11

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Long Side(L1)

G Long Side(L1)
Short span through bar 'a'
Short span tension bar 'e' G

0.15S1
0.25 S1 Short span extra bar 'b'

Long span through bar 'c'


0.25S1
Long span extra bar 'd'
0.25L1
Short Side(S1) Long span tension bar 'f'

Short Side(S1) 0.25L1 0.3L1


F F
0.25L1
0.15L1 F F

0.25 S1
Distribution bar 'h'
0.3S1
Distribution bar 'g'

G
TYPICAL SLAB REINFORCEMENT PLAN G
FOR BOTTOM BARS
TYPICAL SLAB REINFORCEMENT PLAN
Steel along L.S in 2 way/ FOR TOP BARS
distn., steel in 1 way slab c & d
Steel along L.S in 2 way/
Top Tension Bar 'e' g distn., steel in 1 way slab a & b
0.25S1 0.30S1 Top Tension Bar 'f' h
0.25L1 0.30L1
Bottom St. Bar 'a' 0.25S1
0.15S1 Bottom Ex.Bar 'b' Bottom St. Bar 'c' 0.25L1
S1 0.15L1
Bottom Ex.Bar 'd'
SECTION AT G-G L1
SECTION AT F-F
SLAB DETAILS
Bottom Steel Top Steel

Sl. Slab Type Depth Shorter Span Longer Span Shorter Span Longer Span Shorter Span Longer Span
No
Through Bar 'a' Extra Bar 'b' Through Bar 'c' Extra Bar 'd' 'e' 'f' Dist bar'g' Dist bar'h'

1 S1 (Two way) 150 #8 @300 c/c #8 @300 c/c #8 @300 c/c #8 @300 c/c #8 @150 c/c #8 @150 c/c #8 @300 c/c #8 @300 c/c

2 S2 (One way) 150 #8 @300 c/c #8 @300 c/c #8 @300 c/c #8 @300 c/c #8 @150 c/c #8 @150 c/c #8 @300 c/c #8 @300 c/c

3 S3 (One way) 150 #8 @300 c/c #8 @300 c/c #8 @300 c/c #8 @300 c/c #10 @175 c/c #8 @150 c/c #8 @300 c/c #8 @300 c/c

PW.P & IWTD PW.P & IWTD PW.P & IWTD DESIGN CONSULTANT : NAME OF WORK:
Proposed V.V.I.P. Guest House at Honnali, DWG NO: 11 SIZE: A2
SHIVAMOGGA CIRCLE DIVISION DAVANGERE SUBDIVISION HONALLI EIDIEN ENGINEERING SOLUTIONS PVT. LTD
Davangere District
AEE EE SE CE HUBLI
Email: eidienengg@gmail.com DATE: MAR 2021 DRAWN BY: MVP

TITLE: Slab Reinforcement Details


REV: 0 CHECKED BY: SB

You might also like