlah Peralatan 1,815.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 114,229.00
E Overhead & Profit 10.00 % x D 11,422.90
F Harga Satuan Pekerjaan (D+E) 125,651.90
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pembongkaran Beton
Satuan / Unit : M3
Analisa : Analisa EI-7152

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.2390 90,000.00 21,510.00
2 Operator OH 0.2020 150,000.00 30,300.00
3 Mandor OH 0.2000 110,000.00 22,000.00
Jumlah Tenaga Kerja 73,810.00
B BAHAN
1 Solar Jam 1.0000 12,000.00 12,000.00

Jumlah Bahan 12,000.00


C PERALATAN
Sewa Jack Hammer Jam 0.2500 60,000.00 15,000.00
Sewa compressor Jam - - -
Sewa mesin cutter Jam 0.2500 60,000.00 15,000.00
Jumlah Peralatan 15,000.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 100,810.00
E Overhead & Profit 10.00 % x D 10,081.00
F Harga Satuan Pekerjaan (D+E) 110,891.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan pipa HDPE dia. 75 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A2

No Uraian Satuan Koofisien Harga Satuan Jumlah Harga


A TENAGA
1 Pekerja OH 0.1040 - -
2 Tukang OH 0.0520 - -
3 Kepala Tukang OH 0.0050 - -
3 Mandor OH 0.0050 - -
Jumlah Tenaga Kerja -
B BAHAN
1 Solar Liter 0.7830 - -
2 Minyak Pelumas Liter 0.1040 - -
Jumlah Bahan -
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.0444 - -
Jumlah Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) -
E Overhead & Profit 10.00 % x D -
F Harga Satuan Pekerjaan (D+E) -
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengukuran


Satuan / Unit : M1
Analisa : AHSP PU - T.04.1

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0120
2
3 Juru Ukur OH 0.0040
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
1 Alat Bantu Ls 1.0000
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

II PEKERJAAN GALIAN
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja Galian Tanah OH 0.7500
2 Mandor OH 0.0250
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Galian Tanah Keras Sedalam 1 Meter
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.4

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja Galian Tanah OH 1.0000
2 Mandor OH 0.0320
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Mengurug Kembali Galian
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja Galian Tanah OH 0.2500
2 Mandor OH 0.0833
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Urugan Pasir
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja Galian Tanah OH 0.3000
2 Mandor OH 0.0100
Jumlah Tenaga Kerja
B BAHAN
1 Pasir Urug M3 1.2000

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengelasan Flange dia. 250 mm
Satuan / Unit : Bh
Analisa : Anl. L. F. 6

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.9800
2 Tukang OH 0.4900
3 Kepala Tukang OH 0.0490
4 Mandor OH 0.0490
Jumlah Tenaga Kerja
B BAHAN
1 Kawat Las Listrik Kg 9.7968
2 Solar Liter 7.3476
3 Minyak Pelumas Liter 0.9797
Jumlah Bahan
C PERALATAN
Sewa Mesin Las Jam 0.4164
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Timbunan Tanah didatangkan Termasuk Perataan dan pemadatan (Stamper)
Satuan / Unit : M3
Analisa : AHSP PU - T.14 b

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja Galian Tanah OH 0.5000
2 Mandor OH 0.0500
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
1 Pemadat Timbunan (Stamper) Sewa-Hari 0.0500
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Pondasi
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.5200
2 Tukang OH 0.2600
3 Kepala Tukang OH 0.0260
4 Mandor OH 0.0260
Jumlah Tenaga Kerja
B BAHAN
1 Kayu kelas III M3 0.0400
2 Paku 5 cm - 10 cm Kg 0.3000
3 Minyak Bekisting Liter 0.1000
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
` D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 1.6500
2 Tukang OH 0.2750
3 Kepala Tukang OH 0.0280
4 Mandor OH 0.0830
Jumlah Tenaga Kerja
B BAHAN
1 Semen Portland Kg 384.0000
2 Pasir Beton Kg 692.0000
3 Kerikil Kg 1,039.0000
4 Air Liter 215.0000
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Beton Mutu F¹C = 14,5 Mpa (K-175) Slump (12±2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 1.6500
2 Tukang OH 0.2750
3 Kepala Tukang OH 0.0280
4 Mandor OH 0.0830
Jumlah Tenaga Kerja
B BAHAN
1 Semen Portland Kg 326.0000
2 Pasir Beton Kg 760.0000
3 Kerikil Kg 1,029.0000
4 Air Liter 215.0000
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos Atau Besi Ulir
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0700
2 Tukang OH 0.0700
3 Kepala Tukang OH 0.0070
4 Mandor OH 0.0400
Jumlah Tenaga Kerja
B BAHAN
1 Besi Beton Polos Kg 10.5000
2 Kawat Beton Kg 0.1500

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
Per Kg Pembesian = D / 10
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan 1 m pipa HDPE Ø 90 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.1.17

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0380
2 Tukang Pipa OH 0.0190
3 Mandor OH 0.0040
Jumlah Tenaga Kerja
B BAHAN
Pipa HDPE PN 10 SDR 17 Ø 90 mm
1 M' 1.0000
Jumlah Bahan
C PERALATAN
1 Sewa Tripot/Tacket & hendle crane Hari 0.0190
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan 1 m pipa HDPE Ø 110 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.1.18

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0400
2 Tukang Pipa OH 0.0200
3 Mandor OH 0.0040
Jumlah Tenaga Kerja
B BAHAN
Pipa HDPE PN 10 SDR 17 Ø110 mm
1 M' 1.0000
Jumlah Bahan
C PERALATAN
1 Sewa Tripot/Tacket & hendle crane Hari 0.0190
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 m1 Pipa PVC dia. 150 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.1.4

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.1180
2 Tukang Pipa OH 0.0590
3 Mandor OH 0.0120
Jumlah Tenaga Kerja
B BAHAN
1
Jumlah Bahan
C PERALATAN
1
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 m1 Pipa PVC dia. 200 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.1.5

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.1890
2 Tukang Pipa OH 0.0950
3 Mandor OH 0.0190
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan Baja Profil
Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.1

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0600
2 Tukang OH 0.0600
3 Kepala Tukang OH 0.0060
4 Mandor OH 0.0030
Jumlah Tenaga Kerja
B BAHAN
1 Baja Profil Kg 1.1500
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengetesan Pipa dia. 75 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.5.2

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.0080
4 Mandor OH 0.0008
Jumlah Tenaga Kerja
B BAHAN
1 Air Bersih Untuk Pengetesan M3 0.0040
2 Bahan Bakar Solar Liter 0.0600
3 Oli Liter 0.0020
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengetesan Pipa dia. 100 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.5.3

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.0080
4 Mandor OH 0.0008
Jumlah Tenaga Kerja
B BAHAN
1 Air Bersih Untuk Pengetesan M3 0.0080
2 Bahan Bakar Solar Liter 0.0600
3 Oli Liter 0.0020
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengetesan Pipa dia. 150 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.5.4

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.0080
4 Mandor OH 0.0008
Jumlah Tenaga Kerja
B BAHAN
1 Air Bersih Untuk Pengetesan M3 0.0180
2 Bahan Bakar Solar Liter 0.0600
3 Oli Liter 0.0020
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengetesan Pipa dia. 200 mm
Satuan / Unit : M1
Analisa : AHSP PU A.8.4.5.5

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0080
4 Mandor OH 0.0008
Jumlah Tenaga Kerja
B BAHAN
1 Air Bersih Untuk Pengetesan M3 0.0310
2 Bahan Bakar Solar Liter 0.0600
3 Oli Liter 0.0020
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Borring Pipa Horizontal dia. 50 - 200 mm
Satuan / Unit : M'
Analisa : Analisa B.1

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 1.0000
2 Operator OH 3.0000
3 Mandor OH 0.1000
Jumlah Tenaga Kerja
B BAHAN
1 Solar Liter 2.4500

Jumlah Bahan
C PERALATAN
1 Water Pump 4" Jam 2.3330

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Lapis Resap Pengikat (Prime Coat)
Satuan / Unit : M2
Analisa : Analisa El-427.A

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.0300
2 Mandor OH 0.0060
Jumlah Tenaga Kerja
B BAHAN
1 Aspal Kg 0.6340
2 Korosen Ltr 0.4840
Jumlah Bahan
C PERALATAN
1 Dump Truck Jam 0.0030
2 Alat Bantu Jam 1.0000
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Bongkaran Aspal Hotmix dan Beton
Satuan / Unit : M2
Analisa : Analisa El-428.A

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.2000
2 Mandor OH 0.2000
Jumlah Tenaga Kerja
B BAHAN
1 Solar Liter 1.0000
Jumlah Bahan
C PERALATAN
1 Sewa Jack Hammer dan Mesin Cutter Jam 0.2500
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan Accessories dia. Valve dia. 50 -150 mm
Accessories Mekanik (Gate Valve, Water Meter, Chek Valve, Butterfly Valve)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.1

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 1.4290
2 Tukang OH 0.7150
3 Mandor OH 0.1430
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
1

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Accessories dia. 200 mm
Accessories Mekanik (Gate Valve, Water Meter, Chek Valve, Butterfly Valve)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.2

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 1.7140
2 Tukang OH 0.8570
3 Mandor OH 0.1710
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
1
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan 1 buah Accesories dia. 50 -150 mm
Accessories Statis (Bend, Tee, Reducer, Flange Socket, Flange Spigot, Valve Socket
Repair Socket, Gibolt Joint, Clamp Sadle)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.15

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.1060
2 Tukang OH 0.0530
3 Mandor OH 0.0110
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Accesories dia. 200 mm
Accessories Statis (Bend, Tee, Reducer, Flange Socket, Flange Spigot, Valve Socket
Repair Socket, Gibolt Joint, Clamp Sadle)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.16

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.2160
2 Tukang OH 0.1080
3 Mandor OH 0.0220
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
1
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan Accesories dia. 250 mm
Accessories Statis (Bend, Tee, Reducer, Flange Socket, Flange Spigot, Valve Socket
Repair Socket, Gibolt Joint, Clamp Sadle)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.17

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.3260
2 Tukang OH 0.1630
3 Mandor OH 0.0330
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
1
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Accesories dia. 300 mm
Accessories Statis (Bend, Tee, Reducer, Flange Socket, Flange Spigot, Valve Socket
Repair Socket, Gibolt Joint, Clamp Sadle)
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.18

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.4360
2 Tukang OH 0.2180
3 Mandor OH 0.0440
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
1

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan Pipa Baru ke Pipa Lama dia. 100 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.4.2

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 1.6460
2 Tukang OH 0.8230
3 Mandor OH 0.1650
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Clinder Saw Hari 0.6500
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengelasan Pipa Steel dia. 100 mm
Satuan / Unit : Titik
Analisa : Anl. L.3

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.2760
2 Tukang OH 0.1380
3 Kepala Tukang OH 0.0140
4 Mandor OH 0.0140
Jumlah Tenaga Kerja
B BAHAN
1 Kawat Las Listrik Kg 2.7560
2 Solar Liter 2.0670
3 Minyak Pelumas Liter 0.2760
Jumlah Bahan
C PERALATAN
1 Sewa Mesin Las Jam 0.1171
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengelasan Pipa Steel dia. 150 mm
Satuan / Unit : Titik
Analisa : Anl. L.4

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.4010
2 Tukang OH 0.2010
3 Kepala Tukang OH 0.0200
4 Mandor OH 0.0200
Jumlah Tenaga Kerja
B BAHAN
1 Kawat Las Listrik Kg 4.0120
2 Solar Liter 3.0090
3 Minyak Pelumas Liter 0.4010
Jumlah Bahan
C PERALATAN
1 Sewa Mesin Las Jam 0.1705
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengelasan Pipa Steel dia. 200 mm
Satuan / Unit : Titik
Analisa : Anl. L.5

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.5280
2 Tukang OH 0.2640
3 Kepala Tukang OH 0.0260
4 Mandor OH 0.0260
Jumlah Tenaga Kerja
B BAHAN
1 Kawat Las Listrik Kg 5.2750
2 Solar Liter 3.9560
3 Minyak Pelumas Liter 0.5280
Jumlah Bahan
C PERALATAN
1 Sewa Mesin Las Jam 0.2242
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengelasan Flange dia. 200 mm
Satuan / Unit : Bh
Analisa : Anl. L. F. 5

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.7910
2 Tukang OH 0.3960
3 Kepala Tukang OH 0.0400
4 Mandor OH 0.0400
Jumlah Tenaga Kerja
B BAHAN
1 Kawat Las Listrik Kg 7.9128
2 Solar Liter 5.9346
3 Minyak Pelumas Liter 0.7913
Jumlah Bahan
C PERALATAN
Sewa Mesin Las Jam 0.3363
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengelasan Flange dia. 100 mm
Satuan / Unit : Bh
Analisa : Anl. L. F. 3

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.4130
2 Tukang OH 0.2070
3 Kepala Tukang OH 0.0210
4 Mandor OH 0.0210
Jumlah Tenaga Kerja
B BAHAN
1 Kawat Las Listrik Kg 4.1335
2 Solar Liter 3.1001
3 Minyak Pelumas Liter 0.4133
Jumlah Bahan
C PERALATAN
Sewa Mesin Las Jam 0.1757
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengelasan Flange dia. 75 mm
Satuan / Unit : Bh
Analisa : Anl. L. F. 4

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.6020
2 Tukang OH 0.3010
3 Kepala Tukang OH 0.0300
4 Mandor OH 0.0300
Jumlah Tenaga Kerja
B BAHAN
1 Kawat Las Listrik Kg 6.0175
2 Solar Liter 4.5131
3 Minyak Pelumas Liter 0.6017
Jumlah Bahan
C PERALATAN
Sewa Mesin Las Jam 0.2557
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengelasan Pipa Steel dia. 75 mm
Satuan / Unit : Titik
Analisa : Anl. L.2

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.2090
2 Tukang OH 0.1040
3 Kepala Tukang OH 0.0100
4 Mandor OH 0.0100
Jumlah Tenaga Kerja
B BAHAN
1 Kawat Las Listrik Kg 2.0870
2 Solar Liter 1.5660
3 Minyak Pelumas Liter 0.2090
Jumlah Bahan
C PERALATAN
1 Sewa Mesin Las Jam 0.0887
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengelasan Flange dia. 75 mm
Satuan / Unit : Bh
Analisa : Anl. L. F. 2

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.3130
2 Tukang OH 0.1570
3 Kepala Tukang OH 0.0160
4 Mandor OH 0.0160
Jumlah Tenaga Kerja
B BAHAN
1 Kawat Las Listrik Kg 3.1312
2 Solar Liter 2.3484
3 Minyak Pelumas Liter 0.3131
Jumlah Bahan
C PERALATAN
Sewa Mesin Las Jam 0.1331
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Penyambungan Pipa Baru ke Pipa Lama dia. 80 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.4.1

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 1.4460
2 Tukang OH 0.7330
3 Mandor OH 0.1470
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Clinder Saw Hari 0.6060
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan Pipa Baru ke Pipa Lama dia. 150 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.4.3

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 2.0960
2 Tukang OH 1.0480
3 Mandor OH 0.2100
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Clinder Saw Hari 0.7600
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Penyambungan Pipa Baru ke Pipa Lama dia. 200 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.4.4

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 2.5460
2 Tukang OH 1.2730
3 Mandor OH 0.2550
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Clinder Saw Hari 0.8700
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan Pipa Baru ke Pipa Lama dia. 250 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.4.5

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 2.9960
2 Tukang OH 1.4980
3 Mandor OH 0.3000
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Clinder Saw Hari 0.9800
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Baja Profil
Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.1

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0600
2 Tukang OH 0.0600
3 Kepala Tukang OH 0.0060
3 Mandor OH 0.0030
Jumlah Tenaga Kerja
B BAHAN
1 Baja Profil Kg -

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
` Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengecatan Permukaan Baja Secara Manual 2 Lapis
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.20

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.4000
2 Tukang OH 0.8000
3 Kepala Tukang OH 0.0800
3 Mandor OH 0.0200
Jumlah Tenaga Kerja
B BAHAN
1 Cat Dasar Kg 0.1100
2 Cat Penutup/Epoxy Kg 0.0800
3 Kuas Bh 0.0100
4 pengencer Liter 0.0100
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' Pipa Steel dia. 200 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.68

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 1.1130
2 Tukang OH 0.2230
3 Mandor OH 0.1110
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 M' Pipa Steel dia. 150 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.67

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.7080
2 Tukang OH 0.1420
3 Mandor OH 0.0710
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemotongan Pipa Steel dia. 200 mm
Satuan / Unit : Bh
Analisa : AHSP PU A.8.4.2.68

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.4760
2 Tukang OH 0.0950
3 Kepala Tukang OH -
3 Mandor OH 0.0480
Jumlah Tenaga Kerja
B BAHAN
1
2
3
4
Jumlah Bahan
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Clinder Saw Hari 0.0600
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemotongan Pipa Steel dia. 150 mm
Satuan / Unit : Bh
Analisa : AHSP PU A.8.4.2.67

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.1840
2 Tukang OH 0.0370
3 Kepala Tukang OH -
3 Mandor OH 0.0180
Jumlah Tenaga Kerja
B BAHAN
1
2
3
4
Jumlah Bahan
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Clinder Saw Hari 0.0450
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' Pipa Steel dia. 100 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.65

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.5790
2 Tukang OH 0.1160
3 Mandor OH 0.0580
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemotongan Pipa Steel dia. 100 mm
Satuan / Unit : Bh
Analisa : AHSP PU A.8.4.2.65

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0850
2 Tukang OH 0.0170
3 Kepala Tukang OH -
3 Mandor OH 0.0080
Jumlah Tenaga Kerja
B BAHAN
1
2
3
4
Jumlah Bahan
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Clinder Saw Hari 0.0400
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' Pipa Steel dia. 75 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.64.a

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.5390
2 Tukang OH 0.1080
3 Mandor OH 0.0540
Jumlah Tenaga Kerja
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemotongan Pipa Steel dia. 75 mm
Satuan / Unit : Bh
Analisa : AHSP PU A.8.4.2.64.a

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0570
2 Tukang OH 0.0120
3 Kepala Tukang OH -
3 Mandor OH 0.0060
Jumlah Tenaga Kerja
B BAHAN
1
2
3
4
Jumlah Bahan
C PERALATAN
Peralatan Potong Pipa T2/Mekanik/Clinder Saw Hari 0.0370
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Lps. Pond. Ag. Kls. A (LPA)
Satuan / Unit : M3
Analisa : Analisa EI 421.1

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.1540
2 Mandor OH 0.0220
Jumlah Tenaga Kerja
B BAHAN
1 Aggregat Kasar M3 0.6600
2 Agregat Halus M3 0.5400
Jumlah Bahan
C PERALATAN
1 Wheel Loader Jam 0.0178
2 Dump Truck Jam 0.0820
3 Stamper Jam 0.1542
4 Alat Bantu Hari 1.0000
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Lps. Pond. Ag. Kls. B (LPB)
Satuan / Unit : M3
Analisa : Analisa EI 422.1

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.1450
2 Mandor OH 0.0210
Jumlah Tenaga Kerja
B BAHAN
1 Aggregat Kasar M3 0.4200
2 Agregat Halus M3 0.2400
3 Pasir Batu (Sirtu) Material Jalan M3 0.5400
Jumlah Bahan
C PERALATAN
1 Wheel Loader Jam 0.0178
2 Dump Truck Jam 0.0820
3 Stamper Jam 0.1446
4 Water Tanker Jam 0.0211
5 Alat Bantu Hari 1.0000
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Laston Lapis Aus (AC-WC)
Satuan / Unit : M3
Analisa : Analisa EI 635a

No Uraian Satuan Koofisien

A TENAGA
1 Pekerja OH 0.2410
2 Mandor OH 0.0241
Jumlah Tenaga Kerja
B BAHAN
1 Lolos screen2 ukuran ( 9.5 - 19,0) M3 0.2978
2 Lolos screen2 ukuran ( 0 - 5) M3 0.3513
3 Semen Kg 12.4900
4 Aspal Kg 61.8000
Jumlah Bahan
C PERALATAN
1
2
3
4
5
6
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

Banda Aceh, 27 Maret 2019


Penawar
CV. BARONA USAHA

SAIFULLAH, SE
Direktur
MemasangANALISA HARGA
1 M' pipa HDPE SATUAN
dia. 50 mm PEKERJAAN
Jenis Pekerjaan :
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.17

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0350
2 Tukang OH 0.0170
3 Kepala Tukang OH -
3 Mandor OH 0.0030
Jumlah Tenaga Kerja
B BAHAN
1
2
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

MemasangANALISA HARGA
1 M' pipa HDPE SATUAN
dia. 75 mm PEKERJAAN
Jenis Pekerjaan :
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.17.a

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0375
2 Tukang OH 0.0185
3 Kepala Tukang OH -
3 Mandor OH 0.0035
Jumlah Tenaga Kerja
B BAHAN
1
2
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
MemasangANALISA HARGA
1 M' pipa HDPE SATUAN
dia. 100 mm PEKERJAAN
Jenis Pekerjaan :
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.18

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0400
2 Tukang OH 0.0200
3 Kepala Tukang OH -
3 Mandor OH 0.0040
Jumlah Tenaga Kerja
B BAHAN
1
2
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 150 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.20

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.0620
2 Tukang OH 0.0310
3 Kepala Tukang OH -
3 Mandor OH 0.0060
Jumlah Tenaga Kerja
B BAHAN
1
2
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 200 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.21

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.1020
2 Tukang OH 0.0510
3 Kepala Tukang OH -
3 Mandor OH 0.0100
Jumlah Tenaga Kerja
B BAHAN
1
2
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 250 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.22

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.1330
2 Tukang OH 0.0670
3 Kepala Tukang OH -
3 Mandor OH 0.0030
Jumlah Tenaga Kerja
B BAHAN
1
2
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 300 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.23

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.1700
2 Tukang OH 0.0850
3 Kepala Tukang OH -
3 Mandor OH 0.0170
Jumlah Tenaga Kerja
B BAHAN
1
2
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 350 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.23a

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.2300
2 Tukang OH 0.1150
3 Kepala Tukang OH -
3 Mandor OH 0.0230
Jumlah Tenaga Kerja
B BAHAN
1
2
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' pipa HDPE dia. 400 mm
Satuan / Unit : M'
Analisa : AHSP PU A.8.1.24

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.2900
2 Tukang OH 0.1450
3 Kepala Tukang OH -
3 Mandor OH 0.0290
Jumlah Tenaga Kerja
B BAHAN
1
2
Jumlah Bahan
C PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan pipa HDPE dia. 75 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A2

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.1040
2 Tukang OH 0.0520
3 Kepala Tukang OH 0.0050
3 Mandor OH 0.0050
Jumlah Tenaga Kerja
B BAHAN
1 Solar Liter 0.7830
2 Minyak Pelumas Liter 0.1040
Jumlah Bahan
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.0444
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Penyambungan pipa HDPE dia. 100 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A3

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.1380
2 Tukang OH 0.0690
3 Kepala Tukang OH 0.0070
3 Mandor OH 0.0070
Jumlah Tenaga Kerja
B BAHAN
1 Solar Liter 1.0330
2 Minyak Pelumas Liter 0.1380
Jumlah Bahan
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.0586
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan pipa HDPE dia. 150 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A4

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.2010
2 Tukang OH 0.1000
3 Kepala Tukang OH 0.0100
3 Mandor OH 0.0100
Jumlah Tenaga Kerja
B BAHAN
1 Solar Liter 1.5040
2 Minyak Pelumas Liter 0.2010
Jumlah Bahan
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.0852
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Penyambungan pipa HDPE dia. 200 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A5

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.2640
2 Tukang OH 0.1320
3 Kepala Tukang OH 0.0130
3 Mandor OH 0.0130
Jumlah Tenaga Kerja
B BAHAN
1 Solar Liter 1.9780
2 Minyak Pelumas Liter 0.2640
Jumlah Bahan
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.1121
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan pipa HDPE dia. 250 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A6

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.3270
2 Tukang OH 0.1630
3 Kepala Tukang OH 0.0160
3 Mandor OH 0.0160
Jumlah Tenaga Kerja
B BAHAN
1 Solar Liter 2.4490
2 Minyak Pelumas Liter 0.3270
Jumlah Bahan
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.1388
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Penyambungan pipa HDPE dia. 300 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A7

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.3930
2 Tukang OH 0.1960
3 Kepala Tukang OH 0.0200
3 Mandor OH 0.0200
Jumlah Tenaga Kerja
B BAHAN
1 Solar Liter 2.9460
2 Minyak Pelumas Liter 0.3930
Jumlah Bahan
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.1669
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan pipa HDPE dia. 350 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A8

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.4560
2 Tukang OH 0.2280
3 Kepala Tukang OH 0.0230
3 Mandor OH 0.0230
Jumlah Tenaga Kerja
B BAHAN
1 Solar Liter 3.4170
2 Minyak Pelumas Liter 0.4560
Jumlah Bahan
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.1936
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pembongkaran Beton
Satuan / Unit : M3
Analisa : Analisa EI-7152

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.2390
2 Operator OH 0.2020
3 Mandor OH 0.2000
Jumlah Tenaga Kerja
B BAHAN
1 Solar Jam 1.0000

Jumlah Bahan
C PERALATAN
Sewa Jack Hammer Jam 0.2500
Sewa compressor Jam -
Sewa mesin cutter Jam 0.2500
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Penyambungan pipa HDPE dia. 75 mm
Satuan / Unit : M'
Analisa : Anl. HDPE A2

No Uraian Satuan Koofisien


A TENAGA
1 Pekerja OH 0.1040
2 Tukang OH 0.0520
3 Kepala Tukang OH 0.0050
3 Mandor OH 0.0050
Jumlah Tenaga Kerja
B BAHAN
1 Solar Liter 0.7830
2 Minyak Pelumas Liter 0.1040
Jumlah Bahan
C PERALATAN
Sewa mesin Penyambung HDPE Jam 0.0444
Jumlah Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead & Profit 10.00 % x D
F Harga Satuan Pekerjaan (D+E)
HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
#REF! :
#REF!
#REF! : #REF!
#REF! : #REF!

HARGA SATUAN
NO U R A I A N SATUAN ( Rp. )

I. UPAH
1 Pekerja Galian Tanah OH 90,000.00
2 Pekerja OH 90,000.00
3 Tukang OH 100,000.00
4 Kepala Tukang OH 120,000.00
5 Mandor OH 110,000.00
6 Penjaga Malam OH 120,000.00
7 Supir OH 100,000.00
8 Operator OH 150,000.00
9 Pembantu Operator OH 120,000.00
10 Pembantu Juru Ukur OH 80,000.00
11 Juru Ukur OH 120,000.00
II. MATERIAL/BAHAN
1 Air M3 85,000.00
2 Air Liter 100.00
3 Agregat Kasar M3 200,000.00
4 Agregat Halus M3 230,000.00
5 Asphalt kg 25,000.00
6 Alat Bantu Ls 5,000.00
7 Baja Profil Kg 25,000.00
8 Bak Cuci Piring Logam bh 1,500,000.00
9 Batu Bata bh 550.00
10 Batu Kali/Batu Belah (Sungai/Gunung) M3 180,000.00
11 Bensin (Industri) Liter 12,000.00
12 Besi Beton Polos kg 13,000.00
13 Besi Beton Ulir kg 20,000.00
14 Beton Rooster/Kerawang bh 5,000.00
15 Bubungan Seng M' 15,000.00
16 Cat Kayu Dasar kg 35,000.00
17 Cat Kayu Mengkilat/Penutup kg 35,000.00
18 Cat Dasar Kg 45,000.00
19 Cat Penutup kg 45,000.00
20 Cat Tembok kg 40,000.00
21 Kayu kelas I M3 5,500,000.00
22 Kayu kelas I M3 4,800,000.00
23 Kayu kelas III M3 4,000,000.00
24 kawat Las Listrik Kg 25,000.00
25 kawat Beton Kg 15,000.00
26 Kerikil M3 110,000.00
27 Minyak Tanah/Kerosen Liter 8,500.00
28 Minyak Pelumas/Bekisting Liter 5,000.00
29 Flier Kg 3,600.00
30 Plastik Hitam M2 3,000.00
31 Pasir M3 100,000.00
32 Pasir Beton Kerikil M3 100,000.00
33 Pasir Pasang M3 100,000.00
34 Pasir Urug M3 90,000.00
35 Paku 5 cm - 10 cm Kg 15,000.00
36 Pengencer Liter 12,000.00
37 Pelumas/Olie Liter 5,000.00
38 Kuas Bh 38,000.00
39 Sirtu M3 200,000.00
40 Semen Andalas @ 40 Kg Zak 55,000.00
41 Semen Andalas @ 50 Kg Zak 80,000.00
42 Solar Non Subsidi Liter 12,000.00
HARGA SATUAN
NO U R A I A N SATUAN ( Rp. )

PIPA DAN AKSESORIS


1 Pipa PVC RRJ S 12,5 Ø 150 mm M 140,351.25
2 Pipa PVC RRJ S 12,5 Ø 200 mm M 226,845.00
3 Pipa Steel dia. 200 mm M 531,250.00
4 Pipa Steel dia. 150 mm M 337,500.00
5 Pipa Steel dia. 100 mm M 225,000.00
6 Pipa Steel dia. 75 mm M 171,875.00
7 Pipa HDPE PN 10 SDR 17 Ø 90 mm M #REF!
8 Pipa HDPE PN 10 SDR 17 Ø110 mm M #REF!
9 Baut Moor Dia ¾ x 5" Bh 25,000.00
10 Bend PVC RRJ 90o Ø 150 mm Bh 437,500.00
11 Bend PVC RRJ 45o Ø 150 mm Bh 375,000.00
12 Bend PVC RRJ 90o Ø 200 mm Bh 875,000.00
13 Bend PVC RRJ 45o Ø 200 mm Bh 602,500.00
14 Bend Pipa HDPE 90o Ø 110 mm Bh #REF!
15 Flange socket PVC RRJ Ø 75 mm Bh #REF!
16 Flange socket PVC RRJ Ø 200 mm Bh 994,812.50
17 Flange socket PVC RRJ Ø 150 mm Bh 664,781.25
18 Flange socket PVC RRJ Ø 100 mm Bh 603,750.00
19 Flange socket (include Loose Flange) HDPE Dia 110 mm Bh #REF!
20 Flange spigot PVC Ø 200 mm Bh 1,737,500.00
21 Flange spigot PVC Ø 150 mm Bh 1,062,500.00
22 Dop PVC RRJ Ø 100 mm Bh 187,500.00
23 Dop PVC RRJ Ø 150 mm Bh 329,812.50
24 Dop PVC RRJ Ø 200 mm Bh 564,125.00
25 Dop Pipa HDPE Ø 75 mm Bh 130,000.00
26 Dop Pipa HDPE Ø 90 mm Bh #REF!
27 Dop Pipa HDPE Ø 110 mm Bh #REF!
28 Dop Pipa HDPE Ø 160 mm Bh 350,000.00
29 Dop Pipa HDPE Ø 200 mm Bh 500,000.00
30 Gate valve CI Ø 75 mm Bh #REF!
31 Gate valve CI Ø 100 mm Bh #REF!
32 Gate valve CI Ø 150 mm Bh 2,250,000.00
33 Gate valve CI Ø 200 mm Bh 3,125,000.00
34 Giboult Joint Ø 150 mm Bh 728,437.50
35 Giboult Joint Ø 200 mm Bh 1,015,625.00
36 Reducer PVC RRJ Ø 100 x 100 mm Bh #REF!
37 Reducer PVC RRJ Ø 150 x 100 mm Bh #REF!
38 Reducer PVC RRJ Ø 200 x 100 mm Bh 1,150,000.00
39 Reducer PVC RRJ Ø 200 x 150 mm Bh 1,400,000.00
40 Reducer Tee PVC RRJ Ø 100 x 75 mm Bh 670,000.00
41 Reducer Tee PVC RRJ Ø 75 x 75 mm Bh 400,000.00
42 Reducer Tee PVC RRJ Ø 150 x 75 mm Bh 800,000.00
43 Reducer Tee PVC RRJ Ø 150 x 100 mm Bh 1,070,500.00
44 Reducer Tee PVC RRJ Ø 150 x 150 mm Bh 1,250,000.00
45 Reducer Tee PVC RRJ Ø 200 x 100 mm Bh 2,351,062.50
46 Reducer Tee PVC RRJ Ø 200 x 150 mm Bh 2,586,156.25
47 Reducer Tee PVC RRJ Ø 200 x 200 mm Bh 2,821,250.00
48 Reducer Tee Pipa HDPE Ø 110 x 90 mm Bh #REF!
49 Reducer Tee Pipa HDPE Ø 90 x 63 mm Bh #REF!
50 Repair Socket PVC RRJ Ø 90 mm Bh #REF!
51 Repair Socket PVC RRJ Ø 100 mm Bh #REF!
52 Repair Socket PVC RRJ Ø 160 mm Bh #REF!
53 Tee PVC RRJ Ø 75 x 75 mm Bh #REF!
54 Tee Pipa HDPE Ø 110 x 110 mm Bh #REF!
55 Paking Kg 500,000.00
56 Stret Box Ø 100 mm Bh #REF!
HARGA SATUAN
NO U R A I A N SATUAN ( Rp. )

III. PERALATAN
1 Cylinder Saw/Mesin Potong Pipa Hari 50,000.00
2 Sewa Tripot/Tacket & hendle crane Hari 250,000.00
3 Mesin Las Hari 85,000.00
4 Mesin Penyambung HDPE/Butt Fusion Hari 75,000.00
5 Stamper Hari 80,000.00
6 Water Pass Hari 80,000.00
7 Theodolit Hari 80,000.00
8 Sewa Jack Hammer dan Mesin Cutter Jam 120,000.00
9 Sewa Aspalt Spayer Jam 150,000.00
10 Air kompresor Jam 60,000.00
11 Wheel Loader Jam 180,000.00
12 AMP Jam 250,000.00
13 Motor Greder Jam 250,000.00
14 Water Tanker Jam 180,000.00
15 Genset Jam 15,000.00
16 Dump Truck jam 80,000.00
17 Asphal Finisher jam 170,000.00
18 Tandem Roller jam 200,000.00
19 Penetrasi Roller Jam 230,000.00
20 P. Tyre Roller jam 200,000.00
21 Molen Beton 0,3 - 0,6 M3 jam 50,000.00
22 Water Pump Jam 15,000.00

Banda Aceh, 27 Maret 2019


Penawar
CV. BARONA USAHA

SAIFULLAH, SE
Direktur
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN

### : #REF!
### :
#REF!

### : #REF!
### : #REF!

Total Harga
No. URAIAN
(Rp)

I ### #REF!
II ### #REF!
III ### #REF!
IV ### #REF!
V ### #REF!
VI ### #REF!

( A ) Jumlah Harga Pekerjaan 1,600,000,000.00


( B ) Pajak Pertambahan Nilai ( PPN ) : 10 % x ( A ) 160,000,000.00
( C ) Jumlah total harga Pekerjaan 1,760,000,000.00
( D ) Dibulatkan 1,760,000,000.00

Terbilang : #NAME?

Banda Aceh, 27 Maret 2019


Penawar
CV. BARONA USAHA

SAIFULLAH, SE
Direktur
Galian Dan Urugan untuk Jaringan Pipa
Jaringan
Galian Tanah Panjang
Dia. Pipa
Penampan Ukuran Volume (M3) Pipa
g Pipa
Dalam Luar Urugan
Tinggi Lebar Galian M'
dia. 400 415 0.135 1.800 0.850 1.530 1.395
dia. 350 365 0.105 1.600 0.750 1.200 1.095
dia. 300 315 0.078 1.500 0.500 0.750 0.672
dia. 250 265 0.055 1.400 0.450 0.630 0.575
dia. 200 210 0.035 1.350 0.400 0.540 0.505
dia. 150 160 0.020 1.100 0.350 0.385 0.365
dia. 100 110 0.009 1.000 0.300 0.300 0.29 1,500
dia. 100 110 0.009 1.000 0.300 0.300 0.29 1,000
dia. 100 110 0.009 1.000 0.300 0.300 0.291 156
dia. 75 90 0.006 0.875 0.250 0.219 0.212 500
dia. 75 90 0.006 0.875 0.250 0.219 0.212 600
dia. 50 63 0.003 0.750 0.200 0.150 0.147
dia. 40 50 0.002 0.650 0.200 0.130 0.128
JUMLAH 3,756

Pipa Sadap
Galian Tanah Panjang
Dia. Pipa
Penampan Ukuran Volume (M3) Pipa
g Pipa
Dalam Luar Urugan
Tinggi Lebar Galian M'
dia. 400 415 0.135 1.800 0.850 1.530 1.395
dia. 350 365 0.105 1.600 0.750 1.200 1.095
dia. 300 315 0.078 1.500 0.500 0.750 0.672 48
dia. 250 265 0.055 1.400 0.450 0.630 0.575
dia. 200 210 0.035 1.350 0.400 0.540 0.505
dia. 150 160 0.020 1.100 0.350 0.385 0.365
dia. 100 110 0.009 1.000 0.300 0.300 0.291
dia. 75 90 0.006 0.875 0.250 0.219 0.212
dia. 50 63 0.003 0.750 0.200 0.150 0.147
dia. 40 50 0.002 0.650 0.200 0.130 0.128
JUMLAH 48

Galian Dan Urugan untuk Wash Out


Galian Tanah Panjang
Dia. Pipa
Penampan Ukuran Volume (M3) Pipa
g Pipa
Dalam Luar Urugan
Tinggi Lebar Galian M'
dia. 400 415 0.135 1.800 0.850 1.530 1.395
dia. 350 365 0.105 1.600 0.750 1.200 1.095
dia. 300 315 0.078 1.500 0.500 0.750 0.672
dia. 250 265 0.055 1.400 0.450 0.630 0.575
dia. 200 210 0.035 1.350 0.400 0.540 0.505
dia. 150 160 0.020 1.100 0.350 0.385 0.365 6
dia. 100 110 0.009 1.000 0.300 0.300 0.291
dia. 75 90 0.006 0.875 0.250 0.219 0.212
dia. 50 63 0.003 0.750 0.200 0.150 0.147
dia. 40 50 0.002 0.650 0.200 0.130 0.128
JUMLAH 6

Galian Dan Urugan untuk pipa bocor


Galian Tanah Jumlah
Dia. Pipa
Penampan Ukuran Volume (M3) Titik
g Pipa
Dalam Luar Urugan
Tinggi Lebar Galian
dia. 400 415 0.135 1.800 0.800 1.440 1.305
dia. 350 365 0.105 1.600 0.800 1.280 1.175
dia. 300 315 0.078 1.500 0.800 1.200 1.122
dia. 250 265 0.055 1.400 0.800 2.240 2.185 5.00
dia. 200 210 0.035 1.350 0.800 2.160 2.125 10.00
dia. 150 160 0.020 1.100 0.800 0.880 0.860
dia. 100 110 0.009 1.000 0.800 0.800 0.791
dia. 75 90 0.006 0.875 0.800 0.700 0.694
dia. 50 63 0.003 0.750 0.800 0.600 0.597
dia. 40 50 0.002 0.650 0.800 0.520 0.518
JUMLAH 15.00

Galian Tanah Jumlah


Dia. Pipa Penampan
Ukuran Volume (M3) Titik
g Pipa
Dalam Luar Tinggi Lebar Galian Urugan
dia. 400 415 0.135 1.800 0.800 1.440 1.305
dia. 350 365 0.105 1.600 0.800 1.280 1.175
dia. 300 315 0.078 1.500 0.800 1.200 1.122
dia. 250 265 0.055 1.400 0.800 1.120 1.065 1.00
dia. 200 210 0.035 1.350 0.800 1.080 1.045
dia. 150 160 0.020 1.100 0.800 0.880 0.860
dia. 100 110 0.009 1.000 0.800 0.800 0.791
dia. 75 90 0.006 0.875 0.800 0.700 0.694
dia. 50 63 0.003 0.750 0.800 0.600 0.597
dia. 40 50 0.002 0.650 0.800 0.520 0.518
JUMLAH 1.00

Galian Dan Urugan untuk Booring Pipa


Galian Tanah Jumlah
Dia. Pipa
Penampan Ukuran Volume (M3) Titik
g Pipa
Dalam Luar Urugan
Tinggi Lebar Galian
dia. 400 415 0.135 1.800 0.800
dia. 350 365 0.105 1.600 0.800
dia. 300 315 0.078 1.500 1.500 2.250 2.172
dia. 250 265 0.055 1.400 0.800 1.120 1.065
dia. 200 210 0.035 1.500 1.500 2.250 2.215
dia. 150 160 0.020 1.500 1.500 2.250 2.230
dia. 100 110 0.009 1.500 1.500 2.250 2.241 1.50
dia. 75 90 0.006 0.875 0.800 0.700 0.694
dia. 50 63 0.003 0.750 0.800 0.600 0.597
dia. 40 50 0.002 0.650 0.800 0.520 0.518
JUMLAH 1.50

Pengecatan Pipa GIP

Dia. Pipa Tebal


Keliling Pipa Umpak
Pipa
Dalam Luar Panjang Lebar Tinggi
dia. 400.00 412.70 12.70 1.2959 0.50 0.71 0.30
dia. 350.00 362.70 12.70 1.1389 0.50 0.66 0.30
dia. 300.00 312.70 12.70 0.9819 0.50 0.61 0.30
dia. 250.00 260.00 10.00 0.8164 0.45 0.56 0.30
dia. 200.00 210.00 10.00 0.6594 0.45 0.51 0.30
dia. 150.00 159.70 9.70 0.5015 0.40 0.46 0.30
dia. 100.00 109.70 9.70 0.3445 0.40 0.41 0.30
dia. 75.00 83.10 8.10 0.2609 0.30 0.38 0.30
dia. 50.00 57.30 7.30 0.1799 0.30 0.36 0.30
dia. 40.00 46.50 6.50 0.1460 0.30 0.35 0.30
Pipa
Asumsi 50 cm diatas tanah

Volume Galian (M3) Panjang Pipa Perlintasan

Urugan Sisi
Urugan T P
Galian Dipadatkan Miring
- - - 2.30 2.30 6.51
- - - 2.10 2.10 5.94
- - - 2.00 2.00 5.66
- - - 1.90 1.90 5.37
- - - 1.85 1.85 5.23
- - - 1.60 1.60 4.53
450.00 435.8 14.25 1.50 1.50 4.24
300.00 290.5 9.50 1.50 1.50 4.24
46.80 45.3 1.48 1.50 1.50 4.24
109.38 106.2 3.18 1.38 1.38 3.89
131.25 127.4 3.82 1.38 1.38 3.89
- - - 1.25 1.25 3.54
- - - 1.15 1.15 3.25
1,037.43 1,005.20 32.22

Asumsi 50 cm diatas tanah

Volume Galian (M3) Panjang Pipa Perlintasan

Urugan Sisi
Urugan T P
Galian Dipadatkan Miring
- - - 2.30 2.30 6.51
- - - 2.10 2.10 5.94
36.00 32.3 3.74 2.00 2.00 5.66
- - - 1.90 1.90 5.37
- - - 1.85 1.85 5.23
- - - 1.60 1.60 4.53
- - - 1.50 1.50 4.24
- - - 1.38 1.38 3.89
- - - 1.25 1.25 3.54
- - - 1.15 1.15 3.25
36.00 32.26 3.74

ut
Asumsi 50 cm diatas tanah
Volume Galian (M3) Panjang Pipa Perlintasan

Urugan Sisi
Urugan T P
Galian Dipadatkan Miring
- - - 2.30 2.30 6.51
- - - 2.10 2.10 5.94
- - - 2.00 2.00 5.66
- - - 1.90 1.90 5.37
- - - 1.85 1.85 5.23
2.31 2.2 0.12 1.60 1.60 4.53
- - - 1.50 1.50 4.24
- - - 1.38 1.38 3.89
- - - 1.25 1.25 3.54
- - - 1.15 1.15 3.25
2.31 2.19 0.12

cor
Volume Galian (M3)

Urugan
Urugan
Galian Dipadatkan
- - -
- - -
- - - Panjang
11.20 10.9 0.28 2
21.60 21.3 0.35 2
- - -
- - -
- - -
- - -
- - -
32.80 32.18 0.62

Volume Galian (M3)


Urugan
Galian Urugan
Dipadatkan
- - -
- - -
- - -
1.12 1.1 0.06
- - -
- - -
- - -
- - -
- - -
- - -
1.12 1.06 0.06

ipa
Volume Galian (M3)

Urugan
Urugan
Galian Dipadatkan
- - -
- - -
- - -
- - -
- - - 8
- - -
6.75 6.7 0.01 2
- - -
- - -
- - -
6.75 6.72 0.01

Umpak

Volume Vol 2 Unit


0.107 0.214
0.099 0.199
0.092 0.184
0.076 0.151
0.069 0.138
0.055 0.110
0.049 0.098
0.034 0.069
0.032 0.064
0.031 0.062

You might also like