ALL FUNDING SOURCES - Region-Implemented As of 25 September 2023
ALL FUNDING SOURCES - Region-Implemented As of 25 September 2023
15 23KD0006 A. 23,752,563.78 A. 2/13/2023 A. 100.00 P00705961MN- IO issued WSO No. 1 due to The project is currently suspended
CONST OF DRAINAGE ALONG B. 23,752,563.78 B. 8/16/2023 B. 95.33 CW1 obstructions of utility posts from due to obstruction of Road Right of
ROAD, BCIR K1430+000 C. 8/16/2023 C. -4.67 (Removal/Relocat verious service providers. IO is Way by Utility posts from CEPALCO
TO1430+618 ion of utilities) currently awaiting the complete and GLOBE/CONVERGE Optic
ERS CONSTRUCTION (42135) removal/ relocation of the subject Fiber Manholes which suspends the
utility posts. activities related to surplus common
excavation, embankment,
reinforcement works & construction
of box culvert.
16 23KD0007 A. 4,837,407.84 A. 2/13/2023 A. 100.00 P00732249MN- The IO issued Calibrated Action as Project is on-going and the
CONST OF ROAD/PATHWAY B. 4,837,407.84 B. 3/22/2023 B. 92.67 CW1 (Slow per DO 193 s.2016 (Notice of contractor is working under liquidated
BARANGAY CAMAMAN-AN C. 3/22/2023 C. -7.33 Performance) Terminate contract). The IO made damages.
CAGAYAN DE ORO CITY constant communication with
HOLONHAUS CONSTRUCTION & regards to current activity on-site.
DEVELOPMENT, INC. (45153)
17 23KD0011 A. 6,701,436.01 A. 2/13/2023 A. 100.00 P00732691MN- The IO issued Variation Order Completed as of April 28, 2023.
CONST OF MULTI PURPOSE B. 6,701,436.01 B. 4/28/2023 B. 0.00 CW1 (Delays in without TE due to the increase in
BUILDING, BARANGAY GUSA, C. 4/28/2023 C. -100.00 approval of Item 900(1)c1 Structural Concrete,
CAGAYAN DE ORO CITY Variation Orders) since the Multi-Purpose Building is
HOLONHAUS CONSTRUCTION & elevated from the Natural Grade
DEVELOPMENT, INC. (45153) Line, there is a need to construct a
ramp that will serve as a
connection from the existing
pavement to the building and an
introduction of new Item 1000(1)
Soil Poisoning to prevent the
building's foundation from future
infestations
PCMA 9/25/2023 10:22:39 AM Page 6 Of 11
18 23KD0012 A. 4,148,025.70 A. 2/13/2023 A. 100.00 P00732694MN- The Implementing Office together 'Recently resume. Delay was due to
CONSTRUCTION OF MULTI B. 4,148,025.70 B. 4/13/2023 B. 97.35 CW1 (Demolition with School Principal, Barangay the obstruction of Tugas Tree within
PURPOSE BUILDING BARANGAY C. 4/13/2023 C. -2.65 or other clearing Council and contractor conducted the project limits. The Barangay
BALUBAL, CAGAYAN DE ORO related issues joint meeting to address the Council issued Barangay Resolution
CITY (except utilities)) problem regarding the removal of regarding the realignment of the
EBCON 52 VENTURES INC. Tugas Tree within the project limit. covered court. The contractor is
(43865) Thus, the IO is coordinating to the working double time in order the
Barangay Council and Balubal project to be delived as soon as
National High School for the possible.
issuance of Barangay Resolution
due to the above reason.
19 23KD0014 A. 37,884,245.99 A. 2/13/2023 A. 92.66 P00705572MN- IO issued WSO no.1 due to the Project is Suspended as of August 3,
ROAD WIDENING BUTUAN CITY- B. 37,884,245.99 B. 10/18/2023 B. 73.94 CW1 obstruction of PLDT post that 3023 due to the obstruction of PLDT
CAGAYAN DE ORO CITY-ILIGAN C. 10/18/2023 C. -18.72 (Unworkable site impedes the construction activities post that impedes the construction
CITY RD K1424+(-371) TO condition (i.e. within the project limits. activities within the project limits.
K1424+(-220), K1424+63- unfavorable
ANGEL & SAM CONSTRUCTION weather condition
& GEN. MDSE. (19968) at the project site,
access to project
site not
passable))
20 23KD0015 A. 33,790,956.39 A. 2/13/2023 A. 100.00 P00705573MN- The Implementing Office suspends Project is suspended due to the
ROAD WIDENING BUTUAN CITY- B. 33,790,956.39 B. 8/28/2023 B. 30.03 CW1 the project due to the obstruction of obstruction of a 300mm water
CAGAYAN DE ORO CITY-ILIGAN C. 8/28/2023 C. -69.97 (Removal/Relocat the water pipeline of Cagayan de pipeline of Cagayan de Oro Water
CITY ROAD K1424+831 TO ion of utilities) Oro Water District. The main District located within the project limit
K1425+831 pipeline (300mm) was located causing the contractor to discontinue
VICTORIANO C. LIM within the project limit. Thus, the construction activities on site. The IO
CONSTRUCTION CORPORATION contractor cannot proceed due to is coordinating with the affected
(FORMERLY: VICTORIANO C. LIM the latter reason. The IO is agency for the realignment and
CONSTRUCTION) (25318) coordinating to the affected agency relocation of their pipelines.
for the possible realignment and
relocation of their pipelines.
21 23KD0017 A. 51,482,748.67 A. 3/14/2023 A. 73.19 P00732117MN- the contractor made a catch-up Negative slippage is due to the slow
CONST OF BY PASS RD JCT B. 51,482,748.67 B. 12/13/2023 B. 67.82 CW1 (Insufficient plan such as on adding performance of the contractor. IO
BCIR-AGUSAN-BALUBAL-SAYRE C. 12/13/2023 C. -5.37 manpower) construction personnel on-site. issued calibrated actions and also
HIGHWAY CAGAYAN DE ORO issued instructions to the contractor
CITY to submit a catch up plan and
MINDANAO ROCK (23479) provide additional manpower on site.