Professional Documents
Culture Documents
ARCPP 1 Final Output
ARCPP 1 Final Output
Instruction: Choose a SMALL public building/structure and Evaluate their design strategies,
implementation process, and performance outcomes based on BP 344 (Accessibility Law)
standards.
1.0 Introduction
- BP 344
- Building
- Provide pictures
- Provide pictures
4.2 Assessment
4.3 Result
- A4 size paper
- Size 12, Calibre
- Proper citation
- 15% max. on plagiarism checker
- Save file as PDF and name file format with complete name (last name, given name)
- Deadline June 9, 2023 (upload work on google drive, link will be sent on GC)
- The Instructor will evaluate research paper using the following criteria:
25% Depth of discussion
20% Integration of knowledge
10% Topic focus
10% Cohesiveness
10% Quality of information/evidence
10% Similarity rating (at most 15%)
10% Citation format
5% Spelling & grammar