Sub: Handing over/ charge transfer

With reference to the subject, following is a list of monitorable items for Ajmer Workshop with their
present status.

Sr.No Item
1 Workshop Structure – The Ajmer Workshops comprise of the following branches

• Carriage Workshop
• Diesel Loco & Wagon Workshop
• Stores Depot
• Chemical & Metallurgy Testing Lab
• Rail Museum
• Specialised Training Institute

2 Current activities and targets

Carriage Workshop
• BG ICF Coaches POH : 20 (15 Non AC+ 05 AC) Per Month
• SS-II & III for LHB Coaches : 46 (22 Non AC+ 24 AC) Per Month
• DEMU POH : 147 Per Year
• IOH of ICF Bogies : 20 Coach set per Month
• IOH of LHB Bogies : 31 Coach set per Month
The Carriage workshop also overhauls the “Palace on Wheels” rake for RTDC

Loco Workshop
• BG Electric Loco POH : 03 per Year
• DEMU POH (DPC/DTC) : 46 per Year
• MEMU POH : 72 per Year
• SPART/ARME : 13 per Year
• Tower Wagon POH : 03 per Year
• BG Wagons POH : 138 per Month
3 Outturn position of the workshop
Stock Proportionate Outturn Remarks
target (till Sep. 30)
ICF AC 30 67
ICF NAC 90 135
LHB AC 144 137 Shortage in arising of LHB AC coaches
LHB NAC 132 146
DEMU TC 75 47 Shortage in arising of DTC
Total Coaches 471 532
Wagons 828 866
BG Diesel Loco 0 02
Electric Loco 1.5 0 Electric Loco is yet to be received for FY
DEMU DPC 23 22+8 (SR) 22 POH+ 08 special repairs
MEMU 36 32 Shortage in arising of MEMU
SPART 6 11
Tower Wagon 1.5 02
Total (Diesel POH) 68 77
4 Scrap generation and disposal (in Metric Tons)
Total target for FY Proportionate target Achieved Scrap disposal
(till Sep. 30)
5550 2775 3236.44
5 Shop specific items of concern-

Carriage Workshop

- Important RSP works

Name of Work Year of allotment and Qty Status


Upgradation of coach 2019-20 Current balance is 60 coaches.
toilets in AC coaches
79+61 (transferred from Revised estimate for 61 coaches
Jodhpur Workshop) under accounts vetting.
Conversion of ICF coaches 2022-23 (65 coaches) Current balance is 186 coaches.
into NMGHS
2023-24 (180 coaches) Case is under evaluation of TC
recommendations.
Procurement under process for
06 items under shop supply
scope.

Detailed list of current RSP works is enclosed at annexure ‘A’.

- A work of setting up bacteria /inoculum’s generation plant for Bio-toilet of 100 cc capacity
under 1% provision for Environment Related Works with an approximate cost of 68.15
lakhs has been allotted.
- A plant for LHB bogie assembly is being set up by M/s HYT.
- A proposal for development of POH maintenance facilities for rolling stock including
MEMU and train sets has been sent to EDME/Project/Railway Board. Detailed estimate for
this proposed work is under preparation with XEN/Works.
- Another proposal for infrastructure development for reduction of cycle time of rolling
stock is under accounts vetting.
- The provision of Fire detection and suppression system in AC coaches and Power cars is an
emerging area of concern. The work is being carried out under RSP as follows –
AC Coaches Power Cars Pantry Cars
Net target 391 2 10
Achieved 97 2 10
Current Balance 294 Nil Nil

- The fitment and maintenance of CCTV surveillance cameras in coaches is another


important issue.

Loco Workshop

- Important RSP works


Name of Work Year of allotment and Status
Qty
Retrofitment of CBC 2020-21 (960 wagons) Current balance is 406 wagons.

Out of a total 800 nos. received, 148


nos. were used in RSP work and 148
nos. used in POH due to non-
availability of stock item.
Conversion of BOXN wagons 2018-19 (20 wagons) Current balance is 18 wagons.
to BOXNR Case for procurement of 16 sets
under tendering stage.

Twin Pipe retro fitment 2023-24 (400 wagons) No wagon is being turned out
without twin pipe air brake system.
Detailed list of current RSP works is enclosed at annexure ‘A’.

- Work for providing new shed in wheel shop for attending Loco, DEMU and MEMU bearings
in dust free environment with sanctioned cost of Rs. 5 cr is under progress.
- A Proposal for augmentation of berthing capacity to deal all types of wagons including
BTPGLN has been vetted by HQ finance and is currently under approval at Railway Board.
- There has been an issue of premature failure in BTPGLN wagons turned out from the
workshop on account of failure of valves. The valves, repaired by third party through
contract, develop leaks at critical sites that amounts to major NPOH bookings. The issue is
being analyzed at RDSO level.
- Welding of wagon body and bogie components is an important area of concern. Welders
are being sent for training and refresher courses vide JPO no. NWR/HQ/M/WS/12/08
dated 21.02.2022 and the current state of welders in the shop is as follows-
A-category B-category C-category Total
Carriage shop 67 26 07 100
Loco Shop 63 23 08 94
- Developing a wheel pool for ROH depot is an important issue for servicing BOXN and BLC
wheels according to open-line demand.

Diesel POH Shop

- A huge product – mix is being handled by the Diesel POH shop. While the shop used to
carry out POH of only Diesel Locomotives, it is attending DEMU, MEMU, Tower Cars, SPART
and other types of motive power stocks that needs supply of a variety of material. Despite
regular efforts for supply of material, delay in assistance from other units affects the cycle
time of POH critically for these product mix.