Professional Documents
Culture Documents
Eim Trainees Record Book 2
Eim Trainees Record Book 2
Eim Trainees Record Book 2
Department of Education
National Capital Region
Division of City Schools – Valenzuela
CARUHATAN NATIONAL HIGH SCHOOL
Corner Pacencia and Caridad Streets, Caruhatan, Valenzuela City
T.V.L. DEPARTMENT
TRAINEE
RECORD AND
ACTIVITY BOOK
Name:
Qualification: ELECTRICAL INSTALLATION AND
MAINTENANCE NC-II
Nominal
Duration: 640 Hours
Trainer: SANDY WINSTON O. YARANON
TMC-16130601000058
INSTRUCTIONS:
This Trainee’s Record Book (TRB) is intended to serve as
record of all accomplishment/task/activities while undergoing
training in ELECTRICAL INSTALLATION AND
MAINTENANCE NC-II. This will eventually become evidence
that can be submitted for portfolio assessment and for whatever
purpose it will serve you. It is therefore important that all its
contents are viably entered by both the trainees and the trainer.
The Trainee’s Record Book contains all the required
competencies in your chosen qualification. All you have to do is
to fill in the column “Task-Required” and “Date Accomplished”
with all the activities in accordance with the training program and
to be taken up in school and with the guidance of the trainer. The
trainer will likewise indicate his remarks on the “Instructor
Remarks” column regarding the outcome of the task
accomplished by the trainees. Be sure that the trainee will
personally accomplish the task and confirmed by the trainer.
It is very important that the content should be written legibly
on ink. Avoid any erasures and maintain the cleanliness of this
record.
1
DEARTMENT OF EDUCATION
CARUHATAN SENIOR HIGHSCHOOL
CARUHATAN, VALENZUELA CITY
VISION
MISSION
2
PANGAKO NG ISANG
MANGGAGAWANG PILIPINO
AKO AY ISANG BAGONG MANGGAGAWANG
PILIPINO
MAY DANGAL AT BAGONG KAALAMAN
SA KASANAYAN SA GAWAING TEKNIKAL
PINANDAY SA DIWA NG PAGKAMAKABAYAN
AT PANANALIG SA PANGINOON/ AT
NANGANGAKONG MAGIGING MATAPAT SA
AKING GAWAIN
AND
METRIC SYSTEM
(Millimeters,
Centimeters
And
Meter)
THE
PLASTIC MOULDING
(PM)
LAY OUTING
AND
INSTALLATION
PERFORMANCE TASKS
THE
POLYVINYL CHLORIDE
(PVC)
LAY OUTING
AND
INSTALLATION
PERFORMANCE TASKS
(USING SINGLE SWITCHES-S1/
SINGLE POLE SINGLE THROW-
SPST)
THE
POLYVINYL CHLORIDE
(PVC)
LAY OUTING
AND
INSTALLATION
PERFORMANCE TASKS
USING 3-WAY SWITCHES
(S3W)
THE
POLYVINYL CHLORIDE
(PVC)
LAY OUTING
AND
INSTALLATION
PERFORMANCE TASKS
(USING 3-way Switches (S3W)
And
4-way Switches (S4W)
THE
ELECTRICAL METALLIC
TUBING
(EMT)
LAY OUTING
AND
INSTALLATION
PERFORMANCE TASKS
USING
SINGLE SWITCHES (S1),
3-WAY SWITCHES (S3W),
FOUR-WAY SWITCHES (S4W)
THE
RIGID STEEL CONDUIT
(RSC)
LAY OUTING
AND
INSTALLATION
PERFORMANCE TASKS
(USING MASTER SWITCHES,
SINGLE SWITCHES (S1),
3-WAY SWITCHES (S3W),
4-WAY SWITCHES (S4W)
THE
FIRE DETECTION AND
ALARM SYSTEM
(FDAS)
LAY OUTING
AND
INSTALLATION
PERFORMANCE TASKS
(TYY, ASENWARE, CST, and GOALSTAR)
THE
CLOSED-CIRCUIT
TELEVISION
(CCTV)
LAY OUTING
AND
INSTALLATION
PERFORMANCE TASKS
(ANALOGUE, PoE IP, WIRELESS)
THE
WORK
IMMERSION
Portfolio content:
a. Accomplished forms
b. Weekly diary (narrative,
An account of learnings,
achievements, issues faced,
And corresponding resolutions)
c. Work immersion
Written outputs
d. Work immersion
Highlights
e. Other relevant
documents/pictures
THE
J- OINT
D- ELIVERY
V-OUCHER
P-ROGRAM
THE
NATIONAL
CERTIFICATE –
II
ASSESSMENT