Development of new, advanced catalysts (Green chemistry


TS. Nguyễn Thành Duy Quang TS. Phạm Hồ Mỹ Phương D. Both A & B are correct
Chủ nhiệm Bộ môn Chế biến dầu khí, khoa KT Hóa học
Q. 10: Applications of Life Cycle Assessment (LCA)? C5 / 5 , 6
A. Quantitatively evaluating environmental impact of a product / process during its entire life cycle
Học kỳ/năm học 2 2022-2023 B. Comparing competing products / processes based on environmental criteria
THI CUỐI KỲ C. Both A & B are correct D. None is correct
Ngày thi 16/05/2023
Q. 11: Which of the following project could satisfy all the three pillars of sustainable development?
Môn học Sustainable Development and A. Charity project that helps poor people
TRƯỜNG ĐH BÁCH KHOA – ĐHQG-HCM
KHOA KT Hóa học
Environmental Treatment Technology B. Construction of hydroelectricity plant
C. Water irrigation project
Mã môn học CH3389
D. Wild-life preserving project
Thời lượng 90 phút Mã đề 1001
Q. 12: Based on global warming potential, which of the following resources should be chosen to generate electricity?
Ghi chú: - Được sử dụng tài liệu. Không sử dụng laptop, smartphone
A. Hydroelectricity B. Biomass
- Nộp lại đề thi cùng với bài làm
C. Solar power D. Natural gas
trai nguou
Q. 1: Which of the following is contradicted to engineering ethics? C2 Q. 13: The method of integration of reaction and distillation:
A. An inspection engineer is invited to check and approve safety procedure in a factory owned by one of his relatives (ko khach man A. Is called reactive distillation
B. An engineer falsifies some data in his report of an undergoing project because he does not have enough time to finish the B. Reduce capital investment cost and operation cost
required works C. Make process flowsheet become simpler
C. Both A & B are correct D. Both A & B are wrong D. All (A, B, C) are correct
tas dao arc
quy
Q. 2: Which statement is NOT included in the fundamental principles of code of ethics for engineers? 02/36 37 Q. 14: Definition of “sustainable development” as proposed by WCED-World Commission on Environment and
A. Using their knowledge and skill for the enhancement of human welfare
,
Development in 1987 is: 21/18
B. Being honest and impartial, and serving with fidelity the public, their employers and clients A. Development that balances between society, the environment, and economic growth
C. Actively engaging in knowledge sharing B. Development that balances between society, the environment, and economic growth, aiming to preserve biological
D. Striving to increase the competence and prestige of the engineering profession - diversity, combat desertification and climate change
C. Development that balances the economic and social needs of the people with the regenerative capacity of the natural
Q. 3: Which statement is NOT included in the AIChE code of ethics for engineers? C2 39 48 , environment
A. Act in professional matters for each employer or client as faithful agents or trustees, avoiding conflicts of interest and D. Development that can meet the needs of the present generation without compromising the ability of future generations
never breaching confidentiality to meet their own needs.
B. Perform the work as directed by supervisors.
C. Accept responsibility for their actions A company is considering buying one of the two energy-efficiency equipment (that cut down on energy consumption) to
D. Issue statements or present information only in an objective and truthful manner replace an existing equipment in the factory. The equipment would be bought in the current year (year 0) and begin operation
from year 1. Data of the two equipment are as follows:
Q. 4: Issues with fossil fuels? 22/22
A. They are limited natural resources and will run out of reserves in the near future Equipment A B
B. Burning of fossil fuels releases CO2 which causes global warming Initial investment ($) 11450 15785
C. Both A & B are correct D. Both A & B are wrong Expected saving on energy consumption cost ($/year) 2135 2565
Service life (years) 9 12
Q. 5: Which factor is NOT a target of sustainable development? 01/19
A. Technology development B. Assuring social equality Q. 15: If discount rate i = 12%/year. Net present value (NPV) of option of purchasing A is PUACK NPV >
-

C. Economic development- D. Environmental protection A. -74,2 ($) B. 11375,8 ($) C. 103,6 ($) D. 15888,6 ($)
Q. 6: Which technological solution matches with main principles of Inherent Safer Design (ISD) ? C2188 89 90 , ,
Q. 16: If discount rate i = 12%/year. Net present value (NPV) of option of purchasing B is PUACK NPV >
-

A. Substitute a toxic solvent with benign solvent such as water or supercritical CO2 ) Substitute/ A. -74,2 ($) B. 11375,8 ($) C. 103,6 ($) D. 15888,6 ($)
B. Using advanced equipment that is safer, more reliable 2 12 %; NPVa :
-74 2 =
) Nor say
Q. 17: Internal rate of return (IRR) of option of purchasing A is in %; NPV1 34 7
.

11 75
=
= . = .
;
C. New design that helps reduce the size of equipment while maintaining the specifications of product stream coming out
of equipment (Minimize
A. 12,1% gB. 11,8% C. 16.2% D. 7.8%
30 2 ) Nor
D. Both A & C are correct. Q. 18: Internal rate of return (IRR) of option of purchasing B is in 12 25 %; = . NPV =
-
78 79.

: 2 = 12 1 %; . NPVC = .
=
say
A. 12,1% B. 11,8% C. 16.2% D. 7.8%
Q. 7: Which statement is correct statement about the ecological systems? 11450 5x2135 5 , 36
(years
-

A. Any kind of manufacturing activities of human does cause harmful impact to ecological systems Q. 19: Payback time of option of purchasing A is + =
5
years 2155
B. When ecological system is degraded to threshold limit, it can not be naturally restored A. 5,36 (year) B. 6,15 (year) C. 4,87 (year) D. 5,5 (year)
C. Both A & B are correct D. Both A & B are wrong 15785 -

6x2565 = 6, 15/year)
Q. 20: Payback time of option of purchasing B is 6
years + 2565
Q. 8: Strategies to achieve sustainability in chemical industry? (1153 (Part 2) A. 5,36 (year) B. 6,15 (year) C. 4,87 (year) D. 5,5 (year)
A. Process intensification Q. 21: Minimum tax credit (for buying an energy-efficient equipment) that makes option of buying A is a worth-while
B. Development of new, advanced catalysts (Green chemistry
investment: NPV > 0 > Taxcredit)
=
74 2, /.
% tax credit) 74 2
= 0 7% ,
.

= .

C. Increase production and use of bio-fuels and bio-chemicals that are derived from biomass resources (Bio-based economy 11458
A. 0.7 % B. 1% C. 2% D. 5%
D. All (A, B, C) are correct.
Q. 22: According to the above calculations, which equipment should be bought ?:
Q. 9: Methods of process intensification include: Careas of PI) (C6 8) A. Equipment A B. Equipment B C. Both A & B D. None is purchased
A. Process-intensifying equipment
B. Process-intensifying methods such as combining reaction and separation If the expected saving on energy consumption cost increases 5% after a year has passed (e.g., saving in energy consumption

21352241235324712595
Exam Code 1001 Page 1 I 11 I I I I > HK222
157855
1
↓ 3 4 5 6 7 g 9
(n =
0)
cost of equipment A in year 1 and year 2 are 2135 and 2135*1.05 $), give answers to questions 23 to 25 Q. 37: Energy required to heat incoming gas stream from 300oF to 1500oF:
A. 5 760 000 BTU/h B. 3 920 000 BTU/h C. 6 100 000 BTU/h
Q. 23: Payback time of option of purchasing A is
D. 4 320 000 BTU/h
A. 5,36 (year) B. 6,15 (year) C. 4,87 (year) D. 5,5 (year)
Q. 38: Natural gas usage neccesary to accomplish the drsired heat rise:
Q. 24: Payback time of option of purchasing B is
A. 4194 ft3/h B. 5592 ft3/h C. 3389 ft3/h D. 2007 ft3/h
A. 5,36 (year) B. 5,5 (year) C. 4,87 (year) D. 6,15 (year)
Q. 39: Total volumetric flow rate of the gas stream moving through the oxidizer chamber at the desired temperature of 1500oF
%; NPV 6160 3617 ; 12 17 %; NPVz
-143 744
Q. 25: Internal rate of return (IRR) of option of purchasing B is in = 10 =
= = .

A. 9 583 ft3/min B. 15 194 ft3/min C. 11 395 ft3/min D. 13 425 ft3/min


.

A. 16.7% B. 12.1% C. 11.8%=CF [1-ly D. 7.8% ! PFUCF


PV

Q. 40: The oxidizer volume neccesary to treat the gas stream:


Q. 26: Assume the chemical composition of a MSW sample can be represented as C100H250O80N. Estimate the energy content
%8 100X12 A. 76 ft3 B. 127 ft3 C. 92 ft3 D. 155 ft3
based using the Dulong formula Chap 11/53 sample
= 100

A. 5721 BTU/lb B. 3912 BTU/lb C. 8347 BTU/lb D. 9230 BTU/lb Q. 41: Landfill is the process involving: Chap 11/79
A. Oxygen – anaerobic bacteris – nutrients – carbon dioxide
Q. 27: Put actions in right order Chap 11141
B. Carbon dioxide – methane – anaerobic bacteria
A. Recycling-Prevention-Reuse-Disposal-Energy Recovery-Minimisation
C. Nutrients – anaerobic bacteria – methane - water (no oxygens
B. Prevention-Minimisation-Reuse-Recycling-Energy Recovery-Disposal
D. Oxygen – aerobic bateria – nutrients – carbon dioxide - water
C. Minimisation-Prevention-Reuse-Recycling-Disposal-Energy Recovery
D. Minimisation-Prevention-Reuse-Disposal-Energy Recovery-Recycling Q. 42: Compost is the process involving: Chap 11/79
A. Oxygen – aerobic bateria – nutrients – carbon dioxide - water
Q. 28: Six criteria pollutants: Chap 8/21
B. Oxygen – anerobic bacteris – nutrients – carbon dioxide
A. NO2, O3, CO, SO2, PM2.5, Pd
C. Carbon dioxide – methane – anaerobic bacteria
B. NO2, O3, CO, SO2, PM10, Pb
D. Aaerobic bacteria – oxygen – nutrients - methane
C. NO2, O3, CO, VOC, PM2.5, Pb
D. NO2, O3, CO, SO2, PM2.5, Pb Q. 43: Calculate the ThOD of a 300 mg/L phenol solution using the balanced stoichiometric equation for the oxidation of
ko bar
-
phenol to carbon dioxide and water, as given below. Chap 12/12
Q. 29: A boiler burning 928 000 tons per year of coal containing 1.3% sulfur, the total SOX emissions from the boiler is: Chap 8151
C6H5OH + 7 O2 6 CO2 + 3 H2O
5233 24 lb/h A.
.
98 278 lb/h B. 115 392 lb/h C. 23 003 lb/h D. 198 475 lb/h
A. 715 mg/L B. 300 mg/L C. 525 mg/L D. 915 mg/L
Q. 30: Current CO2 concentration: Chap 843
A. 100 ppm B. 200 ppm C. 300 ppm D. 400 ppm Q. 44: TOC of 300 mg/L phenol solution: G + 6)
A. 189.2 mg/L B. 150 mg/L C. 229.8 mg/L D. 250 mg/L
Q. 31: What is total suspended particulate matter? Chap 9/26
A. Particulate matter measured in the ambient air having a size less than approximately 10 micrometers Q. 45: Determine the 5‐day BOD for a 15 ml sample that is diluted with dilution water to a total volume of 300 ml when the
B. Particulate matter measured in the ambient air having a size less than approximately 45 micrometers initial DO concentration is 8 mg/l and after 5 days, has been reduced to 2 mg/l Chap 12/19
C. Particulate matter measured in the ambient air having a size less than approximately 100 micrometers A. 80 B. 120 C. 100 D. 140
D. Particulate matter measured in the ambient air having a size less than approximately 1,000 micrometers
Q. 46: A five-day BOD test is to be performed on a sample of lake water. Estimate the volume of sample that should be used
Q. 32: What are ultrafine particles? Chap9/26 in the BOD test if the anticipated BOD of the lake water is 40 mg/L
A. Particulate matter measured in the ambient air having a size less than approximately 10 micrometers A. 20 ml B. 30 ml C. 40 ml D. 50 ml
B. Particulate matter measured in the ambient air having a size less than approximately 0.1 micrometers
Q. 47: A five-day BOD test is performed on a wastewater effluent sample. 30 ml of the wastewater effluent is added to 300
C. Particulate matter measured in the ambient air having a size less than approximately 0.01 micrometers
ml BOD bottles, to which dilution water is added. The average DO concentration of the diluted wastewater samples at the
D. Particulate matter measured in the ambient air having a size less than approximately 0.001 micrometers
beginning and end of the BOD test is 8 mg/L and 5 mg/L, respectively. The average DO concentration in the blanks containing
Q. 33: The accurately measured ambient concentration of PM10 is 85 micrograms per cubic meter. Which of the following the “seeded” dilution water at the beginning and end of the test is 8.5 mg/L and 6.5 mg/L, respectively. 20 liters of dilution
could be true? water were prepared, containing 40 ml of “seed” material. Calculate the BOD5 of the wastewater effluent Chap 12/22
A. The ambient concentration of PM2.5 is 163 micrograms per cubic meter. A. 6 mg/L B. 8 mg/L C. 10 mg/L D. 12 mg/L
B. The ambient concentration of PM2.5 is 34 micrograms per cubic meter. 85/2 5 34 =

Q. 48: Calculate the threshold odor number (TON) for a 20 ml sample that is diluted to 200 ml before no odor is detected Chap 12/35
.

C. The ambient concentration of PM2.5 is 197 micrograms per cubic meter.


A. 10 B. 11 C. 12 D. 13
D. The ambient concentration of total suspended particulate matter is 75 micrograms per cubic meter.
Q. 49: If the flavor threshold number (FTN) of a water sample is 10, estimate the volume of sample diluted to 200 ml so that
Q. 34: What fraction of the sulfur present in a fossil fuel is converted to sulfur dioxide in a utility or industrial boiler? Chap 10/11
no taste is observed: Chap 12/40
A. 25% to 30% B. 50% to 75% C. 75% to 90% D. 94% to 95%
Q. 35: Calculate the amount of carbon needed to operate a carbon adsorption unit treating an emission rate of 110kg/h of
A. 5 B. 10 C. 20 O D. 30
Q. 50: Put actions in right order: Chap 14/8
Toluene. The adsorber is to be designed for a five-hour duty cycle, and the carbon provider reports a saturation adsorptive
A. Water analysis & testing - Bar screens – Grit removal – Primary clarifier – Aeration – Secondary clarifier –
capacity for Toluene of 39% (0.39). Assume a working capacity of 40% of the saturation capacity. Chap 10/49
Disinfection – Effluent disposal
A. 1023 B. 3526 C. 2175 D. 4012
B. Bar screens – Grit removal – Primary clarifier – Aeration – Secondary clarifier – Disinfection – Water analysis &
Q. 36: Sizing of a basic thermal oxidizer is a Chap 10/71 testing – Effluent disposal
A. Three-step process B. Four-step process C. Five-step proces D. Two-step process C. Grit removal – Bar screens - Primary clarifier – Aeration – Secondary clarifier – Disinfection – Water analysis &
testing – Effluent disposal
Calculate the size of a thermal oxidizer that will be used to control VOC emissions from a gas 3,000 scfm gas stream. The
D. Disinfection - Bar screens – Grit removal – Primary clarifier – Aeration – Secondary clarifier – Water analysis &
temperature of the gas stream entering the oxidizer is 300∘F and the oxidizer design operating temperature is 1,500∘F. For
testing – Effluent disposal
these two temperatures, use an enthalpy of 4.24 BTU/ft3 at 300∘F and 28.24 BTU/ft3 at 1,500∘F. Use a standard temperature
of 68∘F and a heating value of natural gas of 1,030 BTU/ft3. Also use a target oxidizer residence time of 0.4 second. (this is
used for 4 problems: 37-38-39-40): Chap 10/71-76 -------------------------------------------------------------- END -----------------------------------------------------------------------

Exam Code 1001 Page 2 HK222

You might also like