Assignment on Energy Conservation and Audit (22652) 2023-24

Q1.By definition, energy audits emphasis Q7.Energy manger should be well versed
on energy use by with
a)Verification a) Manufacturing and processing skills
b)Monitoring b) Managerial and technical skills
c)Analysis c) Technical and marketing skills
d)All of the above d) Managerial and commercial skills

Q2.Energy efficiency, consumption level, Q8.An energy policy does not include
benefits can be scientifically managed by a) Target energy consumption reduction
a) Energy Audit b) Time period for reduction
b)Energy Conservation c) Declaration of top management
c)Energy Management commitment
d)Energy utilization d) Future production projection

Q3. “The judicious and effective use of Q9. The tool used for performance
energy to maximise profits and enhance assessment and logical evaluation of
competitive positions”. This can be the avenues for improvement in Energy
definition of: management and audit is
a) Energy conservation a) Fuel substitution
b) Energy management b) Monitoring and verification
c) Energy policy c) Energy pricing
d) Energy Audit d) Bench marking

Q4. The objective of energy management Q10. The various types of the instruments,
includes which requires during audit need to be
a) Minimising energy costs a) easy to carry
b) minimising waste b) easy to operate
c) Minimising environmental degradation c) inexpensive
d) all the above d) all of the above

Q5. One unit of electricity is equivalent to Q11.The objective of Energy Management


___ kcal heat units. is
a) 800 a)Optimum energy procurement
b) 860 b)Minimize energy cost
c) 400 c)Minimize environmental effect
d) 680 d) all of the above

Q6. The percentage of energy saved at the Q12.Govenment of India has set up BEE
current rate of use, compared to the under provision of
reference year rate of use, is called a)EC Act 2001
a) Energy Utilization b)Electricity act 2003
b) Energy Performance c)Energy act 2006
c) Energy Efficiency d)None of the above
d) None
Q13. The standard and labelling scheme
was launched on
a)Apr 2016
b)May 2006
c)Jan 2010
d)May 2016
Assignment on Energy Conservation and Audit (22652) 2023-24

Q14.A star rating is based on ..........order Q21. Energy Efficiency Ratio in


of energy efficiency from 1 to 5 BTU/hr/W equals to
a) Average a) 4.18 x EER W/W
b) Descending b) 9.81 x EER W/W
c)Ascending c)3.413 x EER W/W
d)Lowest d)EER W/W

Q15.The following label allow to compare Q22. As low the EER the star rating will
the energy consumption of similar be
products a)Same
a)Endorsement b)Maximum
b)Comparative c)Low
c)Variable d)High
d)Standardized
Q23. Arrange the ascending start ratings
Q16. The ........ label provides certification with EER values
about highly energy efficient product 1)3.5 2)4.0 3)3.3 4)4.5
a)Endorsement a)1-3-2-4
b)Comparative b) 1-2-3-4
c)Variable c) 4-3-2-1
d)Standardized d) 4-2-3-1

Q17. Out of following is the mandatory Q24. Energy monitoring and targeting is
labelling product built on the principle of “ _____”.
a)Ceiling Fans a) “production can be reduced to achieve
b)Laptop reduced energy consumption”
c)Room air conditioner b) “Consumption of energy is proportional
d)Washing machine to production rate”
c) “You cannot manage what you do not
Q18. Out of following is the voluntary measure”
labelling product d) None of the above.
a)Frost free refrigerator
b)Laptop Q25. One of the following is not the
c)Room air conditioner element of energy monitoring & targeting
d)Distribution transformer system
a) Recording the energy consumption
Q19. The S & L can not be registered for b) comparing the energy consumption
a)Company C) Controlling the energy consumption
b)Process d) Reducing the production
c)Model
d)None of the above Q26.Poor scattering on trend line of
production Vs Energy consumption
Q20. ISEER stands for indicates ___.
a) Indian Seasonal Energy Efficiency a) poor level of control
Ratio b) good level of control
b) Indian Sensitive Energy Efficiency c) both the above
Ratio d) none of above.
c) Indian Service Energy Efficiency Ratio
d)Indian Second Energy Efficiency Ratio
Assignment on Energy Conservation and Audit (22652) 2023-24

Q27. The empirical relationship used to Q33. To draw a CUSUM chart following
plot production Vs Energy consumption is data is required
(Y= energy consumed for the period; C = a) Monthly energy consumption&
fixed energy consumption; M = energy monthly production
consumption directly related to production; b) Monthly specific energy consumption
X= production for same period). and turn over
a) X=Y+MC c) Monthly profits and production
b) Y=Mx+C d) None
c) M=Cx+Y
d) None of above Q34. What is specific energy
consumption?
Q28. The energy used by any a) energy consumption per month
manufacturing process varies with b) Energy consumed per unit of
a) production volume production
b) type of process c) energy consumption per year
c) resource input d) none of the above
d) All the above
Q35.Data required to plot a moving annual
Q29. The best way of correlating total is ____.
production and energy data in any plant a) production
is….. b) energy
a) Text format c) both the above
b) Graphical representation d) none the above
c) Oral communication
d) None Q36. Energy and production data is useful
to calculate……
Q30. For any company, energy a) Specific Energy Consumption
consumption mostly relates to…….. b) Specific Fuel consumption
a) Profits c) Specific Cost
b) Inventory d) None
c) Production
d) All the above Q37.What type of data is useful to find out
the fixed energy consumption?
Q31. What is CUSUM? a) SEC Vs production
a) Cumbersome b) SEC Vs Energy
b) Cumulative Sum c) Production Vs energy
c) Calculated Sum d) None
d) None
Q38. What do you mean by “toe”
Q32. A CUSUM graph follows a random a) Total oil equivalent
fluctuation trend and oscillates around. b) Tons of effluent
a) 100 c) Tons of oil equivalent
b) 100% d) none of the above
c) 0
d) none of the above Q39. Energy audit steps can be
a)Gather preliminary data
b)Conduct plant visit
c)Analyze & report results
d)Follow up
e)All of the above
Assignment on Energy Conservation and Audit (22652) 2023-24

Q40.Following is not the audit phase Q47. Amount and type of fuel and material
a)Pre Audit Phase used can be collected during
b)Audit Phase a)Pre Audit Phase
c)Post Audit Phase b)Detailed Audit Phase
d)Follow up c)Post Audit Phase
d)Follow up
Q41. Initial site visit is required and
carried out in Q48. Conduct survey and monitoring is the
a)Pre Audit Phase phase of
b)Audit Phase a)Pre Audit Phase
c)Post Audit Phase b)Detailed Audit Phase
d)Follow up c)Post Audit Phase
d)Follow up
Q42. Finalization of Audit team is the task
of Q49.Detail trial of each equipments and
a)Pre Audit Phase data collection is
b)Audit Phase a)Pre Audit Phase
c)Post Audit Phase b)Detailed Audit Phase
d)Follow up c)Post Audit Phase
d)Follow up
Q43.Planning of time frame of audit is the
phase of Q50.Identification of ENCON (Energy
a)Pre Audit Phase conservation opportunities is under
b)Audit Phase a)Pre Audit Phase
c)Post Audit Phase b)Detailed Audit Phase
d)Follow up c)Post Audit Phase
d)Follow up
Q44.Creating awareness can be done in
a)Pre Audit Phase Q51.Cost benefit analysis is carried out in
b)Audit Phase a)Pre Audit Phase
c)Post Audit Phase b)Detailed Audit Phase
d)Follow up c)Post Audit Phase
d)Follow up
Q45.Energy consumption by each
department can be collected during Q52.Reporting and presentation to top
a)Pre Audit Phase management is
b)Detailed Audit Phase a)Pre Audit Phase
c)Post Audit Phase b)Detailed Audit Phase
d)Follow up c)Post Audit Phase
d)Follow up
Q46.Energy management training program
conducted during Q53. Action plan for future is carried out
a)Pre Audit Phase in
b)Detailed Audit Phase a)Pre Audit Phase
c)Post Audit Phase b)Detailed Audit Phase
d)Follow up c)Post Audit Phase
d)Follow up
Assignment on Energy Conservation and Audit (22652) 2023-24

Q54.Periodic review is taken under Q61.Illumination level can be checked by


a)Pre Audit Phase a)Thermometer
b)Detailed Audit Phase b)Light meter
c)Post Audit Phase c)Tape measure
d)Follow up d)Combustion analyser

Q55.CO2 measurement of Fyrite kit is Q62.Waste heat temperature can be


based on (EA) measure by
a) Weight basis (dry) a)Thermometer
b) Volume basis (dry) b)Light meter
c) Weight basis (wet) c)Tape measure
d) Volume basis (wet) d)Combustion analyser

Q56. Non contact speed measurements can Q63.Combution efficiency can be measure
be carried out by by
a) Tachometer a)Thermometer
b) Stroboscope b)Light meter
c) Oscilloscope c)Tape measure
d) Speedometer d)Combustion analyser

Q57. Infrared thermometer is used to Q64.Electrical measuring instruments are


measure use to measure
a) Surface temperature a)KVA
b) Flame temperature b)KW
c) Flue gas temperature c)PF
d) Hot water temperature d)KVAr
e)All of the above
Q58. Find out the ‘odd’ among the
following choices for fuel substitution for Q65.Power factor of the electrical supply
industrial sector of India. should be
a) LDO with LSHS a)1
b) coal with rice husk b)0
c) natural gas for fertilizer plant c)0.5
d) LPG for soft coke d)0.1

Q59. Air velocity in ducts can be measured Q66. 1. The household energy meter is
by using ___ and manometer
a) Orifice meter a)An indicating instrument
b) Borden gauge b)A recording instrument
c) Pitot tube c)An integrating instrument
d) Anemometer d)None of the above

Q60. The distance can be measure during Q67. The meter constant of single phase
audit by energy meter is expressed in terms of
a)Thermometer
b)Light meter a)Readings in kWh
c)Tape measure b)W/kWh
d)Combustion analyser c)Amps/kW
d)Volts/kWh
Assignment on Energy Conservation and Audit (22652) 2023-24

Q68.Combustion analyser used to measure Q75.Tachometer is used to measure


various gases such as a)Velocity
a) Oxygen b)Speed
b)Carbon dioxide c)Light
c)Nitrogen oxides d)Volume
d)Sulphur oxides
e) All of the above Q76. To detect leak in the compressed air
are normally measure
Q69.The combustion efficiency is a)Stroboscope
calculated by b)Oscilloscope
a)Fyrite c) Ultrasonic leak detector
b)Fuel efficiency Monitor d)Non of the above
c)Contact thermometer
d)Infrared thermometer Q77. A photocell which detect light output
by using instrument called
Q70.To measure different amount of a)Oscilloscope
volumes in the gases like O2 or CO2 .... b)Fyrite
can be used c)Lux meter
a) Combustion analyser d)Stroboscope
b) Thermometer
c) Fyrite Q78.The energy strategies of companies
d) Non contact flow meter have the principle of

Q71. Thermocouples are use for a) restoring and preserving the


a) Contact type temperature environment
measurement b) reducing wastes and pollutants
b) Contact type volume measurement c) educating the people about energy
c)Non Contact type temperature conservation
measurement d) all of these
d) Contact type pressure measurement
Q79. The main objective of energy
Q72. Furnace temperature measure by management is to
a)Thermocouple a) Minimize energy cost
b) Infrared thermometer b) Minimum environmental effects
c)Thermometer
d)gyroscope c.)Maintain optimum energy procurement
and utilization
Q73. The air velocity in the pipe can be d) All of these
measure using
a)Pitot tube
b)Pyroscope Q80. Energy management is a key
c)Water meter component of
d)Lux meter a) Environmental management
b) Carbon management
Q74.The non contact type flow measuring c) Nitrogen management
device are working under d) Water management
a)Pitot principal
b)Leak detection
c)Doppler effect
d)Anemometer