To solve all O&M related problems of power plant,Project Commissioning of Power Plant, EPC of Power Plant,
BOQ making of Power Plant,Spare Parts inventory of Power Plant.

Experience
Assistant Manager
Samuda Power Limited of T.K.Group
Nov 2013 - Present (10 years 7 months)
More than 14-year experience to working with Power generation and Industrial based companies and
last 10-year working at Wartsila and Rolls-Royce Engine based Gas and HFO Power Plant. This has
resulted in professional competency in Operation and Maintenance department.

Operation In Charge of Faridpur 50 MW Peaking Power Plant


Energypac Power Generation PLC
Dec 2011 - Dec 2013 (2 years 1 month)
I worked as an Plant Engineer in Everest Power Plant which has three BVG-20G Rolls-Royce Gas
engine.After that I am working at Faridpur 50 MW HFO Based Peaking Power Plant as an Operation
In- Charge.Then I worked as an Electrical in Charge of Gopalganj 100 MW HFO based Peaking
Power Plant.There are eight Bergen Engine B32:40V16PH,one start-up boiler,three Ingersoll-Rand
Compressors,Four WHRB boilers,One Standby Diesel Generator,Eight LOS,Two HFOS,Eight
EMCC,Eight RMCC,Eight SF6 Breaker,one 11KV VCB,one 11kv/.4 kV transformer and three single
phase 10/25 MVA transformer.The same things are doubled at Goplaganj 100MW Peaking Power
plant.We have to do the regular maintenance,routine maintenance,breakdown maintenance and
troubleshooting of the machinaries baesd on the daily operation.

Executive Engineer
ANLIMA TEXTILE LTD
Oct 2008 - Dec 2011 (3 years 3 months)
It is a 100% export oriented private limited company financed by consortium bank. It is located at
Karnapara, Savar.It has own generation power plant consist of Three (Each 1 MW) gas generators
and 11 KV substation with 1250 KVA capacity. In utility it has one 10 ton boiler, 100 m3 process water
treatment plant, 40 m3 hot water supply plant, 60 m3 waste water treatment plant, three compressor
with each 6.7 m3/min capacity, 70 RT air-conditioning system and central dust collector system. I
have to solving different types of problems related with Knitting, Batch, Lab, Dyeing & Finishing Textile
Machineries.

Education
Chittagong University of Engineering & Technology

nobin khan - page 1


B.Sc. in EEE, Electrical and Electronics
2003 - 2007

Skills
Troubleshooting • Maintenance • Electrical Wiring • Engineering • Electricity • Transformers •
Boilers • Project Management • Renewable Energy • Production Planning