Sor.234.1-21-R.1, Loading Pipe 48 - 32 Indonesia Power
Sor.234.1-21-R.1, Loading Pipe 48 - 32 Indonesia Power
2. SAFETY GEARS
4. TRANSPORTASI
5. EQUIPMENT
Project Mgr.
Name of Bid : LOADING PIPE
Bid Value Rp. 268,632,000.00
1 MOBILIZATION / DEMOBILIZATION
HARGA SATUAN PEKERJAAN LOADING PIPA 32 " / METER 66.67% M1 472,942.50 315,310.76
TOTAL BIAYA LOADING PIPA 48 " ( QTY - 516 mtr ) 516.00 M1 472,942.50 244,038,330.00
TOTAL BIAYA LOADING PIPA 32 " ( QTY - 78 mtr ) 78.00 M1 315,310.76 24,594,239.65
PEMBULATAN 268,632,000.00
Note : 1. Harga pekerjaan yang berlaku adalah Harga Satuan Pekerjaan Pangalengan, August 07, 2021
2. Termijn setiap 7 % Progres Volume Pekerjaan. PT. SRI MUKTI
Berita Acara Serah Terima Pekerjaan ( 100 % ) -
3.
dihitung sesuai volume actual hasil Inspect Bersama.
4. Invoice non Pajak kecuali pph.
Tardi Sutardi
Project Mgr.
PT.SRI MUKTI
BID PRICE - R1
PIPE LINE INSTALLATION SERVICES
SS-1 to WWQ Well Pad