PLATFORM : BEWO

Job description : Pumping Injection produce water into the well


DATE : B14-May-24
CREW OPERATION
DAY SHIFT Sr.E&I OPT
NIGHT SHIFT Sr.OPT GC.OPT

NIGHT SHIFT
FROM TO DESCRIPTION FROM TO

6:00 6:30 Sakmanu N., Itthirit B., RONNAKORN B., CHAIWAT T.

Report Platform GVI to CCR and open PTW.

Continue 1st Phase convert PRISM unit to automation

Completed install tie in line Chicsan of discharg line for

Completed install tie in 10" / 1500 from BEWA to Suctio

Completed Install tie in hard pipe 1" fuel gas line for UG

Completed Install tie in hard pipe 3"/150 from PRISM to

Support FDS add all support of pipind (incomplete).

Completed add torque all of pipeline are installed.

### hug up sling for Chicsan piping.

Performed pressure test on suction and discharge lines

House keeping working area.

17:00 18:00 We traveled from BEWO to BELQ.

Note: 1st Phase convert PRISM unit to automation in sc

Next Plan : FDS continue add support all installed pipe


: Function test operation of PRISM unit and

: OJT PRISM unit operation for with Day shi


OPT
GC.OPT

DAY SHIFT
DESCRIPTION

., RONNAKORN B., CHAIWAT T. and 6 FDS traveled from BELQ to BEWO.

o CCR and open PTW.

onvert PRISM unit to automation in scope replace chicksan pipe to hard piping

n line Chicsan of discharg line form hard piping 3" / 1500 to mannifold of wells 13,21,34

n 10" / 1500 from BEWA to Suction line for PRISM unit and Add HYD touqe is 1310 FP's CS / 1546 PSI.

n hard pipe 1" fuel gas line for UG skid to PRISM unit.

n hard pipe 3"/150 from PRISM to Close drain.

support of pipind (incomplete).

e all of pipeline are installed.

an piping.

est on suction and discharge lines at 1250 PSI with no leaks

ng area.

WO to BELQ.

ert PRISM unit to automation in scope replace chicsan pipe to hard piping and relocate PS equipment achieving a progress of 85%

inue add support all installed pipe.


test operation of PRISM unit and PLC programe.

SM unit operation for with Day shift and Nitgh sift team.
Production summary report
Unit Run Time 24.00 Hrs.
Total Water Pumping Wells -321182 BBLS
Total Water Pumping Well no : 13 -321364 BBLS
Total Water Pumping Well no : 21 53 BBLS
Total Water Pumping Well no : 34 129 BBLS
Total Water Pumping Well no : 67 0 BBLS
Pump Discharge pressure #DIV/0! PSI
Injection Discharge pressure #DIV/0! PSI
Total Water Pumping Cummulative -283,576 BBLS

Diesel consumtion
Diesel daily used 106 Litters
Total Left today 73.2 % 11050 Litters
Last volume 73.9 % 11155 Litters
Diesel tank capacity 15095 Litters
Required top up Litters

Chemical consumtion
CRW24830 GPD IN SCW85763 GPD IN
Daily used 42.05 Daily used 79.895
Total left today 25.23 3 Total left today 412.09 49
Last volume 67.28 8 Last volume 491.985 58.5
Chemical tank capacity 530 63 Chemical tank capacity 530 63
READING SHEET OF PRISM JOB BY OPERATOR

NAME: 0 Sr.E&I 0 OPT DAY


LOCATION : BEWO
NAME: 0 Sr.OPT 0 GC.OPT NIGHT

Well no : 13 Well no : 21 Well no : 34 Well no : 67 Well no : 13 Well no : 21 Well no : 34 Well no : 67


NOV-
GENERATOR AIR COMP SUCTION DISCHARGE WATER PUMPING PRISM WELL NO : 13 WATER PUMPING PRISM WELL NO : 21 WATER PUMPING PRISM WELL NO : 34
PUMP
CHOKE UPSTREAM DOWNSTREAM CHOKE UPSTREAM DOWNSTREAM CHOKE UPSTREAM DOWNSTREAM CHOKE UPSTREAM DOWNSTREAM TUBING CASSING TUBING CASSING TUBING CASSING TUBING CASSING

TIME SIZE PRESSURE PRESSURE SIZE PRESSURE PRESSURE SIZE PRESSURE PRESSURE SIZE PRESSURE PRESSURE VOLT FREQ SPEED PRESSURE PUMP A PRESSURE TRIPLEX PUMP PRESSURE PRESSURE PRESSURE PRESSURE Barrels Barrels Cummalative Reading Meter Barrels Barrels Cummalative Reading Meter Barrels

../64 PSI PSI ../64 PSI PSI ../64 PSI PSI 128/64 PSI PSI V hz RPM PSI RPM PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI Per Min Per Day Barrels Pumped Barrels Per Min Per Day Barrels Pumped Barrels Per Min

74 1705 1787 59 1705 1274 65 1705 1599 35 1705 1638 480 60 1800 120 247 73 1705 1787 #DIV/0! 1274 5 1599 320 1638 #DIV/0! 0.86 1242 7,828 321,364 0.74 1,069 6,015 102,865 0.77

19:00 0 0 0 0 0 0 0 0 0 -5,356.07 -7,712,736 -313,536 0.45 648 6,042 102,892 1.07

20:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.43 624 6,068 102,918 1.08

21:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 -1,715.30 -2,470,032 -96,850 -2,645.88

22:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

23:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

0:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

1:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

2:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

3:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

4:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

5:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

6:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

7:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

8:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

9:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

10:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

11:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

12:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

13:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

14:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

15:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

16:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

17:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

18:00 0 0 0 0 0 0 0 0 0 0.00 0 -313,536 0.00 0 -96,850 0.00

Total #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! -313,536 0 0.442 636 6,068 102,918 1.075

42
Unit Run Time 24.00 Hrs.

Total Water Pumping Well no : 13 -321,364 BBLS

Total Water Pumping Well no : 21 53 BBLS

Total Water Pumping Well no : 34 129 BBLS

Total Water Pumping Well no : 67 0 BBLS

Total Water Pumping Wells -321,182 BBLS


Well no : 13 Well no : 21

CHOKE UPSTREAM DOWNSTREAM CHOKE UPSTREAM


ONLINE
DATE SIZE PRESSURE PRESSURE SIZE PRESSURE
HRS.
../64 PSI PSI ../64 PSI

7-Mar-24 2.5 50 1,960 1,654 92 1,960

8-Mar-24 24 40 1,825 1,325 30 1,825

9-Mar-24 11 40 1,498 1,268 27 1,498

6-Apr-24 1.5 103 1,855 1,937 92 1,855

7-Apr-24 22.5 74 1,705 1,787 59 1,705

8-Apr-24 13.48 61 1,582 1,555 22 1,582


11-May-25

12-May-25

13-May-25

14-May-25

15-May-25

16-May-25

17-May-25

18-May-25

19-May-25

20-May-25

21-May-25

22-May-25

23-May-25

24-May-25

25-May-25

26-May-25

27-May-25

28-May-25

29-May-25

30-May-25
31-May-25

1-Jun-25

2-Jun-25

3-Jun-25

4-Jun-25

5-Jun-25
Well no : 21 Well no : 34 Well no : 67

DOWNSTREAM CHOKE UPSTREAM DOWNSTREAM CHOKE UPSTREAM DOWNSTREAM

PRESSURE SIZE PRESSURE PRESSURE SIZE PRESSURE PRESSURE

PSI ../64 PSI PSI ../64 PSI PSI

1,855 46 1,960 1,837 0 1,960 0

1,362 39 1,825 1,594 0 1,825 0

1,098 24 1,498 954 0 1,498 0

1,862 90 1,855 1,902 40 1,855 0

1,274 65 1,705 1,599 35 1,705 1,638

1,151 20 1,582 1,119 0 1,582 0


PRISM HISTORY

SUCTION DISCHARGE WATER PUMPING PRISM WELL NO : 13 WATER PUMPING PR

PRESSURE NOV PUMP Barrels Barrels Cummalative Reading Meter Barrels

PSI PSI Per Min Per Day Barrels Pumped Barrels Per Min

71 1,960 1.15 1,656 5,428 318,949 1.33

70 1,825 0.94 1,357 6,785 320,306 0.95

69 1,498 0.64 919 7,206 320,727 0.85

73 1,855 0.02 24 7,207 320,743 0.59

73 1,705 0.86 1,242 7,828 321,364 0.74

74 1,582 1.00 1,440 8,668 322,204 0.47


TORY

WATER PUMPING PRISM WELL NO : 21 WATER PUMPING PRISM WELL NO : 34

Barrels Cummalative Reading Meter Barrels Barrels Cummalative Reading Meter

Per Day Barrels Pumped Barrels Per Min Per Day Barrels Pumped Barrels

1,920 2,949 99,781 0.38 552 3,300 155,500

1,368 4,317 101,149 1.06 1,525 4,825 157,025

1,217 4,875 101,707 1.53 2,199 5,833 158,033

852 4,946 101,796 0.17 240 5,853 158,072

1,069 6,015 102,865 0.77 1,104 6,405 158,624

677 6,410 103,260 1.19 1,714 7,405 159,624


WATER PUMPING PRISM WELL NO : 67 TOTAL WATER
PUMPING
PRISM WELLS
Barrels Barrels Cummalative Reading Meter

Per Min Per Day Barrels Pumped Barrels Barrels

0.00 0 15,783 813 29,697

0.00 0 15,783 813 31,710

0.00 0 15,783 813 33,697

2.23 3,204 16,050 1,098 359

1.56 2,242 17,358 2,406 3,550

0.00 0 17,358 2,406 2,235


REMARKS

Start PRISM unit at 16:30 Hrs. and inject produce water from tanker to well 13 / 50 chk, well 21 /
92 chk and well 13 / 46 chk.

Continue run PRISM Unit due to injection water from BIC SEA 104 to wells

Completed injection water from Big sea 104 to wells and stop the PRISM Unit.
Start PRISM unit at 16:30 Hrs. and inject produce water from tanker to well 13 / 103 chk, well 21
/ 92 chk well 34 / 90 chk and well 67/40chk.
Continue run PRISM Unit due to injection water from BIC SEA 104 to wells

Completed injection water from Big sea 104 to wells and stop the PRISM Unit.
PRISM PUMPING MONTHLY RADIO

SCM SCM
DATE SPM OPE STB UCM UPM NMD
(w/o PMI) (PMI)
8-Dec-22 2.75
9-Dec-22 12.25 5 6.75
10-Dec-22 18 1.5 4.5
11-Dec-22 20.5 3.5
12-Dec-22 21.75 2.25
13-Dec-22 0 24
14-Dec-22 10.25 13.75
15-Dec-22 21.5 2.5
16-Dec-22 19 5
17-Dec-22 9 15
18-Dec-22 24
19-Dec-22 24
20-Dec-22 9 15
21-Dec-22 20 4
22-Dec-22 22.5 1.5
23-Dec-22 22.75 1.25
24-Dec-22 22.5 1.5
25-Dec-22 22.5 1.5
26-Dec-22 20.5 3.5
27-Dec-22 22.5 1.5
28-Dec-22 23.5 0.5
29-Dec-22 24
30-Dec-22 24
31-Dec-22 24
1-Jan-23 23.5 0.5
2-Jan-23 24
3-Jan-23 24
4-Jan-23 24
5-Jan-23 4.5 19.5
6-Jan-23 6 18
7-Jan-23 24
8-Jan-23 2 22
9-Jan-23 24
10-Jan-23 24
11-Jan-23 24
12-Jan-23 24
13-Jan-23 24
14-Jan-23 24
15-Jan-23 24
16-Jan-23 24
17-Jan-23 24
18-Jan-23 24
19-Jan-23 24
20-Jan-23 24
21-Jan-23 24
22-Jan-23 24
23-Jan-23 24
24-Jan-23 3 21
25-Jan-23 24
26-Jan-23 24
27-Jan-23 24
28-Jan-23 13.5 10.5
29-Jan-23 24
30-Jan-23 24
31-Jan-23 10 14
1-Feb-23 24
2-Feb-23 24
3-Feb-23 24
4-Feb-23 24
5-Feb-23 24
6-Feb-23 24
7-Feb-23 24
8-Feb-23 24
9-Feb-23 24
10-Feb-23 24
11-Feb-23 19 5
12-Feb-23 23 1
13-Feb-23 24
14-Feb-23 24
15-Feb-23 24
16-Feb-23 24
17-Feb-23 24
18-Feb-23 24
19-Feb-23 24
20-Feb-23 24
21-Feb-23 22 2
22-Feb-23 6 18
23-Feb-23 24
24-Feb-23 24
25-Feb-23 24
26-Feb-23 24
27-Feb-23 24
28-Feb-23 24
1-Mar-23 22 2
2-Mar-23 24
3-Mar-23 24
4-Mar-23 24
5-Mar-23 24
6-Mar-23 24
7-Mar-23 24
8-Mar-23 24
9-Mar-23 24
10-Mar-23 24
11-Mar-23 24
12-Mar-23 24
13-Mar-23 16 6 2
14-Mar-23 24
15-Mar-23
16-Mar-23
30-Nov-23 4.5 19.5
1-Dec-23 7.5 16.5
2-Dec-23 15 9
3-Dec-23 7.5 16.5
4-Dec-23 7.5 16.5
5-Dec-23 24
6-Dec-23 24
7-Dec-23 6.5 17.5
8-Dec-23 8 16
9-Dec-23 24
10-Dec-23 24
11-Dec-23 24
12-Dec-23 24
13-Dec-23 24
14-Dec-23 24
15-Dec-23 24
16-Dec-23 24
17-Dec-23 24
18-Dec-23 24
19-Dec-23 24
20-Dec-23 24
21-Dec-23 24
22-Dec-23 24
23-Dec-23 24
24-Dec-23 24
25-Dec-23 24
26-Dec-23 24
27-Dec-23 24
28-Dec-23 24
29-Dec-23 24
30-Dec-23 24
31-Dec-23 24
1-Jan-24 24
2-Jan-24 24
3-Jan-24 24
4-Jan-24 24
5-Jan-24 21 3
6-Jan-24 24
7-Jan-24 24
8-Jan-24 24
9-Jan-24 24
10-Jan-24 24
11-Jan-24 24
12-Jan-24 24
13-Jan-24 24
14-Jan-24 24
15-Jan-24 24
16-Jan-24 24
17-Jan-24 24
18-Jan-24 24
19-Jan-24 24
20-Jan-24 24
21-Jan-24 24
22-Jan-24 24
23-Jan-24 24
24-Jan-24 24
25-Jan-24 24
26-Jan-24 3 21
27-Jan-24 7 17
28-Jan-24 7 17
29-Jan-24 9 15
30-Jan-24 9 15
31-Jan-24 3 21
1-Feb-24 24
2-Feb-24 24
3-Feb-24 24
4-Feb-24 24
5-Feb-24 24
6-Feb-24 1 24

7-Feb-24 15 9

8-Feb-24 24
9-Feb-24 24
10-Feb-24 24
11-Feb-24 24
12-Feb-24 24
13-Feb-24 24
14-Feb-24 24
15-Feb-24 24
16-Feb-24 24
17-Feb-24 24
18-Feb-24 24
19-Feb-24 24
20-Feb-24 24
21-Feb-24 24
22-Feb-24 6 18
23-Feb-24 24
24-Feb-24 6.5 17.5
25-Feb-24 24
26-Feb-24 24
27-Feb-24 24
28-Feb-24 24
29-Feb-24 24
1-Mar-24 24
2-Mar-24 24
3-Mar-24 24
4-Mar-24 24
5-Mar-24 24
6-Mar-24 24
7-Mar-24 2.5 21.5

8-Mar-24 24

9-Mar-24 11 13

6-Apr-24 1.5 22.5

7-Apr-24 22.5 1.5

8-Apr-24 14 10
9-Apr-24 24
10-Apr-24 24
11-Apr-24 24
12-Apr-24 24
13-Apr-24 24
14-Apr-24 24
15-Apr-24 24
16-Apr-24 24
17-Apr-24 24
18-Apr-24 24
19-Apr-24 24
20-Apr-24 24
21-Apr-24 24
22-Apr-24 24
23-Apr-24 24
24-Apr-24 24
25-Apr-24 24
26-Apr-24 24
27-Apr-24 24
28-Apr-24 24
29-Apr-24 24
30-Apr-24 24
1-May-24 24
2-May-24 24
3-May-24 24
NTHLY RADIO

Events

S/D Discharge pressure pump PAHH-2004 and ball valve of D/S PSV 0102 leaking

Standby 24 hrs. due to bad weather


Standby 13.45 hrs. due to bad weather
Standby 2.5 hrs. stop PRISM unit for crew change day shift to night shift.
Standby 5 hrs. stop PRISM unit for crew change day shift to night shift.
Standby 15 hrs. due to bad weather
Standby 24 hrs. due to bad weather
Standby 24 hrs. due to bad weather
Standby 15 hrs. due to bad weather and crew change day shift to night shift.
Standby 4 hrs. stop PRISM unit for crew change day shift to night shift.
Standby 1.5 hrs. stop PRISM unit for crew change day shift to night shift.
Standby 1.25 hrs. stop PRISM unit for crew change day shift to night shift.
Standby 1.50 hrs. stop PRISM unit for crew change day shift to night shift.
Standby 1.50 hrs. stop PRISM unit for crew change day shift to night shift.
Standby 3.50 hrs. stop PRISM unit for crew change day shift to night shift.
Standby 1.50 hrs. stop PRISM unit for crew change day shift to night shift.
Standby 0.50 hrs. stop PRISM unit for crew change day shift to night shift.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
S/D : Engine clutch position engage (ZSO-2000) lock nut proximity sensor loose
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Preventive maintenance 500 hrs.
Manual S/D 00:00 AM. due to BAD WEATHER
Standby 24 hrs. due to bad weather
Start up PRISM unit back online at 16:00 hrs
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Preventive maintenance 500 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Continue running opeartion 24 hrs.
Manual S/D 07:30 AM. due to BAD WEATHER
Standby 24 hrs. due to bad weather
Standby 24 hrs. due to bad weather
Start up PRISM unit back online at 08:00 hrs
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Shutdown due to rig down well #34 and tie in well #67.
Shutdown due to fusible loop plateform LL. (MOT to maintainance)
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal operation.
Continue running normal operation.
Continue running normal operation.
Continue running normal operation.
Continue running normal operation.
Continue running normal operation.
Shutdown due to Suction Low and waiting Suction Build up from CPP
Scheduel preventive maintenance and connect well head well 67.
Continue running normal operation.
Continue running normal operation.
Continue running normal operation.
Shutdown PRISM unit bad weather
Shutdown PRISM unit bad weather
After bad weather back con't to start online Because CPU PLC error
After bad weather back con't to start online Because CPU PLC error
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Continue running normal opeartion.
Shutdown due to rig down well #67
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
PWIP was shutdown by engine loss of speed
PWIP was shutdown by engine loss of speed
Continue running normal opeartion and manual stop unit at 9:00 am.
Start PRISM unit at 8:30 am and manual stop PRISM unit at 16:00 pm.
Start PRISM unit at 9:30 am and manual stop PRISM unit at 17:00 pm.
PRISM continue shut down.
PRISM continue shut down.
Start PRISM unit at 20:30 Hrs. and manual stop PRISM unit at 03:00 Hrs.
Start PRISM unit at 20:00 Hrs. and manual stop PRISM unit at 04:00 Hrs.
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Completed injection water from Big sea 104 to well # 67 and well # 21.
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Shutdown PRISM unit
Start PRISM unit at 14:00 Hrs. and manual stop PRISM unit at 17:00 Hrs.
Start PRISM unit at 8:00 Hrs. and manual stop PRISM unit at 16:00 Hrs.
Start PRISM unit at 10:00 Hrs. and manual stop PRISM unit at 17:00 Hrs.
Start PRISM unit at 8:00 Hrs. and manual stop PRISM unit at 17:00 Hrs.
Start PRISM unit at 8:00 Hrs. and manual stop PRISM unit at 17:00 Hrs.
Start PRISM unit at 14:00 PM and manual stop PRISM unit at 17:00 PM.
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
17:30 Hrs .Started Injection water from BIC SEA 104 to well
Continue Injection water from BIC SEA 104 to wells control stop unit
08:20
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Start PRISM unit at 10:00 Hrs. and manual stop PRISM unit at 16:00 Hrs.
Stop PRISM unit waiting inject water from baot to well
Start PRISM unit at 9:30 Hrs. and manual stop PRISM unit at 16:00 Hrs.
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Stop PRISM unit waiting inject water from baot to well
Start PRISM unit at 16:30 Hrs. and inject produce water from tanker to
well 13 / 50 chk, well 21 / 92 chk and well 13 / 46 chk.
Continue run PRISM Unit due to injection water from BIC SEA 104 to
wells
Completed injection water from Big sea 104 to wells and stop the
PRISM Unit.
Start PRISM unit at 16:30 Hrs. and inject produce water from tanker to
well 13 / 103 chk, well 21 / 92 chk and well 34 / 90 chk./ well 67/40
chk.
Continue run PRISM Unit due to injection water from BIC SEA 104 to
wells
Completed injection water from Big sea 104 to wells and stop the
PRISM Unit.
Stop PRISM unit waiting inject water from baot to well
1st Phase convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Convert PRISM unit to automation
Route Cause analysis
UCM = unplan corrective maintenance
Waiting gasket for ball valve 3"300 UPM = unplan preventive maintenance
SPM = schedule preventive maintenance
SCM = schedule corrective maintenance
speed pump = speed engine / 4.5

Adjust proximity sensor to original position

Swop well injection of PRISM unit from well # 20 to 21 and well # 47 to 34 follow PE request.
Standby 14 hrs. due to bad weather

Standby for BFSO2 Emergency


Standby for BFSO2 Emergency
Standby for BFSO2 Emergency
Standby for BFSO2 Emergency

Completed receiving water from tanker.


PRISM unit operation Day shift only.
PRISM unit operation Day shift only.
PRISM unit operation Night shift only.
PRISM unit operation Night shift only.

Relocation hose hanger to new location


Relocation hose hanger to new location
Relocation hose hanger to new location
Relocation hose hanger to new location
Relocation hose hanger to new location

Replace MCB for the generator.

PRISM unit operation Day shift only.


SCHEDULE MAINTENANCE R
DAILY GENERATOR CHECK SHEET FOR SKID ON EAC
Location : BEWO Operator Name :
Asset No. PS-GS-010 Engine: CUMMINS
Alternator End: STAMFORD Model/No.: UCI274F1L 32D
Daily Gen Set Service Checks Required Comment
1 Engine Hourmeter Reading Record
2 Engine Crankcase Oil Level Check
3 Coolant Level Check
4 Air Start Lubricator Check
5 Engine RPM Record
6 Engine Oil Temperature Record
7 Jacket Water Outlet Temperature Record
8 Jacket Water Inlet Temperature Record
9 Battery Connections Check
10 Battery Water Level Check
11 Alternator Charging System Record
12 Engine Oil/Coolant System Leaks Inspect
13 Generator Voltage Record
14 Generator Amperage Record
15 Generator Hz Record
16 Unusual Noises/Vibration Report

Piyawat S.
DAILY GENERATOR CHECK SHEET FOR SKID ON EAC
Location : BEWO Operator Name : Jassada J.
Asset No. PS-GS-010 Engine: CUMMINS
Alternator End: STAMFORD Model/No.: UCI274F1L 32D
Daily Gen Set Service Checks Required Comment
1 Engine Hourmeter Reading Record
2 Engine Crankcase Oil Level Check
3 Coolant Level Check
4 Air Start Lubricator Check
5 Engine RPM Record
6 Engine Oil Temperature Record
7 Jacket Water Outlet Temperature Record
8 Jacket Water Inlet Temperature Record
9 Battery Connections Check
10 Battery Water Level Check
11 Alternator Charging System Record
12 Engine Oil/Coolant System Leaks Inspect
13 Generator Voltage Record
14 Generator Amperage Record
15 Generator Hz Record
16 Unusual Noises/Vibration Report
MAINTENANCE REPORT
CK SHEET FOR SKID ON EACH SHIFT BY OPERATOR
Date : 04-May-24 Day
Model No. QS87-G3 NR3 S/No. 46970386
S/No.: M08L617915
Time Record Report Sign

Piyawat S.
CK SHEET FOR SKID ON EACH SHIFT BY OPERATOR
Date : 04-May-24 Night
Model No. QS87-G3 NR3 S/No. 46970386
S/No.: M08L617915
Time Record Report Sign

You might also like